1 DiabloCanyonNPEm Resource From:
Ferrer, Nathaniel Sent:
Wednesday, September 22, 2010 8:42 AM To:
Grebel, Terence; Soenen, Philippe R Cc:
DiabloCanyonNPEm Resource
Subject:
Draft Telecon Summary for August 31, 2010 Attachments:
Telecon Summary 08-31-10 RAI Response (sets 2 and 13).doc Terry & Philippe, Attached is a draft of the Teleconference Call Summary for the August 31, 2010, conference call. Please review and let me know if there are any corrections/changes needed.
Please let me know if you have any questions.
NathanielFerrer ProjectManager DivisionofLicenseRenewal OfficeofNuclearReactorRegulation U.S.NuclearRegulatoryCommission (301)4151045
Hearing Identifier:
DiabloCanyon_LicenseRenewal_NonPublic Email Number:
1242 Mail Envelope Properties (26E42474DB238C408C94990815A02F09115A4A862D)
Subject:
Draft Telecon Summary for August 31, 2010 Sent Date:
9/22/2010 8:42:03 AM Received Date:
9/22/2010 8:42:10 AM From:
Ferrer, Nathaniel Created By:
Nathaniel.Ferrer@nrc.gov Recipients:
"DiabloCanyonNPEm Resource" <DiabloCanyonNPEm.Resource@nrc.gov>
Tracking Status: None "Grebel, Terence" <TLG1@PGE.COM>
Tracking Status: None "Soenen, Philippe R" <PNS3@PGE.COM>
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 444 9/22/2010 8:42:10 AM Telecon Summary 08-31-10 RAI Response (sets 2 and 13).doc 97274 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
LICENSEE:
Pacific Gas and Electric Company FACILITY:
Diablo Canyon Nuclear Power Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 31, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E or the applicant) held a telephone conference call on August 31, 2010, to obtain clarification on the applicants response to request for additional information (RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.
By letters dated June 18, 2010, and August 17, 2010, PG&E sent the staff a response to RAI letters dated May 24, 2010 and June 21, 2010, respectively. The staff reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of the PG&Es response. Enclosure 1 provides a listing of the participants. Enclosure 2 provides discussions on the RAI responses for which the staff requested clarification. PG&E will submit supplemental responses, as necessary, within 30 days of the issuance of this summary. Follow-up RAIs, determined to be necessary, will be issued separately by a formal letter.
The applicant had an opportunity to comment on this summary.
Nathaniel Ferrer, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosures:
As stated cc w/encls: Distribution via Listserv
ML102450755 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME YEdmonds NFerrer DWrona NFerrer DATE 9/ /10 9/ /10 9/ /10 9/ /10
ENCLOSURE 1 TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 31, 2010 PARTICIPANTS AFFILIATIONS Nate Ferrer U.S. Nuclear Regulatory Commission (NRC)
Garry Armstrong NRC Stan Gardocki NRC Greg Casto NRC Philippe Soenen Pacific Gas and Electric Company (PG&E)
Kyle Duke PG&E Kevin Braico PG&E Chalmer Myer Strategic Teaming And Resource Sharing (STARS)
David Kunsemiller STARS Rye Davis STARS Dan Shepard STARS Ken Bryant STARS James Copernicus STARS Randall Boyd STARS
ENCLOSURE 2 Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Request for Additional Information (Sets 2 and 13)
Scoping and Screening RAI 2.1-1 AND 2.1-2 In its June 18 and July 28, 2010, responses to requests for additional information (RAIs) 2.1-1 and 2.1-2, the applicant added several components to the scope of license renewal under 10 CFR 54.4(a)(2). However, the staff was unclear why some fluid-filled, non safety-related components, in the turbine building were excluded from the scope of license renewal given that they were in the same space as safety-related components.
Discussion:
The staff will issue follow-up RAIs to clarify why certain components were excluded from the scope of license renewal.
RAI 2.3.3.5-1 In its August 17, 2010, response to RAI 2.3.3.5-1, the applicant added additional components to the scope of license renewal for 10 CFR 54.4(a)(2) related to the firewater tank. However, the staff was unclear why the firewater tank was not revised to be in scope under 10 CFR 54.4(a)(1).
Discussion:
Pacific Gas and Electric (PG&E) agreed to supplement its response to RAI 2.3.3.5-1 to clarify whether the firewater tank is in scope for 10 CFR 54.4(a)(1), and provide an evaluation of piping attached to the tank to ensure appropriate endpoints are established in accordance with the applicants stated methodology.
RAI 2.3.3.5-4 In its August 17, 2010, response to RAI 2.3.3.5-4, the applicant provided an explanation for their selection of endpoints for various license renewal boundaries. However, the staff was unclear how the seismic anchors for non safety-related connections to the condensate storage tank, firewater storage tank, and primary storage tank were established.
Discussion:
PG&E agreed to supplement its response to RAI 2.3.3.5-4 to clarify how appropriate endpoints were established based upon criteria in the applicants stated methodology.
RAI 2.3.3.5-5 In its August 17, 2010, response to RAI 2.3.3.5-5, the applicant provided information on the procedural mitigation methods related to the makeup to the component cooling water surge tank. However, the response was not clear with respect to whether the makeup to the spent fuel pool is addressed with a similar method.
Discussion:
PG&E agreed to supplement its response to RAI 2.3.3.5-5 to clarify the procedural mitigation methods related to the makeup to the spent fuel pool.
RAI 2.3.3.6-1 In its August 17, 2010, response to RAI 2.3.3.6-1 the applicant indicated that the heat exchangers of concern were revised to be within scope of license renewal under 10 CFR 54.4(a)(2). However, the staff was unclear on the basis for why the heat exchangers were no longer designated as safety-related components which would require them to be in the scope of license renewal under 10 CFR 54.4(a)(1).
Discussion:
PG&E agreed to supplement its response to RAI 2.3.3.6-1 to clarify why the heat exchangers were no longer designated as safety-related components.
RAI 2.3.3.7-1 In its August 17, 2010, response to RAI 2.3.3.7-1, the applicant provided details for why solenoid valves and the tubing between both sets of solenoid valves were excluded from scope of license renewal. However the staff made the following observations:
- 1. The staff was unclear why both valves 1-PCV-19 and 1-PCV-20 were discussed in the description.
Discussion:
The applicant indicated that the reference to 1-PCV-19, in the response, should have been 1-PCV-20. Based on the discussion, this portion of the response is clear.
- 2. The staff was unclear how appropriate endpoints were established on the non safety-related piping connecting to safety-related solenoid valves. The existing license renewal boundary did not include the non safety-related piping past the safety-related/non safety-related interface to a seismic anchor in accordance with the applicants stated methodology.
Discussion:
PG&E agreed to supplement its response to RAI 2.3.3.7-1 to clarify how the seismic endpoints were established.
Memorandum To PG&E Company from N. Ferrer dated September XX, 2010
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 31, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC [or NON-PUBLIC, if appropriate]
RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailRoom Resource N. Ferrer K. Green A. Stuyvenberg D. Wrona A. Wang M. Peck, RIV T. Brown, RI G. Miller, RIV N. OKeefe, RIV I. Couret, OPA V. Dricks, OPA W. Maier, RIV J. Weil, OCA E. Williamson, OGC S. Uttal, OGC R. Rihm, EDO