ML071800242

From kanterella
Jump to navigation Jump to search
08/02/2007, Revised for Room Change, Forthcoming Meeting with Firstenergy Nuclear Operating Company Regarding the Beaver Valley Power Station, Units 1 and 2, License Renewal Application
ML071800242
Person / Time
Site: Beaver Valley
Issue date: 07/10/2007
From: Hoffman S
NRC/NRR/ADRO/DLR/RLRB
To: Rajender Auluck
NRC/NRR/ADRO/DLR/RLRB
Hoffman S, NRR, DLR 415-3245
References
Download: ML071800242 (7)


Text

July 10, 2007

      • REVISED TO SHOW ROOM CHANGE***MEMORANDUM TO:Rajender Auluck, Branch Chief License Renewal Branch B

Division of License Renewal

Office of Nuclear Reactor RegulationFROM:Stephen T. Hoffman, Senior Project Manager

/RA/License Renewal Branch B

Division of License Renewal

Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY REGARDING THE BEAVER VALLEY POWER

STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATIONDATE & TIME:Thursday, August 2, 2007 12:30 p.m. - 1:30 p.m.LOCATION:U.S. Nuclear Regulatory Commission (NRC)

One White Flint North

11555 Rockville Pike, Room O-5B4 O-13G4 Rockville, Maryland 20852PURPOSE:Pre-submittal meeting to discuss the Beaver Valley Power Station, Units 1 and 2, license renewal application. The agenda for the meeting is

enclosed. Information on the license renewal process is available at

http://www.nrc.gov/reactors/operating/licensing/renewal.html on the NRC's Web site.CATEGORY 1:* This is a Category 1 Meeting. The public is invited to observe this meeting (see agenda) and will have one or more opportunities to

communicate with the NRC after the business portion but before the

meeting is adjourned.MEETING CONTACTS:Stephen T. Hoffman, NRR 301-415-3245 sth@nrc.gov

  • Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002 R. Auluck-2-PARTICIPANTS:Participants consist of members of the Office of Nuclear Reactor Regulation (NRR) and FirstEnergy Nuclear Operating Company (FENOC): NRR Staff FENOCP.T. KuoP. SenaS. LeeG. Halnon K. ChangC. Custer R. AuluckD. Kunsemiller L. Lundet al.

R. Franovich

et al.Docket Nos. 50-334 and 50-412

Enclosure:

Meeting agenda cc w/encl: See next page PARTICIPANTS:Participants consist of members of the Office of Nuclear Reactor Regulation (NRR) and FirstEnergy Nuclear Operating Company (FENOC): NRR Staff FENOCP.T. KuoP. SenaS. LeeG. Halnon K. ChangC. Custer R. AuluckD. Kunsemiller L. Lundet al.

R. Franovich

et al.Docket Nos. 50-334 and 50-412

Enclosure:

Meeting agenda cc w/encl: See next page DISTRIBUTION

See next pageAdams Accession No:

ML071800242OFFICEPM:RLRB:DLRLA:DLRBC:RLRB:DLR NAME S. HoffmanI. KingR. Auluck DATE07/10/0707/10/0707/10/07 OFFICIAL RECORD COPY Memo to R. Auluck From S. Hoffman Dated July 10, 2007 DISTRIBUTION:

SUBJECT:

FORTHCOMING MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY REGARDING THE BEAVER VALLEY POWER STATION, UNITS 1

AND 2, LICENSE RENEWAL APPLICATION HARD COPY DLR RF E-MAIL: PUBLIC SSmith (srs3)

SDuraiswamy

RidsNrrDlr

RidsNrrDlrRlra

RidsNrrDlrRlrb

RidsNrrDlrRlrc

RidsNrrDlrReba

RidsNrrDlrRebb

RidsNrrDci

RidsNrrDra

RidsNrrDe RidsNrrDeEemb

RidsNrrDeEeeb

RidsNrrDss

RidsOgcMailCenter

RidsNrrAdes


PBuckberg NMorgan MModes, RI

PCataldo, RI

DWerkheiser, RI Beaver Valley Power Station, Units 1 and 2 cc: Joseph J. Hagan President and Chief Nuclear Officer

FirstEnergy Nuclear Operating Company

Mail Stop A-GO-14

76 South Main Street

Akron, OH 44308James H. Lash Senior Vice President of Operations

and Chief Operating Officer

FirstEnergy Nuclear Operating Company

Mail Stop A-GO-14

76 South Main Street

Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering

FirstEnergy Nuclear Operating Company

Mail Stop A-GO-14

76 South Main Street

Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight

FirstEnergy Nuclear Operating Company

Mail Stop A-GO-14

76 South Main Street

Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation

Mail Stop A-GO-15

76 South Main Street

Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company

Mail Stop A-GO-2

76 South Main Street

Akron, OH 44308 Ohio EPA-DERR ATTN: Zack A. Clayton

P.O. Box 1049

Columbus, OH 43266-0149James H. Lash Site Vice President

FirstEnergy Nuclear Operating Company

Beaver Valley Power Station

Mail Stop A-BV-SEB1

P.O. Box 4, Route 168

Shippingport, PA 15077 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company

Mail Stop A-GO-2

76 South Main Street

Akron, OH 44308 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company

Beaver Valley Power Station

Mail Stop A-BV-A

P.O. Box 4, Route 168

Shippingport, PA 15077 Richard Anderson Vice President, Nuclear Support

FirstEnergy Nuclear Operating Company

Mail Stop A-GO-14

Akron, OH 44308 Commissioner James R. Lewis West Virginia Division of Labor

749-B, Building No. 6

Capitol Complex

Charleston, WV 25305 Director, Utilities Department Public Utilities Commission

180 East Broad Street

Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency

2605 Interstate Drive

Harrisburg, PA 17110-9364 Beaver Valley Power Station, Units 1 and 2 cc: Dr. Judith Johnsrud Environmental Coalition on Nuclear Power

Sierra Club

433 Orlando Avenue

State College, PA 16803 Director Bureau of Radiation Protection

Pennsylvania Department of

Environmental Protection

Rachel Carson State Office Building

P.O. Box 8469

Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3

Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission

475 Allendale Road

King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission

P.O. Box 298

Shippingport, PA 15077 Ms. Julie Keys Nuclear Energy Institute

1776 I Street, NW, Suite 400

Washington, DC 20006-3708 AGENDA NRC MEETING WITH FENOC BEAVER VALLEY LICENSE RENEWAL APPLICATION1.Introductions 2.FENOC presentationa.Project status review - submittal date b.Steps taken by FENOC License Renewal Project to ensure a quality license renewal applicationc.Technical Issues d.Form of submittal3.Discussion 4.Public participation 5.Closing ENCLOSURE