Notice of the Public Meeting with First Energy Nuclear Operating Company (FENOC) Ref: the Annual Assessment of Beaver Valley Station
ML050680497
Person / Time
Site: Beaver Valley
Issue date: 03/16/2005
From: Arthur Burritt
NRC/RGN-I/DRP/PB7
To:
Burritt A RGN-I/DRP/PB7/610-337-5069
Shared Package
ML050680486 List:
References
MN 05-009
Download: ML050680497 (5)


Text

MN No.05-009 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 16, 2005 Licensee: First Energy Nuclear Operating Company (FENOC)

Facility: Beaver Valley Power Station, Units 1 & 2 Docket Nos.: 50-334 & -412 Date/Time: March 30, 2005 at 1:00 p.m.

Location: Beaver Valley Nuclear Power Station Training Building, Room 103 Shippingport Road, Shippingport, PA 15077 (Located across Shippingport Road from the Beaver Valley parking lot entrance)

Purpose:

The NRC requested an Annual Assessment Meeting with FENOC management to discuss NRCs assessment of the safety performance of the Beaver Valley Nuclear Power Station for calendar year 2004. NRCs assessment is documented in a letter dated March 2, 2005.

Attendees*:

NRC: A. Burritt, Acting Chief Projects Branch 7, Region I P. Cataldo, Senior Resident Inspector G. Smith, Resident Inspector T. Colburn, Project Manager, NRR R. Bellamy, Chief, Division of Nuclear Materials Safety Licensee: W. Pearce, Site Vice President J. Lash, Director - Beaver Valley Site Operations T. Cosgrove, Director, Nuclear Engineering/Projects R. Mende, Director, Performance Improvement Public Participation: This is a Category 1 Meeting. The Public is invited to observe this meeting and will have the opportunity to communicate with the NRC staff following the business portion of the meeting.

NRCs assessment letter and the meeting notice with agenda (attachment to this notice) can be found within ADAMS (Accession Number ML050610384 and ML050680497). ADAMS is accessible through the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

2 In addition, the draft NRC presentation slides for this meeting are also accessible in ADAMS by Accession Number ML050750418.

Additional information relative to the NRCs Annual Assessment process and the safety performance of Beaver Valley Power Station can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Meeting

Contact:

Arthur Burritt, Acting Chief, Projects Branch 7 610-337-5069 E-mail: alb1@nrc.gov.

C Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 28, 2005, via telephone to the NRC meeting contact.

Approved by: _/by Richard S. Barkley for/_

Arthur L. Burritt, Chief Projects Branch 7 Division of Reactor Projects

3 Distribution:

W. Pearce, Site Vice President J. Lash, Director, Site Operations R. Mende, Director, Performance Improvement T. Cosgrove, Director, Nuclear Engineering/Projects L. Freeland, Manager, Nuclear Regulatory Affairs/Regulatory Compliance M. Clancy, Mayor, Shippingport, PA R. Janati, Chief, Division of Nuclear Safety, Commonwealth of Pennsylvania C. OClaire, State Liaison to the NRC, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia R. Chiodo, Beaver County Emergency Management Agency Commonwealth of Pennsylvania, SLO Designee Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

4 Annual Assessment Meeting Agenda:

C Introduction C Review of NRC Reactor Oversight Process C National Summary of Plant Performance C Discussion of Beaver Valley Performance Results C FENOC Response and Remarks C NRC Closing Remarks C Break C NRC available to address public questions*

  • Note: In the interest of better meeting the information needs of the public, meeting participants are encouraged to contact Art Burritt of the NRC prior to the meeting to present topics of interest they want to discuss at this question and answer session.

5 Distribution: (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA J. Wiggins, DRA W. Lanning, DRS J. Lubinski, DRS A. Burritt, DRP R. Barkley, DRP S. Lee, RI OEDO R. Laufer, NRR T. Colburn, PM, NRR R. Guzman, NRR K. Farrar, Regional Counsel D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA P. Catald, SRI, Beaver Valley G. Smith, RI - Beaver Valley P. Garrett, Resident OA G. Matakas, ORA PMNS ML050680497 SISP Review Complete: RSB (Reviewers Initials)

DOCUMENT NAME: G:\DRP\BRANCH7\Meeting Notices\BV Meeting Notice 3-30-05.wpd After declaring this document An Official Agency Record it will be released to the Public.