Category:Letter
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams 05000416/LER-2024-001, High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close2024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 05000416/LER-2023-002, Reactor Scram Due to Generator Stator Fault to Ground2024-02-13013 February 2024 Reactor Scram Due to Generator Stator Fault to Ground ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 2024-09-09
[Table view] Category:License-Operator
MONTHYEARIR 05000416/20243022024-03-21021 March 2024 Notification of NRC Initial Operator Licensing Exam 05000416/2024302 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20243012023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML22342B2602022-10-14014 October 2022 10 Public Forms ML22342B2592022-10-14014 October 2022 10 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20223012021-12-0808 December 2021 GG-2022-10 Corp Notification Ltr - Cco, Grand Gulf Nuclear Station - Notification of NRC Initial Operator Licensing Examination 05000416/2022301 ML21334A0152021-10-25025 October 2021 GG-2021-10 Draft Written Exam Comments ML21334A0122021-10-25025 October 2021 GG 2021-10 Draft Op Test Comments ML21333A2532021-10-25025 October 2021 GG-2021-10 Post Exam Analysis ML21349A1562021-10-25025 October 2021 GG-2021-10 Public Forms ML21334A0162021-10-25025 October 2021 GG-2021-10 Draft Written Exam ML21333A2552021-10-25025 October 2021 GG-2021-10 Final Operating Test ML21333A2562021-10-25025 October 2021 GG-2021-10 Final Written Exam ML21334A0182021-10-25025 October 2021 GG-2021-10-DRAFT Outline Comments ML21334A0142021-10-25025 October 2021 GG-2021-10 Draft Outlines ML21334A0172021-10-25025 October 2021 GG-2021-10 Final Outlines ML21334A0132021-10-25025 October 2021 GG-2021-10 Draft Operating Test ML21280A0732021-10-0707 October 2021 NRC Initial Operator Licensing Examination Approval 05000416/2021301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML21041A5352021-02-11011 February 2021 Notification of NRC Initial Operator Licensing Examination 05000416/2021301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20069C2262020-03-0909 March 2020 Notification of NRC Initial Operator Licensing Examination 05000416/2020302 ML20058H6152020-02-10010 February 2020 GG-2020-02 Draft Outlines ML20058J8102020-02-10010 February 2020 GG-2020-02 Post Examination Analysis ML20058J8112020-02-10010 February 2020 GG-2020-02 Public Forms ML20058H6242020-02-10010 February 2020 GG-2020-02 Final Written Examination ML20058H6262020-02-10010 February 2020 GG-2020-02 Draft Outline Comments ML20058H6172020-02-10010 February 2020 GG-2020-02 Draft Written Examination Comments ML20058H6212020-02-10010 February 2020 GG-2020-02 Final Operating Test ML20058H6222020-02-10010 February 2020 GG-2020-02 Final Outlines ML20058H6182020-02-10010 February 2020 GG-2020-02 Draft Written Examination ML20058H6142020-02-10010 February 2020 GG-2020-02 Draft Operating Test ML20058H6112020-02-10010 February 2020 GG-2020-02 Draft Operating Test Comments ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19128A1582019-05-0808 May 2019 Notification of NRC Initial Operator Licensing Examination 05000416/2020301 ML19045A3732019-02-12012 February 2019 March 2019 GFE Cover Letter Riv ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18116A2382018-04-26026 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations. ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18050A0562017-12-11011 December 2017 2017-12 Post-Exam Analysis ML18061A1722017-12-11011 December 2017 2017-12 Public Forms ML18050A0542017-12-11011 December 2017 2017-12 Final Written Exams ML18061A1652017-12-11011 December 2017 2017-12 Final Outlines ML18061A1702017-12-11011 December 2017 2017-12 Proposed Written Exam Comments ML18061A1692017-12-11011 December 2017 2017-12 Proposed Outlines ML18061A1672017-12-11011 December 2017 2017-12 Proposed Operating Tests 2024-03-21
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000416/20243022024-03-21021 March 2024 Notification of NRC Initial Operator Licensing Exam 05000416/2024302 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20243012023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML22342B2592022-10-14014 October 2022 10 Post Examination Analysis ML22342B2602022-10-14014 October 2022 10 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20223012021-12-0808 December 2021 GG-2022-10 Corp Notification Ltr - Cco, Grand Gulf Nuclear Station - Notification of NRC Initial Operator Licensing Examination 05000416/2022301 ML21334A0152021-10-25025 October 2021 GG-2021-10 Draft Written Exam Comments ML21333A2552021-10-25025 October 2021 GG-2021-10 Final Operating Test ML21333A2562021-10-25025 October 2021 GG-2021-10 Final Written Exam ML21334A0182021-10-25025 October 2021 GG-2021-10-DRAFT Outline Comments ML21334A0172021-10-25025 October 2021 GG-2021-10 Final Outlines ML21334A0132021-10-25025 October 2021 GG-2021-10 Draft Operating Test ML21334A0162021-10-25025 October 2021 GG-2021-10 Draft Written Exam ML21334A0142021-10-25025 October 2021 GG-2021-10 Draft Outlines ML21334A0122021-10-25025 October 2021 GG 2021-10 Draft Op Test Comments ML21349A1562021-10-25025 October 2021 GG-2021-10 Public Forms ML21333A2532021-10-25025 October 2021 GG-2021-10 Post Exam Analysis ML21280A0732021-10-0707 October 2021 NRC Initial Operator Licensing Examination Approval 05000416/2021301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21041A5352021-02-11011 February 2021 Notification of NRC Initial Operator Licensing Examination 05000416/2021301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20069C2262020-03-0909 March 2020 Notification of NRC Initial Operator Licensing Examination 05000416/2020302 ML20058J8102020-02-10010 February 2020 GG-2020-02 Post Examination Analysis ML20058H6212020-02-10010 February 2020 GG-2020-02 Final Operating Test ML20058H6222020-02-10010 February 2020 GG-2020-02 Final Outlines ML20058H6262020-02-10010 February 2020 GG-2020-02 Draft Outline Comments ML20058H6182020-02-10010 February 2020 GG-2020-02 Draft Written Examination ML20058H6152020-02-10010 February 2020 GG-2020-02 Draft Outlines ML20058H6172020-02-10010 February 2020 GG-2020-02 Draft Written Examination Comments ML20058H6242020-02-10010 February 2020 GG-2020-02 Final Written Examination ML20058H6142020-02-10010 February 2020 GG-2020-02 Draft Operating Test ML20058J8112020-02-10010 February 2020 GG-2020-02 Public Forms ML20058H6112020-02-10010 February 2020 GG-2020-02 Draft Operating Test Comments ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19128A1582019-05-0808 May 2019 Notification of NRC Initial Operator Licensing Examination 05000416/2020301 ML18116A2382018-04-26026 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations. ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18061A1682017-12-11011 December 2017 2017-12 Proposed Outline Comments ML18061A1692017-12-11011 December 2017 2017-12 Proposed Outlines ML18050A0552017-12-11011 December 2017 2017-12 Final Operating Tests ML18050A0562017-12-11011 December 2017 2017-12 Post-Exam Analysis ML18050A0542017-12-11011 December 2017 2017-12 Final Written Exams ML18061A1702017-12-11011 December 2017 2017-12 Proposed Written Exam Comments ML18061A1722017-12-11011 December 2017 2017-12 Public Forms ML18061A1712017-12-11011 December 2017 2017-12 Proposed Written Exams ML18061A1672017-12-11011 December 2017 2017-12 Proposed Operating Tests ML18061A1652017-12-11011 December 2017 2017-12 Final Outlines 2024-03-21
[Table view] |
Text
Entergy Operations Inc.
7003 Ba ld Hill Road
- ~ Ent ergx Po rt Gibs on. MS 391 50
February 8, 2024
John Kirkland USNRC Chief Examiner U.S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Blvd Arlington, TX 76011-4511
Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29
SUBJECT : NRC POST EXAMINATION SUBMITTIAL
GNRO 2024-00007
Dear Mr. Kirkland,
Post examination materials are being submitted for the NRC Initial License Written Examination administered on January 29, 2024, at Grand Gulf Nuclear Station. The examination was administered to 1 RO, 2 Instant SROs, and 2 Upgrade SRO applicants.
As Grand Gulf NRC Exam Management Sponsor and Facility Reviewer, we have confirmed the quality of the exam grading and concur with the individual and collective examination results.
There are no proposed changes to the examination.
This submittal includes all req uired documentation for the written examina tion in accordance with NURE G 1021 Revision 12, Section 4.4, "Grading and Doc um enting Written Examinations". The documents of the submittal are contained in an Entergy sponsored ShareFile. You have full admin rights to the ShareFile. The organization and content of the ShareFile folder is attached.
In accordance with NUREG 1021, Revision 12, Section ES-1.3, "Examination Security," please ensure that these materials a re withheld from public disclosure until after the examinations are complete. Additionally, Grand Gulf requests tha t the written examination outlines be w ithheld from public disclosure for two years after administration of the exams to allow reuse o f the examination mater ials in future initial licensing classes.
For questions concerning examination materials, please contact Rich Bolduc (601) 996-7361.
Sine~ / ()1
~ ska ~ Gabriel Harg ave Manager, Training & Development Facility Representative Grand Gulf Nuclear Station Grand Gulf Nuclear Station Entergy Operations Inc.
7003 Bald Hill Road
- ~ Entergy; Po rt Gibson MS 39150
February 8, 2024 Page 2
ShareFile: 2024 GG NRG EXAM Folder: POST EXAM SUBMITTAL
Folder: Graded Written Exam Documentation
RO and SRO Graded Exam Records
Folder: Documents for NRG Exam Grading
- Applicant Un-graded Answer Sheets
- Tabular Grading Answer Keys
- Machine Grading Answer Keys
Folder: Administered Written Exam
- GG 2024 NRG Exam Master Answer Key
- GG 2024 NRG Exam Applicant Copy
- 2024 NRG Written Exam SRO Provided References
- Exam Administration Log of Applicant Questions During Exam
Folder: Written Exam Analysis
- Analysis from Applicant Input for High Missed Questions
- RO and SRO Exam Analysis 1-75
Folder: Additional Documents
- Signed-Off Examination Security Agreement Forms (Form 1.3-1)
- Examination Seating Chart
- Post Exam Submittal Cover Letter
- NRG Exam Related Condition Reports Analysis from Applicant Input for High Miss Questions
Q 16: (60% RO+2 SROs)
K/A 700000 AA2.06
Applicants selected the Over-hearting of the Main Generator. We have recently down powered several times due to stator bar temperatures.
Question reviewed and applicants understand the correct answer.
No changes to the question are being proposed.
The plant is operating at 100% power with the following:
- Grid instabilities are occurring.
- 05 02-I-8, Loss of BOP AC Power / Grid Instability ONEP, is entered.
- Grid frequency is 58 Hz and lowering slowly.
Which one of the following identifies:
- a concern with this frequency
and
- the need for a Reactor scram,
in accordance with 05-1-02-I-8?
Concern Reactor Scram
A. Trip of EPA breakers Required
B. Trip of EPA breakers NOT required
C. Over-heating of Main Generator Required
D. Over-heating of Main Generator NOT required
Answer: A
Q 16.A (2, 40.0%} B (0, 0.0%) C ( 2, 4 0.0 °/o) D ( 1., 2 0.0%)
2, 4 0.0% 60.0°/o
Page 1 of 9 Analysis from Applicant Input for High Miss Questions
Q 55: (60% 1 RO+2 SROs)
K/A 290001 A3.01
2 Applicants selected D because they knew that valve received a closed signal, 1 Applicant guessed. The applicants did not think they would have to know the normal positions for the valves at 100% reactor power.
Question reviewed and applicants understand the correct answer.
No changes to the question are being proposed.
The plant is operating at 100% power with the following:
- Reactor water level reaches a low of -45.
Which one of the following identifies an isolation valve whose position indication has changed status (from OPEN to CLOSED) on the Isolation Valve Status Board?
A. B21-F028A, MSL A CTMT OUTBOARD ISOL
B. P11-F 062, CST WATER SUPPLY HEADER TO AUX BLDG
C. B21-F019, INBOARD MSL DRAINS OUTBOARD DRAIN VALVE
D. P11-F047, REFUEL WATER TRANSFER PUMP SUCTION FROM RADWASTE
Answer: B
Q 55 A (0, 0.0%) B (2, 40.0%) C (1, 20.0%) D (2, 40.0%)
2, 40.0% 6 0. 0 °/o
Page 2 of 9 Analysis from Applicant Input for High Miss Questions
Q 65: (60% 1 RO+2 SROs)
K/A 2.1.4
Applicants could not remember watchstanding proficiency requirements.
Question reviewed and applicants understand the correct answer.
No changes to the question are being proposed.
Which one of the following is the minimum number of twelve (12) hour shifts a licensed operator is required to complete in a calendar quarter to maintain an active license, in accordance with 02-S 39, Maintaining Watchstanding Proficiency?
A. 3
B. 5
C. 7
D. 9
Answer: B
Q 65.A (2, 40.0%) B (2, 40.0%} C (1, 20.0%) D (0, 0.0%)
2, 40.0% 60.0°/o
Page 3 of 9 Analysis from Applicant Input for High Miss Questions
Q78: (50% 2 SROs)
K/A 295016 AA2.03
Applicants remember the 20- minute limit listed in the PTLR and thought that rate was used at the Remote Shutdown Panel
Question reviewed and applicants understand the correct answer.
No changes to the question are being proposed.
The plant is operating at 100% power with the following:
- A fire in the Control room requires an evacuation.
- Reactor pressure is 1000 psig and slowly rising.
Which one of the following describes the required control of Reactor pressure/temperature, in accordance with 05 02-II-1?
A. Stabilize Reactor pressure below 1060 psig, but do NOT commence a cooldown.
B. Commence a cooldown. The cooldown rate is limited to no more than 20°F/hr.
C. Commence a cooldown. The cooldown rate is limited to no more than 90°F/hr.
D. Rapidly depressurize the Reactor irrespective of cooldown rate.
Answer: C
Q 78.A (0, 0.0%) B (1, 25.0%) C (2, 50.0%) D ( 1, 25.0%)
2, 50.0% so. b%
Page 4 of 9 Analysis from Applicant Input for High Miss Questions
Q80: (50% 2 SROs)
K/A 295026 2.4.23
Applicants were confused because they thought the legs would be prioritized and said that means the specified order.
Question reviewed and applicants understand the correct answer.
No changes to the question are being proposed.
The plant has experienced a spurious opening of an SRV with the following:
- The Reactor has been manually scrammed.
Which one of the following describes how to implement EP-3?
A. All legs are entered. There IS a specified order for which leg to execute first.
B. All legs are entered. There IS NOT a specified order for which leg to execute first.
C. Only the SP/T and SP/L legs are entered. There IS a specified order for which leg to execute first.
D. Only the SP/T and SP/L legs are entered. There IS NOT a specified order for which leg to execute first.
Answer: B
Q 80.A {O, 0.0%) lJ (2, 50.0%) C (1, 25.0%) D ( 1, 25.0%)
2, 50.0% 5 0. 0/o
Page 5 of 9 Analysis from Applicant Input for High Miss Questions Q81: (50% 2 SROs)
K/A 295006 AA2.05
Applicants thought that because we dont have a leak or challenge to feedwater injection, we are not allowed to lower pressure.
Question reviewed and applicants understand the correct answer.
No changes to the question are being proposed.
The plant has been scrammed with the following:
- APRMs indicate downscale.
- IRMs are fully inserted and indicate downscale on Range 1.
- SRMs are fully inserted and trending down with a negative period.
- A cluster of ten (10) adjacent control rods remain withdrawn at position 04.
- EP-2, RPV Control, has been entered due to low Reactor water level.
- NO steps have yet been performed in the Emergency Procedures (EPs).
- Reactor pressure is 940 psig and steady.
Which one of the following describes the required procedure execution and control of Reactor pressure, in accordance with the EPs?
Required Procedure Execution Control of Reactor Pressure
A. Remain in EP-2 Depressurization is allowed
B. Remain in EP-2 Depressurization is NOT allowed
C. Exit EP-2 and enter EP-2A, ATWS Depressurization is allowed RPV Control
D. Exit EP-2 and enter EP-2A, ATWS Depressurization is NOT allowed RPV Control
Answer: C
Q 8 1.A (0, 0.0%), B (0, 0.0%) C (2, 501.0 9/oJ D ( 2, 5 0.0%)
2, 5 0.0% 5 0.p%
Page 6 of 9 Analysis from Applicant Input for High Miss Questions
Q96: (75% 3 SROs)
K/A 2.4.40
Applicants did not remember what item could be delegated. They thought INFORM option C was delegated.
Question reviewed and applicants understand the correct answer.
No changes to the question are being proposed.
The plant has experienced an accident with the following:
- Conditions warrant emergency classification.
- You are assuming the role of the Emergency Director.
- The Emergency Response Organization has NOT yet been activated.
Which one of the following is a responsibility that you ARE allowed to delegate, in accordance with EN-EP-609, Emergency Operations Facility (EOF) Operation?
A. Ordering local area/building evacuation
B. Classifying and declaring the emergency
C. Emergency notifications of the accident to off-site agencies
D. Making Protective Action Recommendations (PARs) to off-site agencies
Answer: A
Q 96 A (1., 25.. 0%) B (0, 0.0%) C (3, 75.0%) D (0, 0.0%)
l, 2S.0% 75.0%
Page 7 of 9 Analysis from Applicant Input for High Miss Questions
Q97: (75% 3 SRO)
K/A 2.2.37
Applicants selected the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, they did not consider up to the limit of the specified frequency
Question reviewed and applicants understand the correct answer.
No changes to the question are being proposed.
The plant is operating at 100% power with the following:
- It is discovered that a surveillance has NOT been completed on time for a Technical Specification required system.
- The surveillance frequency is quarterly (92 days).
- The surveillance was last performed 120 days ago.
- A risk evaluation has been performed and the associated impact is being managed.
- It is expected that the system will pass the surveillance when it is performed.
Which one of the following describes the requirement for this missed surveillance, in accordance with Technical Specifications?
A. The associated LCO must be declared NOT met at this time
B. Complete the surveillance within a maximum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from the time of discovery or then the associated LCO must be declared NOT met
C. Complete the surveillance within a maximum of 23 days from the time of discovery or then the associated LCO must be declared NOT met
D. Complete the surveillance within a maximum of 92 days from the time of discovery or then the associated LCO must be declared NOT met
Answer: D
Q 97.A (0, 0.0%) 1 13 (3, 75.. 0%) C (0, 0.. 0%)
1, 25.0% 7 5.0%
Page 8 of 9 Analysis from Applicant Input for High Miss Questions
Q99: (50% 2SRO)
K/A 2.1.15
Applicants remembered that Shift Managers post/discuss these in the control room but did not know OPS Director approves.
Question reviewed and applicants understand the correct answer.
No changes to the question are being proposed.
The plant is operating at 100% power with the following:
- A degraded plant condition requires issuing temporary written guidance to Operations personnel, in accordance with EN -OP-112, Night and Standby Orders.
- It is desired for the guidance to remain in effect for approximately one month and until formally cancelled.
Which one of the following identifies:
- the type of order to be used
and
- who is required to approved this order,
in accordance with EN-OP-112?
Type of Order Required Approval
A. Night Order Shift Manager
B. Night Order Director, Operations
C. Standing Order Shift Manager
D. Standing Order Director, Operations
Answer: D
Q 99.A (0, 0.0%), C ( 2, 5 0.0%} D (2, 50.0%,) '
2, 5 0.0% 50. 0%