OFFICIAL USE ONL'{ - PROPRIETARY INFORMATION dw UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 14, 2012 Vice President, Operations Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 SUB-IECT: GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION FOR THE STEAM DRYER EVALUATION RE: EXTENDED POWER UPRATE LICENSE AMENDMENT REQUEST (TAC NO. ME4679)

Dear Sir or Madam:

By application dated September 8,2010 (Reference 1), as supplemented by letters dated November 18, 2010 (Reference 2), November 23, 2010 (Reference 3), February 23, 2011 (four letters, References 4,5,6, and 7), March 9. 2011 (two letters. References 8) and 9, March 22, 2011 (Reference 10), March 30, 201>1 (Reference 11), March 31. 2011 (Reference 12). April 14.

2011 (Reference 13), April 21 , 2011 (Reference 14), May 3, 2011 (Reference 15). May 5. 2011 (Reference 16), May 11. 2011 (Reference 17), June 8.2011 (Reference 18). June 15, 2011 (Reference 19), June 21, 2011 (Reference 20) June 23, 2011 (Reference 21). July 6,2011 (Reference 22), July 28. 2011 (Reference 23). August 25. 2011 (Reference 24). August 29.

2011 (Reference 25), August 30. 2011 (Reference 26). September 2.2011 (Reference 27),

September 9, 2011 (Reference 28), September 12, 2011 (Reference 29). September 15. 2011 (Reference 30). September 26,2011 (Reference 31), October 10,2011 (two letters, References 32 and 33), October 24, 2011 (Reference 34). November 14, 2011 (Reference 35).

November 25. 2011 (Reference 36), November 28, 2011 (Reference 37), December 19, 2011 (Reference 38), and February 6, 2012 (Reference 39), Entergy Operations, Inc. (Entergy, the licensee), submitted a license amendment request for Grand Gulf Nuclear Station, Unit 1 (GGNS). Portions of the letters dated September 8 and November 23,2010. and February 23, April 21, May 11. July 6, July 28, September 2. October 10, November 14. November 25, and November 2B, 2011, and February 6. 2012 contain sensitive unclassified non-safeguards information (proprietary) and. accordingly, have been withheld from public disclosure. The proposed amendment requests an increase in the maximum steady-state power level at GGNS from 3B9B megawatts thermal (MWt) to 440B MWt. This represents an approximate 13 percent increase above the current licensed thermal power or an approximate 15 percent increase above the original licensed thermal power.

The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the following additional information is needed for the NRC staff to complete our review of this amendment.

This enclosed request for additional information (RAI) pertaining to the steam dryer evaluation was discussed with Mr. Jerry Burford of your staff on January 21, 2012, and it was agreed that a NOTICE: Enclosure 1 to this letter contains Proprietary Information. Upon separation from Enclosure 1, this letter is DECONTROLLED.

OFFICIAL USE ONLY PROPRIETARY INFORMATION c/vJ

OFFICIAL USE ONLY PROPRIETARY INFORMATION JvJ response to all RAls would be provided by February 15, 2012. The NRC staff's proprietary version of the RAI is provided in Enclosure 1 and a nonproprietary version is provided in . A list of references is provided In Enclosure 3.

If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1445 or via e-mail at Alan.Wang@nrc.gov.

Sincerely,

~a~ng,~:t.::

Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416

Enclosure:

1. Request for Additional Information (proprietary)
2. Request for Additional Information (non-proprietary)
3. List of References cc wtEncl 2 and 3: Distribution via Listserv OFFICIAL USE ONLY
  • PROPRIETARY INFORMATION /vJ

OFFICIAL USE ONLY PROPRIETARY INFORMATION ENCLOSURE 2 (NON-PROPRIETARY)

REQUEST FOR ADDITIONAL INFORMATION STEAM DRYER EVALUATION GRAND GULF NUCLEAR STATION. UNIT NO.1 EXTENDED POWER UPRATE LICENSE AMENDMENT REQUEST ENTERGY OPERATIONS. INC.

DOCKET NO. 50-416 OFFICIAL USE ONLY* PROPRIETARY INFORMATION

OFFICIAL USE ONLY PROPRIETARY INFORMATION ~W REQUEST FOR ADDITIONAL INFORMATION STEAM DRYER EVALUATION GRAND GULF NUCLEAR STATION. UNIT NO.1 EXTENDED POWER UPRATE LICENSE AMENDMENT REQUEST ENTERGY OPERATIONS. INC.

DOCKET NO. 50-416 By letter dated September 8,2010, as supplemented (see Enclosure 3), Entergy Operations, Inc. (Entergy), submitted a license amendment request (LAR) for the Grand Gulf Nuclear Station, Unit No. 1 (GGNS). The proposed amendment requests an increase in the maximum steady-state power level at GGNS from 3898 megawatts thermal (MWt) to 4408 MWt. This represents an approximate 13 percent increase above the current licensed thermal power or an approximate 15 percent increase above the original licensed thermal power.

The U.S, Nuclear Regulatory Commission (NRC) staffs review of the LAR has identified areas regarding the steam dryer for which additional information is required for the NRC staff to complete its review. Please note that the staff has determined that portions of this request for additional information (RAI) contain sensitive unclassified non-safeguards information (proprietary) and, accordingly, those portions of the RAI identified by text enclosed within double brackets have been withheld from public disclosure.

EMCB*GGNS1-S0....-RAI-01 Rebenchmarking of PBlE and Clean Reanalysis (a) Based on examining the images and cutaway views of the Quad Cities Unit 2 (QC2) benchmarking model provided by General Electric - Hitachi (GEH) during staff interviews at GEH-Wilmington on December 7, 2011, the NRC staff can no longer confirm the conservatism of the plant based load evaluation (PBLE) approach using a and its accompanying bi QC2 benchmark are too large to resolve I while maintaining a minimum of seam line (MSL) nozzle regions are In..".,.t"_"ACi>t\l\l.:l*.., may several inconsistencies between the acoustic model and structural models have and been identified. The current frequency benchmarking is limited to frequencies , many regions in the model appear to use

\ only between adjacent dryer bank regions, which acoustic loads.

The licensee is therefore requested to provide:

An updated QC2 PBLE benchmark that satisfies acoustic mesh resolution requirements. is shown to be converged in spatially narrow regions (such as those within the dryer) and over , and is shown to OFFICIAL USE ONLY PROPRIETARY INFORMATION clw

OFFICIAL USE ONLY; PROPRIETARY INFORMATION / vJ

-2 resolve previously provided LMS concerns about meshing errors and discrepancies between the acoustic and structural finite element (FE) models.

The revised aC2 acoustic model should be consistent with the model developed for the GGNS and Susquehanna Steam Electric Station (SSES) calculations.

\ Benchmarks for both PBLE approaches should be revised.

_ _ plots of QC2 dryer surface pressures, delta pressures for

~ inner and outer pressure transducers are available and accompanying low frequency (LF), high uency (HF). and bias errors and uncertainties f o r _ and Plots of the updated terms for the revised aC2 benchmark.

The licensee is also requested to apply their updated aC2 PBlE approach to demonstrate its I'1'\..".,Ar"",t, In,.,."""nTI"Q to the GGNS valid prototype- the SSES replacement dryer. This updated calculation should be performed ed, accurate SSES PBlE acoustic model, with mesh resolution satisfying the requirement, accurate MSL nozzle representations, and an approp

_ The licensee should ng errors uncertainties are bounded by the aC2 benchmark bias errors and uncertainties. If they are not bounded the licensee should provide an updated set of bias errors and uncertainties for the PBlE that bound the worst-case conditions from both the aC2 and SSES Finally, the licensee is requested to update its FE stress modeling bias error and uncertainty calculations using end-to-end benchmarking of both the aC2 and SSES instrumented dryer datasets. Worst-case bias errors and uncertainties should be provided based on the re benchmarking.

(b) Following the resolution of part (a) above, the licensee is requested to provide a clean reanalysis of the GGNS dryer as there are many errors noted in aC2 benchmark as well as GGNS to capture the integrated cumulative effect of the errors rather than addressing individual effects as some of the effects may not be linear or fully captured by superposition of the linear effects ..

EMCB-GGNS1-SD-4-RAI-02 MSl Strain Gage Bias Errors The licensee is requested to provide a detailed description of the bias errors and uncertainties (including actual values) of the strain gages used for the aC2, SSES, and GGNS MSL acoustic pressure measurements and how they are accounted for in the PBlE benchmarking and in the GGNS an . In . ar, the licensee is requested to explain the ramifications OFFIOIAL USE ONLY PROPRIETARY INFORMATION oIw

O~~ICIAL USE ONLY PROPRIETARY INFORMATION /vJ

- 3 GGNS dryer stress calculations.

EMCB-GGNS1-SD-4-RAI-03 Stresses near partial penetration welds in the GGNS and SSES dryers The licensee is requested to provide a full accounting of all errors in alternating stress calculations made near welds in the GGNS and SSES dryer, and in particular near partial penetration welds. For GGNS, the licensee is requested to provide a complete list of any dryer design changes, including weld changes that were specified to reduce alternating stresses below 50 percent of the American Society of Mechanical Engineers (ASME) alternating stress limits.

EMCB-GGNS1-SD-4-RAI-04 Solid to Shell Transition Interface Modeling (Follow-Up to Action Item #5)

In response to Action Item #5 (letter GNRO-2011/00088 dated October 10, 2011; Reference 32), the licensee explains how it determined based on a study of response appears affect the steam dryer overall structural response. For solid-shell transition interface modeling, the ANSYS general purpose FE program does have an option to use constraint equations with Command CEINTF. In addition, ANSYS has another option for modeling shell-solid assembly as described in Section 9.2, Modeling a Shell-Solid Assembly, of ANSYS Documentation, Release 11. The licensee is requested to confirm whether the use of these options the steam dryer stresses that are similar to the ones obtained using the EMCB-GGNS1-SD-4-RAI-05 Dryer Inspection Plan (Follow-up RAI 8)

a. In response to RAI 8(a)(ii) in the previous round of RAls, the licensee stated that the steam dryer inspection plan includes a detailed inspection of the dryer in order to identify potential problems related to fabrication. The NRC staff requests that the licensee explain whether the inspection plan would include inspection of the partial penetration welds. Also explain whether industry operating experience includes any fatigue cracking of partial penetration welds. The licensee is also requested to provide the root cause report for SSES (which is prototype for GGNS) steam dryer cracking (fatigue cracking of seismic block-support ring area).
b. In response to RAI 8(b), the licensee states that it will follow the inspection recommendations of the Boiling Water Reactor Vessel Internals Program (BWRVIP)-139, "Steam Dryer Inspection and Flaw Evaluation Guidelines," and consider the detailed inspection results (mentioned above in (a) above) in OFFICIAL USE ONLY* PROPRIETARY INFORMATION -01 (Ai

OFFICIAL USE ONLY PROPRIETARY INFORMATION cluJ

-4 developing the re-inspection plan for the GGNS Replacement Steam Dryer (RSD). The licensee is requested to quantify the re-inspection frequency. The licensee is also requested to explain whether the re-inspection frequency and scope would be adequate for a timely detection of high-cycle fatigue cracks, which may take place within the first three or four cycles of operation or after as long as 16 years of operation as described in General electric Service Information letter, Sil No. 644, Rev. 2 (P. 3, BWRl5-Style Dryer Observation).

EMCB*GGNS1-SD-4-RAI*06 Partial Penetration Welds (Follow-Up RAIS)

a. In response to RAI 9(a) in the previous round of RAls, the licensee states that the weld fatigue factors are discussed in Subsections 3.3.4.3 and 3.3.4.4 of NEDC 33601P, "Grand Gulf Steam Dryer Fatigue Stress Analysis Using PBlE Methodology" (a non-proprietary version, designated as NEDO-33601, is available in Reference 1). The NRC staff does not find any discussion offatigue factors in these sections, but it does find it in Section 3.3.2.2.3 of NEDC-33601, which discusses fatigue factors for but not partial penetration welds. In NEDC-33601, states, "The weld relevance for the steam dryer analysis and discusses weld factors for

~i\A"il'iiv F only refers to these two types of welds. The lack of discussion on partial penetration welds provides a false impression that the fatigue assessment of these welds is not important for the structural integrity of the RSD. The NRC staff therefore requests that the licensee modify Section 3.3.2.2.3 of NEDC-33601 and Section 4.2 and Figure 4.2-1 of Appendix F by discussing the fatigue factor for partial penetration welds.

b. The response to RAI9(c) in the previous round of RAls states that all partial penetration welds in the RSD have been evaluated and only one weld was not analyzed in accordance with the response to RAI 9(b) in the previous round of RAls. The licensee is requested to explain how many partial penetration welds are in the RSD, what are the plate thicknesses at these locations and any applicable undersize factors.

EMCB-GGNS1-SD-4*RAI-07.

Assessment of FE Modeling Bias and Uncertainty (SSES Dryer Hammer Test Datal RAI deleted from GGNS RAJ scope.

EMCB-GGNS1-SD-4-RAI-oS.

GGNS Steam Dryer Finite Element Model Verification (i) The licensee is requested to perform a thorough re-verification of the FE models (global model, sub-models, and shell-to-solid transition areas) used in the steam dryer analysis for GGNS and confirm that in the FE models used in the steam dryer analysis for GGNS: (a) all nodes are appropriately connected; (b) nodes OFFICIAL U8& ONLY PROPRI&TARY INFORMATION / W

OFFICIAL USE ONLY* PROPRIETARY INFORMATION olvJ

- 5 that are supposed to be connected are not left free inadvertently, and the load path is not shifted away from the critical areas; (c) in case that there are any unconnected nodes, the licensee is requested to provide a description of such locations and the impact on the GGNS steam dryer stresses at EPU conditions.

(ii) The licensee is also requested to verify and confirm that the quality of the FE mesh (shape or aspect ratios) is acceptable to ensure that there are no regions with poor mesh quality in the global model, in the submodels, and in shell-to-solid transition areas of the GGNS steam dryer FE model. In case that there is a poor quality mesh, the licensee is requested to provide a description of the impact on the GGNS steam dryer stresses at EPU conditions.

(iii) The licensee is further requested to provide a summary of the results from the FE model mesh density convergence studies, used in the steam dryer analysis for GGNS, to validate proper stress convergence.

EMCB-GGNS1-SD-4-RAI-09 Instrumenting the Steam Dryer The NRC staff notes that the licensee is planning to instrument the GGNS RSD. The licensee is requested to provide a strong, technically sound, defensible, and convincing justification for the type, number, location, and redundancy of instruments to be used on the steam dryer. The licensee is also requested to provide the calibration and measurement errors associated with the instruments. In addition, the licensee is requested to describe (1) how the PBlE validation will be made using the actual GGNS plant data at various power plateaus during power ascension using MSl and on-dryer instrument data, particularly pressure differences between internal and external sensors; (2) how the validation of the overall end-to-end strain calculations will be made using the structural FE model based on actual GGNS plant data at various plateaus during power ascension using loads derived from instrument data, and (3) how the maximum fatigue stress locatlcm determined during power ascension.

EMC B-GGNS1-SD-4-RAI-1 0 Reference to ESBWR LTRs The Economic Simplified Boiling Water Reactor (ESBWR) Licensing Topical Reports (LTRs) will be revised due to recently identified errors. In addition, theGGNS EPU LAR predates the approval dates of the ESBWR l TRs. The review of PBlE methodology will be a plant-specific review for the GGNS application. Therefore the licensee is requested to remove the following references to ESBWR LTRs, as noted in Attachment 11 B of GGNS's LAR (Reference 1):

Appendix B, NEDC-33408P, Revision 1: 'ESBWR Steam Dryer - Plant Based Load Evaluation Methodology', June 2009; Appendix C, NEDC-33408P, Supplement 1, Revision 2, "ESBWR Steam Dryer - Plant Based Load Evaluation Methodology," July 2010; and Appendix D, NEDC-33436P, Revision 0, "GEH Boiling Water Reactor Steam Dryer - Plant Based Load Evaluation Methodology," November 2008.

OFFICIAL USE ONLY

  • PROPRIETARY INFORMATION oiw

OFFICIAL USE ONLY* PROPRIETARY INFORMATION

-6 EMCB-GGNS1-SD-4-RAI-11 Repair/Rework of the Replacement Steam Dryer The NRC staff notes that the GGNS RSD is being modified at several partial penetration weld locations. The licensee is requested to describe which quality control and other measures are implemented to ensure that these locations do not become locations for intergranular stress corrosion cracking (IGSCC), due to any cold work and residual stresses that could grow under fatigue loading. Therefore, the staff also requests the licensee to describe whether the requirements addressed in the topical reports BWRVIP-84, "BWR Vessel and Internals Project.

Guidelines for Selection and Use of Materials for Repairs to BWR Internal Components,"

October 2000, and BWRVIP-181, "BWR Vessel and Internals Project, Steam Dryer Repair Design Criteria," November 2007, will be followed during the repair of the steam dryers.

EMCB-GGNS1-SD-4-RAI-12 Dryer Stress: Analysis versus Operating Dryer Cracking Experience Fatigue cracking was observed in the SSES steam dryer (which is a prototype for GGNS) near the dryer support. The licensee is requested to describe what was deficient in the FE modeling at that location of the SSES dryer in order that the dynamic FE stress analysis did not predict high alternating stresses to cause a fatigue crack. The licensee is requested to provide the fatigue stress at the cracked location. The NRC staff notes that the licensee made design improvements to the GGNS dryer at the location corresponding to the SSES steam dryer.

However, the licensee is requested to describe whether a similar deficiency is present at one or more locations in the GGNS dryer. The staff requests that the licensee review the FE model of the GGNS dryer by comparing it with the design drawings to confirm whether the deficiency similar to that of the SSES steam dryer model is present at any location in the GGNS dryer. If present, the licensee is requested to explain how the deficiency in the GGNS steam dryer FE model will be corrected.

EMCB-GGNS1-SD-4-RAI-13 VPF Loading In response to Audit Action Item 7 regarding the vane passing frequency (VPF), the licensee

- . q .. p e p g

a. Since the GGNS has a constant speed recirculation pump and its VPF frequency is different from those for SSES, the licensee is requested to explain why the finding regarding the VPF loads based on the SSES test results is applicable to GGNS.

OffiCIAL USE ONLY - PROPRIETARY INFORMAl10N / W

OFFICIAL USE ONLY PROPRIETARY INFORMATION oZW b.

OFFICIAllJ8E ONLY PROPRIETARY INFORMATION c/.-cJ

OFFICIAL USE ONLY

  • PROPRIETARY INFORMATION c1vV ENCLOSURE3-REFERENCES
1. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "License Amendment Request, Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,n dated September 8,2010 (GNRO-2010/00056) (ADAMS Accession No. ML102660409).
2. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental License Amendment Request, Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 18, 2010 (GNRO-2010/00071) (ADAMS Accession No. ML103260003).
3. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory CommiSSion, "Supplemental License Amendment Request, Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 23,2010 (GNRO-2010/00073) (ADAMS Accession No. ML103330146).
4. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 23, 2011 (GNRO-2011/00007) (ADAMS Accession No. ML110540534).
5. Krupa, M. A.. Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1, n dated February 23, 2011 (GNRO*2011/00012) (ADAMS Accession No. ML110540540).
6. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,n dated February 23,2011 (GNRO-2011/00011) (ADAMS Accession No. ML110540545).
7. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf

. Nuclear Station, Unit 1," dated February 23,2011 (GNRO-2011/00013) (ADAMS Accession No. ML110550318).

8. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1, n dated March 9, 2011 (GNRO-2011/00017) (ADAMS Accession No. ML110680507).
9. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated March 9, 2011 (GNRO-2011/00016) (ADAMS Accession No. ML110730025).

1of4 OFFICIAl use ONlY PROPRIETARY INFORMATION

OFFlelAL USE ONLY* PROPRIETARY INFORMATION

10. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated March 22, 2011 (GNRO-2011/00019) (ADAMS Accession No. ML110820262).
11. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated March 30, 2011 (GNRO-2011/00018) (ADAMS Accession No. ML110900275).
12. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated March 31, 2011 (GNRO-2011/00021) (ADAMS Accession No. ML110900586).
13. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated April 14, 2011 (GNRO-2011/00024) (ADAMS Accession No. ML111050134).
14. Krupa, M. A. Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated April 21, 2011 (GNRO-2011/00025) (ADAMS Accession No. ML111120329).
15. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated May 3,2011 (GNRO-2011/00034) (ADAMS Accession No. ML111240288).
16. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated May 5, 2011 (GNRO-2011/00035) (ADAMS Accession No. ML111250552).
17. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated May 11. 2011 (GNRO-2011/00037) (ADAMS Accession No. ML111320263).
18. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,n dated June 8, 2011 (GNRO-2011/00043) (ADAMS Accession No. ML111590836).
19. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 15, 2011 (GNRO-2011/00046) (ADAMS Accession No. ML111670059).

20f4 OFFICIAL USE ONLY* PROPRIETARY INFORMATION c/UJ

OFFICIAL USE ONLY* PROPRIETARY INFORMATION

20. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 21, 2011 (GNRO-2011/00050) (ADAMS Accession No. ML111730235).
21. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,* dated June 23, 2011 (GNRO-2011100052) (ADAMS Accession No. ML111750244).
22. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated July 6,2011 (GNRO-2011/00053) (ADAMS Accession No. ML111880138).
23. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,* dated July 28, 2011 (GNRO-2011100055) (ADAMS Accession No. ML112101485).
24. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated August 25, 2011 (GNRO-2011100070) (ADAMS Accession No. ML112370770).
25. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated August 29, 2011 (GNRO-2011/00073) (ADAMS Accession No. ML112410566).
26. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,* dated August 30,2011 (GNRO-2011/00074) (ADAMS Accession No. ML112420169).
27. Krupa. M. A. Entergy Operations, Inc" letter to U.S. Nuclear Regulatory Commission.

"Supplemental Information Extended Power Uprate. Grand Gulf Nuclear Station, Unit 1,*

dated September 2, 2011 (GNRO-2011/00075) (ADAMS Accession No. ML112490050).

28. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental Information Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,'

dated September 9,2011 (GNRO-2011/00033) (ADAMS Accession No. ML112521284).

29. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 12, 2011 (GNRO-2011/00079) (ADAMS Accession No. ML112550495).

30f4 OFFICIAL USE ONLY PROPRIETARY INFORMATION otuJ

OFFICIAL USE ONLY PROPRIETARY INFORMATION  ;/vJ

30. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, BResponse to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 15, 2011 (GNRO-2011/00080)

(ADAMS Accession No. ML112580223).

31. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 26, 2011 (GNR0-2011/00082)

(ADAMS Accession No. ML112690143).

32. Krupa, M. A" Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated October 10, 2011 (GNRO-2011/00087) (ADAMS Accession No. ML112840155).
33. Krupa, M. A" Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,If dated October 10, 2011 (GNRO-2011/00088) (ADAMS Accession No. ML112840171).
34. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental Information Pertaining to Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated October 24, 2011 (GNRO-2011/00092) (ADAMS Accession No. ML112980113).
35. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 14,2011 (GNRO-2011/00101) (ADAMS Accession No. ML113190403).
36. Krupa. M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 25,2011 (GNRO-2011/00105) (ADAMS Accession No. ML113290137).
37. Krupa, M. A.. Entergy Operations. Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 28,2011 (GNRO-2011/00107) (ADAMS Accession No. ML113320403).

38 . Krupa, M. A., Entergy Operations. Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated December 19,2011 (GNRO-2011/00111) (ADAMS Accession No. ML113530656).

39. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 6,2012 (GNRO-2012/00006) (ADAMS Accession No. ML12039A071).

40f4 OFFICIAL USi ONLY PROPRIETARY INFORMATION c/vJ

OFFICIAL USE ONLY* PROPRIETARY INFORMATION ~L-J

-2 response to all RAls would be provided by February 15, 2012. The NRC staff's proprietary version of the RAI is provided in Enclosure 1 and a nonproprietary version is provided in Enclosure 2. A list of references is provided in Enclosure 3.

If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1445 or via e-mail at Alan.Wang@nrc.gov.

Sincerely, IRA!

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416

Enclosure:

1. Request for Additional Information (proprietary)
2. Request for Additional Information (non-proprietary)
3. List of References cc w/Encl 2 and 3: Distribution via Listserv DISTRIBUTION:

NON-PUBLIC LPLIV rtf RidsAcrsAcnw_MailCTR Resource RidsNrrDeEmcb Resource RidsNrrDorlLpl4 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMGrandGulf Resource RidsRgn4MailCenter Resource CBasavaraju, NRR/DE/EMCB ADAMS Accession Nos.: Pkg ML120400181; Proprietary RAI ML120400213; Non-Proprietary RAI ML120400216 *RAI memol dated OFFICE NRRlDORULPL4/PM NRRlDORULPL4/LA NRRlDElEMCBlBC NRRlDORULPL4/BC NRRlDORLIlPL4IPM NAME AWang JBurkhardt MMurphy" MMarkley AWang (LWilkins for)

DATE 2113112 2110/12 1126112 2114/12 2/14/12 OFFICIAL AGENCY RECORD OFFICIAL USE ONLY PROPRIETARY INFORMATION d u.)