1 DiabloCanyonNPEm Resource From:
Rogers, Billy Sent:
Thursday, March 04, 2010 2:29 PM To:
Grebel, Terence; Soenen, Philippe R Cc:
Green, Kimberly
Subject:
RE: Scoping and Screening Methodology Audit Attachments:
Diablo Canyon S&S Methodology Audit Site Documentation List.doc Terry and Philippe, Good afternoon. I've attached the Diablo Canyon Power Plant Units 1 and 2 license renewal scoping and screening methodology audit documentation list.
- Thanks, Bill BillRogers Sr.ReactorEngineer DivisionofLicenseRenewal OfficeofNuclearReactorRegulation U.S.NuclearRegulatoryCommissionM/S:O11F1 WashingtonDC,20555
Office:OWFN11E8 Phone:3014152945 Email:billy.rogers@nrc.gov From: Green, Kimberly Sent: Monday, March 01, 2010 6:33 PM To: Grebel, Terence; Soenen, Philippe R Cc: Rogers, Billy
Subject:
Scoping and Screening Methodology Audit
Terry and Philippe, Bill Rogers will be sending you a document needs list for the scoping and screening methodology audit. We will be ready for a call on Monday after 1:00 pm EST. If you have any questions, I'll be here until 6:00 pm EST today, and on Friday. Otherwise, you can find me at the meeting on Wednesday.
KimberlyGreen SafetyPM (301)4151627 kimberly.green@nrc.gov
Hearing Identifier:
DiabloCanyon_LicenseRenewal_NonPublic Email Number:
57 Mail Envelope Properties (Billy.Rogers@nrc.gov20100304142800)
Subject:
RE: Scoping and Screening Methodology Audit Sent Date:
3/4/2010 2:28:40 PM Received Date:
3/4/2010 2:28:00 PM From:
Rogers, Billy Created By:
Billy.Rogers@nrc.gov Recipients:
"Green, Kimberly" <Kimberly.Green@nrc.gov>
Tracking Status: None "Grebel, Terence" <TLG1@pge.com>
Tracking Status: None "Soenen, Philippe R" <PNS3@pge.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1144 3/4/2010 2:28:00 PM Diablo Canyon S&S Methodology Audit Site Documentation List.doc 38906 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Diablo Canyon Power Plant Units 1 and 2 License Renewal Scoping and Screening Methodology Audit Documentation List Engineering reports and procedures which contain requirements or guidelines for the implementation of scoping and screening methodology.
10 CFR 54.4(a)(1) plant evaluations and implementing procedures.
10 CFR 54.4(a)(2) plant evaluations and implementing procedures.
10 CFR 54.4(a)(3) plant evaluations, implementing procedures and any specific analyses performed.
Description of the design basis events included in the FSAR, and all other additional events (e.g. high energy line break, fire, high wind, earthquakes, flooding, tornadoes),
which were evaluated during the scoping process.
License renewal drawings.
System design basis documents and system and component level scoping and screening reports for the following systems and structures:
- 3. Main steam
- 4. Auxiliary building
- 5. Turbine Building Documentation of quality assurance activities associated with license renewal application development.
Documentation of training activities associated with license renewal application development.
Assisted access to the plant equipment database and administrative controls procedure.
Assisted access to the DCCP Corrective Action and Operating Experience Programs database.