Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17059C7911999-09-30030 September 1999 Proposed Tech Specs Re Rev B to Conversion of Unit 2 Current TS to ITS ML20211P5931999-09-10010 September 1999 Marked-up Tech Specs Pages Reflecting Conforming Administrative License Amend Associated with Proposed Transfer of Facilities to Amergen Energy Co,Llc ML20211H2231999-08-26026 August 1999 Proposed Tech Specs,Supporting Implementation of Noble Metal Chemical by Raising Reactor Water Conductivity Limit in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b ML20206P2661998-12-30030 December 1998 Proposed Tech Specs Making Application of Emergency Condenser Vent Ng Activity Monitor Channel Operability Requirement & Daily Sensor Check SR Consistent with Conditions Stated in LCO 3.1.3.a Re Emergency Cooling Sys ML20197K1041998-12-0404 December 1998 Revised Proposed TS Bases Reflecting Previous Removal of Condenser Low Vacuum Scram Function from TS as Well as Plant Design & Changes to EDG Ratings,Design Basis Load Limits & Loading Profiles ML20196H0671998-11-30030 November 1998 Proposed Tech Specs,Correcting LCO & Associated Bases for TS Section 3.1.2, Liquid Poison Sys, That Had Been Incorporated Into TS as Part of NMP Unit 1 TS Amend 101 ML20196D2081998-11-24024 November 1998 Proposed Tech Specs B 2.1.1, Fuel Cladding - Safety Limit, B 3.2.5 & 4.2.5, Reactor Coolant Sys Leakage Rate ML20154R1101998-10-16016 October 1998 Proposed Ts,Revising LCO 3.7.1.1 & Associated Actions & SRs to Provide Assurance That Four SW Pumps Are Operable & Are Operating within Acceptable Sys Parameters,With Divisional Cross Connect Valves Open ML20217N7911998-04-24024 April 1998 Revised Pages 2-1,3/4 4-1 & B2-1 to Replace Previously Submitted Pages Contained within Attachment a of 971215 Proposed Change to TS to License NPF-49 ML20202G3751998-02-0505 February 1998 Proposed Tech Specs Pages,Reflecting References to 10CFR50.55a(f) & (G) as Well as Terminology Used in Second Ten Year Isi/Ist,Beginning on 980405 ML20197H3371997-12-15015 December 1997 Proposed Tech Specs Revising SLMCPR from 1.07 to 1.09 for Two Recirculation Loop Operation & from 1.08 to 1.10 for Single Loop Operation ML20211M5231997-10-0707 October 1997 Proposed Tech Specs Section 4.9.6,reflecting New Setpoints Due to Difference in Weights of Two Existing Triangular Refueling Platform Masts ML20217G9011997-07-31031 July 1997 Proposed Tech Specs Changing Wording in Action 36 of TS Table 3.3.3-1, Emergency Core Cooling Sys Actuation Instrumentation ML20148A7751997-04-30030 April 1997 Proposed Change to Tech Specs,Removing Section 3.3.7.3 & Associated Surveillance Section 4.3.7.3,associated Tables 3.3.7.3-1 & 4.3.7.3-1,Bases Section 3.4.3.7.3 & Revising Section 0.0 (Index) Pages VII & Xvii ML20116D8121996-07-26026 July 1996 Proposed Tech Specs Re Option B of App J to 10CFR50 ML20115H1521996-07-12012 July 1996 Proposed Tech Specs Section 6.2.2.i Re App a ML20117F9501996-05-15015 May 1996 Proposed Tech Specs Section 3/4.3.2 Re Isolation Actuation Instrumentation ML20101F4281996-03-20020 March 1996 Proposed TS 3/4.3.1 Re RPS Instrumentation,Deleting Operability Requirements for APRM Neutron flux-upscale, Setdown & Inoperative Functions in Operational Conditions (Oc) 3 & 4 & Modifying Operability Requirements in Oc 5 ML20101D7551996-03-15015 March 1996 Proposed Tech Specs Section 4.6.2 Re Depressurization Sys - Suppression Pool ML20097D2391996-02-0707 February 1996 Proposed Tech Specs Re Administrative Controls ML20100C1021996-01-25025 January 1996 Proposed Tech Specs Table 3.3.3-1 Re Emergency Core Cooling Sys Actuation Instrumentation ML20096G8401996-01-17017 January 1996 Proposed Tech Specs,Representing Revs to Specs 3/4.3.1, 3/4.3.2,3/4.3.3,3/4.3.4.2 & Associated Bases to Relocate Response Time Limit Tables from TSs to Plant USAR ML20094B5421995-10-25025 October 1995 Proposed Tech Specs Re Position Title Changes & Reassignments of Responsibilities at Upper Mgt Level ML20091Q9571995-08-28028 August 1995 Proposed TS 3.6.1.7,increasing Time 12-inch & 14-inch Containment Purge Sys Supply & Exhaust Valves May Be Open in Operational Condition 1,2 & 3 from 90 H Per 365 Days to 135 H Per 365 Days & Deleting Expired Footnotes for Clarity ML20081E2491995-03-0909 March 1995 Proposed Tech Specs,Revising SR 4.6.1.2.a,allowing Second Primary Containment ILRT (Type a) to Be Performed at Refueling Outage 5 or 72 Months After First Type a Test ML20077N1591995-01-0606 January 1995 Proposed Tech Specs Re Min Gallons of Fuel Oil Required in Day Tanks & Storage Tanks ML20077N2071995-01-0606 January 1995 Proposed Tech Specs Re Deletion of Certain Instruments Not Classified as Category 1 ML20078Q9241994-12-13013 December 1994 Proposed Tech Specs Re Change to Table 3.6.1.2-1 That Will Allow Maximum Leakage of 24.0 Scfh for Each of Eight MSIVs ML20077E1561994-12-0202 December 1994 Proposed TS Page 3/4 1-20,reflecting Rev of SLCS Relief Valve Setpoint to Show Influence of Back Pressure & Rev of Bases Page B3/4 5-2 to Show That Hpsc Sys Designed to Supply 517 Gpm Flow Rate at 1,200 (Instead of 1,175) Psid ML20078J3781994-11-14014 November 1994 Proposed Tech Specs Reducing Leak Rate Test Pressure for Safety Related ADS Nitrogen Receiving Tanks from 385 Psig to 365 Psig ML20078E0331994-10-28028 October 1994 Proposed Tech Specs 1.0, Definitions, 3/4.3.2, Isolation Actuation Instrumentation & 3/4.9.3, Control Rod Position ML20078B9841994-10-21021 October 1994 Proposed Tech Specs SR 4.8.1.1.2.e.8,reflecting Addition of Footnote Re 24 H Functional Test of DGs ML20073L8781994-10-0505 October 1994 Proposed TS Table 3.3.7.1-1 Re Radiation Monitoring Instrumentation ML20072U3491994-09-0202 September 1994 Proposed Tech Specs Re 18 Month Operability Test of Svc Water Pumps Sys & Resistance Test of Intake Deicing Heater Sys ML17059A4471994-09-0101 September 1994 Proposed Tech Specs Section 3.2.2, Minimum Reactor Vessel Temperature for Pressurization, & Associated Bases ML20072P6211994-08-26026 August 1994 Proposed TS 3/4.6.1.3, Primary Containment Air Locks, Allowing Continued Plant Operation If Interlock Becomes Inoperable as Long as Operable Door Locked Shut & Periodically Checked as Being Locked Shut ML20071G2771994-07-0101 July 1994 Proposed Tech Specs Surveillance Requirements 4.6.5.1.c.1 & 4.6.5.1.c.2 ML20029D4001994-04-27027 April 1994 Proposed Tech Specs Re Drawdown Time Testing & Inleakage Testing for Secondary Containment Integrity ML20058N3491993-12-14014 December 1993 Proposed Tech Specs 3/4.8.2, DC Sources, 3/4.8.4, Electrical Equipment Protective Devices & Bases for 3/4.6.3, Primary Containment Isolation Valves ML20056G9391993-09-0202 September 1993 Proposed Tech Specs Section 3/4.1.3.5, CR Scram Accumulators ML20056G1951993-08-27027 August 1993 Proposed Tech Specs,Revising TS 4.8.1.1.2.e, AC Sources - Operating & Adding TS 4.8.1.1.2.f ML20044G6261993-05-26026 May 1993 TS Section 6.8 Re Review & Approval Process for Procedure Changes ML20044F7421993-05-21021 May 1993 Proposed Tech Specs Pages 2-3,3/4 2-2,3/4 3-60,3/4 3-62, 3/4 3-63,3/4 3-64,3/4 3-65 & 6-22 & Bases Page B3/4 2-1 ML20044F3041993-05-19019 May 1993 Proposed Tech Specs Sections 3.4.3.1 & 3.4.3.2 Re Generic Ltr 88-01,drywell Leak Detection Requirements ML17058B7751993-05-14014 May 1993 Proposed Tech Specs,Reflecting Editorial Changes, Administrative Corrections & Retyping of TS ML17056C3281993-03-29029 March 1993 Proposed TS Pages 139 & 140 Re LCO SR for Type a & Local Leak Rate Type B & C Tests ML20012G5441993-02-27027 February 1993 Proposed TS Sections 1.0, Definitions & 3/4.3.6, Control Rod Block Instrumentation. ML17056C2741993-02-18018 February 1993 Proposed TS Table 3.2.7 Re RCS Isolation Valves,Table 3.2.7.1 Re Primary Coolant Sys Pressure Isolation Valves & Table 3.3.4 Re Primary Containment Isolation Valves,Lines Entering Free Space of Containment ML17056C2571993-02-12012 February 1993 Proposed,Revised TS Pages 204,204a,207,225a & 230 to Clarify Operator Actions in Event of Loss of Two Instrument Channels ML20126H9941992-12-30030 December 1992 Proposed Tech Specs 3.4.3.1 & 3.4.3.2 Re RCS Leakage Detection Sys & Operational Leakage to Conform W/ Recommendations of Generic Ltr 88-01 1999-09-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17059C7911999-09-30030 September 1999 Proposed Tech Specs Re Rev B to Conversion of Unit 2 Current TS to ITS ML20211P5931999-09-10010 September 1999 Marked-up Tech Specs Pages Reflecting Conforming Administrative License Amend Associated with Proposed Transfer of Facilities to Amergen Energy Co,Llc ML20211H2231999-08-26026 August 1999 Proposed Tech Specs,Supporting Implementation of Noble Metal Chemical by Raising Reactor Water Conductivity Limit in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b ML18041A0731999-07-27027 July 1999 Rev 1 to NMP2-ISI-006, Second Ten Year Interval Inservice Insp Program Plan for Nine Mile Point Nuclear Power Station Unit 2. ML20206P2661998-12-30030 December 1998 Proposed Tech Specs Making Application of Emergency Condenser Vent Ng Activity Monitor Channel Operability Requirement & Daily Sensor Check SR Consistent with Conditions Stated in LCO 3.1.3.a Re Emergency Cooling Sys ML20197K1041998-12-0404 December 1998 Revised Proposed TS Bases Reflecting Previous Removal of Condenser Low Vacuum Scram Function from TS as Well as Plant Design & Changes to EDG Ratings,Design Basis Load Limits & Loading Profiles ML20196H0671998-11-30030 November 1998 Proposed Tech Specs,Correcting LCO & Associated Bases for TS Section 3.1.2, Liquid Poison Sys, That Had Been Incorporated Into TS as Part of NMP Unit 1 TS Amend 101 ML20196D2081998-11-24024 November 1998 Proposed Tech Specs B 2.1.1, Fuel Cladding - Safety Limit, B 3.2.5 & 4.2.5, Reactor Coolant Sys Leakage Rate ML20154R1101998-10-16016 October 1998 Proposed Ts,Revising LCO 3.7.1.1 & Associated Actions & SRs to Provide Assurance That Four SW Pumps Are Operable & Are Operating within Acceptable Sys Parameters,With Divisional Cross Connect Valves Open ML20217N7911998-04-24024 April 1998 Revised Pages 2-1,3/4 4-1 & B2-1 to Replace Previously Submitted Pages Contained within Attachment a of 971215 Proposed Change to TS to License NPF-49 ML20202G3751998-02-0505 February 1998 Proposed Tech Specs Pages,Reflecting References to 10CFR50.55a(f) & (G) as Well as Terminology Used in Second Ten Year Isi/Ist,Beginning on 980405 ML20197H3371997-12-15015 December 1997 Proposed Tech Specs Revising SLMCPR from 1.07 to 1.09 for Two Recirculation Loop Operation & from 1.08 to 1.10 for Single Loop Operation ML20211M5231997-10-0707 October 1997 Proposed Tech Specs Section 4.9.6,reflecting New Setpoints Due to Difference in Weights of Two Existing Triangular Refueling Platform Masts ML20217G9011997-07-31031 July 1997 Proposed Tech Specs Changing Wording in Action 36 of TS Table 3.3.3-1, Emergency Core Cooling Sys Actuation Instrumentation ML20148A7751997-04-30030 April 1997 Proposed Change to Tech Specs,Removing Section 3.3.7.3 & Associated Surveillance Section 4.3.7.3,associated Tables 3.3.7.3-1 & 4.3.7.3-1,Bases Section 3.4.3.7.3 & Revising Section 0.0 (Index) Pages VII & Xvii ML17059B2911996-09-0404 September 1996 NMP Nine Mile Point Nuclear Station Unit 2,Pump & Valve First Ten-Yr Inservice Testing Program Plan. ML20116D8121996-07-26026 July 1996 Proposed Tech Specs Re Option B of App J to 10CFR50 ML20115H1521996-07-12012 July 1996 Proposed Tech Specs Section 6.2.2.i Re App a ML20117F9501996-05-15015 May 1996 Proposed Tech Specs Section 3/4.3.2 Re Isolation Actuation Instrumentation ML20101F4281996-03-20020 March 1996 Proposed TS 3/4.3.1 Re RPS Instrumentation,Deleting Operability Requirements for APRM Neutron flux-upscale, Setdown & Inoperative Functions in Operational Conditions (Oc) 3 & 4 & Modifying Operability Requirements in Oc 5 ML20101D7551996-03-15015 March 1996 Proposed Tech Specs Section 4.6.2 Re Depressurization Sys - Suppression Pool ML20097D2391996-02-0707 February 1996 Proposed Tech Specs Re Administrative Controls ML20100C1021996-01-25025 January 1996 Proposed Tech Specs Table 3.3.3-1 Re Emergency Core Cooling Sys Actuation Instrumentation ML20096G8401996-01-17017 January 1996 Proposed Tech Specs,Representing Revs to Specs 3/4.3.1, 3/4.3.2,3/4.3.3,3/4.3.4.2 & Associated Bases to Relocate Response Time Limit Tables from TSs to Plant USAR ML20094B5421995-10-25025 October 1995 Proposed Tech Specs Re Position Title Changes & Reassignments of Responsibilities at Upper Mgt Level ML20091Q9571995-08-28028 August 1995 Proposed TS 3.6.1.7,increasing Time 12-inch & 14-inch Containment Purge Sys Supply & Exhaust Valves May Be Open in Operational Condition 1,2 & 3 from 90 H Per 365 Days to 135 H Per 365 Days & Deleting Expired Footnotes for Clarity ML20081E2491995-03-0909 March 1995 Proposed Tech Specs,Revising SR 4.6.1.2.a,allowing Second Primary Containment ILRT (Type a) to Be Performed at Refueling Outage 5 or 72 Months After First Type a Test ML17059B0221995-02-15015 February 1995 Rev 0 to UT-NMP-311V0, Procedure for Manual Ultrasonic Exam of Nozzles Inner Radius & Bore. ML17059B0211995-02-10010 February 1995 Rev 0 to UT-NMP-309V0, Procedure for Manual Ultrasonic Exam of Planar Flaw Sizing for Nozzle Inner Radius & Bore Regions. ML17059B0201995-02-10010 February 1995 Rev 0 to UT-NMP-703V0, Procedure for Geris 2000 Ultrasonic Exam of RPV Nozzle Inner Radius & Bore Regions. ML17059A8881995-01-18018 January 1995 Rev 0 to Field Disposition Instruction 0245-90800, Shroud. ML20077N1591995-01-0606 January 1995 Proposed Tech Specs Re Min Gallons of Fuel Oil Required in Day Tanks & Storage Tanks ML20077N2071995-01-0606 January 1995 Proposed Tech Specs Re Deletion of Certain Instruments Not Classified as Category 1 ML20078Q9241994-12-13013 December 1994 Proposed Tech Specs Re Change to Table 3.6.1.2-1 That Will Allow Maximum Leakage of 24.0 Scfh for Each of Eight MSIVs ML20077E1561994-12-0202 December 1994 Proposed TS Page 3/4 1-20,reflecting Rev of SLCS Relief Valve Setpoint to Show Influence of Back Pressure & Rev of Bases Page B3/4 5-2 to Show That Hpsc Sys Designed to Supply 517 Gpm Flow Rate at 1,200 (Instead of 1,175) Psid ML20078J3781994-11-14014 November 1994 Proposed Tech Specs Reducing Leak Rate Test Pressure for Safety Related ADS Nitrogen Receiving Tanks from 385 Psig to 365 Psig ML17059A5661994-11-0909 November 1994 Rev 2 to Emergency Plan Maint Procedure EPMP-EPP-08, Maint, Testing & Operation of Oswego County Prompt Notification Sys. ML20078E0331994-10-28028 October 1994 Proposed Tech Specs 1.0, Definitions, 3/4.3.2, Isolation Actuation Instrumentation & 3/4.9.3, Control Rod Position ML20078B9841994-10-21021 October 1994 Proposed Tech Specs SR 4.8.1.1.2.e.8,reflecting Addition of Footnote Re 24 H Functional Test of DGs ML20073L8781994-10-0505 October 1994 Proposed TS Table 3.3.7.1-1 Re Radiation Monitoring Instrumentation ML20072U3491994-09-0202 September 1994 Proposed Tech Specs Re 18 Month Operability Test of Svc Water Pumps Sys & Resistance Test of Intake Deicing Heater Sys ML17059A4471994-09-0101 September 1994 Proposed Tech Specs Section 3.2.2, Minimum Reactor Vessel Temperature for Pressurization, & Associated Bases ML20072P6211994-08-26026 August 1994 Proposed TS 3/4.6.1.3, Primary Containment Air Locks, Allowing Continued Plant Operation If Interlock Becomes Inoperable as Long as Operable Door Locked Shut & Periodically Checked as Being Locked Shut ML17059A4241994-07-0606 July 1994 Rev 14 to Nine Mile Point Nuclear Station Unit 1 Odcm. ML20071G2771994-07-0101 July 1994 Proposed Tech Specs Surveillance Requirements 4.6.5.1.c.1 & 4.6.5.1.c.2 ML20029D4001994-04-27027 April 1994 Proposed Tech Specs Re Drawdown Time Testing & Inleakage Testing for Secondary Containment Integrity ML18040A2941993-12-17017 December 1993 Rev 13 to Nine Mile Point Nuclear Station Unit 1 Odcm. ML20058N3491993-12-14014 December 1993 Proposed Tech Specs 3/4.8.2, DC Sources, 3/4.8.4, Electrical Equipment Protective Devices & Bases for 3/4.6.3, Primary Containment Isolation Valves ML17059A0971993-10-25025 October 1993 Rev 4 to NMP2-IST-001,NMP,Nine Mile Point Nuclear Station, Unit 2,Pump & Valve First Ten-Yr Inservice Testing Program Plan. ML20056G9391993-09-0202 September 1993 Proposed Tech Specs Section 3/4.1.3.5, CR Scram Accumulators 1999-09-30
[Table view] |
Text
_ _-__ - -__- _ _ __ _ - _
TABLE 3.3.31_ (Ccntinued)
'. EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION ACTION ACTION 32 - With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> declare the associated ADS Trip System or ECCS inoperable.
ACTION 33 - With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, place the inoperable channel in the tripped condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
ACTION 34 - Not Used.
ACTION 35 - With the number of OPERABLE channels less than required by the
! Minimum OPERABLE Channels per Trip Functicn requirement, restore the inoperable channel to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or declare the associated ADS valve or ECCS inoperable.
ACTION 36 - With the number of OPERABLE channels less than required by the l Minimum OPERABLE Channels per Trip Function requirement:
- a. With one channel inoperable, place the inoperable channel in [
the tripped condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- b. With more than one channel inoperable, declare the HPCS l system inoperable.
ACTION 37 - With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, place at least one inoperable channel in the tripped condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />' or declare the HPCS system inoperable.
ACTION 38 - With the number of OPERABLE channels less than the Total Number of Channels, declare the associated emergency diesel generator inoperable and take the ACTION required by Specification 3.8.1.1 or 3.8.1.2, as appropriate.
ACTION 39 - With the number of OPERABLE channels one less than the Total Number of Channels, place the inoperable channel in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> *; operation may then continue until performance of the next required CHANNEL FUNCTIONAL TEST.
+'
- The provisions of Specification 3.0.4 are not applicable.
NINE MILE POINT - UNIT 2 .,
3/4334 AMENDMENT NO. N 9708000106 970731 PDR ADOCK 05000410 P PDR ,
se *'
TABLE 3.3.3-1 (Continued)
E TAGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTAT1QH ACTION ACTION 32 -
With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> declare the l associated ADS Trip System or ECCS inoperable.
ACTION 33 - With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, place the inoperable channel in the tripped condition vithin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. l ACTION 34 - Not used.
hCTION 35 - With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, restore the inoperable channel to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or declare the associated ADS valve or ECCS inoperable.
ACTION 36 -
With the number of OPERABLE channels-ene-less than l required by the Minimum OPERABLE Channels per Trip l Function requirement:
wa ra cut cumuts. **JcteMed +lte '"cPEA AG A CHoddet
- a. Ter enc Trip Oystem, place-thct Trip Oystem in the tripped condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
wow su.st ruw cae CHMaa sus /custs
- b. Ter beth Trip Systems, declare the HPCS system inoperable.
ACTION 37 - .
With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, place at least one inoperable channel in the tripped condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
ACTION 38 -
With the number of OPERABLE channels less than the Total Number of Channels, declare the associated emergency diesel generator inoperable and take the ACTION required by Specification 3.8.1.1 or 3.8.1.2, as appropriate.
ACTION 39 -
With the number of OPERABLE channels one less than the Total Number of Channels, place the inoperable channel in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> *;
operation may then continue until performanca cf the next required CHANNEL FUNCTIONAL TEST.
The provisions of Specification 3.0.4 are not applicable.
NINE MILE POINT - UNIT 2 3/4 3-34 AMENDMENT NO. )d'
___D
~
ATTACHMENT B NIAGARA MOHAWK POWER CORPORATION LICENSE NO. NPF-69 DOCKET NO. 50 410 Supportino Information and No Stanificant Hazards Consideration Analysis INTRODUCTION The proposed Nine Mile Point Unit 2 (NMP2) Technical Specification (TS) change contained herein presents a revision to NMP2 TS Table 3.3.3-1, " Emergency Core Cooling System Actuation Instrumentation."
On March 27,1997, the NRC granted NMP2 enforcement discretion with respect to TS l 3.0.3. A failure to meet certain response time testing surveillance requirements forced
' NMP2 to enter into Required Action 3.3.3.b and, by reference, Table 3.3.3-1. However, inappropriate wording added by a previous amendment that changed Action 36 of Table 3.3.3-1 resulted in the action statement not addressing the plant condition of more than one inoperable channel per trip function in the High Pressure Core Spray (HPCS) drywell pressure and reactor water level instrumentation. This caused NMP2 to enter TS 3.0.3.
As part of the enforcement discretion, Niagara Mohawk Power Corporation (NMPC) committed to correct the restrictive wording with a TS amendment request submitted on a -
non-emergency basis.
The proposed changes revise the wording of Action 36 so that it addresses the plant condition of more than one channel being inoperable. Presently, the action only addresses the plant condition of having one channel per trip function inoperable. The Action 36 currently states "With the number of OPERABLE channels one less than required by the Minimum OPERABLE Channels per Trip Function requirements:...". The proposed change would revise the wording so that the statement will read "With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirements:..." The wording of Action 36-a and 36-b was revit.ed to describe actions to be taken with one or more channels inoperable within a trip function.
EVALUATION The proposed revisions to TS Table 3.3.3-1, " Emergency Core Cooling System Actuation Instrumentation," Action 36, will allow Action 36 to be in effect for plant conditions where more than one channel per trip function is inoperable in the HPCS drywell pressure and reactor water level instrumentation.
Page 1 of 3
The changes would prevent unnecessary plant shutdowns per TS 3.0.3 when the plant has more than one channel inoperable per trip function in the HPCS drywell pressure and reactor water levelinstrumentation. The proposed revision would give NMP2 the capability to declare the HPCS inoperable should the plant enter the condition described above.
The proposed change provides consistency between the ECCS instrumentation and system TS. Clearly the initiating instrumentation should not haw more restrictive actions than the system which it automatically initiates. For example, inoperability of the HPCS system p -
LCO 3.5.1 may be due to the unavailability of the pump; whereas, initiating instrumentation being inoperable does not preclude manually starting the HPCS pump to deliver rated flow to the vessel. The TS also continues to require the operability of other injection systems coincidental with HPCS inoperability. Accordingly, inoperability of the auto initiating instrumentation is equivalent to or less severe than inoperability of the entire -
system. This capability to declare the system inoperable under these conditions is consistent with the Improved Technical Specifications (ITS standard).
CONCLUSIONS The current wording is inappropriate because it requires actions for initiating instrumentation that are more restrictive in regard to plant operation than the actions required for HPCS inoperability. The proposed revisions to Action 36 of Table 3.3.31 will change the inappropriate wording that caused NMP2 to be in a TS 3.0.3 condition on March 26,1997 and will clarify the actions required if more than one channel is inoperable.
This revision will prevent unnecessary plant shutdowns per TS 3.0.3 by allowing NMP2 to declare the HPCS system inoperable under these conditions and to enter the apprcpriate TS for HPCS inoperability. The capability to declare HPCS inoperable under these conditions is consistent with ITS.
ANALYSIS No Sionificant Hazards Consideration Analvtn i 10CFR50.91 requires that at the time a licensee requests an amendment, it must provide to the Commission its analysis using the standards in 10CFR50.92 concerning the issue of no significant hazards consideration. Therefore, in accordance with 10CFR50.91, the following analyses have been performed with respect to the requested change:
The coeration of Nine Mile Point Unit 2. in accordance with the crocosed amendment, will not involve a sionificant increase in the orobability or conseauences of an accident oreviousiv evaluatod.
The changes to Table 3.3.3-1, Action 36, will allow Action 36 to be in effect for the plant condition where more than one channel is inoperable per trip function in the HPCS drywell pressure and reactor water levelinstrumentation and will clarify the actions required if more than one channel is inoperable. Specifically, this action statement will allow the HPCS to be declared inoperable rather than to initiate plant shutdown per TS 3.0.3.- None of the precursors of previously evaluated accidents are affected and therefore, the probability of an accident previously evaluated is not increased.
Page 2 of 3 o
The'HPCS system will continue to perform its safety function to automatically initiate and inject water into the vessel. The out of service time for the initiating instruments remains bounded by the out of service time for HPCS. Therefore, these changes will not involve a significant increase in the consequences of an accident previously evaluated.
The coeration of Nine Mile Point Unit 2. in accordance with the orooosed amendment, will not create the oossibility of a new or different kind of accident from any accident previousiv evaluated.
The changes to Table 3.3.3-1, Action 36, will allow Action 36 to be in effect for plant conditions where more than one channel is inoperable per .tip function in the HPCS drywell pressurc and reactor water level instrumentation and will clarify the actions required if more than one channel is inoperable. No physical modification of the plant is involved and no changes to the methods in which plant systems are operated are required. The changes do not introduce any new failure modes or conditions that may create a new or different accident. Therefore, the changes do not by themselves create the possibility of a new or different kind of accident previously evaluated.
l The coeration of Nine Mile Point Unit 2. In accordance with the crocosed amendment. will not involve a sianificant reduction in a marain of safety.
The change to Table 3.3.3-1, Action 36, will allow Action 36 to be in effect for plant conditions where more than one channel is inoperable per trip function in tho HPCS drywell pressure and reactor water level instrumentation and will clarify the actions required if more than one channel is inoperable. The changes do not adversely affect any physical barrier to the release of radiation to plant personnel or to the public. The proposed chance provides consistency between the ECCS instrumentation and system TS. The TS also continues to require the operability of other injection systems coincidental with HPCS inoperability. The change has the benefit of avoiding unnecessary challenges to plant systems during an unnecessary plant shutdown. Therefore, the changes do not involve a significant reduction in a margin of safety.
Accordingly, the proposed changes do not present a significant hazards consideration.
Page 3 of 3
___ _ D
ATTACHMENT C NIAGARA MOHAWK POWER CORPORATION l 1.lCENSE NO. NPF 69 DOCKET NO. 50-410 Matked Cooy of Proposed Chances to Current Technical Specification The current version of page 3/4 3-34 of the NMP2 Technical Specifications has been hand marked-up to reflect the proposed change. -
i a . .
-. E