ML073550467

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss FENOC Fleet Wide Performance
ML073550467
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 12/21/2007
From: Bellamy R
NRC/RGN-I/DRP/PB6
To:
BELLAMY RR
Shared Package
MN No. 08-002 List:
References
MN 08-002
Download: ML073550467 (2)


Text

MN No.08-002 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING December 21, 2007 Licensee: FirstEnergy Nuclear Operating Company Facilities: Beaver Valley, Perry, and Davis-Besse Nuclear Generating Stations Docket No(s). 50-334, 50-412, 50-440, and 50-346 Time and Date: January 9, 2008, 9:00am - 11:30am Location: Davis Besse Nuclear Power Station Administration Building Energy Education Center 5501 North State Route 2 Oak Harbor, OH 43449-9760

Purpose:

NRC requested multi-regional meeting with FENOC management to discuss FENOC fleet wide performance.

NRC Attendees: James Caldwell, Region III, Regional Administrator Samuel Collins, Region I, Regional Administrator James Dyer, Director, Office of Nuclear Reactor Regulation (NRR)

Cynthia Pederson, Region III, Director, Division of Reactor Projects Ronald Bellamy, Region I, Branch Chief, Beaver Valley Bruce Burgess, Region III, Branch Chief, Perry & Davis Besse Mark Kowal, Chief, Division of Reactor Licensing, NRR Thomas Wengert, Chief, Division of Reactor Licensing, NRR Licensee Attendees: Joseph Hagan, FENOC President & Chief Nuclear Officer James Lash, Senior Vice President and Chief Operating Officer Danny Pace, Senior Vice President, Engineering Jeannie Rinckel, Vice President, Fleet Oversight Barry Allen, Vice President, Perry Mark Bezilla, Vice President, Davis Besse Peter Sena, Vice President, Beaver Valley Gregory Halnon, Director, Fleet Regulatory Affairs

2 Public Participation: This is a Category 1 Meeting. Following the business portion of the meeting, members of the public will have an opportunity to discuss FENOC=s performance and the role of the NRC in ensuring safe operations at the plants.

Meeting

Contact:

Dr. Ronald Bellamy, Chief, Projects Branch 6 610-337-5200 E-mail: rrb1@nrc.gov.

$ The NRC=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@

effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov, and contains information regarding visitors and security.

C Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by January 6, 2005, via telephone to the NRC meeting contact.

Approved by: _________/RA/___________

Dr. Ronald Bellamy, Chief Projects Branch 6 Division of Reactor Projects cc:

J. Hagan, President and Chief Nuclear Officer J. Lash, Senior Vice President of Operations D. Pace, Senior Vice President, Fleet Engineering P. Sena, III, Site Vice President, Beaver Valley Power Station J. Rinckel, Vice President, Fleet Oversight R. Anderson, Vice President, Nuclear Support, FirstEnergy Nuclear Operating Company D. Jenkins, Attorney, FirstEnergy Corporation G. Halnon, Director, Fleet Regulatory Affairs, FirstEnergy Nuclear Operating Company K. Ostrowski, Director, Site Operations E. Hubley, Director, Maintenance M. Manoleras, Director, Engineering L. Freeland, Director, Site Performance Improvement C. Keller, Manager, Regulatory Compliance M. Clancy, Mayor, Shippingport, PA D. Allard, Director, PADEP C. OClaire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency Region I Docket Room

2 Public Participation: This is a Category 1 Meeting. Following the business portion of the meeting, members of the public will have an opportunity to discuss FENOC=s performance and the role of the NRC in ensuring safe operations at the plants.

Meeting

Contact:

Dr. Ronald Bellamy, Chief, Projects Branch 6 610-337-5200 E-mail: rrb1@nrc.gov.

$ The NRC=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@

effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov, and contains information regarding visitors and security.

C Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by January 6, 2005, via telephone to the NRC meeting contact.

Approved by: ____/ra/_________________________

Dr. Ronald Bellamy, Chief Projects Branch 6 Division of Reactor Projects Distribution: (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)

Director, Division of Inspection and Regional Support, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDORLLPL1-1, RIDSNRRDORLLPL1-2)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, Regional Administrator RI D. Roberts, RI DRS T. Taylor, RIII DRP J. Caldwell, Regional Administrator RIII K. Farrar, RI Regional Counsel D. Werkheiser, SRI - Beaver Valley M. Dapas, DRA, RI J. Heck, RIII Regional Counsel M. Franke, SRI - Perry J. Lubinski, NRR G. West, RI EDO Coordinator J. Rutkowski, SRI - Davis-Besse N. Morgan, NRR, PM R. Bellamy, RI DRP G. Matakas, RI ORA R. Guzman, NRR Backup S. Barber, RI DRP P. Buckley, RIII ORA D. Lew, RI DRP J. Robbins, RIII DRP N. McNamara, SLO J. Clifford, RI DRP P. Voss, RIII DRP PMNS M. Gamberoni, RI DRS G. Wright, RIII DRP WEBWORK SUNSI REVIEW COMPLETE: ____RRB_____________ (Reviewers Initials)

DOCUMENT NAME: G:\DRP\BRANCH6a\+++Beaver Valley\FENOC Meeting Notice 1-09-08.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE: RI/DRP RI/DRP RI/DRP RIII/DRP NAME: JHeinly/JH SBarber/SB RBellamy/RRB BBurgess/via phone DATE: 12/ 20/ 07 12/ 20/ 07 12/21/07 12/21/07 OFFICIAL RECORD COPY