Letter Sequence Request |
|---|
|
Results
Other: L-13-243, Firstenergy Nuclear Operating Companys, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No, L-13-254, Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049, L-14-025, Firstenergy Nuclear Operating Companys Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-, L-14-257, Davis-Bes, Perry, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Reqard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, L-15-002, Firstenergy Nuclear Operating Companys (Fenocs) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies, L-15-219, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External, L-16-004, Sixth Six-Month Status Report in Response to March 12. 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), ML13364A166, ML14029A021, ML15152A218, ML15292A139
|
MONTHYEARL-13-035, Firstenergy Nuclear Operating Companys Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12013-02-27027 February 2013 Firstenergy Nuclear Operating Companys Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-1 Project stage: Other L-13-057, Overall Integrated Plan in Response to March 12, 2012 Commission Order Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)2013-02-27027 February 2013 Overall Integrated Plan in Response to March 12, 2012 Commission Order Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) Project stage: Other DCL-13-021, Areva Affidavit for Areva Calculations 32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and 32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer N2013-03-0505 March 2013 Areva Affidavit for Areva Calculations #32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and #32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Noz Project stage: Request DCL-13-024, Supplement to ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 22013-03-0707 March 2013 Supplement to ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 2 Project stage: Supplement L-13-156, Capability of Perform Offsite Dose Assessment During an Event Involving Multiple Release Sources2013-06-25025 June 2013 Capability of Perform Offsite Dose Assessment During an Event Involving Multiple Release Sources Project stage: Request ML13172A1792013-06-25025 June 2013 Request for Additional Information Regarding Overall Integrated Plan in Response to Order Number EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: RAI ML13183A2162013-07-0303 July 2013 Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049 Project stage: Approval L-13-234, Response to Request for Additional Information Regarding Firstenergy Nuclear Operating Companys (Fenocs) Overall Integrated Plan in Response to 03/12/2012 Commission Order Issuance of Order to Modify2013-07-18018 July 2013 Response to Request for Additional Information Regarding Firstenergy Nuclear Operating Companys (Fenocs) Overall Integrated Plan in Response to 03/12/2012 Commission Order Issuance of Order to Modify Project stage: Response to RAI ML13211A1682013-07-26026 July 2013 Westinghouse, Notification of Potential Existence of Defects Pursuant to 10 CFR Part 21 Inconsistency Between the Intended Design Functionality of the Shield Passive Thermal Shutdown Seal (SDS) and That Observed During Post-Service Testing Project stage: Request L-13-254, Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-0492013-08-0505 August 2013 Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049 Project stage: Other L-13-243, Firstenergy Nuclear Operating Companys, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No2013-08-26026 August 2013 Firstenergy Nuclear Operating Companys, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No Project stage: Other IR 05000412/20132012013-08-26026 August 2013 FENOC, Closed Meeting Notice 13-02, Requested a Regulatory Conference with the NRC to Discuss IR 05000354 and 05000412/2013201 Project stage: Request L-13-244, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)2013-08-26026 August 2013 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) Project stage: Other ML13232A3082013-08-28028 August 2013 Relief Request REP-1 U2, Revision 2, Alternative to Code Requirements for Pressurizer Structural Weld Overlays, for the Third 10-Year Inservice Inspection Interval Project stage: Approval ML13297A2332013-11-19019 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: RAI ML14029A0212014-01-28028 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Beaver Valley Power Station, Units 1 and 2, TAC Nos.: MF0841 and MF0842 (Revision 2) Project stage: Other ML13364A1662014-01-29029 January 2014 Interim Staff Evaluation Related to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) Project stage: Other L-14-025, Firstenergy Nuclear Operating Companys Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-2014-02-27027 February 2014 Firstenergy Nuclear Operating Companys Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- Project stage: Other L-14-024, Firstenergy Nuclear Operating Companys (Fenocs) Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-02-27027 February 2014 Firstenergy Nuclear Operating Companys (Fenocs) Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other L-14-119, Request for Schedule Relief/Relaxation from NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-04-25025 April 2014 Request for Schedule Relief/Relaxation from NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Request ML14120A0492014-05-20020 May 2014 Relaxation of the Schedule Requirements for Order EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events, Project stage: Approval L-14-257, Davis-Bes, Perry, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Reqard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-28028 August 2014 Davis-Bes, Perry, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Reqard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other L-14-259, Firstenergy Nuclear Operating Companys (Fenocs) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-28028 August 2014 Firstenergy Nuclear Operating Companys (Fenocs) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other L-15-002, Firstenergy Nuclear Operating Companys (Fenocs) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies2015-02-26026 February 2015 Firstenergy Nuclear Operating Companys (Fenocs) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies Project stage: Other L-15-001, Firstenergy Nuclear Operating Companys (Fenocs) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool2015-02-26026 February 2015 Firstenergy Nuclear Operating Companys (Fenocs) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Project stage: Other ML15152A2182015-06-0909 June 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other L-15-218, Firstenergy Nuclear Operating Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)2015-08-18018 August 2015 Firstenergy Nuclear Operating Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) Project stage: Other L-15-219, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External2015-08-27027 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Project stage: Other ML15292A1392015-11-0202 November 2015 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other L-15-337, Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool2015-12-21021 December 2015 Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool Project stage: Other L-16-004, Sixth Six-Month Status Report in Response to March 12. 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-02-26026 February 2016 Sixth Six-Month Status Report in Response to March 12. 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other 2014-01-28
[Table View] |
Text
MN N U.S. NUCLEAR REGULATORY COMMISSION
REGION I
NOTICE OF LICENSEE MEETING
August 26, 2013
Licensee:
FirstEnergy Nuclear Operating Company (FENOC)
Facility:
Beaver Valley Power Station, Units 1 and 2
Docket Nos.:
50-334
50-412
Date/ Time:
September 5, 2013
11:00 a.m. to 2:00 Location:
U. S. Nuclear Regulatory Commission (NRC)
Yellowstone Conference Room
Region I Office
2100 Renaissance Boulevard
King of Prussia, PA 19406
Purpose:
FENOC requested a Regulatory Conference with the NRC to discuss a potentially greater than green security-related finding, documented in NRC Inspection Report 05000334 and 05000412/2013201, dated August 8, 201 The nature of the security related greater than green finding is considered to be sensitive information and is not included in this notic Category:
This is a Category 1 Meetin This meeting will be closed to public participation due to information being discussed that is security-sensitive in natur Attendees:
NRC:
James T. Wiggins, Director, Office of Nuclear Security and Incident
Response (NSIR)
William M. Dean, Regional Administrator, Region I Patricia K. Holahan, Director, Division of Security Operations, NSIR
Raymond K. Lorson, Director, Division of Reactor Safety, Region I
R. John VandenBerghe, Acting Chief, Security Performance Evaluation
Branch, NSIR
Anthony Dimitriadis, Chief, Plant Support Branch 1, Region I
Gordon K. Hunegs, Chief, Division of Reactor Projects Branch 6, Region I
Joseph Willis, Team Leader, Security Performance Evaluation Branch,
NSIR
Kenneth S. Hussar, Physical Security Inspector, Region I
Jefferson Clark, Security Specialist, Security Performance Evaluation Branch, NSIR
Robert Dexter, Security Specialist, Security Performance Evaluation Branch, NSIR
FENOC:
E. Larson, Site Vice President
R. Bologna, Director, Site Operations
D. Benyak, Director, Fleet Security
D. Craine, Manager, Site Protection
Meeting Contact:
Anthony Dimitriadis, Chief, Plant Support Branch 1, Region I 610-337-6953 E-mail: anthony.dimitriadis@nrc.gov
This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML13238A21 ADAMS is accessible from the NRC website at HTTP://www.nrc.gov/reading-m/adams.htm Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meetin Attendance by NRC personnel should be made known by September 3, 2013 to the meeting contac Approved By: /RA/
_____________
John F. Rogge, Acting Deputy Director
Division of Reactor Safety
cc: Distribution via ListServ
ML13238A211
SUNSI Review
Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRS RI/DRP HQ/NSIR RI/DRS
NAME KHussar GHunegs/SB CJohnson via email ADimitriadis/JFR
DATE 8/26/13 8/26/13 8/23/13 8/26/13
Distribution w/encl: (VIA E-MAIL)
W. Dean, RA D. Lew, DRA D. Roberts, DRP
M. Scott, DRP R. Lorson, DRS
J. Rogge, DRS
G. Hunegs, DRP D. Spindler, DRP, SRI E. Carfang, DRP, RI P. Garrett, DRP, OA B. Bickett, DRP A. Dugandzic, DRP D. Screnci, PAO N. Sheehan, PAO N. McNamara, SLO D. Tift, SLO D. Holody, OE M. McLaughlin, OE D. Furst, OE J. Wiggins, NSIR P. Holahan, NSIR C. Johnson, NSIR R. Albert, NSIR S. Coker, NSIR L. Pinkham, DRP K. Heater, DRS L. Larche, DRM D. Beard, ORA C. ODaniell, ORA RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1-2 Resource
REGULATORY CONFERENCE AGENDA CLOSED CONFERENCE WITH FENOC (BEAVER VALLEY POWER STATION)
September 5, 2013 11:00 am - 2:00 pm NRC REGION I, KING OF PRUSSIA, PENNSYLVANIA INTRODUCTIONS and OPENING REMARKS - Presiding NRC Official, Nuclear Security and Incident Response APPARENT VIOLATION, SECURITY SIGNIFICANCE and REGULATORY CONCERNS - Joseph Willis, Team Leader, Security Performance and Evaluation Branch LICENSEE PRESENTATION - Senior Licensee Official NRC CAUCUS RESUMPTION OF CONFERENCE CLOSING REMARKS - Licensee CLOSING REMARKS - Presiding NRC Official