ML12256A792

From kanterella
Jump to navigation Jump to search
Notice of All-FENOC Public Meeting to Discuss Fleet Wide Performance
ML12256A792
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 09/12/2012
From: Jamnes Cameron
NRC/RGN-III/DRP/B6
To:
References
Download: ML12256A792 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 12, 2012 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company (FENOC)

Name of Facilities: Beaver Valley, Perry, and Davis-Besse Nuclear Generating Stations Docket No(s): 50-334, 50-412, 50-440, and 50-346 Date and Time: Wednesday, September 26, 2012, 8:30 a.m. to 11:00 a.m. (EDT)

Location: Quail Hollow Resort 11080 Concord-Hambden Road Painesville, Ohio 44077

Purpose:

To discuss FirstEnergy Nuclear Operating Company (FENOC) fleet wide performance with FENOC management.

Public Participation: This is a Category 1 Meeting. The public is invited to observe the meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. Following the business portion of the meeting, members of the public will have an opportunity to discuss FENOCs performance and the role of the NRC in ensuring safe operations at the plants.

NRC Attendees:

Chuck Casto, Region III, Regional Administrator William Dean, Region I, Regional Administrator Bruce Boger, Deputy Director, Office of Nuclear Reactor Regulation, Reactor Safety Programs Gary Shear, Region III, Deputy Director, Division of Reactor Projects Michele Evans, Office of Nuclear Reactor Regulation, Director, Division of Operating Reactor Licensing Michael Dudek, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, Branch Chief, Plant Licensing Branch III-2 Gordon Hunegs, Region I, Branch Chief, Beaver Valley Jamnes Cameron, Region III, Branch Chief, Davis-Besse

Notice of Significant Licensee Meeting Licensee Attendees:

James Lash, President FirstEnergy Generation and Chief Nuclear Officer Peter Sena, President FirstEnergy Nuclear Operating Company and Chief Operating Officer Danny Pace, Senior Vice President, Fleet Engineering Eric Larson, Vice President, Nuclear Support Kevin Ostrowski, Vice President, Nuclear Oversight Paul Harden, Vice President, Beaver Valley Barry Allen, Vice President, Davis-Besse Vito Kaminskas, Vice President, Perry Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jamnes Cameron at (630) 829-9833 by Wednesday, September 19, 2012. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC=s meeting coordinator.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, confirm the meeting schedule.

Approved By: __/RA/____

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Meeting

Contact:

Jamnes Cameron, Chief Branch 6 630-829-9833 Jamnes.Cameron@nrc.gov

Notice of Significant Licensee Meeting DISTRIBUTION:

Silas Kennedy, Region III Coordinator, OEDO Allen Howe, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrPMDavisBesse Resource RidsNrrPMPerry Resource RidsNrrDorlLpl3-2 Resource RidsNrrPMBeaverValley Resource Gary Shear, Acting Director, Division of Reactor Projects, RIII Steven Reynolds, Director, Division of Reactor Safety, RIII Kenneth OBrien, Acting Deputy Director, Division of Reactor Projects, RIII Richard Skokowski, Acting Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI Davis-Besse, Perry, Beaver Valley DRS Branch Chiefs:

Robert Daley David Hills AnnMarie Stone Billy Dickson Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Marjorie Zerth, DRP

Notice of Significant Licensee Meeting Licensee Attendees:

James Lash, President FirstEnergy Generation and Chief Nuclear Officer Peter Sena, President FirstEnergy Nuclear Operating Company and Chief Operating Officer Danny Pace, Senior Vice President, Fleet Engineering Eric Larson, Vice President, Nuclear Support Kevin Ostrowski, Vice President, Nuclear Oversight Paul Harden, Vice President, Beaver Valley Barry Allen, Vice President, Davis-Besse Vito Kaminskas, Vice President, Perry Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jamnes Cameron at (630) 829-9833 by Wednesday, September 19, 2012. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC=s meeting coordinator.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, confirm the meeting schedule.

Approved By: ___/RA/___

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Meeting

Contact:

Jamnes Cameron, Chief Branch 6 630-829-9833 Jamnes.Cameron@nrc.gov DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress\All FENOC Meeting Notice Sept 26 2012.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME TBriley JCameron DATE 09/12/12 09/12/12 OFFICIAL RECORD COPY