October 15, 2010 David A. Repka, Esq. Diane Curran, Esq.
Tyson Smith, Esq. Harmon, Curran, Spielberg, and Eisenberg Carlos Sisco 1726 M Street NW Winston & Strawn LLP Washington, DC 20036 101 California Street Suite 600 San Francisco, CA 94111-5802 E-mail: dcurran@harmoncurran.com E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.
San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2)
Docket Nos.52-275 and 52-323
Dear Parties:
Pursuant to the Licensing Board's Memorandum and Order dated September 15, 2010, the Staff is providing the parties an index identifying the hearing file and mandatory disclosures in accordance with 10 C.F.R. §§ 2.1203 and 2.336. As discussed over the phone, this index contains almost all of the documents those regulations require the NRC Staff to include in the hearing file. Due to technical difficulties, the NRC Staff was unable to include some documents that those regulations require to be in the hearing file by October 15, 2010 deadline. The NRC intends to add those omitted documents to the hearing file next week and will send the parties an index identifying those documents at that time. The NRC Staff apologizes for any inconvenience or confusion that may result from the delay these technical difficulties caused.
For purposes of producing the mandatory disclosures and hearing file, and considering any document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff. The index contains the ADAMS accession number, date, and title of each item so as to make the item readily retrievable from the agencys website, www.nrc.gov, using the ADAMS Find function in accordance with 10 C.F.R. § 2.1203. Additionally, within a few days of this notification, the Staff will have created a separate folder in the agencys Electronic Hearing Docket (EHD)
associated with this proceeding, entitled Diablo Canyon Hearing File. Also attached is the Affidavit of Andrew L. Stuyvenberg, as required by 10 C.F.R. § 2.336(c).
Respectfully submitted,
/signed (electronically) by/
Lloyd B. Subin Counsel for the NRC Staff
Enclosures:
Attachment 1: Hearing File Index Attachment 2: Affidavit of Andrew L Stuyvenberg Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 01-0001 ML102850574 1/5/2010 2010/01/05 Diablo Canyon LR - RE: Area Information for DCPP Scouting Trip 01-0002 ML102850575 1/5/2010 2010/01/05 Diablo Canyon LR - RE: Area Information for DCPP Scouting Trip 2010/01/08 Diablo Canyon LR - RE: Additional Information for DCPP Scouting 01-0003 ML102850576 1/8/2010 Meeting 01-0004 ML102731020 1/19/2010 2010/01/19 Diablo Canyon LR - Acceptance Letter and Schedule 01-0005 ML102731019 1/27/2010 2010/01/27 Diablo Canyon LR - FW: Public Meetings on February 10 and 11, 2010 01-0006 ML102731022 1/27/2010 2010/01/27 Diablo Canyon LR - Rescheduled Date for Public Meeting 01-0007 ML102731018 1/28/2010 2010/01/28 Diablo Canyon LR - FRN for Intent to Prepare an EIS 01-0008 ML102850577 2/19/2010 2010/02/19 Diablo Canyon LR - Upcoming Audit on March 15th 01-0009 ML102731057 2/26/2010 2010/02/26 Diablo Canyon LR - PG&E Reply to ANR Letter to Chairman Jaczko 01-0010 ML102731058 3/1/2010 2010/03/01 Diablo Canyon LR - California President Peevey Letter to PG&E 01-0011 ML102731017 3/1/2010 2010/03/01 Diablo Canyon LR - Call on Monday 01-0012 ML102731056 3/1/2010 2010/03/01 Diablo Canyon LR - PG&E Response to Peevey Letter 01-0013 ML102731063 3/1/2010 2010/03/01 Diablo Canyon LR - Scoping and Screening Methodology Audit 01-0014 ML102310383 3/4/2010 2010/03/04 Diablo Canyon LR - RE: Scoping and Screening Methodology Audit 01-0015 ML102731051 3/11/2010 2010/03/11 Diablo Canyon LR - FW: Scoping and Screening Methodology Audit 01-0016 ML102731060 3/12/2010 2010/03/12 Diablo Canyon LR - Random Sample Exercise for Upcoming Audit 01-0017 ML102460776 3/26/2010 2010/03/26 Diablo Canyon LR - RE: Draft Site Audit Needs 01-0018 ML102730988 3/26/2010 2010/03/26 Diablo Canyon LR - Upcoming AMP Audit 01-0019 ML102530223 4/1/2010 2010/04/01 Diablo Canyon LR - RE: Upcoming AMP Audit 01-0020 ML102530408 4/2/2010 2010/04/02 Diablo Canyon LR - RE: Personal Information for upcoming Audit 01-0021 ML102530376 4/2/2010 2010/04/02 Diablo Canyon LR - RE: Upcoming AMP Audit Page 1 of 14
Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 01-0022 ML102730964 4/4/2010 2010/04/04 Diablo Canyon LR - RE: Upcoming AMP Audit 01-0023 ML102731036 4/5/2010 2010/04/05 Diablo Canyon LR - FW: Personal Information for upcoming Audit 01-0024 ML102460645 4/5/2010 2010/04/05 Diablo Canyon LR - Proposed Site Audit Schedule Changes 01-0025 ML102460294 4/5/2010 2010/04/05 Diablo Canyon LR - RE: DCPP Site Access Information 01-0026 ML102460660 4/5/2010 2010/04/05 Diablo Canyon LR - Site audit - Phone call today?
01-0027 ML102530372 4/6/2010 2010/04/06 Diablo Canyon LR - DC AMP Audit Schedule 01-0028 ML102730946 4/6/2010 2010/04/06 Diablo Canyon LR - FW: Access for Reviewers for Upcoming Audit 01-0029 ML102731034 4/7/2010 2010/04/07 Diablo Canyon LR - Duc Nguyen 2010/04/07 Diablo Canyon LR - RE: NRC site audit of Diable Canyon Nuclear Power 01-0030 ML102460646 4/7/2010 Plant 2010/04/07 Diablo Canyon LR - RE: Site audit - Interest from National Marine 01-0031 ML102460778 4/7/2010 Fisheries Service 2010/04/07 Diablo Canyon LR - RE: Site audit - Interest from National Marine 01-0032 ML102460779 4/7/2010 Fisheries Service 2010/04/07 Diablo Canyon LR - Site audit - Interest from National Marine Fisheries 01-0033 ML102460661 4/7/2010 Service 01-0034 ML102530214 4/8/2010 2010/04/08 Diablo Canyon LR - DCPP AMP Audit Schedule_Master File 01-0035 ML102530218 4/8/2010 2010/04/08 Diablo Canyon LR - DCPP AMP Audit Schedule_Master File 01-0036 ML102730940 4/8/2010 2010/04/08 Diablo Canyon LR - RE: DCPP AMP Audit Schedule_Master File 01-0037 ML102730934 4/8/2010 2010/04/08 Diablo Canyon LR - RE: Who's Coming Next Week?
01-0038 ML102730937 4/8/2010 2010/04/08 Diablo Canyon LR - Who's Coming Next Week?
01-0039 ML102460780 4/9/2010 2010/04/09 Diablo Canyon LR - DCPP Environmental Audit Schedule 01-0040 ML102460649 4/9/2010 2010/04/09 Diablo Canyon LR - RE: NRC Public Meeting 01-0041 ML102730933 4/9/2010 2010/04/09 Diablo Canyon LR - Yet another change to the list of reviewers 01-0042 ML102730931 4/11/2010 2010/04/11 Diablo Canyon LR - Teleconference calls 01-0043 ML102460303 4/12/2010 2010/04/12 Diablo Canyon LR - RE: Diablo Canyon Comments 2010/04/13 Diablo Canyon LR - RE: Follow up NRC Diablo License Renewal Process 01-0044 ML102460304 4/13/2010 meeting Feb 9th and FINANCE QUESTIONS Page 2 of 14
Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 01-0045 ML102460662 4/14/2010 2010/04/14 Diablo Canyon LR - National Marine Fisheries Service Staff 2010/04/14 Diablo Canyon LR - RE: NRC site audit of Diablo Canyon Nuclear Power 01-0046 ML102460305 4/14/2010 Plant 2010/04/14 Diablo Canyon LR - Section 106 Consultation for License Renewal for 01-0047 ML102440195 4/14/2010 Diablo Canyon - NRC090303A 01-0048 ML102460313 4/16/2010 2010/04/16 Diablo Canyon LR - Follow-up to revised site audit schedule 2010/04/19 Diablo Canyon LR - FW: Section 106 Consultation for License Renewal 01-0049 ML102440183 4/19/2010 for Diablo Canyon - NRC090303A 2010/04/19 Diablo Canyon LR - RE: Section 106 Consultation for License Renewal for 01-0050 ML102440190 4/19/2010 Diablo Canyon - NRC090303A 01-0051 ML102730881 4/21/2010 2010/04/21 Diablo Canyon LR - Breakout sessions 01-0052 ML102731050 4/21/2010 2010/04/21 Diablo Canyon LR - DCPP AMP Audit Schedule 01-0053 ML102530209 4/21/2010 2010/04/21 Diablo Canyon LR - FW: Draft RAI response to XI.S1-1 IWE 01-0054 ML102731047 4/21/2010 2010/04/21 Diablo Canyon LR - RE: Breakout sessions 01-0055 ML102731048 4/21/2010 2010/04/21 Diablo Canyon LR - RE: DCPP AMP Audit Schedule 01-0056 ML102730872 4/21/2010 2010/04/21 Diablo Canyon LR - Update to list of attendees for week of April 26 01-0057 ML102730874 4/21/2010 2010/04/21 Diablo Canyon LR - Walkdowns 2010/04/22 Diablo Canyon LR - Pre-Hearing Conference Date for Diablo Canyon 01-0058 ML102460447 4/22/2010 License Renewal Review 01-0059 ML102730868 4/22/2010 2010/04/22 Diablo Canyon LR - RE: DCPP AMP Audit Schedule 2010/04/22 Diablo Canyon LR - RE: Section 106 Consultation for License Renewal for 01-0060 ML102440175 4/22/2010 Diablo Canyon - NRC090303A 2010/04/22 Diablo Canyon LR - RE: Section 106 Consultation for License Renewal for 01-0061 ML102440176 4/22/2010 Diablo Canyon - NRC090303A 01-0062 ML102420788 4/26/2010 2010/04/26 Diablo Canyon LR - Draft RAI Set 1 01-0063 ML102530206 4/27/2010 2010/04/27 Diablo Canyon LR - RE: DCPP Site Access and Info 2010/04/27 Diablo Canyon LR - RE: Section 106 Consultation for License Renewal for 01-0064 ML102460449 4/27/2010 Diablo Canyon - NRC090303A Page 3 of 14
Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 2010/04/28 Diablo Canyon LR - Diablo Canyon Reading Room (Portal) 01-0065 ML102530334 4/28/2010 troubleshooting tip 01-0066 ML102460671 4/29/2010 2010/04/29 Diablo Canyon LR - Re: Diablo Canyon 01-0067 ML102530202 5/5/2010 2010/05/05 Diablo Canyon LR - DCPP Notification Posted on Portal 01-0068 ML102850673 5/6/2010 2010/05/06 Diablo Canyon LR - Teleconference Call 01-0069 ML102730841 5/6/2010 2010/05/06 Diablo Canyon LR - Teleconference Call 2010/05/07 Diablo Canyon LR - Draft RAI Set 2 - Scoping and Screening 01-0070 ML102850669 5/7/2010 Methodology 01-0071 ML102460651 5/7/2010 2010/05/07 Diablo Canyon LR - RE: DCPP ER Audit Q&A Spreadsheet 01-0072 ML102850668 5/7/2010 2010/05/07 Diablo Canyon LR - Teleconference Call on 5/18 01-0073 ML102170432 5/7/2010 2010/05/07 Diablo Canyon LR - Teleconference Call on 5/18 01-0074 ML102730823 5/7/2010 2010/05/07 Diablo Canyon LR - Teleconference Call on 5/18 2010/05/07 Diablo Canyon LR - Teleconference Call on Fire Protection and Fire 01-0075 ML102730845 5/7/2010 Water System AMPs 2010/05/07 Diablo Canyon LR - Teleconference Call on Fire Protection and Fire 01-0076 ML102850671 5/7/2010 Water System AMPs 01-0077 ML102460464 5/12/2010 2010/05/12 Diablo Canyon LR - RE: response to request for ESA species list 01-0078 ML102850666 5/17/2010 2010/05/17 Diablo Canyon LR - Draft RAI Set 3 - AMP Audit RAIs Part 1 01-0079 ML102730754 5/17/2010 2010/05/17 Diablo Canyon LR - Draft RAI Set 3 - AMP Audit RAIs Part 1 01-0080 ML102850457 5/19/2010 2010/05/19 Diablo Canyon LR - Issuance of RAI 01-0081 ML102850661 5/20/2010 2010/05/20 Diablo Canyon LR -
01-0082 ML102730737 5/20/2010 2010/05/20 Diablo Canyon LR -
01-0083 ML102730740 5/20/2010 2010/05/20 Diablo Canyon LR - Draft RAI Set 4 (Correction Email) 01-0084 ML102850660 5/20/2010 2010/05/20 Diablo Canyon LR - Draft RAI Set 4 (Correction Email) 01-0085 ML102730587 5/20/2010 2010/05/20 Diablo Canyon LR - Draft RAI Set 4--IGNORE 01-0086 ML102460656 5/20/2010 2010/05/20 Diablo Canyon LR - RE: DCPP Environmental Phone call this morning 01-0087 ML102870327 5/24/2010 2010/05/24 Diablo Canyon LR - Diablo Canyon License Renewal Costs to Date Page 4 of 14
Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 01-0088 ML102460654 5/24/2010 2010/05/24 Diablo Canyon LR - RE: DCPP Environmental Phone call this morning 01-0089 ML102850659 5/25/2010 2010/05/25 Diablo Canyon LR - Copy of Request for Additional Information 01-0090 ML102530543 5/25/2010 2010/05/25 Diablo Canyon LR - Copy of Request for Additional Information 01-0091 ML102530542 6/7/2010 2010/06/07 Diablo Canyon LR - Draft RAI Set 5 - Structures AMPs 01-0092 ML102850657 6/7/2010 2010/06/07 Diablo Canyon LR - Draft RAI Set 5 - Structures AMPs 01-0093 ML102850655 6/7/2010 2010/06/07 Diablo Canyon LR - Draft RAI Set 6 AMP Audit RAIs 01-0094 ML102530539 6/7/2010 2010/06/07 Diablo Canyon LR - Draft RAI Set 6 AMP Audit RAIs 01-0095 ML102530201 6/7/2010 2010/06/07 Diablo Canyon LR - PG&E responses to RAI Set #1 - DCL-10-057 2010/06/08 Diablo Canyon LR - Draft RAI Set 7 Scoping and Screening - Fire 01-0096 ML102850654 6/8/2010 Protection 2010/06/08 Diablo Canyon LR - Draft RAI Set 7 Scoping and Screening - Fire 01-0097 ML102530535 6/8/2010 Protection 01-0098 ML102530534 6/8/2010 2010/06/08 Diablo Canyon LR - Draft RAI Set 8 AMP Audit RAIs 01-0099 ML102850653 6/8/2010 2010/06/08 Diablo Canyon LR - Draft RAI Set 8 AMP Audit RAIs 01-0100 ML102850652 6/11/2010 2010/06/11 Diablo Canyon LR - Draft RAI Sets 9 and 10 01-0101 ML102530532 6/11/2010 2010/06/11 Diablo Canyon LR - Draft RAI Sets 9 and 10 01-0102 ML102530529 6/14/2010 2010/06/14 Diablo Canyon LR -
01-0103 ML102850648 6/14/2010 2010/06/14 Diablo Canyon LR -
01-0104 ML102850646 6/15/2010 2010/06/15 Diablo Canyon LR -
01-0105 ML102530528 6/15/2010 2010/06/15 Diablo Canyon LR -
01-0106 ML102530200 6/15/2010 2010/06/15 Diablo Canyon LR - RE:
01-0107 ML102850644 6/17/2010 2010/06/17 Diablo Canyon LR - Draft RAI Set 11 - Reactor Vessel 01-0108 ML102530525 6/17/2010 2010/06/17 Diablo Canyon LR - Draft RAI Set 11 - Reactor Vessel 01-0109 ML102530524 6/18/2010 2010/06/18 Diablo Canyon LR - Draft RAI Set 12 - AMR and AMP RAIs 01-0110 ML102850642 6/18/2010 2010/06/18 Diablo Canyon LR - Draft RAI Set 12 - AMR and AMP RAIs 01-0111 ML102530199 6/21/2010 2010/06/21 Diablo Canyon LR - DCL-10-067 - DCPP response to RAI Set 2 01-0112 ML102850638 6/21/2010 2010/06/21 Diablo Canyon LR - Draft RAI Set 13 - Scoping and Screening RAIs Page 5 of 14
Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 01-0113 ML102530523 6/21/2010 2010/06/21 Diablo Canyon LR - Draft RAI Set 13 - Scoping and Screening RAIs 01-0114 ML102530522 6/22/2010 2010/06/22 Diablo Canyon LR - RAI Letter dated, June 21, 2010 01-0115 ML102850633 6/22/2010 2010/06/22 Diablo Canyon LR - RAI Letter dated, June 21, 2010 2010/06/25 Diablo Canyon LR - Draft Telecon Summary 06-24-10 Fire Protection 01-0116 ML102850629 6/25/2010 and AMPS 2010/06/25 Diablo Canyon LR - Draft Telecon Summary 06-24-10 Fire Protection 01-0117 ML102530518 6/25/2010 and AMPS 01-0118 ML102460664 6/25/2010 2010/06/25 Diablo Canyon LR - RE: RAI Teleconference follow-up 01-0119 ML102850625 6/29/2010 2010/06/29 Diablo Canyon LR - RAI Set 6 - AMPs 01-0120 ML102730578 6/29/2010 2010/06/29 Diablo Canyon LR - RAI Set 6 - AMPs 2010/06/29 Diablo Canyon LR - RE: Draft Telecon Summary 06-24-10 Fire Protection 01-0121 ML102530198 6/29/2010 and AMPS 01-0122 ML102850624 7/1/2010 2010/07/01 Diablo Canyon LR - Draft RAI Set 14 - AMR and TLAA 01-0123 ML102530517 7/1/2010 2010/07/01 Diablo Canyon LR - Draft RAI Set 14 - AMR and TLAA 01-0124 ML102530515 7/6/2010 2010/07/06 Diablo Canyon LR - Draft RAI Set 15 - AMR and AMP RAIs 01-0125 ML102850623 7/6/2010 2010/07/06 Diablo Canyon LR - Draft RAI Set 15 - AMR and AMP RAIs 01-0126 ML102460603 7/6/2010 2010/07/06 Diablo Canyon LR - RAI Issuance 01-0127 ML102850622 7/7/2010 2010/07/07 Diablo Canyon LR - RAI Letter dated, July 6, 2010 01-0128 ML102530514 7/7/2010 2010/07/07 Diablo Canyon LR - RAI Letter dated, July 6, 2010 01-0129 ML102730482 7/7/2010 2010/07/07 Diablo Canyon LR - Request for addition to the portal 01-0130 ML102730475 7/8/2010 2010/07/08 Diablo Canyon LR - RE: Request for addition to the portal 01-0131 ML102731042 7/8/2010 2010/07/08 Diablo Canyon LR - RE: Request for addition to the portal 01-0132 ML102731043 7/8/2010 2010/07/08 Diablo Canyon LR - RE: Request for addition to the portal 01-0133 ML102530642 7/8/2010 2010/07/08 Diablo Canyon LR - RE: Thursday NRC Clarification Meeting Sets 11-13 01-0134 ML102710744 7/13/2010 2010/07/13 Diablo Canyon LR - Diablo Canyon LR Procedures (1 of 2) 01-0135 ML102710743 7/13/2010 2010/07/13 Diablo Canyon LR - Diablo Canyon LR Procedures (2 of 2) 01-0136 ML102710742 7/14/2010 2010/07/14 Diablo Canyon LR - Diablo Canyon Pull box Page 6 of 14
Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 01-0137 ML102530512 7/15/2010 2010/07/15 Diablo Canyon LR - Draft Telecon Summaries for 7/1/10 and 7/8/10 01-0138 ML102850617 7/15/2010 2010/07/15 Diablo Canyon LR - Draft Telecon Summaries for 7/1/10 and 7/8/10 01-0139 ML102850611 7/16/2010 2010/07/16 Diablo Canyon LR - Draft RAI Set 16 - AMR and AMP RAIs 01-0140 ML102530510 7/16/2010 2010/07/16 Diablo Canyon LR - Draft RAI Set 16 - AMR and AMP RAIs 01-0141 ML102730322 7/16/2010 2010/07/16 Diablo Canyon LR - Letter from NRC 01-0142 ML102530509 7/16/2010 2010/07/16 Diablo Canyon LR - RAI Letter dated, July 15, 2010 01-0143 ML102850610 7/16/2010 2010/07/16 Diablo Canyon LR - RAI Letter dated, July 15, 2010 01-0144 ML102460665 7/16/2010 2010/07/16 Diablo Canyon LR - RAIs - SAMA and Environmental 2010/07/19 Diablo Canyon LR - Copy of Scoping and Screening Methodology Audit 01-0145 ML102850606 7/19/2010 Report 2010/07/19 Diablo Canyon LR - Copy of Scoping and Screening Methodology Audit 01-0146 ML102530506 7/19/2010 Report 01-0147 ML102530504 7/19/2010 2010/07/19 Diablo Canyon LR - Draft RAI Set 17 - TLAA and AMP RAIs 01-0148 ML102850605 7/19/2010 2010/07/19 Diablo Canyon LR - Draft RAI Set 17 - TLAA and AMP RAIs 01-0149 ML102850609 7/19/2010 2010/07/19 Diablo Canyon LR - RAI Letter dated, July 14, 2010 01-0150 ML102530508 7/19/2010 2010/07/19 Diablo Canyon LR - RAI Letter dated, July 14, 2010 01-0151 ML102530195 7/20/2010 2010/07/20 Diablo Canyon LR - DCL-10-077 - Response to DCPP RAI Set 5 01-0152 ML102850604 7/20/2010 2010/07/20 Diablo Canyon LR - RAI Letter dated, July 19, 2010 01-0153 ML102530502 7/20/2010 2010/07/20 Diablo Canyon LR - RAI Letter dated, July 19, 2010 01-0154 ML102530499 7/21/2010 2010/07/21 Diablo Canyon LR - RAI Letters dated July 20, 2010 01-0155 ML102850602 7/21/2010 2010/07/21 Diablo Canyon LR - RAI Letters dated July 20, 2010 01-0156 ML102850600 7/22/2010 2010/07/22 Diablo Canyon LR - Additional RAI letter dated July 20, 2010 01-0157 ML102530497 7/22/2010 2010/07/22 Diablo Canyon LR - Additional RAI letter dated July 20, 2010 2010/07/22 Diablo Canyon LR - Draft RAI Set 18 - Scoping and Screening and AMR 01-0158 ML102530494 7/22/2010 RAIs 2010/07/22 Diablo Canyon LR - Draft RAI Set 18 - Scoping and Screening and AMR 01-0159 ML102850596 7/22/2010 RAIs 01-0160 ML102850594 7/23/2010 2010/07/23 Diablo Canyon LR - RAI Letters dated July 22, 2010 Page 7 of 14
Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 01-0161 ML102530493 7/23/2010 2010/07/23 Diablo Canyon LR - RAI Letters dated July 22, 2010 01-0162 ML102710741 7/29/2010 2010/07/29 Diablo Canyon LR - FW: Diablo Canyon Pull box 01-0163 ML102710740 8/2/2010 2010/08/02 Diablo Canyon LR - Information Request 01-0164 ML102710738 8/2/2010 2010/08/02 Diablo Canyon LR - RE: Information Request 01-0165 ML102710739 8/2/2010 2010/08/02 Diablo Canyon LR - RE: Information Request 01-0166 ML102710737 8/3/2010 2010/08/03 Diablo Canyon LR - Open Cycle Cooling Water Program 01-0167 ML102710733 8/4/2010 2010/08/04 Diablo Canyon LR - DCPP drawings for the Diesel Fuel Oil Storage Tanks 01-0168 ML102530491 8/4/2010 2010/08/04 Diablo Canyon LR - Draft RAI Set 19 - Metal Fatigue 01-0169 ML102850593 8/4/2010 2010/08/04 Diablo Canyon LR - Draft RAI Set 19 - Metal Fatigue 01-0170 ML102850592 8/4/2010 2010/08/04 Diablo Canyon LR - FW: Draft RAI Set 19 - Metal Fatigue 01-0171 ML102530374 8/4/2010 2010/08/04 Diablo Canyon LR - FW: Draft RAI Set 19 - Metal Fatigue 01-0172 ML102710736 8/4/2010 2010/08/04 Diablo Canyon LR - Information for unescorted access for DCPP 01-0173 ML102710734 8/4/2010 2010/08/04 Diablo Canyon LR - RE: Information for unescorted access for DCPP 01-0174 ML102710735 8/4/2010 2010/08/04 Diablo Canyon LR - RE: Information for unescorted access for DCPP 01-0175 ML102710731 8/5/2010 2010/08/05 Diablo Canyon LR - Buried Piping Questions 01-0176 ML102530490 8/5/2010 2010/08/05 Diablo Canyon LR - RAI Letter dated August 3, 2010 01-0177 ML102850591 8/5/2010 2010/08/05 Diablo Canyon LR - RAI Letter dated August 3, 2010 01-0178 ML102710732 8/5/2010 2010/08/05 Diablo Canyon LR - RE: DCPP correspondence on GL 89-13 01-0179 ML102460666 8/5/2010 2010/08/05 Diablo Canyon LR - RE: ER Information Request 01-0180 ML102710727 8/6/2010 2010/08/06 Diablo Canyon LR - RE: Information for unescorted access for DCPP 01-0181 ML102710729 8/6/2010 2010/08/06 Diablo Canyon LR - RE: Information for unescorted access for DCPP 01-0182 ML102710730 8/6/2010 2010/08/06 Diablo Canyon LR - RE: Information for unescorted access for DCPP 01-0183 ML102710725 8/9/2010 2010/08/09 Diablo Canyon LR - RE: Information for unescorted access for DCPP Page 8 of 14
Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 01-0184 ML102530488 8/11/2010 2010/08/11 Diablo Canyon LR - Draft RAI Set 20 - Aging Management Programs 01-0185 ML102850587 8/11/2010 2010/08/11 Diablo Canyon LR - Draft RAI Set 20 - Aging Management Programs 2010/08/11 Diablo Canyon LR - Draft Telecon Summary 08-03-10 Scoping/Screening 01-0186 ML102850589 8/11/2010 and AMR 2010/08/11 Diablo Canyon LR - Draft Telecon Summary 08-03-10 Scoping/Screening 01-0187 ML102530489 8/11/2010 and AMR 01-0188 ML102710721 8/11/2010 2010/08/11 Diablo Canyon LR - Pull-boxes 01-0189 ML102530486 8/11/2010 2010/08/11 Diablo Canyon LR - RAI Letter dated August 9, 2010 01-0190 ML102850586 8/11/2010 2010/08/11 Diablo Canyon LR - RAI Letter dated August 9, 2010 2010/08/11 Diablo Canyon LR - RE: Draft Telecon Summary 08-03-10 01-0191 ML102530190 8/11/2010 Scoping/Screening and AMR 01-0192 ML102710719 8/12/2010 2010/08/12 Diablo Canyon LR - RE: DCPP Buried Piping Document Requests 2010/08/16 Diablo Canyon LR - Audit Report Regarding DCPP LRA - Aging 01-0193 ML102530483 8/16/2010 Management Programs 2010/08/16 Diablo Canyon LR - Audit Report Regarding DCPP LRA - Aging 01-0194 ML102850585 8/16/2010 Management Programs 01-0195 ML102850583 8/16/2010 2010/08/16 Diablo Canyon LR - Draft RAI Set 21 - AMR and TLAA 01-0196 ML102530482 8/16/2010 2010/08/16 Diablo Canyon LR - Draft RAI Set 21 - AMR and TLAA 01-0197 ML102530481 8/17/2010 2010/08/17 Diablo Canyon LR - Draft Telecon Summary 07-29-10 TLAA & AMP 01-0198 ML102850582 8/17/2010 2010/08/17 Diablo Canyon LR - Draft Telecon Summary 07-29-10 TLAA & AMP 01-0199 ML102530186 8/18/2010 2010/08/18 Diablo Canyon LR - Response submittal for RAI Set 10 01-0200 ML102530189 8/18/2010 2010/08/18 Diablo Canyon LR - Response submittal for RAI Set 8 01-0201 ML102710717 8/24/2010 2010/08/24 Diablo Canyon LR - Containment Structure Questions 2010/08/24 Diablo Canyon LR - Teleconference Call Request for RAI Response 01-0202 ML102530373 8/24/2010 Clarification Page 9 of 14
Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 01-0203 ML102710716 8/25/2010 2010/08/25 Diablo Canyon LR - Data request/Follow-up to phone message 01-0204 ML102710714 8/25/2010 2010/08/25 Diablo Canyon LR - Items uploaded to DCPP IMS 01-0205 ML102710711 8/26/2010 2010/08/26 Diablo Canyon LR - RE: Items uploaded to DCPP IMS 01-0206 ML102710712 8/26/2010 2010/08/26 Diablo Canyon LR - RE: Items uploaded to DCPP IMS 01-0207 ML102710713 8/26/2010 2010/08/26 Diablo Canyon LR - RE: Items uploaded to DCPP IMS 01-0208 ML102530480 8/26/2010 2010/08/26 Diablo Canyon LR - Teleconference Call Availability 01-0209 ML102710699 8/30/2010 2010/08/30 Diablo Canyon LR - FW: Fuel Oil AMP 01-0210 ML102530478 8/31/2010 2010/08/31 Diablo Canyon LR - 2nd RAI letter dated August 26, 2010 01-0211 ML102530479 8/31/2010 2010/08/31 Diablo Canyon LR - RAI letter dated August 26, 2010 01-0212 ML102710698 8/31/2010 2010/08/31 Diablo Canyon LR - RE: Fuel Oil AMP 01-0213 ML102710710 9/2/2010 2010/09/02 Diablo Canyon LR - Availability the week of Sept. 6 01-0214 ML102530476 9/2/2010 2010/09/02 Diablo Canyon LR - Draft RAI Set 24 - Aging Management Programs 01-0215 ML102530474 9/7/2010 2010/09/07 Diablo Canyon LR - Draft RAI Set 25 - TLAA 01-0216 ML102710707 9/7/2010 2010/09/07 Diablo Canyon LR - Info Request 01-0217 ML102710703 9/8/2010 2010/09/08 Diablo Canyon LR - Info Request #2 01-0218 ML102710704 9/8/2010 2010/09/08 Diablo Canyon LR - RE: Availability the week of Sept. 6 01-0219 ML102710705 9/8/2010 2010/09/08 Diablo Canyon LR - RE: Availability the week of Sept. 6 01-0220 ML102710706 9/8/2010 2010/09/08 Diablo Canyon LR - RE: Availability the week of Sept. 6 01-0221 ML102710702 9/8/2010 2010/09/08 Diablo Canyon LR - RE: Availability the week of Sept. 6 01-0222 ML102530471 9/9/2010 2010/09/09 Diablo Canyon LR - RAI letter dated August 30, 2010 01-0223 ML102530472 9/9/2010 2010/09/09 Diablo Canyon LR - RAI letter dated September 1, 2010 01-0224 ML102710701 9/9/2010 2010/09/09 Diablo Canyon LR - RE: Availability the week of Sept. 6 2010/09/10 Diablo Canyon LR - Draft Telecon Summaries for August 12 and August 01-0225 ML102530470 9/10/2010 18, 2010 01-0226 ML102580581 9/15/2010 2010/09/15 Diablo Canyon LR - Draft Telecon Summary for August 5, 2010 01-0227 ML102580595 9/15/2010 2010/09/15 Diablo Canyon LR - RAI letter dated September 13, 2010 01-0228 ML102580265 9/15/2010 2010/09/15 Diablo Canyon LR - RE: Diablo Canyon relicensing schedule slides Page 10 of 14
Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 01-0229 ML102590218 9/16/2010 2010/09/16 Diablo Canyon LR - Draft RAI Set 27 - Aging Management Review 01-0230 ML102630559 9/20/2010 2010/09/20 Diablo Canyon LR - RAI Letters Dated September 17, 2010 2010/09/21 Diablo Canyon LR - Environmental Impact of License Renewal of Diablo 01-0231 ML102720374 9/21/2010 Canyon Power Plant 01-0232 ML102650054 9/22/2010 2010/09/22 Diablo Canyon LR - Draft Telecon Summary for August 31, 2010 01-0233 ML102650234 9/22/2010 2010/09/22 Diablo Canyon LR - Draft Telecon Summary for September 2, 2010 01-0234 ML102650172 9/22/2010 2010/09/22 Diablo Canyon LR - RE: Draft Telecon Summary for August 5, 2010 2010/09/23 Diablo Canyon LR - Telecon Summaries from August 12 and August 18, 01-0235 ML102660337 9/23/2010 2010 01-0236 ML102670725 9/24/2010 2010/09/24 Diablo Canyon LR - RE: Reference - Seasonal Distribution of Plankton 01-0237 ML102670726 9/24/2010 2010/09/24 Diablo Canyon LR - Reference - Seasonal Distribution of Plankton 01-0238 ML102710122 9/27/2010 2010/09/27 Diablo Canyon LR -
2010/09/27 Diablo Canyon LR - DCL-10-120, "Response to NRC Letter dated August 26, 2010, Request for Additional Information (Set 17) for the Diablo Canyon License 01-0239 ML102710126 9/27/2010 Renewal Application" 01-0240 ML102700392 9/27/2010 2010/09/27 Diablo Canyon LR - RAI letter dated September 23, 2010 01-0241 ML102710103 9/27/2010 2010/09/27 Diablo Canyon LR - RE: Draft Telecon Summary for August 31, 2010 01-0242 ML102710104 9/27/2010 2010/09/27 Diablo Canyon LR - RE: Draft Telecon Summary for September 2, 2010 01-0243 ML102700090 9/27/2010 2010/09/27 Diablo Canyon LR - Telecon Summary for August 5, 2010 01-0244 ML102731071 9/30/2010 2010/09/30 Diablo Canyon LR - Draft RAI Set 29 - Aging Management Programs 2010/10/01 Diablo Canyon LR - FW: DCPP NRC Regional Inspection Exit Meeting 01-0245 ML102740138 10/1/2010 Roster 9/16/2010 Page 11 of 14
Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 01-0246 ML102740101 10/1/2010 2010/10/01 Diablo Canyon LR - FW: DCPP Regional Inspection Notifications 01-0247 ML102740061 10/1/2010 2010/10/01 Diablo Canyon LR - FW: Documents Request 01-0248 ML102740060 10/1/2010 2010/10/01 Diablo Canyon LR - FW: Files uploaded to IMS 01-0249 ML102780325 10/5/2010 2010/10/05 Diablo Canyon LR - FW: RAI Set 28 01-0250 ML102780324 10/5/2010 2010/10/05 Diablo Canyon LR - RAI Set 28 01-0251 ML102780457 10/5/2010 2010/10/05 Diablo Canyon LR - Telecon Summaries 01-0252 ML102780459 10/5/2010 2010/10/05 Diablo Canyon LR - Telecon Summary of 8/31 01-0253 ML102790581 10/6/2010 2010/10/06 Diablo Canyon LR - RE: DCNPP L.R. Data request of the NRC to PG&E 01-0254 ML102790103 10/6/2010 2010/10/06 Diablo Canyon LR - RE: Phone call on DCPP Draft RAI Sets 3 & 4 01-0255 ML102810284 10/8/2010 2010/10/08 Diablo Canyon LR - RE: Clarification phone call for DCPP Draft RAI Set 17 01-0256 ML102810294 10/8/2010 2010/10/08 Diablo Canyon LR - RE: Clarification phone call for DCPP Draft RAI Set 17 01-0257 ML102810368 10/8/2010 2010/10/08 Diablo Canyon LR - RE: Clarification phone call for DCPP Draft RAI Set 17 2010/10/08 Diablo Canyon LR - RE: Clarification phone call on DCPP Draft RAI Set #5 01-0258 ML102810372 10/8/2010 and 6 01-0259 ML102810367 10/8/2010 2010/10/08 Diablo Canyon LR - RE: Clarification phone call on DCPP Draft RAI Set 18 01-0260 ML102810292 10/8/2010 2010/10/08 Diablo Canyon LR - RE: Clarification phone call on DCPP Draft RAI Set 18 2010/10/08 Diablo Canyon LR - RE: Clarification phone call on DCPP draft RAI sets 9 01-0261 ML102810370 10/8/2010 and 10 2010/10/08 Diablo Canyon LR - RE: Clarification phone call on NRC Follow-up 01-0262 ML102810289 10/8/2010 Questions to OTI and OTI of Class 1 Small Bore Piping Programs 2010/10/08 Diablo Canyon LR - RE: Clarification phone call on NRC Follow-up 01-0263 ML102810205 10/8/2010 Questions to OTI and OTI of Class 1 Small Bore Piping Programs Page 12 of 14
Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 2010/10/08 Diablo Canyon LR - RE: Clarification phone call on NRC Follow-up 01-0264 ML102810207 10/8/2010 Questions to OTI and OTI of Class 1 Small Bore Piping Programs 2010/10/08 Diablo Canyon LR - RE: Clarification phone call on RAI response letters 01-0265 ML102810204 10/8/2010 dated June 18th, and July 28th 2010/10/08 Diablo Canyon LR - RE: Clarification phone call on RAI response letters 01-0266 ML102810288 10/8/2010 dated June 18th, and July 28th 2010/10/08 Diablo Canyon LR - RE: Clarification Phone Call on RAI Set 2 Follow Up 01-0267 ML102810211 10/8/2010 Questions 2010/10/08 Diablo Canyon LR - RE: Clarification Phone Call on RAI Set 2 Follow Up 01-0268 ML102810291 10/8/2010 Questions 2010/10/08 Diablo Canyon LR - RE: Clarification phone on DCPP Draft RAI Set 7 and 01-0269 ML102810371 10/8/2010 8 2010/10/08 Diablo Canyon LR - RE: Clarification Phone on Telecon Summary Dated 01-0270 ML102810201 10/8/2010 8/31/10 01-0271 ML102810202 10/8/2010 2010/10/08 Diablo Canyon LR - RE: Demonstration of DCPP Reference Portal 2010/10/08 Diablo Canyon LR - RE: Fuel Oil Chemistry NRC Regional Inspection 01-0272 ML102810195 10/8/2010 Meeting 2010/10/08 Diablo Canyon LR - RE: NRC Clarification Phone Call on Draft DCPP RAI 01-0273 ML102810209 10/8/2010 Set 19 2010/10/08 Diablo Canyon LR - RE: NRC Clarification Phone Call on Draft DCPP RAI 01-0274 ML102810290 10/8/2010 Set 19 01-0275 ML102810375 10/8/2010 2010/10/08 Diablo Canyon LR - RE: Phone call clarification on DCPP Draft RAI Set #2 2010/10/08 Diablo Canyon LR - RE: Phone call for clarification on responses to RAIs 01-0276 ML102810287 10/8/2010 B2.1.13-2 and B2.1.13-4 2010/10/08 Diablo Canyon LR - RE: Phone call for clarification on responses to RAIs 01-0277 ML102810203 10/8/2010 B2.1.13-2 and B2.1.13-4 01-0278 ML102810374 10/8/2010 2010/10/08 Diablo Canyon LR - RE: Phone call on DCPP Draft RAI Sets 3 & 4 01-0279 ML102850201 10/12/2010 2010/10/12 Diablo Canyon LR - RAI Set 28 Page 13 of 14
Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index - Initial Disclosures - October 15, 2010 ADAMS ADAMS Package Accession Document Nos. (If ID No. Number Date Applicable) Title 01-0280 ML102850202 10/12/2010 2010/10/12 Diablo Canyon LR - RAI Set 28 01-0281 ML102850083 10/12/2010 2010/10/12 Diablo Canyon LR - Telecon Summaries 01-0282 ML102870342 10/13/2010 2010/10/13 Diablo Canyon LR - FW: Telecon at 1:00 pm EDT 01-0283 ML102870335 10/13/2010 2010/10/13 Diablo Canyon LR - Telecon at 1:00 pm EDT Page 14 of 14
In the Matter of PACIFIC GAS & ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Units 1 and 2)
Docket Nos. 50-275-LR and 50-323-LR NRC Staff Transmittal Letter dated October 15, 2010 Attachment 2 Affidavit of Andrew L. Stuyvenberg
October 14. 2010 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
PACIFIC GAS & ELECTRIC COMPANY ) Docket Nos. 50-275-LR/ 50-323-LR
)
(Diablo Canyon Nuclear Power Plant )
Units 1 and 2)
AFFIDAVIT OF ANDREW L. STUYVENBERG CONCERNING MANDATORY DlSCLOSLlRE REQUIREMENT OF 10 C.F.R. 6 2.336(b)
I, Andrew L. Stuyvenberg, do hereby state as follows:
- 1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 license renewal application ("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
- 2. I hereby certify that most relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate for documents identified by the Staff as of October 14, 2010. Some relevant materials identified by the Staff have not been disclosed due to internal technical difficulties. The Staff intends to supplement the hearing file next week with those documents. At that time, the hearing file will contain all documents required to be disclosed pursuant to 10 C.F.R. § 2.336(b) and (c) that have been identified by the Staff as of October 14, 2010.
- 3. I declare under penalty of perjury that the foregoing is true and correct to the
best of my knowledge, information and belief.
Andrew ~ . ' ~ t u y v e n b e b Executed in Rockville, Maryland this 14'hday of October, 201 0
October 15, 2010 Administrative Judge Administrative Judge Alex S. Karlin, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)
Docket Nos. 50-275-LR and 50-323-LR
Dear Administrative Judges:
In accordance with the Boards September 15, 2010, Memorandum, and Section 2.1203(a), the NRC Staff is providing notice that it has created the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the NRC Staff will create a separate folder in the agencys Electronic Hearing Docket (EHD) associated with this proceeding entitled Diablo Hearing File, and the documents, along with an index listing the documents, will be published in that folder. Due to technical difficulties, the NRC Staff was not able to include all documents required to be in the hearing file by October 15, 2010. The NRC Staff intends to supplement the hearing file next week with those documents. At that time, the NRC Staff will send the parties and the Board notification of the update. The Staff has discussed this problem with the other parties to this proceeding, and no other party had an objection to the delay for adding some documents to the
hearing file. The NRC Staff apologizes for any inconvenience or confusion that may result from the delay these technical difficulties caused.
Respectfully submitted,
/signed (electronically) by/
Lloyd B. Subin Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1988 Lloyd.Subin@nrc.gov
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
PACIFIC GAS AND ELECTRIC COMPANY ) Docket Nos. 50-275-LR/ 50-323-LR
)
(Diablo Canyon Nuclear Power Plant, ) ASLBP No. 10-900-01-LR-BD01 Units 1 and 2) )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing NRC Staff letter dated October 15, 2010, have been served upon the following by the Electronic Information Exchange, this 15th day of October, 2010:
Administrative Judge Office of Commission Appellate Alex S. Karlin, Chair Adjudication Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop - T-3 F23 Mail Stop - O-16G4 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov E-mail: ask2@nrc.gov Administrative Judge Office of the Secretary Nicholas G. Trikouros Attn: Rulemakings and Adjudications Staff Atomic Safety and Licensing Board Panel Mail Stop: O-16G4 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: HEARINGDOCKET@nrc.gov E-mail: ngt@nrc.gov Administrative Judge David A. Repka, Esq.
Paul B. Abramson Tyson Smith, Esq.
Atomic Safety and Licensing Board Panel Carlos Sisco Mail Stop - T-3 F23 Winston & Strawn LLP U.S. Nuclear Regulatory Commission 101 California Street Washington, DC 20555-0001 San Francisco, CA 94111-5802 E-mail: pba@nrc.gov E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com
Jill ZamEk, Esq. Diane Curran, Esq.
San Luis Obispo Mothers for Peace Harmon, Curran, Spielberg, and Eisenberg 1123 Flora Road 1726 M Street NW Arroyo Grande, CA 93420 Suite 600 E-mail: jzk@charter.net Washington, DC 20036 E-mail: dcurran@harmoncurran.com Signed (electronically) by Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1988 E-mail: Lloyd.Subin@nrc.gov Date of signature: October 15, 2010