ML051780394
| ML051780394 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 06/28/2005 |
| From: | Colburn T NRC/NRR/DLPM/LPD1 |
| To: | Richard Laufer NRC/NRR/DLPM/LPD1 |
| Colburn T, NRR/DLPM, 415-1402 | |
| References | |
| TAC MC6725 | |
| Download: ML051780394 (5) | |
Text
June 28, 2005 MEMORANDUM TO: Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation (NRR)
FROM:
Timothy G. Colburn, Senior Project Manager, Section 1
/RA/
Project Directorate I Division of Licensing Project Management, NRR
SUBJECT:
FORTHCOMING MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC), ET AL., REGARDING BEAVER VALLEY POWER STATION, UNIT NO. 1 (BVPS-1), STEAM GENERATOR REPLACEMENT (TAC NO. MC6725)
DATE & TIME:
Monday, July 11, 2005 9:00 a.m. to 3:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission (NRC)
One White Flint North 11555 Rockville Pike, Room O-6B4 Rockville, Maryland 20852 PURPOSE:
A working-level meeting to discuss FENOCs steam generator replacement application dated April 13, 2005 (Agencywide Documents Access and Management System, Accession Number ML051080573).
CATEGORY 1:*
This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
The meeting agenda is attached, and is located at ADAMS Accession Number ML051780394.
MEETING CONTACT: Timothy G. Colburn, NRR 301-415-1402 tgc@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"
(67 FR 36920), May 28, 2002
R. Laufer PARTICIPANTS:
NRC/NRR FENOC Westinghouse M. Barillas M. Testa J. DeBlasio J. Hayes K. Frederick R. Surman T. Colburn M. Manoleras N. Salgado C. Keller L. Brown J. Maracek Y. Diaz N. Hanley S. Rhow S. Sarver R. Laufer H. Hegrat Docket No. 50-334
Enclosure:
Meeting Agenda cc w/encl: See next page
ML051780394 NRC-001 OFFICE PDI-1/PM PDI-2/LA PDI-1/SC NAME TColburn MOBrien RLaufer DATE 6/28/2005 6/28/2005 6/28/2005
MEETING AGENDA JULY 11, 2005, CATEGORY 1 WORKING-LEVEL MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC)
STEAM GENERATOR REPLACEMENT FOR BEAVER VALLEY POWER STATION, UNIT NO. 1 DOCKET NO. 50-334 9:00 - 9:15 a.m.
Introductory Remarks/Introductions 9:15 - 9:30 a.m.
Background
9:30 - 10:30 a.m.
Overview of Replacement Steam Generator (RSG) License Amendment Request (LAR)
- Subset of Extended Power Uprate (EPU) LAR
- Steam Generator Technical Specification (TS) Changes
- Analyses-Related TS Changes
- Bounding Analyses Done at 2900 MWt
- Meteorology and Computer Codes 10:30 - 10:45 a.m.
Break 10:45 - 11:30 a.m. RSG LAR - Interrelationship with pending LARs
- Containment Conversion LAR
- Best-Estimate Loss-of-Coolant Accident Methodology LAR
- Relaxed Axial Offset Control LAR 11:30 - 12:30 p.m.
Lunch 12:30 - 1:30 p.m. RSG/EPU - Request for Additional Information Interrelationship 1:30 - 2:30 p.m.
NRC Staff Questions 2:30 - 2:45 p.m.
Summary/Closing Remarks Enclosure
Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Mary OReilly, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation 76 South Main Street Akron, OH 44308 FirstEnergy Nuclear Operating Company Regulatory Affairs/Performance Improvement Larry R. Freeland, Manager Beaver Valley Power Station Post Office Box 4, BV-A Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.
Harrisburg, PA 17110-9364 Ohio EPA-DERR ATTN: Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB)
FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 Rich Janati, Chief Division of Nuclear Safety Bureau of Radiation Protection Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P O Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 298 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station ATTN: R. G. Mende, Director Work Management (BV-IPAB)
Post Office Box 4 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. B. F. Sepelak Post Office Box 4, BV-A Shippingport, PA 15077 Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077