GNRO-2011/00035, Response to Request for Additional Information Regarding Extended Power Uprate

From kanterella
Jump to navigation Jump to search

Response to Request for Additional Information Regarding Extended Power Uprate
ML111250552
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/05/2011
From: Krupa M
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2011/00035
Download: ML111250552 (21)


Text

Entergy Operations, Inc.

P. O. Box 756 Port Gibson, MS 39150 Michael A. Krupa Director, Extended Power Uprate Grand Gulf Nuclear Station Tel. (601) 437-6684 GNRO-2011/00035 May 5, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Request for Additional Information Regarding Extended Power Uprate Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

REFERENCES:

1. Email from A. Wang to F. Burford dated April 5, 2011, GG EPU Electrical Engineering Branch Request for Additional Information (ME4679) (Accession Number ML110950281)
2. License Amendment Request, Extended Power Uprate, dated September 8, 2010 (GNRO-2010/00056, Accession Number ML102660403)

Dear Sir or Madam:

The Nuclear Regulatory Commission (NRC) requested additional information (Reference 1) regarding certain aspects of the Grand Gulf Nuclear Station, Unit 1 (GGNS) Extended Power Uprate (EPU) License Amendment Request (LAR) (Reference 2). Attachment 1 provides responses to the additional information requested by the Electrical Engineering Branch.

No change is needed to the no significant hazards consideration included in the initial LAR (Reference 2) as a result of the additional information provided. There are no new commitments included in this letter.

If you have any questions or require additional information, please contact Jerry Burford at 601-368-5755.

GNRO-2011/00035 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on May 5, 2011.

Sincerely, MAK/FGB/dm Attachments:

1. Response to Request for Additional Information, Electrical Engineering Branch cc: Mr. Elmo E. Collins, Jr.

Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 612 East Lamar Blvd., Suite 400 Arlington, TX 76011-4005 U. S. Nuclear Regulatory Commission ATTN: Mr. A. B. Wang, NRR/DORL (w/2)

ATTN: ADDRESSEE ONLY ATTN: Courier Delivery Only Mail Stop OWFN/8 B1 11555 Rockville Pike Rockville, MD 20852-2378 State Health Officer Mississippi Department of Health P. O. Box 1700 Jackson, MS 39215-1700 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150

Attachment 1 GNRO-2011/00035 Grand Gulf Nuclear Station Extended Power Uprate Response to Request for Additional Information Electrical Engineering Branch to GNRO-2011/ 00035 Page 1 of 18 Response to Request for Additional Information Electrical Engineering Branch By letter dated September 8, 2010, Entergy Operations, Inc. (Entergy) submitted a license amendment request (LAR) for an Extended Power Uprate (EPU) for Grand Gulf Nuclear Station, Unit 1 (GGNS). The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the following additional information requested by the Electrical Engineering Branch is needed for the NRC staff to complete their review of the amendment. Entergys response to each item is also provided below.

RAI # 1 In Figure 2.3-1 of Section 2.3 of the LAR, the licensee presented the worst case environmental qualification (EQ) enveloping accident temperature profiles. Explain whether Figure 2.3-1 represents profiles for both high energy line break (HELB) and loss of coolant accident (LOCA) conditions. Also, describe the impact of the change in rate between the existing drywell temperature and drywell temperature under EPU conditions on the EQ of equipment.

Response

Figure 2.3-1 delineates the worst case EPU environmental qualification enveloping profiles which include HELB and LOCA conditions.

The current licensed thermal power (CLTP) EQ accident temperature profile used for qualification of equipment bounds the EPU drywell enveloping accident temperature profile from Figure 2.3-1 until day 60, when the temperature is approximately 147°F. After 60 days, the EPU drywell enveloping accident temperature curve continues a downward slope (cooling) out to 100 days, but at a slower cool down rate than the CLTP EQ profile. This temperature difference from 60 to 100 days is acceptable for affected EQ equipment based on Arrhenius methodology, since margin exists in the predicted EPU drywell temperature accident response for EPU versus the drywell enveloping accident temperature profile shown in Figure 2.3-1. Use of Arrhenius methodology for thermal aging is considered acceptable in Regulatory Guide 1.89, Rev. 1, Environmental Qualification of Certain Electrical Equipment Important to Safety for Nuclear Power Plants.

RAI # 2 With regards to Section 2.3.1, provide, in table form, a list of parameters (i.e., temperature, pressure, humidity, chemical spray, submergence, and radiation) that shows that the EQ limits remain bounding under EPU conditions for Normal Operation, Accident (LOCA), Accident (MSLB/HELB), and Post Accident for both inside and outside containment (e.g., Auxiliary Building, Turbine Building, Containment Façade, etc.). Include the existing EQ limits in your response and show how EQ margins (e.g., temperature, pressure, radiation, etc.) are being maintained.

to GNRO-2011/ 00035 Page 2 of 18

Response

The changes to EQ parameters potentially changed due to EPU are summarized in Table 2-1; changes are discussed in more detail below.

Table 2-1 Environmental Inside Containment Outside Containment Parameter Temperature, Normal No Change No Change No change in peak. HELB - No change in peak; short term profile changes.

Temperature, Accident Long term profile changes for LOCA - Increase in peak and LOCA inside the drywell change in profile in some areas Pressure No Change No Change Humidity No Change No Change Chemical Spray No Change No Change Submergence No Change No Change Total integrated dose (TID)

Radiation TID increases in many areas increases in all areas No changes to maximum room temperatures are required due to EPU during normal operation.

EPU does not change relative humidity, peak pressures, chemical spray, or flooding effects due to a LOCA or MSLB/HELB.

Temperature Inside Containment As shown in EPU LAR Attachment 5, Figure 2.3-1, the containment temperature profile for EPU only exceeded the CLTP envelope in the period beyond 60 days in the drywell, which is addressed in RAI #1. EPU did not change any peak temperatures used for qualification of EQ equipment inside containment; therefore, CLTP margins for this equipment remain unchanged for EPU.

Temperature Outside Containment Table 2-2 reflects the EPU temperature impact to EQ equipment due to LOCA considering the lowest qualification test temperature for any qualified component located in the affected areas and the most limiting (highest) calculated EPU temperature for those areas.

to GNRO-2011/ 00035 Page 3 of 18 Table 2-2 LOCA Outside Containment Lowest Test Peak EPU Temperature (F) Temperature (F) 212 163 CLTP EQ temperature margins for the peak MSLB / HELB temperatures were not affected by EPU. However, the EPU temperature profile for MSLB / HELB will change. EPU LAR , Figure 2.3-1 shows that the EPU MSLB / HELB temperature profile changes during the first 200 seconds of the event, with the short term plateau rising to 304F for approximately 200 seconds. For any qualified equipment located in the affected areas that is required to function during this event, the lowest qualification test temperature for aging (with a duration greater than 200 seconds) is 318F.

Radiation Environment Inside and Outside Containment Table 2-3 identifies each type of equipment qualified in the GGNS EQ program along with the qualification TID and the EPU TID for the most limiting environmental zones (inside and outside containment) in which the equipment is qualified to be located. The listed EPU TID includes normal dose plus 1.1 times the accident dose; therefore, it includes the 10% margin on the accident dose required per IEEE 323-1974. Additional margin (beyond IEEE 323-1974 requirements) is also shown reflecting the difference between the equipments qualified TID and the EPU TID.

EQ Equipment Identified As Requiring Replacement Several items were identified in the EPU LAR Attachment 5, Table 2.3-2 as requiring replacement. Some of these items have been re-evaluated based on location specific doses and found to be acceptable for EPU without modification. All of the items on Table 2.3-2 have been qualified for EPU with the exception of the Electro Products Scotch Tape Electrical Splices associated with the RHR Jockey Pump motors (1E12C003A and B) and four of the Residual Heat Removal (RHR) motor operated valves (MOVs) listed on the table (1E12F003A, 1E12F024A, 1E12F024B, and 1E12F048A). As indicated in Entergys letter dated November 12, 2010 (GNRO-2010/00071, NRC ADAMS Accession Number ML103260003), these splices are to be replaced with qualified splices.

to GNRO-2011/ 00035 Page 4 of 18 Table 2-3 Equipment Affected By EPU Revised Radiation Total Integrated Doses Qualification EPU TID EPU TID %

Environmentally Qualified Equipment IC/OC* TID (rads) (rads) Margin**

ASCO HTX Series Solenoid Valves IC 2.00E+07 1.05E+07 47.8 ASCO NP Series Solenoid valves IC 2.00E+07 2.00E+07 0.2 AVCO Solenoid Valve Cluster Assembly for IC 5.00E+07 4.99E+07 0.2 Main Steam Isolation Valve (MSIV) Actuators Conax Electrical Conductor Seal Assemblies IC 2.25E+08 8.55E+07 62.0 (ECSAs)

Crouse Hinds Drywell Seal Condulets IC 1.02E+08 4.99E+07 51.1 Eugen Seitz Main Steam Safety Relief Valve IC 2.92E+07 2.92E+07 0.0 (MSSRV) Control Valve Assemblies FCI Water Level Sensors IC 1.15E+08 1.05E+07 90.9 GE Vulkene SIS wire IC 2.00E+08 1.62E+08 18.8 Limitorque with AC class RH Motors IC 2.00E+08 1.98E+08 0.9 Morrison-Knudsen Hydrogen Igniters IC 1.23E+09 4.99E+07 95.9 MSSRV Control Valve Assemblies with Ethylene IC 2.44E+08 4.99E+07 79.6 Propylene Diene Monomer (EPDM) Elastomers Patel Connectors and Conduit Seals (EGS) IC 2.00E+08 7.49E+07 62.6 PCI Pressure Switches IC 5.00E+07 6.27E+06 87.5 Pyco Temperature Elements IC 2.20E+08 7.12E+07 67.6 Raychem Cable and Instrument Sealing IC 1.96E+08 1.96E+08 0.1 Products Reliance Drywell Purge Compressor Motors IC 1.10E+08 5.72E+06 94.8 Rockbestos SIS Wire IC 2.00E+08 7.49E+07 62.6 Rosemount 1152 Transmitters IC 5.00E+06 8.95E+05 82.1 Rosemount 1152T0280 Transmitters IC 2.20E+07 6.17E+06 72.0 Rosemount 1153 with R-output code IC 2.44E+07 6.16E+06 74.7 Rosemount 1153B Transmitters IC 2.44E+07 6.27E+06 74.3 Rosemount 1153D Series Transmitters IC 5.19E+07 6.16E+06 88.1 ThermoElectric Temperature Elements IC 5.00E+07 4.99E+07 0.2 Thermon Heat Tracing IC 9.20E+06 6.17E+06 33.0 Victoreen Hi Rad Radiation Detectors and IC 2.20E+08 7.49E+07 66.0 Cables AMP Terminals and Splices IC/OC 2.60E+08 7.18E+07 72.4 BIW SIS Wire IC/OC 4.00E+08 3.52E+08 11.9 Buchanon Terminal Blocks IC/OC 1.00E+09 2.16E+08 78.4 Cinch-Jones Terminal Blocks IC/OC 1.00E+09 2.69E+08 73.1 Curtis Terminal Blocks IC/OC 1.00E+09 2.69E+08 73.1 to GNRO-2011/ 00035 Page 5 of 18 Table 2-3 Equipment Affected By EPU Revised Radiation Total Integrated Doses Qualification EPU TID EPU TID %

Environmentally Qualified Equipment IC/OC* TID (rads) (rads) Margin**

EGS Grayboot Connectors IC/OC 2.00E+08 8.55E+07 57.3 EGS Quick Disconnects IC/OC 2.50E+08 8.55E+07 65.8 GE Terminal Blocks IC/OC 1.00E+09 2.69E+08 73.1 General Purpose Lubrication IC/OC 2.28E+08 2.28E+08 0.0 Kulka Terminal Blocks IC/OC 1.00E+09 2.69E+08 73.1 Limitorque Actuators with Fiberite IC/OC 2.28E+08 2.16E+08 5.2 Marathon Terminal blocks IC/OC 1.00E+09 2.69E+08 73.1 Okonite Power and Control Cable IC/OC 2.00E+08 1.23E+08 38.5 Raychem Coax, Triax, Twinax, and Specialty IC/OC 2.00E+08 1.23E+08 38.5 Cable Rockbestos Coax and Twinax Cable IC/OC 2.00E+08 1.23E+08 38.5 Rockbestos Firewall III Power and Control IC/OC 2.00E+08 1.23E+08 38.5 Cable Rockbestos Firewall III Specialty Cable IC/OC 2.00E+08 Note 1 Note 1 Rockbestos I&C Cable IC/OC 2.00E+08 1.23E+08 38.5 Samuel Moore I&C Cables IC/OC 2.00E+08 1.23E+08 38.5 Samuel Moore Thermocouple Extension Wire IC/OC 2.00E+08 1.23E+08 38.5 Teledyne Thermatics SIS Wire IC/OC 2.08E+08 1.77E+08 15.0 ABB Brown-Boveri 480V Load Centers OC 1.70E+05 1.64E+05 3.4 Anaconda SIS Wire OC 2.00E+08 1.88E+07 90.6 Comsip Delphi Hydrogen Analyzer Panels OC 1.20E+05 9.74E+04 18.8 GE ECCS Pump Motors OC 6.00E+07 4.56E+07 24.1 Gould 125 VDC Starters OC 1.00E+06 5.26E+04 94.7 Gould Electrical Penetration Protection Cabinets OC 1.00E+07 3.50E+05 96.5 and Motor Short Circuit Protectors (MSCPs)

Gould Handswitch Stations OC 8.60E+05 1.94E+05 77.5 Gould Transmitters OC 3.66E+07 5.43E+05 98.5 ITT Electric Control Actuators OC 1.00E+07 1.00E+07 0.0 Kerite 9Kv Power Cable OC 2.00E+08 8.55E+07 57.3 K-M 480V Motor Control Centers OC 1.00E+05 4.52E+04 54.9 Limitorque with DC Class H and RH Motors OC 1.00E+07 9.49E+06 5.1 Limitorque with AC Class H and B and DC OC 2.00E+07 6.07E+06 69.6 Class B Motors Local Control Station 1H22P295 OC 1.30E+06 6.15E+04 95.3 Namco EA180 Limit Switches OC 2.04E+08 6.42E+07 68.5 Namco EA740 Limit Switches OC 6.90E+07 6.60E+07 4.3 to GNRO-2011/ 00035 Page 6 of 18 Table 2-3 Equipment Affected By EPU Revised Radiation Total Integrated Doses Qualification EPU TID EPU TID %

Environmentally Qualified Equipment IC/OC* TID (rads) (rads) Margin**

Raymond Control System Damper Actuators OC 1.00E+07 7.38E+06 26.2 Reliance Fan Motors OC 2.00E+08 1.64E+07 91.8 RTE Delta 125 VDC Distribution Panels OC 3.05E+05 8.23E+04 73.0 Scotch Tape Splices OC 2.05E+07 1.88E+07*** 8.5***

Siemens MSIV LCS Blowers OC 4.60E+07 5.73E+06 87.5 Standby Gas Treatment System (SGTS) OC 1.13E+08 1.13E+08 0.0 Heaters and Controls Target Rock Solenoid Valves OC 1.00E+08 6.38E+07 36.2 Westinghouse Jockey Pump Motors OC 1.13E+08 4.75E+07 57.9 Westinghouse Electrical Penetrations OC 2.20E+08 4.99E+07 77.3 Westinghouse SGTS Exhaust Fan Motors OC 1.13E+08 1.13E+08 0.0

  • IC - Inside Containment, OC - Outside Containment
      • The EPU TID and EPU % Margin are for the components with the highest acceptable TID for the splices. This does not include those splices that are to be replaced.

Note 1: This cable is qualified using required insulation thickness for the TID it receives. The required insulation thickness is 19.19 mils; the cable has 21 mils of insulation which is a 20% margin in insulation thickness.

RAI # 3 In Section 2.3.2.1 of the LAR, the licensee stated that the grid stability analysis has determined that the power uprate will not adversely affect bulk power transmission system steady-state power flow (thermal ratings and voltage), stability, short circuit duty, or power transfer level.

Provide a detailed discussion on the effects of the power uprate on the degraded voltage setpoint and how the existing setpoint remains acceptable under EPU conditions.

Response

The grid stability analysis evaluated the impact of the EPU on the off-site power transmission system (i.e., the grid). The evaluation of the impact of EPU on the on-site power distribution system, including the degraded voltage protection system, was performed separately and is described below.

As described in UFSAR section 8.3.1.1.2.2, degraded voltage protection for safety related buses is provided by:

to GNRO-2011/ 00035 Page 7 of 18 three sets of bistable devices which monitor voltage at the ESF bus of its safety division.

Each set of bistables is arranged in a one-out-of-two twice logic. A measured nominal voltage of less than 70 percent for 0.5 second indicates unacceptable degradation (total loss) of the preferred source that is connected to the bus.

The second set is arranged to act upon observing a nominal bus voltage between 70 percent and 90 percent for 9 seconds when the bus is connected to an offsite (preferred) source.

Calculations were performed using Electrical Transient Analyzer Program (ETAP) version 7.0.0N (refer to RAI #7 for more details), to evaluate the performance of the GGNS auxiliary electric power distribution system under EPU conditions, with respect to satisfying the degraded grid voltage and voltage recovery set point requirements. More specifically, steady state load flow, static and dynamic motor start and short circuit calculations were performed to:

Determine and assess the acceptability of bus and equipment steady state voltages under maximum load and minimum source voltage and minimum load and maximum source voltage conditions.

Determine motor start voltage at the instant of motor start, using static motor start simulations, under maximum load and minimum source voltage condition and evaluate the acceptability of motor voltage with required acceptance criteria.

Determine motor and bus voltage and voltage recovery time, using dynamic motor start simulations, and evaluate the acceptability of results by comparing them with voltage and bus voltage recovery time acceptance criteria.

Determine maximum available short circuit current duties for the medium and low voltage buses.

The results of the calculations, relative to degraded voltage relays are summarized in Table 3-1:

Table 3-1 4160 V ESF Bus 15AA 16AB Drop Out Voltage (V) 3831.5 3831.5 Drop Out Voltage (% of rated) 92.1 92.1 Reset Voltage (V) 3859.1 3859.1 Reset Voltage (% of rated) 92.8 92.8 Minimum Allowable Time Delay to Reset (sec) 8.5 8.5 Maximum EPU Time to Reset (sec) 1.6 1.5 Maximum Voltage Drop Below DO Setting (V) 137.0 84.9 to GNRO-2011/ 00035 Page 8 of 18 These results indicate:

No change is required to the degraded voltage setpoints as a result of EPU.

Analysis of the results of the LOCA sequencing study shows that the undervoltage relay on each of the ESF buses is able to reset within the relay minimum time delay setting of 8.5 seconds following a dropout, with a maximum recovery time less than 1.7 seconds.

Reliable voltage above the undervoltage relay reset value is available at the 4160V safety-related ESF buses 15AA and 16AB since the voltage dips during motor start transients recover quickly relative to sequencing other loads onto the buses.

The lower 70% setpoint is not approached due to station load transients.

RAI # 4 In Section 2.3.2.2 of the LAR the licensee stated that the existing protective relay settings for the main generator will have to be recalculated due to the increased EPU power output.

Further, in Attachment 8 to the EPU, the licensee stated that changes to the protective relay setpoints for the main unit differential and main transformer differential relays are required due to EPU power output levels and the increased size of the main transformer. Provide further discussion in regards to calculations performed to demonstrate the adequacy of the new relay settings for the main generator and main transformers.

Response

The setpoints for the Main Generator and Main Transformer protection relays that were potentially affected due to the EPU power and current levels were examined. These were the Main Generator Differential, Negative Phase Sequence, Phase Distance, Power Directional, and Loss of Field, as well as the Main Transformer Differential and the Unit Differential. The inputs that changed by EPU were the Current Transformer (CT) ratios on the low voltage (22kV) side and the maximum generator current, calculated at 1600 MVA. The revised calculations demonstrate that the setpoints for these relays are adequate for EPU conditions and will not be changed.

Other protective relays associated with the Main Generator, namely Generator Undervoltage, Neutral Time Overcurrent, Volts/Hertz, Low Frequency Ground Fault, Under-frequency and Synch Check, were not affected by EPU.

Based on the further evaluation described above, it was concluded that no changes are required to the protective relay setpoints for the Main Unit Differential and Main Transformer Differential relays. Therefore, the changes reflected in EPU LAR Attachment 5, Section 2.3.2.2 and , List of Planned Modifications, are no longer needed.

to GNRO-2011/ 00035 Page 9 of 18 RAI # 5 In Section 2.3.3.2, the license stated that selective coordination is maintained between the pump motor breakers and the 34.5 kilovolt (kV), 6.9 kV, and 4.16 kV switchgear main feeder breakers. Explain what is intended by selective coordination.

Response

Use of the adjective selective in the subject sentence was extraneous in this case. The sentence should have read, Coordination is maintained between the pump motor breakers and the 34.5 kV, 6.9 kV, and 4.16 kV switchgear main feeder breakers. None of the EPU changes to AC On-Site Power (Normal Operation) will have an impact on the existing coordination of protective devices.

RAI # 6 In Section 2.3.3 of the LAR, the licensee stated that there are no changes to the emergency diesel generator loads or load sequencing for EPU. Describe the impact on the emergency diesel generators due to the extended loading time resulting from the EPU?

Response

There are no changes to the emergency diesel generator loads, load sequencing, or equipment loading times due to EPU. Therefore, the existing emergency diesel generator loads, load sequencing and equipment loading times remain bounding at EPU conditions.

RAI # 7 In Section 2.3.3 of the LAR, the licensee stated that the electrical analysis software Electrical Transient Analysis Program (ETAP) was utilized to compute load, voltage drop, and short circuit current values for the alternating current power components. Describe the pedigree of the ETAP software (i.e., is it a nuclear qualified version) used to perform these electrical analyses.

Provide a summary of the results obtained from ETAP that shows the changes in electrical load demand.

Response

The Load Flow, ANSI Short Circuit, and Motor Start analysis modules of the ETAP 7.0.0N (nuclear version) software were used for the EPU analysis. The ETAP software is licensed for use by Operation Technology, Inc. (OTI). The nuclear version of ETAP is verified and validated by OTI and is version controlled with each licensee; notifications are issued to each licensee when changes are available to correct or enhance certain features. Specific test problems are also provided to each licensee to allow benchmarking of each installation of the software to ensure correct and consistent results are calculated. The specific application of ETAP 7.0.0N used for this EPU evaluation was qualified for use in accordance with Shaws QA Program for to GNRO-2011/ 00035 Page 10 of 18 software usage, which complies with NQA-1 (Quality Assurance Requirements for Nuclear Facility Applications), Subpart 2.7, Editions 1994 through 2004.

To evaluate the impact on plant hardware, the CLTP ETAP plant model was modified to incorporate the plant electrical loading changes due to EPU; the changes in electrical loading are provided in the EPU LAR Attachment 5, Table 2.3-4.

Tables 7-1 and 7-2 provide a summary of the effect of these load changes on the plant electrical load demand. The comparisons shown in these tables demonstrate the adequacy of the electrical systems for the EPU changes.

Table 7-1 Transformer Loading Evaluation Maximum CLTP Maximum Load CLTP % EPU Load Increase EPU %

XFMR # Rating (MVA) Margin (MVA) (MVA) Margin Service XFMR #11 500/34.4kV, 40.54 54.96 42.639 2.099 52.62 90MVA Service XFMR #21 500/34.4kV, 43.537 51.63 44.141 0.604 50.95 90MVA BOP XFMR #14 34.4kV/13.8kV, 3.742 68.82 5.275 1.533 56.04 12MVA BOP XFMR #13 34.4kV/4160V, 2.336 68.85 2.881 0.545 61.59 7.5MVA BOP XFMR #23 34.4kV/4160V, 2.487 66.84 3.033 0.546 59.56 7.5MVA ACT XFMR #1X191 13.8kV/480V, 1.836 51.04 2.566 0.73 31.84 (1R20S910) 3.75MVA ACT XFMR #1X192 13.8kV/480V, 1.824 51.36 2.554 0.73 32.16 (1R20S920) 3.75MVA XFMRLC - 11BD2 6.9kV/480V, 0.7119 5.08 0.7179 0.006 4.28 0.75MVA XFMRLC - 12BE4 6.9kV/480V, 0.649 13.47 0.699 0.05 6.80 0.75MVA XFMRLC - 13BD1 4160V /480V, 0.696 7.20 0.721 0.025 3.87 0.75MVA XFMRLC - 13BD2 4160V/480V, 0.6507 13.24 0.7007 0.05 6.57 0.75MVA XFMRLC - 14BE1 4160V/480V, 0.735 2.00 0.742 0.007 1.07 0.75MVA to GNRO-2011/ 00035 Page 11 of 18 Table 7-2 Steady-State Continuous Current Designed Maximum Maximum Bus Rating CLTP Load EPU Load Increase Bus ID # (Amps) (Amps) (Amps) (Amps)  % Margin Comments 34.5kV Bus 11R 3000 692.8 730.7 37.90 63.47 Note 1 21R 3000 723.7 734.5 10.80 63.28 Note 1 12R 2000 624.3 652.5 28.20 67.38 13R 2000 528.5 529.8 1.30 73.51 13.8kV Switchgear Bus 19UD 1200 164.7 233.7 69.00 80.53 6.9kV Switchgear Bus 11HD 2000 1654.2 1656.2 2.0 17.19 12HE 2000 1641.7 1647.0 5.30 17.65 4160V Switchgear Bus 18AG 1200 334.5 415.1 80.60 65.41 28AG 1200 355.4 435.7 80.30 63.69 13AD 2000 1907.6 1913.7 6.10 4.32 14AE 2000 1663.2 1664.7 1.50 16.77 15AA 2000 239.2 239.1 -0.10 88.05 Note 2 16AB 2000 534.4 534.4 0.00 73.28 17AC 2000 40.1 40.1 0.00 97.99 480V Load Center Switchgear Bus 19BD1 5000 2375.6 3367.3 991.70 32.65 19BD2 5000 2360.4 3351.4 991.00 32.97 11BD2 1600 1379.0 1388.6 9.6 13.21 12BE4 1600 863.0 936.00 73.00 41.50 13BD1 1600 915.0 947.2 32.2 40.8 13BD2 1600 1422.5 1422.0 -0.5 11.13 14BE1 1600 898.5 907.3 8.8 43.29 480V MCC Switchgear Bus 19B13 2000 0 949.6 949.60 52.52 19B23 2000 0 949.3 949.30 52.54 11B21 600 452.4 462.5 10.1 22.92 13B11 600 213.8 250.1 36.30 58.32 14B12 600 326.0 336.2 10.20 43.97 Notes:

1 The 11R and 21R buses are rated for 3000 amps each; however, ETAP models and margins for 11R and 21R are based on the feeder breaker rating which is 2000 amps.

2 Apparent decrease in amps is due to rounding not an actual load decrease.

to GNRO-2011/ 00035 Page 12 of 18 RAI # 8 In Section 2.3.5 of the LAR, the licensee stated that evaluation of the Class 1E battery capacity has shown that there is enough battery capacity to support decay heat removal during SBO for the required coping duration. Provide detailed information that shows that the Class 1E battery capacity and Compressed Air Capacity remain bounding for Station Blackout under EPU conditions (i.e., provide the pre and post-EPU capacities and the design capacity of the Batteries and Compressed Air supply).

Response

Class 1E Battery Capacity The Division I & II, Class 1E batteries were designed, built, and rated to perform in accordance with recognized industry codes and standards. Each Class 1E battery is capable of supplying the required load cycle for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and to perform three complete cycles of intermittent loads of 1 minute duration, occurring at 0, 120 and 239 minutes, after the loss of AC power without the voltage at the battery terminal falling below 105 volts. The battery sizing also includes a minimum operating temperature correction factor and a 125 percent aging factor to permit operation of the battery down to 80 percent capacity. The battery sizing also considers that one cell is out for replacement or maintenance.

The Division I & II Class 1E battery parameters are as follows:

Type of battery Lead Calcium Number Cells 61 Capacity 2,320 Ampere-Hours at 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> rate Volts/Cell (minimum) 1.75 (at design discharge condition)

Volts/Cell (maximum) 2.295 (during equalizing charge)

DC System voltage range 105 to 140 volts Table 8-1 summarizes the calculated Class 1E battery size requirements and calculated CLTP and EPU loads. The calculations demonstrate that there is ample battery capacity in the Division I and II DC system for the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> SBO event. Since EPU does not add load to the Division I or II 125 VDC system, the Class 1E battery capacity remains bounding for Station Blackout under EPU conditions.

to GNRO-2011/ 00035 Page 13 of 18 Table 8-1 Required Capacity for Minimum Voltage Calculated Battery Division 4 Hour Discharge Maintained After Ampere-Hours After (Plates/Cell) 4 Hour Discharge (VDC) 4 Hour Discharge (A-H)

Required Provided CLTP EPU CLTP EPU I 21 33 >105 >105 706.68 706.68 II 19 33 >105 >105 677.0 677.0 Compressed Air Capacity An assessment for compressed air capacity is performed to ensure that air operated valves required for decay heat removal have sufficient reserve air or can be manually operated under station blackout conditions for the specified duration.

GGNS compressed air capacity meets the requirement to support the SBO response. GGNS air operated valves that are required for decay heat removal have sufficient compressed air for the required automatic and manual SRV operations during the SBO event for EPU conditions.

Furthermore, sufficient capacity remains to perform emergency RPV depressurization (Automatic Depressurization System initiation) in case it is required. The required SRV cycles (demand) for SBO at EPU conditions is obtained from the analysis. The comparison of demand for EPU relative to CLTP is summarized in Table 8-2.

Table 8-2 Design EPU -

CLTP EPU Limit /

Parameter Units CLTP Comment Value Value Acceptance Change Criteria The number of cycles for both cases is less than the compressed air capacity acceptance SRV Manual criteria (<200 cycles).

Pressure No. of 61 86 25 <200 Additional cycles were Reduction cycles experienced for the EPU Cycles case due to cooldown rate adjustment toward the end of the coping period.

to GNRO-2011/ 00035 Page 14 of 18 RAI # 9 In Section 2.3.5 of the LAR, the licensee stated that evaluation of areas with equipment necessary to cope with station blackout (SBO) has shown that equipment operability is maintained because the SBO environment is milder that the existing design and qualification bases. Provide the summary of this evaluation.

Response

The plant areas that house equipment required to function during a SBO event were conservatively evaluated to assess the area temperature increase during a SBO event. A summary of the evaluation performed for each area is provided below.

1. Control Room and Upper Cable Spreading Room A CLTP evaluation of the control room, including the control cabinet area above the control room, and upper cable spreading room heat load following a loss of ventilation demonstrated that the maximum air temperature would reach approximately 94°F. These rooms are classified as Condition 1 rooms in accordance with NUMARC 87-00, Guidelines and Technical Bases for NUMARC Initiatives Addressing Station Blackout at Light Water Reactors (Revision 1, August 1991). Condition 1 areas are those that do not exceed a maximum temperature of 120°F. NUMARC 87-00, Section 2.7.1, further states: By opening cabinet doors, adequate air mixing is achieved to maintain internal cabinet temperatures in equilibrium with the control room temperature. Therefore, cabinets containing instrumentation and controls required for achieving and maintaining safe shutdown in a station blackout are considered to be in Condition 1. As such, additional cooling may be provided in a station blackout by opening cabinet doors within 30 minutes of the events onset. GGNS station procedures provide administrative guidance requiring operators to take such precautionary actions for enhanced cooling of this equipment.

Equipment in the upper cable spreading room is not impacted by EPU. The maximum air temperature in that room due to the heat load following a loss of ventilation remains unchanged at EPU.

As a result of a modification being implemented at EPU, new Power Range Neutron Monitoring (PRNM) equipment is being added to both the control room and the control cabinet area above the control room. A conservative evaluation of the heat load in each of these areas following a loss of ventilation demonstrates that the maximum expected control room temperature would increase by less than 1°F and the maximum expected control cabinet area temperature would increase by less than 1.5°F. Thus, the maximum steady state air temperature in these areas remains significantly less than the NUMARC 87-00 recommended maximum of 120°F.

to GNRO-2011/ 00035 Page 15 of 18

2. Reactor Core Isolation Cooling (RCIC) Pump Room The current evaluation of the RCIC pump room following a loss of ventilation indicated that the maximum air temperature would reach 123°F at six hours. The suppression pool temperature will not impact the RCIC room since the main source of water supply during SBO is the Condensate Storage Tank. Since no changes were made to the RCIC pump room equipment due to EPU, there is no additional heat load generated. The room temperature remains unchanged at EPU conditions.
3. Steam Tunnel The main steam tunnel area outside containment had been eliminated as a dominant area of concern for the SBO event for the CLTP conditions. A station off-normal event procedure provides instructions for bypassing the RCIC steam tunnel high temperature trip feature to ensure RCIC availability during the SBO coping period. The effect of heat buildup due to RCIC steam line operation will not impact area equipment since no credit is taken for long term operation of other systems in this area (besides RCIC) during this period. Furthermore, EPU does not impact this area since the process parameters for RCIC operation remain unchanged at EPU conditions.
4. Switchgear Room / Inverter Room The heat loads used in the design basis evaluation of the switchgear/inverter rooms under SBO conditions remain unchanged at EPU conditions. Thus, EPU will have no adverse impact on the temperature of the switchgear/inverter rooms under SBO conditions.
5. Drywell The current design basis analyses of the drywell and suppression pool areas under SBO conditions indicate sufficient margin exists between peak temperatures and design temperatures for CLTP conditions. An evaluation of these areas under SBO conditions at EPU demonstrates that the peak temperature remains below the design temperature. Any increases in heat load from these areas to adjacent rooms evaluated under SBO conditions are limited and not significant during the four hour coping period. The effect of increased seal leakage from the recirculation pumps was evaluated for the drywell area and the evaluation demonstrated that the design temperature remains bounding during SBO.

Therefore, at EPU conditions the drywell and suppression pool area temperatures remain within the design temperature.

to GNRO-2011/ 00035 Page 16 of 18 RAI # 10 Appendix H of NUMARC 87-00 Rev. 1 lists the dominant areas of concern for the analysis of the effects of loss of ventilation under SBO conditions. For boiling water reactors, the dominant areas of concern are the high-pressure coolant injection (HPCI)/high-pressure core spray (HPCS) and reactor core isolation cooling (RCIC) pump rooms and the main steam tunnel. In Section 2.3.5 of the LAR, the licensee stated that the following areas were evaluated for the effect of loss of ventilation due to an SBO: drywell, steam tunnel, RCIC room, control room and upper cable spreading room and switchgear room/inverter room. Please confirm that the HPCI/HPCS pump rooms have been evaluated for the effect of loss of ventilation due to an SBO and provide a summary of the evaluation

Response

The HPCS pump room was not evaluated for the effect of a loss of ventilation due to EPU. The GGNS plant specific SBO evaluation does not credit HPCS as a coping system and HPCS was not used in the SBO analysis. Thus, the HPCS room is not a dominant area of concern for the SBO response analysis.

RAI # 11 In Attachment 8 to the LAR, the licensee stated that the increased isophase bus current due to EPU will result in exceeding the design limit for both the main bus and the self-cooled delta bus.

Further, the licensee proposes to replace the isophase bus duct cooler and fans to increase the heat removal capability of the bus duct cooling system for both buses. Provide further discussion in regards to calculations performed to demonstrate the adequacy of the new bus duct cooling system and how this system will be able to perform its function under EPU conditions.

Response

An evaluation of the existing isophase bus (IPB) duct was performed by an IPB duct manufacturer, which determined that the following modifications are required to operate the IPB at the EPU power level:

Upgrade the delta buses from self-cooled to forced-cooled.

Install a new IPB cooler with higher cooling capacity to remove the higher EPU heat loads.

Change the existing IPB cooling air flow path to provide sufficient cooling air flow to remove the higher EPU heat loads and prevent hot spots.

to GNRO-2011/ 00035 Page 17 of 18 Increase the cooling water flow to the IPB cooler to dissipate the additional heat rejected by the IPB main bus, plus the heat rejected from the delta bus converted to forced-cooling.

Increase cooling fan air flow and motor horsepower to provide sufficient cooling.

The IPB manufacturer modeled the IPB enclosure, bus conductors and IPB cooling system, and prepared performance calculations at CLTP and EPU full load IPB current. The calculations considered the temperature rise through the bus from increased current, along with material and environmental effects. The software model used for the EPU evaluation of the IPB was benchmarked against the existing IPB performance. A computational fluid dynamic analysis was performed to pinpoint potential hot spots in the IPB and optimize air flow at EPU conditions.

The IPB manufacturers evaluation demonstrates that the IPB will be able to perform its intended function at EPU conditions with either the three (3) single phase Main Transformers in operation, or with the spare Main Transformer operating in place of one of the three (3) single phase Main Transformers following implementation of the bulleted modifications listed above.

RAI # 12 In attachment 12 to the LAR, Grid Stability Evaluation, the gross generation at maximum power is stated to be 1503.5 Mega Watts electric (MWe), whereas Table 2.3-3 in Safety Analysis Report indicates the EPU duty as 1600 Mega Volt Amperes at 0.95 power factor which translates to 1520 MWe. Please explain the differences of these two values and provide the maximum output of the generator in MWe with power factor value on EPU duty.

Response

The value of 1503.5 MWe reported in Attachment 12 to the EPU LAR is based on a targeted 178 MWe EPU increase above the present nominal operating point. The value of 1600 MVA at 0.95 power factor (PF) represents an estimated duty for the generator based on the winter heat balance for the EPU configuration of 1523.5 MWe (1600 MVA at 0.952 PF). The maximum expected gross output is 1523.5 MWe at a PF of 0.952 under EPU conditions.

Note, Entergy has determined the statement in Attachment 12 about maximum gross generation

("To accommodate seasonal swings in MWe output, the grid stability analysis was evaluated assuming a maximum gross generation of 1503.5 MWe.") is incorrect. The grid stability analysis, performed for our Independent Coordinator of Transmission, conservatively considered a value of 1544 MWe.

to GNRO-2011/ 00035 Page 18 of 18 RAI # 13 In attachment 12 to the LAR, Grid Stability Evaluation, it is stated that approximately 216 Mega Volt Amperes Reactive of additional reactive power capability is required to meet the Interconnection Agreement. It is also stated that the capacitor banks will be installed throughout the system and will be controlled by operational procedure. Please confirm that these capacitors are scheduled to be installed and connected to the system prior to EPU operation.

Response

All scheduled capacitor banks are currently either in design or construction. There are no known constraints to the scheduled completion by 1/31/2011.