Letter Sequence Response to RAI |
|---|
TAC:ME4640, Steam Generator Tube Integrity (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples, L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems, L-11-334, Reply to Request Additional Information for the Review of the License Renewal Application Amendment No. 21, L-12-337, Review of the Safety Evaluation Report with Open Items Related to the License Renewal, L-12-341, Firstenergy Nuclear Operating Cos Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), L-12-444, Submittal of Contractor Equivalent Margins Assessments for Reactor Vessel Welds (Nonproprietary Versions), L-12-456, Notification of Closure of Commitments Related to the Review of the License Renewal Application, L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45), L-13-330, License Renewal Application Amendment No. 46 - Annual Update, L-13-341, Review of the Safety Evaluation Report Related to the License Renewal of Davis-Besse Nuclear Power Station, L-14-085, License Renewal Application (TAC No. ME4640) Amendment No. 48, L-14-206, License Renewal Application Amendment No. 50 - Annual Update, L-15-120, Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55, L-15-139, License Renewal Reactor Vessel Internals Inspection Plan, L-15-214, License Renewal Application Amendment No. 59 - Annual Update, L-15-309, License Renewal Application Amendment No. 60, L-15-310, C-CSS-099.20-069, Rev 0, Shield Building Laminar Cracking Limits, ML111050091, ML11110A089, ML11110A091, ML11110A092, ML11110A093, ML11110A094, ML11110A095, ML11110A105, ML11110A106, ML11110A107, ML11122A014, ML11126A017, ML11126A018, ML11126A019, ML11126A020, ML11126A021, ML11126A022, ML11126A023, ML11126A024, ML11126A025, ML11126A026, ML11126A032, ML11126A033, ML11126A034, ML11126A035, ML11126A036, ML11126A037, ML11126A038, ML11126A039, ML11126A040, ML11126A041, ML11126A042, ML11126A043... further results
|
MONTHYEARML11126A0842003-01-22022 January 2003 Drawing No. LR-M039A, Revision 3, Piping & Instrument Diagram Miscellaneous Liquid Radioactive Waste. Job Code 12501 Project stage: Other ML11126A0762003-01-22022 January 2003 Drawing No. LR-M047, Revision 1, Piping & Instrument Diagram Radwaste Drumming Station Project stage: Other ML11126A0552003-08-12012 August 2003 Drawing No. LR-M030B, Revision 1, Reactor Coolant System Instrumentation Project stage: Other ML11126A0862005-08-23023 August 2005 Drawing No. LR-M040D, Revision 2, Piping & Instrument Diagram Reactor Coolant Pump & Motor. Job Code 12501 Project stage: Other ML11126A0882008-01-12012 January 2008 Drawing No. LR-M041B, Revision 1, Piping & Instrument Diagram Primary Service Water System. Job Code 12501 Project stage: Other ML11126A0902008-01-15015 January 2008 Drawing No. LR-OS41A1, Revision 1, Operational Schematic Emergency Diesel Generator Systems Project stage: Other L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems2008-01-15015 January 2008 Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems Project stage: Other ML11126A0682008-05-0505 May 2008 Drawing No. LR-M-037E, Revision 28, Piping & Instrument Diagram Clean Liquid Radioactive Waste System Project stage: Other ML11126A0652008-08-0606 August 2008 Drawing No. LR-M036B, Revision 1, Piping & Instrument Diagram Component Cooling Water System Project stage: Other ML11126A0592008-10-0909 October 2008 Drawing No. LR-M033A, Revision 1, Piping & Instrument Diagram High Pressure Injection Project stage: Other ML11126A0632008-10-10010 October 2008 Drawing No. LR-M033B, Revision 1, Piping & Instrument Diagram Decay Heat Train 1 Project stage: Other ML11126A0702008-10-10010 October 2008 Drawing No. LR-M033C, Revision 1, Piping & Instrument Diagram Decay Heat Train 2 Project stage: Other ML11126A0742008-11-0606 November 2008 Drawing No. LR-M043, Revision 1, Piping & Instrument Diagram Auxiliary Building Chilled Water System Project stage: Other ML11126A0832008-12-18018 December 2008 Drawing No. LR-M038C, Revision 2, Piping & Instrument Diagram Gaseous Radioactive Waste System. Job Code 12501 Project stage: Other ML11126A0712009-04-0707 April 2009 Drawing No. LR-M034, Revision 1, Piping & Instrument Diagram Emerg. Core Cooling System Ctmt. Spray & Core Flooding Systems Project stage: Other ML11126A0892009-04-0707 April 2009 Drawing No. LR-OS002, Revision 1, Operational Schematic Makeup and Purification System Project stage: Other ML1104500462011-02-17017 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Fire Protection Project stage: RAI L-11-037, Independent Spent Fuel Storage Installation - Changes, Tests, and Experiments2011-02-17017 February 2011 Independent Spent Fuel Storage Installation - Changes, Tests, and Experiments Project stage: Request ML11126A0792011-02-25025 February 2011 Drawing No. LR-M900A, Revision 0, Instrument Air System Piping Schematic Project stage: Other ML1104205972011-02-28028 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 2.4 Project stage: RAI ML1106801722011-03-17017 March 2011 Request for Additional Information on the Reactor Vessel Surveillance Aging Management Program, Time-Limited Aging Analyses for Neutron Embrittlement of the Rv and Internals, and Other TLAAs for the Review of the Davis-Besse Nuclear Power s Project stage: RAI L-11-078, Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 12011-03-18018 March 2011 Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 1 Project stage: Response to RAI ML1107007322011-03-18018 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.2 & 2.3 Project stage: RAI ML11068A0002011-03-21021 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 4.7 (TAC Number ME4640) Project stage: RAI L-11-079, Reply to Request for Additional Information for the Review of the License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-11-089, Reply to Request for Additional Information for the Review License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review License Renewal Application Project stage: Response to RAI ML1108206242011-03-30030 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.1 (Tac No. ME4640) Project stage: RAI ML1109002952011-03-31031 March 2011 Safety Evaluation Report Related to the License Renewal of Salem Nuclear Generating Station Project stage: Approval ML1108204902011-04-0505 April 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 1 Project stage: RAI ML11110A0882011-04-15015 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application, Sections 2.2 & 2.3, License Renewal Application Amendment No. 3, and Revised License Renewal Project stage: Response to RAI L-11-107, Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application.2011-04-15015 April 2011 Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application. Project stage: Response to RAI L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples2011-04-15015 April 2011 Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples Project stage: Other ML11110A0892011-04-15015 April 2011 Drawing No. M-0060, Rev. 52, Auxiliary Feedwater System Project stage: Other ML11110A0912011-04-15015 April 2011 Drawing No. M-011, Rev. 61, Domestic Water System Project stage: Other ML11110A0922011-04-15015 April 2011 Drawing No. M-037C, Rev. 30, Clean Liquid Radioactive Waste System Project stage: Other ML11110A0932011-04-15015 April 2011 Drawing No. M-037D, Rev. 21, Clean Liquid Radioactive Waste System Project stage: Other ML11110A0942011-04-15015 April 2011 Drawing No. M-039A, Rev. 33, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A0952011-04-15015 April 2011 Drawing No. M-039B, Rev. 18, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A1052011-04-15015 April 2011 Drawing No. M-040A, Rev. 76, Reactor Coolant System Details Project stage: Other ML11110A1062011-04-15015 April 2011 Drawing No. M-042C, Rev. 33, Sampling System Sh. 3 Project stage: Other ML11110A1072011-04-15015 April 2011 Drawing No. M-045, Rev. 56, Chemical Addition Systems Project stage: Other ML1110500912011-04-19019 April 2011 Scoping and Screening Audit Report Regarding the Davis-Besse Nuclear Power Station License Renewal Application Project stage: Other ML1109807182011-04-20020 April 2011 Request for Additional Information for the Review of the Davis-Bessie Nuclear Power Station - Batch 2 Project stage: RAI L-11-115, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 42011-04-20020 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 4 Project stage: Response to RAI ML11126A0342011-04-29029 April 2011 Drawing No. LR-M017B, Revision 1, Piping & Instrument Diagram, Diesel Generators Air Start Project stage: Other ML11126A0172011-04-29029 April 2011 Drawing No. LR-M006E, Revision 1, Piping & Instrument Diagram Condensate System Project stage: Other ML11126A0182011-04-29029 April 2011 Drawing No. LR-M007A, Revision 1, Piping & Instrument Diagram Steam Generator Secondary System Project stage: Other ML11126A0192011-04-29029 April 2011 Drawing No. LR-M003A, Revision 1, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 1 Project stage: Other ML11126A0202011-04-29029 April 2011 Drawing No. LR-M003B, Revision 1, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 2 Project stage: Other ML11126A0212011-04-29029 April 2011 Drawing No. LR-M003C, Revision 2, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 3 Project stage: Other 2011-02-17
[Table View] |
Text
-FENOC F""%
5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Barny S. Allen 419-321-7676 Vice President - Nuclear Fax: 419-321-7582 November 9, 2011 L-1 1-343 10 CFR 54 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License Number NPF-3 Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640)
By letter dated August 27, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102450565), FirstEnergy Nuclear Operating Company (FENOC) submitted an application pursuant to Title 10 of the Code of Federal Regulations, Part 54 for renewal of Operating License NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS). During a telephone conference call with the Nuclear Regulatory Commission (NRC) held October 26, 2011, regarding the FENOC supplemental response to NRC request for additional information (RAI) 4.6-1 related to containment fatigue analyses provided by FENOC letter dated October 7, 2011 (ML1I1285A064), the NRC requested additional information.
The Attachment provides the FENOC reply to the NRC request for additional information. The NRC request is shown in bold text followed by the FENOC response.
By letter dated October 11,2011 (ADAMS Accession No. ML11271A147), the NRC requested additional information to complete its review of the License Renewal Application (LRA). By letter dated October 31, 2011, FENOC responded to three of the four NRC RAI questions, however, the response to the fourth question requires further analysis. The submittal date for the response to the RAI was discussed with Mr. Samuel Cuadrado de Jesus, NRC Project Manager, on November 8, 2011, and it was mutually agreed to defer the response to a later date.
1:4iLV
Davis-Besse Nuclear Power Station, Unit No. 1 L-1 1-343 Page 2 There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.
I declare under penalty of perjury that the foregoing is true and correct. Executed on November
, 2011.
Sincerely, Barry S.
lien
Attachment:
Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS), License Renewal Application, Section 4.6 cc:
NRC DLR Project Manager NRC Region III Administrator cc:
w/o Attachment or Enclosure NRC DLR Director NRR DORL Project Manager NRC Resident Inspector Utility Radiological Safety Board
Attachment L-1 1-343 Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS), License Renewal Application, Section 4.6 Page 1 of 2 Section 4.6 Supplemental Question RAI 4.6-1 The NRC initiated a telephone conference call with FENOC on October 26, 2011, to discuss the FENOC supplemental response to RAI 4.6-1 submitted under FENOC letter dated October 7, 2011 (ML11285A064). The NRC staff requested that the applicant provide the basis for the original analysis of fatigue cycles of the containment vessel. Specifically, the staff requested the basis for the pressure range (-25 to 20 psi) used in the fatigue waiver for the original fatigue cycles analysis.
FENOC agreed to provide a supplemental response to address the review of the current licensing basis (i.e., containment vessel stress report, the containment vessel construction specification and the USAR) relative to the containment vessel pressure range. FENOC also agreed to address the re-performed fatigue waiver.
SUPPLEMENTAL RESPONSE RAI 4.6-1 The original fatigue waiver calculation for the containment vessel was performed in accordance with N-415.1 of the ASME Code 1968 Edition, Section II1. This calculation verified the requirements of N-415.1 against 400 pressure cycles (from -25 psi to 20 psi) and 400 temperature cycles (from 30°F to 120 0F). Based on a review of the containment vessel stress report, the containment vessel construction specification and the Updated Safety Analysis Report (USAR), the basis for the pressure range of
-25 psi to 20 psi could not be determined. Therefore, the fatigue waiver was re-performed using the maximum possible full range pressure fluctuation. This approach is conservative since the maximum possible full range pressure fluctuation bounds the pressure fluctuation during normal operation.
The review of the containment vessel stress report, the containment vessel construction specification and the USAR determined that the maximum possible full range pressure fluctuation is from -0.67 psig to 45 psig based on the containment vessel design allowable negative pressure of 0.67 psig and the containment vessel pneumatic test pressure of 45 psig (design pressure of 36 psig times 1.25). As provided in the containment vessel fatigue waiver calculation, the specified full range of pressure fluctuations during normal operations may not exceed the quantity of 80 psi. The maximum possible full range pressure fluctuation of 45.67 psi (-0.67 psig to 45 psig) is
Attachment L-1 1-343 Page 2 of 2 less than the quantity of 80 psi, and therefore the pressure fluctuation condition in the fatigue waiver is met.