ML051780394

From kanterella
Jump to navigation Jump to search

Notice of Meeting with Firstenergy Operating Company (Fenoc), ET Al., Regarding Beaver Valley Power Station, Unit No. 1 (BVPS-1) Steam Generator Replacement
ML051780394
Person / Time
Site: Beaver Valley
Issue date: 06/28/2005
From: Colburn T
NRC/NRR/DLPM/LPD1
To: Richard Laufer
NRC/NRR/DLPM/LPD1
Colburn T, NRR/DLPM, 415-1402
References
TAC MC6725
Download: ML051780394 (5)


Text

June 28, 2005 MEMORANDUM TO: Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation (NRR)

FROM: Timothy G. Colburn, Senior Project Manager, Section 1 /RA/

Project Directorate I Division of Licensing Project Management, NRR

SUBJECT:

FORTHCOMING MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC), ET AL., REGARDING BEAVER VALLEY POWER STATION, UNIT NO. 1 (BVPS-1), STEAM GENERATOR REPLACEMENT (TAC NO. MC6725)

DATE & TIME: Monday, July 11, 2005 9:00 a.m. to 3:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission (NRC)

One White Flint North 11555 Rockville Pike, Room O-6B4 Rockville, Maryland 20852 PURPOSE: A working-level meeting to discuss FENOCs steam generator replacement application dated April 13, 2005 (Agencywide Documents Access and Management System, Accession Number ML051080573).

CATEGORY 1:* This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

The meeting agenda is attached, and is located at ADAMS Accession Number ML051780394.

MEETING CONTACT: Timothy G. Colburn, NRR 301-415-1402 tgc@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

R. Laufer PARTICIPANTS: NRC/NRR FENOC Westinghouse M. Barillas M. Testa J. DeBlasio J. Hayes K. Frederick R. Surman T. Colburn M. Manoleras N. Salgado C. Keller L. Brown J. Maracek Y. Diaz N. Hanley S. Rhow S. Sarver R. Laufer H. Hegrat Docket No. 50-334

Enclosure:

Meeting Agenda cc w/encl: See next page

ML051780394 NRC-001 OFFICE PDI-1/PM PDI-2/LA PDI-1/SC NAME TColburn MOBrien RLaufer DATE 6/28/2005 6/28/2005 6/28/2005 MEETING AGENDA JULY 11, 2005, CATEGORY 1 WORKING-LEVEL MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC)

STEAM GENERATOR REPLACEMENT FOR BEAVER VALLEY POWER STATION, UNIT NO. 1 DOCKET NO. 50-334 9:00 - 9:15 a.m. Introductory Remarks/Introductions 9:15 - 9:30 a.m. Background 9:30 - 10:30 a.m. Overview of Replacement Steam Generator (RSG) License Amendment Request (LAR)

- Subset of Extended Power Uprate (EPU) LAR

- Steam Generator Technical Specification (TS) Changes

- Analyses-Related TS Changes

- Bounding Analyses Done at 2900 MWt

- Meteorology and Computer Codes 10:30 - 10:45 a.m. Break 10:45 - 11:30 a.m. RSG LAR - Interrelationship with pending LARs

- Containment Conversion LAR

- Best-Estimate Loss-of-Coolant Accident Methodology LAR

- EPU LAR

- Relaxed Axial Offset Control LAR 11:30 - 12:30 p.m. Lunch 12:30 - 1:30 p.m. RSG/EPU - Request for Additional Information Interrelationship 1:30 - 2:30 p.m. NRC Staff Questions 2:30 - 2:45 p.m. Summary/Closing Remarks Enclosure

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Mary OReilly, Attorney Rich Janati, Chief FirstEnergy Nuclear Operating Company Division of Nuclear Safety FirstEnergy Corporation Bureau of Radiation Protection 76 South Main Street Department of Environmental Protection Akron, OH 44308 Rachel Carson State Office Building P.O. Box 8469 FirstEnergy Nuclear Operating Company Harrisburg, PA 17105-8469 Regulatory Affairs/Performance Improvement Mayor of the Borough of Shippingport Larry R. Freeland, Manager P O Box 3 Beaver Valley Power Station Shippingport, PA 15077 Post Office Box 4, BV-A Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Commissioner James R. Lewis 475 Allendale Road West Virginia Division of Labor King of Prussia, PA 19406 749-B, Building No. 6 Capitol Complex Resident Inspector Charleston, WV 25305 U.S. Nuclear Regulatory Commission Post Office Box 298 Director, Utilities Department Shippingport, PA 15077 Public Utilities Commission 180 East Broad Street FirstEnergy Nuclear Operating Company Columbus, OH 43266-0573 Beaver Valley Power Station ATTN: R. G. Mende, Director Director, Pennsylvania Emergency Work Management (BV-IPAB)

Management Agency Post Office Box 4 2605 Interstate Dr. Shippingport, PA 15077 Harrisburg, PA 17110-9364 FirstEnergy Nuclear Operating Company Ohio EPA-DERR Beaver Valley Power Station ATTN: Zack A. Clayton Mr. B. F. Sepelak Post Office Box 1049 Post Office Box 4, BV-A Columbus, OH 43266-0149 Shippingport, PA 15077 Dr. Judith Johnsrud Mr. L. William Pearce National Energy Committee Vice President Sierra Club FirstEnergy Nuclear Operating Company 433 Orlando Avenue Beaver Valley Power Station State College, PA 16803 Post Office Box 4 Shippingport, PA 15077 J. H. Lash, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077