1 DiabloCanyonNPEm Resource From:

Pick, Greg Sent:

Friday, August 06, 2010 3:35 PM To:

Soenen, Philippe R

Subject:

RE: Information for unescorted access for DCPP Perfect -

A few more logistics -

1) I would like to schedule a tentative, detailed debrief for September 16 at 10 or 11 a.m. (this will likely replace the morning routine discussions described below). This would support an exit or site debrief at 4:30 p.m. on that same day.
2) I prefer to debrief my team around 3 or 3:30 and inform the LR project team that evening or the next morning at 8 or 8:30 am.
3) I expect to debrief a detailed status on Thursday August 19 at say 4:30 p.m.
4) What is the number to the response team room _____ and the NRC inspection team room ______

From: Soenen, Philippe R [1]

Sent: Wednesday, August 04, 2010 11:31 AM To: Pick, Greg Cc: Grebel, Terence

Subject:

RE: Information for unescorted access for DCPP We have the entrance meeting set for 0900 on Monday 8/16.

Philippe Soenen Pacific Gas & Electric 142 Cross St. Suite 200 San Luis Obispo, CA 93401 Office: 805.781.9782 Cell: 805.459.3701 From: Pick, Greg [2]

Sent: Wednesday, August 04, 2010 9:25 AM To: Soenen, Philippe R Cc: Carson, Louis

Subject:

RE: Information for unescorted access for DCPP

Thanks, When is our entrance meeting?

2 Lou Carson is only available the first week. He is doing buried piping. He will want to walk down the systems included in this AMP. Also, he is evaluating the connection between LR buried piping and the NEI 07-07 ground water initiative (which includes buried piping). Other systems of interest, if not included in the LR AMP, are liquid radwaste.

He will want to walk down systems on Monday.

If you have any questions, please call me or Lou at 817 860-8221.

Have a great day!

From: Soenen, Philippe R [3]

Sent: Wednesday, August 04, 2010 10:19 AM To: Pick, Greg Cc: Kaminski, Cindy; Grebel, Terence

Subject:

Information for unescorted access for DCPP Greg, Below is the information that is needed to get your team into the system for the inspections. Please respond to Cindy Kaminski, who I have copied on this email, with the information requested. Please also provide a list of the members of your inspection team so that Cindy can make sure we have the information for all of the individuals.

Full Name Date of Birth Social Security Number US Citizen: Yes or No Sex If contractor for NRC - name of company Attached are the read and signs they will need to complete (just last page) and return to Cindy so that she can enter them into PIMS.

<<GPAA102.doc>> <<GPAA101.DOC>>

Thank you, Philippe Soenen Pacific Gas & Electric 142 Cross St. Suite 200 San Luis Obispo, CA 93401 Office: 805.781.9782 Cell: 805.459.3701

Hearing Identifier:

DiabloCanyon_LicenseRenewal_NonPublic Email Number:

1326 Mail Envelope Properties (Greg.Pick@nrc.gov20100806153400)

Subject:

RE: Information for unescorted access for DCPP Sent Date:

8/6/2010 3:34:40 PM Received Date:

8/6/2010 3:34:00 PM From:

Pick, Greg Created By:

Greg.Pick@nrc.gov Recipients:

"Soenen, Philippe R" <PNS3@PGE.COM>

Tracking Status: None Post Office: