Rev 0 to Technical Dept Procedure TDP-9, Independent Safety Engineering Group.
ML17055B540
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 01/09/1986
From: Drews W, Randall R, Spadafore J
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17055B512 List:
References
TDP-9, NUDOCS 8604280289
Download: ML17055B540 (6)


Text

Enclosure Pl4 NINE MILE POINT NUCLEAR STATION UNIT 2 TECHNICAL DEPARTMENT PROCEDURE PROCEDURE NO. TDP-9 INDEPENDENT SAFETY ENGINEERING GROUP DATE AND INITIALS APPROVALS SIGNATURES REVISION 0 REVISION 1 REVISION 2 Technical Superintendent W. C. Drews Technical Servic p,'r gee ent J. R. Spada Sup Qdali T hnical p ort R. G Summar of Pa es Revision 0 (Effective 1/9/86

~Pa ea Date 1-2 December 1985 NIAGARA MOHAWK POWER CORPORATION THIS PROCEDURE NOT TO BE USED AFTER JANUARY 1990 SUBJECT TO PERIODIC REVIEW.

8604880889 880418 PDR ADOCK 05000410 P'

P PDR

1 I, I

PDP-9 INDEPENDENT SAFETY ENGINEERING GROUP 1.0 PURPOSE This procedure describes the purpose, requirements and activities of the Unit 2 Independent Safety Engineering Group. This procedure does not apply to Unit 1, and is effective for Unit 2 when the Technical .

Specifications take effect.

2.0 REFERENCES

2.1 NUREG 0737, I.B.1.2 2.2 AP-3.4.2 Operation Experience Assessment 2.3 FSAR Section 1.10 2.4 Technical Specification 6.2.3 2.5 TDP-5 Administration of Operations Assesment Items 2.6 TDP-3 Instructions For Procedure Review 2.7 AP-2 Production and Control of Procedures 3.0 DISCUSSION NUREG 0737,Section I.B.1.2, and, as a result, the Unit 2 FSAR and Technical Specifications require an Independent Safety Engineering Group. This group will perform much of the work specified in AP-3.4.2. This procedure augments, but in no way supercedes AP-3.4.2.

4.0 GROUP COMPOSITION AND PERSONNEL UALIFICATIONS The ISEG shall be composed of at least five, dedicated, full-time engineers located onsite. Each shall have a bachelor's degree in engineering or related science and at least 2 years professional level experience in his field, at least 1 year of which experience shall be in the nuclear field. (T.S. 6.2.3) 5.0 RESPONSIBILITIES The principal function of the ISEG is to examine plant operating characteristics and the -various NRC and industry licensing and service advisories, and to recommend areas for improving plant operations or safety. The ISEG will perform independent review of plant activities, including maintenance, modifications, operational concerns and analysis and make recommendations to the Supervisor Technical Support-Nuclear. (T.S, 6.2.3)

TDP-9 -1 December 1985

6.0 PROCEDURE 6.1 The ISEG shall analyze, make recommendations regarding, and provide documentation of disposition of the various plant, NRC and industry reports as specified in AP-3.4.2 Section S,-using TDP-5.

6.2 The ISEG will observe plant operations and maintenance activities to determine that these activities are being performed properly and provide written recommendations (when useful improvements can be achieved). The ISEG does not perform detailed (QA-type) audits and is not responsible for sign-off functions associated with daily operational activities (FSAR 1.10). The recommended frequency of such observations is one per ISEG engineer per month, but will depend on other workloads. These observations must be documented.

6.3 The ISEG may meet the requirement for independent review of the items in section 5.0 above by functioning as an independent reviewer of documents per AP-2. The site may take credit for the ISEG engineer as being one of the two independent reviewers without conflicting with 6.2 above or FSAR section 1.10. ISEG will use TDP-3 when reviewing procedures.

6.4 The site may take credit for ISEG activities performed by the Supervisors and Superintendents in the ISEG's management chain up to but not including the General Superintendent, provided the documentation requirements of 7.0 below are complied with. The site may not take credit for these individuals in meeting the five man requirement of 4.0 above.

7.0 DOCUMENTATION 7.1 The activities of the ISEG must be documented and presented to SORC via the Operations Assessment Procedure, AP-3.4.2. AP-3.4.2 provides for SRAB review of the OAC minutes and associated documents. In this manner assurance is provided that operational, financial, or political situations do not adversely impact the ISEG's commitment to safety.

7.2 Records of activities performed by the ISEG shall be prepared, maintained, and forwarded each calendar month to the Manager Nuclear Technology (TS 6.2.3). SORC (OAC) minutes may be used to satisfy this T.S. requirement.

TDP-9 -2 December 1985