ML082980483
ML082980483 | |
Person / Time | |
---|---|
Site: | Duane Arnold |
Issue date: | 09/30/2008 |
From: | Duane Arnold |
To: | Office of Nuclear Reactor Regulation |
References | |
FOIA/PA-2010-0209, NG-08-0713 | |
Download: ML082980483 (367) | |
Text
(4OOOI~A FPL Energy.Duane Arnold Energy Center License Renewal Application Appendix E Environmental Report September 2008 Applicant's Environmental Report -Operating License Renewal Stage Duane Arnold Energy Center FPL Energy Duane Arnold, LLC Unit 1 Docket No. 05000331 License No. DPR-49 September 2008 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE OF CONTENTS Section Paqe ACRONYMS AND ABBREVIATIONS
....................................................................
vi
1.0 INTRODUCTION
..........................................................................................
1.1-1 1.1 Purpose of and Need for Action ....................................................................
1.1-1 1.2 Environmental Report Scope and Methodology
...........................................
1.2-1 1.3 Duane Arnold Energy Center Licensee and Ownership
.............................
1.3-1 2.0 SITE AND ENVIRONMENTAL INTERFACES
..............................................
2.1-1 2 .1 Location and Features ...................................................
............................
2.1-1 2 .2 A quatic R esources .......................................................................................
2 .2-1 2.3 Groundwater Resources
..............................................................................
2.3-1 2.3.1 Ground Water Supply .....................................................................
2.3-1 2.3.2 Offsite Ground Water Usage ..........................................................
2.3-2 2.3.3 Plant Ground Water Usage .............................
.2.3.2 2.4 Critical and Important Terrestrial Habitats ....................................................
2.4-1 2.5 Threatened or Endangered Species ............................................................
2.5-1 2 .6 D e m og ra p hy ................................................................................................
2 .6 -1 2.6.1 Regional Demography
..................................................................
2.6-1 2.6.2 Minority and Low-Income Populations
...........................................
2.6-3 2.6.2.1 Minority Populations
........................................................
2.6-3 2.6.2.2 Low-Income Populations
.................................................
2.6-5 2 .7 T a x e s ..........................................................................................................
.2 .7 -1 2 .8 La nd U se ....................................................................................................
.2 .8 -1 2.9 Social Services and Public Facilities
............................................................
2.9-1 2.9.1 Public Water Systems .....................................................................
2.9-1 2 .9 .2 T ra nspo rtatio n ..................................................................................
2 .9-1 2.10 Meteorology and Air Quality .........................................................................
2.10-1 2.11 Historic and Archaeological Resources
.......................................................
2.11-1 2.12 Known or Reasonably Foreseeable Projects in the DAEC Vicinity ....... 2.12-1 3.0 PROPOSED ACTION ...............................................................................
3.1-1 3.1 General Plant Information
.............................................................................
3.1-1 3.1.1 Reactor and Containment Systems .................................................
3.1-1 3.1.2 Cooling and Auxiliary Water Systems .............................................
3.1-2 3.1.2.1 S urface W ater ..................................................................
3.1-2 3.1.2.2 Groundwater Resources
...................................................
3.1-4 3.1.3 Wastewater Treatment
....................................................................
3.1-5 3.1.4 Radioactive Waste System .............................................................
3.1-5 3.1.4.1 Liquid Waste System ........................................................
3.1-5 Pagei Duane Arnold Energy Center License Renewal Application Environmental Report TABLE OF CONTENTS (CONTINUED)
Section Page 3.1.4.2 Gaseous Waste System ...................................................
3.1-6 3.1.4.3 Solid Waste System ...........................
3.1-6 3.1.4.4 Nonradioactive Solid Waste System ................................
3.1-7 3.1.5 T ransm ission Facilities
....................................................................
3.1-7 3.2 R efurbishm ent A ctivities
...............................................................................
3.2-1 3.3 Programs and Activities for Managing the Effects of Aging ..........................
3.3-1 3 .4 E m p lo y m e nt ..................................................................................................
3 .4 -1 4.0 Environmental Consequences of the Proposed Action And Mitigating Actions ........................................
................................
4.0-1 4.1 Water Use Conflicts (Plants With Cooling Ponds or Cooling Towers Using Makeup Water from a Small River with Low Flow) ................
4.1-1 4.2 Entrainment of Fish and Shellfish in Early Life Stages (Plants with Once-Through Cooling or Cooling Ponds) .............................................................
4.2-1 4.3 Impingement of Fish and Shellfish (Plants with Once-Through Cooling or C o o ling P o nd s) ............................................................................................
4 .3-1 4.4 Heat Shock (Plants with Once-Through Cooling or Cooling Ponds) .............
4.4-1 4.5 Groundwater Use Conflicts (Plants Using > 100 gpm of Groundwater)
........ 4.5-1 4.6 Groundwater Use Conflicts (Plants Using Cooling Towers Withdrawing Makeup Water from a Small River) .........................................
4.6-1 4.7 Groundwater Use Conflicts (Plants Using Ranney Wells) ............................
4.7-1 4.8 Degradation of Groundwater Quality ............................................................
4.8-1 4.9 Impacts of Refurbishment On Terrestrial Resources
....................................
4.9-1 4.10 Threatened or Endangered Species .............................................................
4.10-1 4.11 Air Quality during Refurbishment (Non-Attainment and Maintenance A re a s ) ...........................................................................................................
4 .1 1 -1 4.12 Impacts on Public Health of Microbiological Organisms
...............................
4.12-1 4.13 Electric Shock from Transmission-Line-Induced Currents ............................
4.13-1 4 .14 H o using Im pacts ...........................................................................................
4 .14 -1 4.15 Public Utilities:
Public Water Supply Availability
..........................................
4.15-1 4.16 Education Impacts from Refurbishment
........................................................
4.16-1 4 .17 O ffsite Land U se ...........................................................................................
4 .17-1 4.17.1 Offsite Land Use -Refurbishment
...................................................
4.17-1 4.17.2 Offsite Land Use -License Renewal Term ......................................
4.17-2 4 .18 T ra nspo rtatio n ..............................................................................................
4 .18-1 4.19 Historic and Archaeological Resources
........................................................
4.19-1 4.20 Severe Accident Mitigation Alternatives
.......................................................
4.20-1 4 .2 1 E nvironm ental Justice ................................................................................
4 .2 1-1 ENVIRONMENTAL REPORT Page ii Duane Arnold Energy Center License Renewal Application Environmental Report 5.0 ASSESSMENT OF NEW AND SIGNIFICANT INFORMATION
...................
5.0-1 TABLE OF CONTENTS (CONTINUED)
Section Pacie 6.0
SUMMARY
OF LICENSE RENEWAL IMPACTS AND MITIGATING A C TIO N S ...........................................................................................
...........
6.1-1 6.1 License R enew al Im pacts .............................................................................
6.1-1 6 .2 M itig a tio n ......................................................................................................
6 .2 -1 6.3 U navoidable A dverse Im pacts ......................................................................
6.3-1 6.4 Irreversible and Irretrievable Resource Commitments
..................................
6.4-1 6.5 Short-term Use versus Long-term Productivity of the Environment
..............
6.5-1 7.0 ALTERNATIVES TO THE PROPOSED ACTION ........................................
7.0-1 7 .1 N o-A ction A lternative
....... ..........
7..............................................................
7 .1-1 7.2 Alternatives that Meet System Generating Needs ........................................
7.2-1.7.2.1 A lternatives C onsidered
..................................................................
7.2-2 7.2.1.1 Construct and Operate Fossil-Fuel-Fired G e ne ratio n ........................................................................
7 .2 -4 7.2.1.2 Construct and Operate New Nuclear Reactor ..................
7.2-8 7.2.1.3 Purchase Power ..............................
7.2-8 7.2.1.4 Demand-Side Management
......................
7.2-8 7.2.1.5 Other Alternatives
.............................
7.2-8 7.2.2 Environmental Impactsof Alternatives
....................
7.2-14 7.2.2.1 G as-Fired G eneration
.......................................................
7.2-14 7.2.2.2 Coal-Fired Generation
......................................................
7.2-16 7.2.2.3 New Nuclear Reactor .......................
- ...............................
7.2-18 8.0 COMPARISON OF ENVIRONMENTAL IMPACTS OF LICENSE RENEWAL WITH THE ALTERNATIVES
......................
,..............................
8.0-1 9.0 STATUS OF COMPLIANCE
.........
..............................................................
9.1-1 9 .1 P ro po se d A ctio n ...........................................................................................
9 .1-1 9 .1 .1 G e n e ra l ....................................................
......................................
9 .1-1 9.1.2 Threatened or Endangered Species ...............................................
9.1-1 9.1.3 Coastal Zone Management Program Compliance
..........................
9.1-2 9.1.4 H istoric P reservation
.......................................................................
9.1-2 9.1.5 Water Quality (401) Certification
.....................................................
9.1-2 9 .2 A lte rnative s ...................................................................................................
9 .2 -1
10.0 REFERENCES
.............................................................................................
10.0-1 ENVIRONMENTAL REPORT Page iii Duane Arnold Energy Center License Renewal Application Environmental Report TABLE OF CONTENTS (CONTINUED)
List of Appendices Appendix A NRC NEPA Issues for License Renewal of Nuclear Power Plants Appendix B NPDES Permit Appendix C Special-Status Species Correspondence Appendix D Cultural Resource Correspondence Appendix E Public Health Agency Correspondence Appendix F Severe Accident Mitigation Alternatives List of Tables Table Page 1.2-1 Environmental Report Responses to License Renewal Environmental R egulatory R equirem ents ..............................................................................
1.2-2 2.3-1 Duane Arnold Energy Center W ell Use ........................................................
2.3.3 2.3-2 Duane Arnold Energy Center W ell W ater Use .............................................
2.3-3 2.5-1 Protected Species in Iowa Counties Containing Duane Arnold Facilities and T ransm ission Lines ................
I ..............................................................
2.5-3 2.6-1 Decennial Populations, Projections, and Growth Rates ...............................
2.6-6 2.6-2 Block Groups within 50 Miles of DAEC with Minority or Low-Income Populations More than 20 Percent Over the State or Greater than 50 Percent ...............................................
2.6-7 2.7-1 Duane Arnold Energy Center Tax Payment Information for 2003-2007
....... 2.7-2 2.7-2 Duane Arnold Energy Center Tax Payment Comparison with Local T ax R eve n ue s ..............................................................................................
2 .7 -2 2.8-1 Housing Trends, 1990 to 2005, in Linn and Benton Counties, City of Cedar Rapids, and the State of Iow a .......................................................................
2.8-3 2.9-1 Public Water Supply Systems in Linn and Benton Counties .........................
2.9-3 2.9-2 Public Water Supply Systems in Linn and Benton Counties Serving Population of M ore than 1,000 ......................................................................
2.9-6 3.1-1 Duane Arnold Energy Center Number Of Radioactive Material Shipments..
3.1-9 3.4-1 Counties of Residence for Permanent Workforce
........................................
3.4-3 ENVIRONMENTAL REPORT Page iv Duane Arnold Energy Center License Renewal Application Environmental Report TABLE OF CONTENTS (CONTINUED)
List of Tables (Continued)
Table Page 6.5-1 Environmental Impacts Related to License Renewal at DAEC .....................
6.5-2 7 .2-1 G as-Fired A lternative
....................................................................................
7.2-5 7.2-2 C oal-Fired A lternative
..................................................................................
7.2-7 8.0-1 Im pacts Com parison Sum m ary ....................................................................
8.0-2 8.0-2 Im pacts C om parison Detail ..........................................................................
8.0-3 9.1-1 Environmental Authorizations for Current DAEC Operations
.......................
9.1-3 9.1-2 Environmental Authorizations for DAEC License Renewal ...........................
9.1-6 List of Figures Figure Page 2.1-1 6-Mile Vicinity Map.................................................................
2.1-3 2.1-2 50 M ile V icinity M ap ..................
....................................................................
2.1-4 2.1-3 DA EC S ite Boundary ...................................................................................
2.1-5 2.6-1 B lack M inority Population
.................................
..........................................
2.6-9 2.6-2 American Indian or Alaskan Native Minority Population
..............................
2.6-10 2.6-3 Aggregate Minority Population
................................
2.6-11 2.6-4 Hispanic Ethnicity Population
......................................................................
2.6-12 2.6-5 Low -Incom e Population
.................................................................................
2.6-13 3.1-1 T ransm ission System ...................................
..............................................
3.1-10 7.2-1 Iowa Generating Capacity by Fuel Type,. 2005 .............................................
7.2-2 7.2-2 Iowa Generation by Fuel Type, 2005 ....... ..............................
7.2-2 ENVIRONMENTAL REPORT Page v ENVIRONMENTAL REPORT Page v Duane Arnold Energy Center License Renewal Application Environmental Report ACRONYMS AND ABBREVIATIONS AC&H Archaeological, Cultural, and Historic AEC U.S. Atomic Energy Commission AQCR Air Q~uality Control Region AWEA American Wind Energy Association BWR Boiling Water Reactor CCP Coal Combustion Product CEQ Council on Environmental Quality CFR Code of Federal Regulations cfs cubic feet per second CO Carbon monoxide CRWD Cedar Rapids Water Department CSFCC California Stationary Fuel Cell Collaborative CWA Clean Water Act DAEC Duane Arnold Energy Center DDT Dichloro-Diphenyl-Trichloroethane DOE U.S. Department of Energy DOT Department of Transportation DSM demand-side management EC Environmental Coordinator EIA Energy Information Administration EPA U.S. Environmental Protection Agency EPU Extended Power Uprate ESW emergency service water OF degrees Fahrenheit FES Final Environmental Statement FPL-DA FPL Energy Duane Arnold, LLC GElS Generic Environmental Impact Statement for License Renewal of Nuclear Plants GIS Geographic Information System gpd gallons per day gpm gallons per minute GWh gigawatt-hours IBI Index of Biotic Integrity ICC Iowa Conservation Commission IDNR Iowa Department of Natural Resources IDPH Iowa Department of Public Health IEEE Institute of Electrical and Electronics Engineers ENVIRONMENTAL REPORT Page vi Duane Arnold Energy Center License Renewal Application Environmental Report IPA IPE IPEEE IPL ITC kV LOS Mg MSA msl MW MWd/MtU MWe MWt NA NAAQS NEPA NESCNMC NO 2 NO, NPDES NPS NRC NREL NSPS NSSS NAWQA PM PM 1 0 PM 2.5 PPA RBCCW RHR RHRSW ROI ROW SAMA ACRONYMS AND ABBREVIATIONS (CONTINUED)
Integrated Plant Assessment Individual Plant Examination Individual Plant Examination for External Events Interstate Power and Light ITC Midwest, LLC kilovolt level of service million gallons Metropolitan Statistical Area mean sea level megawatt megawatt-days per metric ton uranium megawatts-electrical megawatts-thermal Not Applicable National Ambient Air Quality Standards National Environmental Policy Act National Electrical Safety CodeNuclear Management Company Nitrogen dioxide Nitrogen oxides National Pollutant Discharge Elimination System National Park Service U.S. Nuclear Regulatory Commission National Renewable Energy Laboratory New Source Performance Standards Nuclear steam supply system National Water Quality Assessment Particulate Matter Particulate matter with aerodynamic diameters of 10 microns or less Particulate matter with aerodynamic diameters of 2.5 microns or less power purchase agreement Reactor Building Closed Cooling Water residual heat removal residual -heat removal service water Region of Interest right-of-way Severe Accident Mitigation Alternatives' ENVIRONMENTAL REPORT Page vii ENVIRONMENTAL REPORT Page vii Duane Arnold Energy Center License Renewal Application Environmental Report ACRONYMS AND ABBREVIATIONS (CONTINUED)
SCR selective catalytic reduction SHPO State Historic Preservation Officer SMITTR -surveillance, monitoring, inspections, testing, trending, and recordkeeping SO 2 sulfur dioxide SO, Sulfur oxides STP sewage treatment plant TtNUS Tetra Tech NUS, Inc.UI University of Iowa USCB U.S. Census Bureau USFWS U.S. Fish and Wildlife Service USGS U.S. Geological Survey ENVIRONMENTAL REPORT Page viii Duane Arnold Energy Center License Renewal Application Environmental Report
1.0 INTRODUCTION
1.1 PURPOSE
OF AND NEED FOR ACTION The U.S. Nuclear Regulatory Commission (NRC) licenses the operation of domestic nuclear power plants in accordance with the Atomic Energy Act of 1954, as amended, and NRC implementing regulations.
FPL Energy Duane Arnold, LLC (FPL-DA)operates the Duane Arnold Energy Center (DAEC) Unit 1, pursuant to NRC Operating License DPR-049. The license for Unit 1 will expire February 21, 2014. FPL-DA has prepared this environmental report in conjunction with its application to NRC to renew the DAEC operating license, as provided by the following NRC regulations:
- Title 10, Energy, Code of Federal Regulations (CFR), Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, Section 54.23, Contents of Application-Environmental Information (10 CFR 54.23) and* Title 10, Energy, CFR, Part 51, Environmental Protection Requirements for Domestic Licensing and Related Regulatory Functions, Section 51.53, Postconstruction Environmental Reports, Subsection 51.53(c), Operating License Renewal Stage [10 CFR 51.53(c)].
NRC has defined the purpose and need for the proposed action, the renewal of the operating license for nuclear power plants such as DAEC, as follows: "...The purpose and need for the proposed action (renewal of an operating license) is to provide an option that allows for power generation capability beyond the term of a current nuclear power plant operating license to meet future system generating needs, as such needs may be determined by State, utility, and, where authorized, Federal (other than NRC) decision makers." (NRC 1996a)The renewed operating license would allow an additional 20 years of plant operation beyond the current DAEC licensed operating period of approximately 40 years.INTRODUCTION 1.1-1 Duane Arnold Energy Center License Renewal Application Environmental Report 1.2 ENVIRONMENTAL REPORT SCOPE AND METHODOLOGY NRC regulations for domestic licensing of nuclear power plants require environmental review of applications to renew operating license. The NRC regulation 10 CFR 51.53(c)requires that an applicant for license renewal submit with its application a separate document entitled Applicant's Environmental Report -Operating License Renewal Stage. In determining what information to include in the DAEC Environmental Report, FPL-DA has relied on NRC regulations and the following supporting documents that provide additional insight into the regulatory requirements:
- NRC supplemental information in the Federal Register (NRC 1996a, 1996b, 1996c, 1996d, and 1999a)* Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GELS) (NRC 1996e and 1999b)* Regulatory Analysis for Amendments to Regulations for the Environmental Review for Renewal of Nuclear Power Plant Operating Licenses (NRC 1996f)* Public Comments on the Proposed 10 CFR Part 51 Rule for Renewal of Nuclear Power Plant Operating Licenses and Supporting Documents:
Review of Concerns and NRC Staff Response (NRC 1996g)* Supplement 1 to Regulatory Guide 4.2, Preparation of Supplemental Environmental Report for Applications to Renew Nuclear Power Plant Operating Licenses (NRC 2000)FPL-DA has prepared Table 1.2-1 to verify conformance with regulatory requirements.
Table 1.2-1 indicates where the environmental report responds to each requirement of 10 CFR 51.53(c).
In addition, each responsive section is prefaced by a boxed quote of the regulatory language and applicable supporting document language.INTRODUCTION 1.2-1 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 1.2-1 ENVIRONMENTAL REPORT RESPONSES TO LICENSE RENEWAL ENVIRONMENTAL REGULATORY REQUIREMENTS Regulatory Requirement 10 CFR 51.53(c)(1) 10 CFR 51.53(c)(2), Sentences 1 and 2 10 CFR 51.53(c)(2), Sentence 3 10 CFR 51.53(c)(2) and 10 CFR 51.45(b)(1) 10 CFR 51.53(c)(2) and 10 CFR 51.45(b)(2) 10 CFR 51.53(c)(2) and 10 CFR 51.45(b)(3) 10 CFR 51.53(c)(2) and 10 CFR 51.45(b)(4) 10 CFR 51.53(c)(2) and 10 CFR 51.45(b)(5) 10 CFR 51.53(c)(2) and 10 CFR 51.45(c)10 CFR 51.53(c)(2) and 10 CFR 51.45(d)10 CFR 51.53(c)(2) and 10 CFR 51.45(e)10 CFR 51.53(c)(3)(ii)(A) 10 CFR 51.53(c)(3)(ii)(B) 10 CFR 51.53(c)(3)(ii)(C) 10 CFR 51.53(c)(3)(ii)(D)
Responsive Environmental Report Section(s)
Entire Document 3.0 Proposed Action 7.2.2 Environmental Impacts of Alternatives
4.0 Environmental
Consequences of the Proposed Action and Mitigating Actions 6.3 Unavoidable Adverse Impacts 7.0 Alternatives to the Proposed Action 8.0 Comparison of Environmental Impacts of License Renewal with the Alternatives 6.5 Short-Term Use Versus Long-Term Productivity of the Environment
6.4 Irreversible
and Irretrievable Resource Commitments
4.0 Environmental
Consequences of the Proposed Action and Mitigating Actions 6.2 Mitigation
7.2.2 Environmental
Impacts of Alternatives
8.0 Comparison
of Environmental Impacts of License Renewal with the Alternatives
9.0 Status
of Compliance
4.0 Environmental
Consequences of the Proposed Action and Mitigating Actions 6.3 Unavoidable Adverse Impacts 4.1 Water Use Conflicts (Plants with Cooling Ponds or Cooling Towers Using Makeup Water from a Small River with Low Flow)4.6 Groundwater Use Conflicts (Plants Using Cooling Towers or Cooling Ponds and Withdrawing Makeup Water from a Small River)4.2 Entrainment of Fish and Shellfish in Early Life Stages (Plants With Once-through Cooling or Cooling Ponds)4.3 Impingement of Fish and Shellfish (Plants With Once-through Cooling or Cooling Ponds)4.4 Heat Shock (Plants With Once-through Cooling or Cooling Ponds)4.5 Groundwater Use Conflicts (Plants Using >100 gpm of Groundwater)
4.7 Groundwater
Use Conflicts (Plants Using Ranney Wells)4.8 Degradation of Groundwater Quality (Plants Using Cooling Ponds At Inland Sites)INTRODUCTION 1.2-2 INTRODUCTION 1.2-2 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 1.2-1 (CONTINUED)
ENVIRONMENTAL REPORT RESPONSES TO LICENSE RENEWAL ENVIRONMENTAL REGULATORY REQUIREMENTS Regulatory Requirement 10 CFR 51.53(c)(3)(ii)(E) 10 CFR 51.53(c)(3)(ii)(F) 10 CFR 51.53(c)(3)(ii)(G) 10 CFR 51.53(c)(3)(ii)(H) 10 CFR 51.53(c)(3)(ii)(I) 10 CFR 51.53(c)(3)(ii)(J) 10 CFR 51.53(c)(3)(ii)(K) 10 CFR 51.53(c)(3)(ii)(L) 10 CFR 51.53(c)(3)(iii) 10 CFR 51.53(c)(3)(iv) 10 CFR 51, Appendix B, Table B-i, Footnote 6 Responsive Environmental Report Section(s)
4.9 Impacts
of Refurbishment on Terrestria[Resources 4.10 Threatened or Endangered Species 4.11 Air Quality During Refurbishment (Non-Attainment Areas)4.12 Impacts on Public Health of Microbiological Organisms 4.13 Electric Shock from Transmission-Line-Induced Currents 4.14 Housing Impacts 4.15 Public Utilities:
Public Water Supply Availability 4.16 Education Impacts from Refurbishment 4.17 Offsite Land Use 4.18 Transportation 4.19 Historical and Archaeological Resources.4.20 Severe Accident Mitigation Alternatives
4.0 Environmental
Consequences of the Proposed Action and Mitigating Actions 6.2 Mitigation
5.0 Assessment
of New and Significant Information
2.6.2 Minority
and Low-Income Populations INTRODUCTION 1.2-3 Duane Arnold Energy Center License Renewal Application Environmental Report 1.3 DUANE ARNOLD ENERGY CENTER LICENSEE AND OWNERSHIP Ownership of DAEC is shared by FPL-DA, Palo, Iowa (70 percent), Central Iowa Power Cooperative, Cedar Rapids, Iowa (20 percent), and Corn Belt Power Cooperative, Humboldt, Iowa (10 percent).
FPL Energy Duane Arnold, LLC is a subsidiary of FPL Energy, LLC, which is a subsidiary of FPL Group, Inc. based in Juno Beach, Florida.FPL Group, Inc. generates electricity at power plants in the southeastern and northeastern United States; operates wind power throughout the Midwest; and delivers energy to customers in over 26 states including Iowa, Wisconsin, Minnesota, North Dakota, South Dakota, Kansas, New Hampshire, and Florida (FPL 2006). FPL-DA is the licensed operator of DAEC (NRC 2006).Transmission assets at 34.5 kilovolts or higher were sold by Interstate Power and Light, a subsidiary of Alliant Energy, to ITC Midwest LLC in December of 2007. This included transmission lines, transmission substations, and associated land rights, contracts, permits, and equipment.
Pursuant to the agreement, Interstate Power and Light will maintain the lines and rights-of-way through 2008.INTRODUCTION 1.3-1 Duane Arnold Energy Center License Renewal Application Environmental Report 2.0 SITE AND ENVIRONMENTAL INTERFACES
2.1 LOCATION
AND FEATURES Duane Arnold Energy Center (DAEC) is located in Linn County, Iowa on the western bank of a north-south reach of the Cedar River, approximately two miles north-northeast of the Town of Palo and approximately three miles east of the Benton county line (Figure 2.1-1). DAEC is located in a primarily rural, sparsely populated area. There are three metropolitan areas within 50 miles of the site: Waterloo, approximately 34 miles to the northwest, Iowa City, approximately 32 miles to the southeast, and Cedar Rapids, the closest city, approximately
5.7 miles
to the southeast (Figure 2.1-2).The site encompasses approximately 500 acres. DAEC utilizes only a small portion of the acreage for power production; the remaining portion of the land is leased to area farmers (FPL 2007a). The site boundary/exclusion area is shown in Figure 2.1-3 (DAEC 2005a).The site is located on a strip of land running northeast and parallel to the Cedar River, which is the largest tributary of the Iowa River. This strip of land is a relatively flat plain at approximately 750 feet above mean sea level (msl). The general topographical features in this portion of the Cedar River consist of broad valleys with relatively narrow flood plains. Across the river from the site, the land rises to an elevation of about 900 feet. The slopes are heavily wooded, but away from the immediate vicinity of the river the land is gently rolling farmland (DAEC 2005a).The industrial activities within 10 miles of the site are confined principally to the Cedar Rapids metropolitan area. There is no significant industrial activity near the site.Manufacturing is the-most important single industry in the Linn County economy (USCB 2005). The smaller communities in the vicinity of the site consist of small retail business establishments.
Pleasant Creek State Recreation Area is a 1,927 acre park located 1 mile northwest of the site. Included in this acreage is a 410 acre lake that was jointly developed by the Iowa Conservation Commission and the Iowa Electric Light and Power Company to provide both a supplemental water supply for DAEC and at the same time provide regional recreation opportunities (IDNR 2007a). Recreational activities at several park areas within ten miles of the site mostly consist of boating, fishing, hunting, camping, hiking, picnicking, and swimming.
Palo Marsh Wildlife Refuge, located 2 miles south of the site, is a 144-acre site featuring a wetland trail and bottomland forest for wildlife observation.
The Wickiup Hill is a 563-acre natural area located across the Cedar River just east of the site which includes the 240-acre Wickiup Hill Outdoor Learning Area and 10,000 square foot Learning Center (LCCD 2007a). Cedar Rapids offers many attractions that draw visitors from surrounding areas, including the annual Cedar Rapids Freedom Festival which is typically a 16-day event (Cedar Rapids 2007).SITE AND ENVIRONMENTAL INTERFACES 2.1-1 SITE AND ENVIRONMENTAL INTERFACES 2.1-1 Duane Arnold Energy Center License Renewal Application Environmental Report DAEC is the only reactor in the state and employs more than 600 Iowans (FPL 2007a).The-single 610 gross megawatt-electrical (MWe) unit is a General Electric boiling water reactor of the standard BWR-4 design. Two mechanical draft cooling towers are used, drawing water from the Cedar River (Figure 2.1-3). Water used in the reactor and most other plant systems is piped in from the site's well water supply (FPL 2007a). Qther site structures include administration building, control building, turbine building, radwaste building, low-level radwaste processing and storage building, pump house, intake structure, and off-gas stack. The Independent Spent Fuel Storage Installation is located on the northern part of the site property (Figure 2.1-3).Section 3.1 describes key features of DAEC, including reactor and containment systems, cooling water system, and transmission system.Duane Arnold Energy Center SITE AND ENVIRONMENTAL INTERFACES Page 2.1-2 Duane Arnold Energy Center License Renewal Application Environmental Report FIGURE 2.1-1 6-MILE VICINITY MAP SITE AND ENVIRONMENTAL INTERFACES 2.1-3 SITE AND ENVIRONMENTAL INTERFACES 2.1-3 Duane Arnold Energy Center License Renewal Application Environmental Report FIGURE 2.1-2 50-MILE VICINITY MAP 0 SITE AND ENVIRONMENTAL INTERFACES 2.1-4 SITE AND ENVIRONMENTAL INTERFACES 2.1-4 Duane Arnold Energy Center License Renewal Application Environmental Report FIGURE 2.1-3 DAEC SITE BOUNDARY SITE AND ENVIRONMENTAL INTERFACES 2.1-5 SITE AND ENVIRONMENTAL INTERFACES 2.1-5 Duane Arnold Energy Center License Renewal Application Environmental Report 2.2 AQUATIC RESOURCES Aquatic communities of the Cedar River in the vicinity of DAEC are directly influenced by the quantity and quality of water in the river, which is the source of makeup water for the plant's mechanical draft cooling towers. Flows in the river are largely a function of the amount and timing of precipitation in the watershed.
Water quality in the river is affected by upstream point-source discharges (from municipal wastewater treatment plants and industrial facilities) and non-point source discharges (fertilizers and animal wastes from agricultural operations).
This section characterizes the hydrology of the Cedar River and the distribution and abundance of aquatic organisms in the reach of the river adjacent to DAEC.Description of Cedar River Basin The Cedar River rises in southeastern Minnesota (Dodge County) and flows southeast for some 330 miles across Iowa to its confluence with the Iowa River, approximately 20 miles upstream of the point at which the Iowa River empties into the Mississippi.
River (Encyclopedia Britannica).
The Cedar River's 7,819-square-mile drainage basin is mostly fertile farmland.
More than 90 percent of the land in the region is devoted to agriculture; most of this land is in row crops (Sullivan 2000).The U.S. Geological Survey (USGS) operates and maintains stream flow gauging stations on the Cedar River up- and downstream of DAEC. Annual mean flow at a Cedar River gauging station in Waterloo, Iowa (approximately 50 air miles upstream of DAEC) ranged from 636 to 10,580 cubic feet per second (cfs) over the 1941-2005 period and averaged 3,329 cfs (Nalley et al. 2006). Annual average flow at a Cedar River gauging station at Cedar Rapids, Iowa (approximately 15 miles downstream of DAEC) ranged from 689 to 15,130 cfs over the 1903-2005 period and averaged 3,783 cfs (Nalley et al. 2006). Several substantial tributaries flow into the 65-mile reach of river between Waterloo and Cedar Rapids: Black Hawk Creek (at Waterloo), Wolf Creek (near LaPorte City), and Prairie Creek (at Cedar Rapids).Precipitation in Iowa averages 34 inches per year, with highest rainfall in the southeast part of the state (approximately 37 inches per year) and lowest rainfall in the northwest (approximately 29 inches per year) (Nalley et al. 2006). Annual precipitation in east-central Iowa, where DAEC is located, averaged 35.6 inches per year between 1971 and 2000 (Nalley et al. 2006). Nearly three-fourths of the state's precipitation is received during the spring-summer growing season (NCDC 2006). Cedar River flows reflect this seasonal pattern of precipitation.
Flows at the Cedar Rapids gauging station from 1903 through 2005 were highest in the spring (March through June) and lowest in the fall and winter (October through January).
Cedar River flows over the March-June period are typically 3 times those of the October-January period, averaging 6,221 cfs versus 2,043 cfs (Nalley et al. 2006).SITE AND ENVIRONMENTAL INTERFACES 2.2-1 Duane Arnold Energy Center License Renewal Application
... Environmental Report Studies of Aquatic Biota DAEC conducted pre-operational surveys of Cedar River aquatic communities from April 1971 to February 1975. This monitoring continued from the time the DAEC commenced commercial operation through 1999. The USGS conducted studies of fish community structure in the Cedar River in 1996 as part of the National Water Quality Assessment Program (NAWQA). Nuclear Management Company (NMC), which operated DAEC from May 2000 to December 2005, commissioned focused surveys of freshwater mussels in the area of the DAEC intake canal in 2002. The various aquatic surveys and studies are summarized in the sections that follow.Benthic Macroinvertebrates Contract biologists monitored benthic organisms in the Cedar River in the DAEC vicinity from mid-1971 through 1999 to determine if plant operations were having an effect on their distribution and abundance (McDonald 2000). It became clear in the early years of the monitoring that the shifting sand substrate in the river prevented establishment of a diverse community of benthic macroinvertebrates.
In subsequent years, artificial substrates were employed upstream and downstream of the discharge canal and in the discharge canal to confirm that substrate, rather than water quality or some other factor, limited the density and diversity of macroinvertebrates.
Benthic communities that developed on the artificial substrates were much larger and more diverse that those associated with the Cedar River's natural shifting sand and silt substrates.
As reported by McDonald (2000), "Ponar grab samples taken from the five sites contain few if any benthic organisms, but a diverse assemblage of organisms develop on the (artificial) substrates during the six-week colonization period." Freshwater Mussels Frest (1987 in Helms 2003) conducted a mussel survey 1.5 miles upstream of DAEC in the area of Lewis Preserve County Park and found live representatives of 7 mussel species [plain pocketbook (Lampsilis cardium), white heelsplitter (Lasmigona complanata), fragile papershell (Leptodea fragilis), hickorynut (Obovaria olivaria), pink papershell (Potamilis ohiensis), pimpleback (Cyclonaias tuberculata), and lilliput (Toxalasma parvus)] and the dead shell of another species, the threeridge (Amblema plicata) (Frest 1987 in Helms 2003). NMC commissioned surveys of mussels along the west shore of the Cedar River upstream of the DAEC intake canal in 2002, in an area that was slated to be cleared of dead wood and snags and dredged (Helms 2003).Fourteen living mussels representing four species were collected:
plain pocketbook (10 individuals), black sandshell (Ligumia recta; 2 individuals), pink papershell (1 individual), and white heelsplitter (1 individual).
In addition, a single dead strange floater (Strophitus undulatus; also known as squawfoot and creeper) was collected.
The Iowa Mussel Team reviewed the status of the state's freshwater mussels in 2002 (CVRC&D 2002). The Mussel Team reported that "about half' of the freshwater mussel species found in Iowa at the time of European settlement survives today.. Siltation, SITE AND ENVIRONMENTAL INTERFACES
.2.2-2 Duane Arnold Energy Center License Renewal Application Environmental Report pollution, impoundment of rivers, and non-native invasive species were cited as the reasons for the decline of native mussels. With regard to the mussel species found by Helms in the DAEC vicinity, the Mussel Team classified them as follows: " Plain pocketbook
--- common* Black sandshell
--- uncommon" Pink papershell
--- uncommon* White heelsplitter
--- uncommon* Strange floater/sq uawfoot/creeper
--- threatened Table 2.5-1 in Section 2.5 lists mussel species formally protected by the state of Iowa or the U.S. Fish and Wildlife Service that are known to occur in Linn, Benton, and Blackhawk Counties, Iowa.Fish The most comprehensive sources of information on fish populations in the Cedar River in the area of DAEC are the operational ecological studies conducted by Ecological Analysts, Inc., for Iowa Electric Light and Power Company over the period 1979-1983.
Fish were collected in spring, summer, and fall from two locations in the Cedar River, one immediately downstream of the station's discharge canal and one approximately five miles upstream of the plant. Fish were collected by electrofishing, seining, and hoop netting, a mix of active and passive sampling techniques intended to capture fish of different sizes with different habitat preferences.
A total of 41 fish species representing 8 families were collected over the five year (1979-1983) period. Fifteen species were collected in every year of the study. In 1983, the last year for which detailed catch data is available, collections were dominated by a single species, the spotfin shiner (Cyprinella spiloptera).
Of the 1,387 fish collected with all methods, 818 (59 percent) were spotfin shiners. The spotfin shiner is found across the Midwestern United States in small to large streams, particularly low-gradient streams (Lee et al. 1980; Loan-Wilsey et al. 2005). It is found in north-central and northeast Iowa streams, but is more abundant in large rivers like the Cedar and Iowa Rivers. Spotfin shiners have been described as "aggressive" and often outnumber other Cyprinids in waters that are turbid, silty, and organically polluted (Trautman 1957;Loan-Wilsey et al. 2005).Other species that appeared frequently in DAEC collections included the river carpsucker (Carpiodes carpio; 123 fish, 8.9 percent), bullhead minnow (Pimephales vigilax; 83 fish, 6.0 percent), bluntnose minnow (Pimephales notatus; 70 fish, 5 percent), and common carp (Cyprinus carpio; 49 fish, 3.5 percent).
The river carpsucker is found in streams and rivers across the Midwest, and "thrives in the silty, turbid waters of rivers.. .with slow currents over soft bottoms of sand, clay, and gravel" (Loan-Wilsey et al. 2005). The bullhead minnow is found in many tributaries of the Mississippi River, including the Cedar, Des Moines, and Iowa Rivers. It is known to be SITE AND ENVIRONMENTAL INTERFACES 2.2-3 Duane Arnold Energy Center License Renewal Application Environmental Report highly tolerant of turbidity and siltation (Trautman 1957; Loan-Wilsey et al. 2005). The bluntnose minnow is found in a variety of habitats across the Midwestern U.S. and is tolerant of turbidity and pollutants, both organic and inorganic (Trautman 1957; Lee et al. 1980). A hardy species, it is widely used as a bait minnow. The common carp, introduced to the U.S. in 1877, is found in streams, lakes, and impoundments across the country (Lee et al 1980). It tolerates a wide range of water quality conditions, and may thrive in polluted or eutrophic waters that exclude other, more desirable game fish species (Scott and Crossman 1973).A variety of recreationally-important species were collected near DAEC in 1983, but only one, the channel catfish, was present in significant numbers (36 fish). Other gamefish in samples included smallmouth bass (6 fish), bluegill (5 fish), largemouth bass (4 fish), white crappie (4 fish), black crappie (3 fish), and northern pike (1 fish).The USGS collected data on fish communities at 12 sites in 4 eastern Iowa river basins (the Wapsipinicon, the Cedar, the Iowa, and the Skunk) in 1996 as part of the NAWQA program (Sullivan 2000). Two. Cedar River sites were sampled, one upstream (Site #5)and one downstream (Site #2) of DAEC. Fish communities at all the large river sites, including the two Cedar River sites, were numerically dominated by minnows (Cyprinids) and suckers (Catastomids).
Minnows made up more than 42 percent of fish collected at Cedar River Site 2 (upstream of DAEC); 44.8 percent were suckers. Eight minnow species and three sucker species were collected.
More than 81 percent of fish collected at Site 5 (downstream of DAEC) were minnows (8 species);
approximately 15 percent were suckers (9 species).
Bullhead minnows (32 percent of total) and river carpsuckers (44 percent of total) dominated collections at Cedar River Site 2; spoffin shiner (39 percent of total) and bluntnose minnow (27 percent of total) dominated collections at Cedar River Site 5 (Sullivan 2000). Based on surveys conducted at DAEC in the 1970s and 1980s, all four of these species are common in the area of the plant.The USGS NAWQA report rated the fish communities of the two Cedar River sites as"fair," using the Index of Biotic Integrity (IBI) scoring systems of the states of Ohio and Wisconsin.
The two Cedar River sites were the highest-scoring of six "large river" sites in eastern Iowa (Sullivan 2000). All other large-river sites were rated "fair" (but with lower numerical ratings) or "poor." The study listed eutrophication, toxic contamination, and soil erosion and sedimentation as factors that have degraded aquatic habitats and altered fish communities in eastern Iowa. The report notes that non-point-source pollutants have become more of a concern in recent years as improved wastewater treatment has reduced the amount of pollutants entering streams and rivers from industrial and municipal sources.The NAWQA study published in 2000 mirrored earlier fish studies conducted by DAEC in that relatively few sport fish were collected.
Channel catfish comprised nine percent of all fish collected at Cedar River Site 2, but less than one percent of fish collected at Site 5 (Sullivan 2000). Smallmouth bass made up approximately one percent of all fish collected at each site. No other recreationally important species was present in SITE AND ENVIRONMENTAL INTERFACES 2.2-4 Duane Arnold Energy Center License Renewal Application Environmental Report substantial numbers. The Cedar River is a popular destination for channel catfish anglers in summer, and is attracting an increasing number of smallmouth bass fishermen.
Smallmouth bass are caught in all reaches of the river, including the portion of the river that moves through downtown Cedar Rapids (Patterson 2007). A recent article in Iowa Outdoors, "Fishing Forecast 2007", urged fishermen to seek out several rivers in eastern Iowa, including the Cedar, that offer "...excellent smallmouth fishing from riffles to deeper pools... almost any type of habitat in these streams hold fish..." (IDNR 2007b).AQUATIC RESOURCES Page 2.2-5, Duane Arnold Energy Center License Renewal Application Environmental Report 2.3 GROUNDWATER RESOURCES DAEC is located in the Cedar River Basin on the west bank of the Cedar River, 133.5 river miles above its confluence with the Iowa River and 5.7 miles northwest of Cedar Rapids. At the DAEC site, the Cedar River Basin drainage area is approximately 6,250 square miles. The Cedar River is the Ilirgest tributary of the Iowa River. The-aquifers in the vicinity of the site include shallow unconsolidated glacial and surficial deposits, and deep underlying bedrock aquifers.
The bedrock strata immediately underlying the site are the Wapsipinicon and Gower Formations, of Middle Devonian and Upper Silurian age respectively (DAEC 2005a).The lower rock aquifer is composed of Ordovician and Cambrian rocks, which include St. Peter sandstone, Prairie du Chien dolomite and sandstone, Jordan sandstone, and St. Lawrence dolomite (DAEC 2005a).2.3.1 GROUND WATER SUPPLY Although the Jordan sandstone is the most prolific source of groundwater from the deep wells into the underlying bedrock aquifers, DAEC has not developed the Jordan aquifer for plant water supply because the Jordan aquifer is a sandstone aquifer that cannot tolerate excessive pumping; alternate wet and dry conditions would lead to ultimate crumbling and collapse (DAEC 2005a). Instead, DAEC production wells are.located within the Devonian and Silurian age aquifers.Adequate supplies of good water are also available from sand and gravel aquifers in the surficial deposits that overlie the bedrock. These are replenished by direct precipitation, periodic flooding, and, where adequate underground hydraulic connections with streambeds exist, by river recharge.
Two shallow aquifers underlie most of the site area, an upper water table aquifer composed of fine to medium sand, and a lower artesian aquifer in weathered rock. The two aquifers are separated by 10 to 60 feet of relatively impervious clay. This clay aquiclude is believed to be continuous over most of the site area. The clay extends above and below river bottom elevation (DAEC 2005a).Groundwater measurements indicate that flows in the upper aquifer are toward the river in a general southeasterly direction across the site. Potentiometric surface contours indicate that flows in the lower aquifer are also in this same general direction.
During DAEC production well operation, no interference of the upper aquifer has been noted (DAEC 2005a).Domestic wells within a one-mile radius west and north of the plant are upslope of the plant. Groundwater flows past these wells through the plant site or along an offsite path directly toward the river. Domestic wells southwest and south of the plant are approximately one mile away and are not in the line of groundwater flow past the plant.DAEC production wells drilled into the lower artesian Silurian-Devonian aquifer in weathered rock yield approximately 750 gallons per minute (gpm). Water analysis test reports indicate a good mineral quality (DAEC 2005a).SITE AND ENVIRONMENTAL INTERFACES 2.3-1 Duane Arnold Energy Center License Renewal Application Environmental Report 2.3.2 OFFSITE GROUND WATER USAGE The primary user of groundwater in the region is the Cedar Rapids Water Department (CRWD undated).
The department obtains its drinking water from the shallow sand and gravel aquifers along the Cedar River. The well system consists of 4.well fields, 4 collector wells and 45 vertical wells. Conventional lime softening is performed at 2 treatment plants and the water is distributed to 16 water towers. Serving a population of 123,000, the system has a peak flow of 50 million gallons per day (mgd), average flow of 35 mgd and could be expanded to its design capacity of 65 mgd. An additional 2,000 people are served by 2 wholesale water service agreements.
Residential, commercial, and municipal customers use 25 percent of the water and 75 percent is used by 16 local industries.
2.3.3 PLANT
GROUND WATER USAGE DAEC uses 4 production wells to provide approximately 100 gpm of demineralizer makeup and less than 10 gpm of potable water. In addition, these wells supply 1,400 gpm to an air-cooling system to provide high quality, cool (55 0 F),water to assist in the removal of heat from system components in an energy efficient manner during startup, normal operation, shutdown, and cool down (AEC 1973).The 4 wells, designated A, B, C, and D (DAEC 2006a), range in depth from 285 feet to 380 feet (DAEC 2004a). The wells are all installed in the Silurian-Devonian aquifer..Table 2.3-1 presents well depths and design yields.FPL-DA reports monthly and annual water use (well, reservoir, and surface water) to the Iowa Department of Natural Resources (IDNR) on the IDNR Annual Water Use Report Form (Curtland 2006). Table 2.3-2 presents well water use for 2001 through 2005.SITE AND ENVIRONMENTAL INTERFACES 2.3-2 Duane Arnold Energy Center License Renewal Application Environmental Report.TABLE 2.3-1 DUANE ARNOLD ENERGY CENTER WELL SYSTEM SDWIS ID Local Well Construction Depth Average Deep Well Capacity (Feet) Flow (gpm)GPM WL04 D 1980 285 1,000 Yes 1650 WL05 B 1992 375 500 Yes 1200 WL06 C 1999 380 600 Yes 750 WL07 A 2001 375 750 Yes 750 Adapted from DAEC 2004a, DAEC 2006a & IDNR 2004b TABLE 2.3-2 DUANE ARNOLD ENERGY CENTER WELL WATER USE Year 2001 2002 2003 2004 2005 Average 2001-2005 Annual Use (Mg) 702 707 768 848 640 733 Continuous 1,336 1,345 1,461 1,609 1,217 1,394 Average (gpm)Maximum Monthly 79.0 68.0 75.0 88.7 63.5 74.8 Use (Mg)Adapted from Curtland 2006 Mg = million gallons SITE AND ENVIRONMENTAL INTERFACES 2.3-3 Duane Arnold Energy Center License Renewal Application Environmental Report 2.4 CRITICAL AND IMPORTANT TERRESTRIAL HABITATS DAEC is located approximately
5.7 miles
northwest of Cedar Rapids, Iowa, in Linn County. The total plant site covers approximately 500 acres. The DAEC site is relatively flat and slopes gradually down to the Cedar River, which forms the 1.3-mile-long eastern boundary of the property.The DAEC was primarily farmland prior to plant construction and approximately 25 percent (126 acres) of the current site is leased farmland.
The remainder of the site is a combination of small forested plots, a marsh and hardwood forest along the river, and the industrial plant complex. The latter encompasses approximately 140 acres and includes facility buildings, a switchyard, parking areas, and maintained (mowed) areas.A discharge canal drains to the Cedar River.Predominant tree species in the floodplain forests along the Cedar River include silver maple (Acer saccharinum), green ash (Fraxinus pennsylvanica), box elder (Acer negundo) and hawthorn (Crataegus mollis) (Niemann and McDonald 1972). Due to the periodic flooding associated with the river floodplain, understory trees and plants in this area are sparse. Oaks (Quercus spp.) and hickories (Carya spp.) are the primary species in the remaining forested plots and field edges (AEC 1973).The terrestrial wildlife that occurs at DAEC and the surrounding areas are those species typically found in similar habitats throughout Iowa (AEC 1973). As the result of more than a century of conversion of the native habitats to agriculture, the existing flora and fauna of the region is not diverse. Common mammals observed during wildlife surveys associated with site construction included white-tailed deer (Odocoileus virginianus), raccoon (Procyon lotor), muskrat (Ondatra zibethica), opossum (Didelphis virginiana), spotted skunk (Spilogale putorius), and striped skunk (Mephitis mephitis) (Collins and McDonald 1972). Most of these were observed in the areas near the Cedar River.Common avian species observed on DAEC included meadowlark (Sturnella spp.), barn swallow (Hirundo rustica), red-wing blackbird (Agelaius phoeniceus), bluejay (Cyanocitta cristata), ring-necked pheasant (Phasianus colchicus), and wood duck (Aix sponsa). These species are still commonly observed on DAEC property by site personnel.
Ospreys (Pandion haliaeetus) are large, fish-eating birds that historically inhabited the waterways in Iowa; however, successful nesting by this species has not been documented in Iowa since Europeans first settled in the region. The IDNR and multiple conservation partners initiated an osprey restoration program in the late 1990s. In 1998, osprey fledglings from Minnesota and Wisconsin were released along the Cedar River in Black Hawk County (IDNR 2006a) and in 2006 another release was performed at Wickiup Hill (IDNR 2006b), across the Cedar River from DAEC in Linn County.DAEC personnel report a recent nesting attempt by ospreys on DAEC's meteorological tower. DAEC has initiated discussions with IDNR concerning construction of an artificial nesting platform for the ospreys. The osprey, generally considered an indicator species for good water quality, is not a federal- or state-listed species in Iowa.SITE AND ENVIRONMENTAL INTERFACES 2.4-1 Duane Arnold Energy Center License Renewal Application Environmental Report Section 3.1.3 describes the transmission lines/corridors built to connect DAEC to the transmission grid system. These lines are currently maintained by Alliant Energy, who maintains the vegetation (primarily the removal of fast-growing trees) within the transmission corridors once every five years (AE undated) to insure continued and safe dispersal of electricity through this system. In late 2008 or early 2009, the responsibility for maintenance will transition to ITC Midwest, the current owners of the transmission lines. The principle land use category of the area crossed by these transmission lines is agricultural.
SITE AND ENVIRONMENTAL INTERFACES 2.4-2 SITE AND ENVIRONMENTAL INTERFACES 2.4-2 DuaneArnold Energy Center License Renewal Application Environmental Report 2.5 THREATENED OR ENDANGERED SPECIES No threatened or endangered species are known to occur on the DAEC property (AEC 1973) or within the adjacent reaches of the Cedar River (Helms 2003), although there are known occurrences within the counties associated with the facility and transmission lines. Table 2.5-1 indicates animal and plant species under federal and state protection known to occur in counties in which DAEC and its associated transmission lines are located. These include federally-or state-listed species, species proposed for federal listing, and candidates for federal listing. The transmission lines are located in.Benton, Black Hawk, and Linn counties.
Special status species reported in Table 2.5-1 as occurring in these counties were taken from county records maintained by the U.S. Fish and Wildlife Service (USFWS 2007a) and the Natural Areas Inventory of the Iowa Department of Natural Resources (IDNR 2007c).Two plant species recorded in the counties associated with DAEC and its transmission corridors are federally-listed as threatened.
These are discussed below, as well as two state-listed avian species, one of which was introduced on the DAEC site.Prairie Bush Clover The prairie bush clover (Lespedeza leptostachya) is a legume found only in the tallgrass prairie region of Iowa, Illinois, Minnesota and Wisconsin (USFWS 2000). Because of its restricted range, it is considered a midwestern endemic plant. Prairie bush clover has slender clover-like leaves, is between 9 and 18 inches tall, and has flowers loosely arranged on an open spike.Prairie bush clover is listed as threatened by federal and state agencies (IDNR 2007c, USFWS 2007a). It thrives in mesic to dry prairie. The decline of this species was associated with the conversion of these natural prairies to cropland (through plowing) as well as overgrazing and herbicide application.
It has been recorded in Linn County, Iowa (IDNR 2007c), but is not known to occur on the DAEC site.Western Prairie Fringed Orchid The western prairie fringed orchid (Platanthera praeclara) is a prairie perennial that produces a tall (up 47 inches) flower stalk with 20 to 40 flowers. These flowers attract hawkmoths (various species of Sphingidae), which feed nocturnally on nectar within these flowers and transfer pollen between flowers and plants. Western prairie fringed orchids occur west of the Mississippi River in Iowa, Kansas, Minnesota, Nebraska, North Dakota, and in Manitoba, Canada. They occur most often in mesic to wet, unplowed tallgrass prairies and meadows, but have occasionally been found in old fields and roadside ditches.Western prairie fringed oichids are listed as threatened by federal and state agencies (IDNR 2007c, USFWS 2007a). The species has been recorded in Benton, Black Hawk, and Linn counties; however, these are historical records (all pre-1940) and not due to SITE AND ENVIRONMENTAL INTERFACES 2.5-1 Duane Arnold Energy Center License Renewal Application Environmental Report extant populations within these counties (USFWS 1996). There are no records of the western prairie fringed orchid on the DAEC site.Bald Eagle The bald eagle (Haliaeetus leucocephalus) is a well-known large raptor with distinctive white head plumage that is distributed throughout the United States. Recently de-listed (USFWS 2007b), it remains protected under the Bald and Golden Eagle Protection Act and the Migratory Bird Treaty Act. Bald eagles are still listed as endangered by the state of Iowa (IDNR 2007c). Breeding bald eagles were considered extirpated from Iowa shortly after the turn of the century (IDNR 2006c). Nesting by eagles re-occurred in the 1970s and by 2006, nesting eagles were present in 75 Iowa counties.
Bald eagles are reported as nesting in Benton, Black Hawk and Linn counties, but are not known to nest on or near the DAEC property.Peregrine Falcon Peregrine falcons (Falco peregrinus) were considered extirpated from the eastern United States, including Iowa, in the mid-1960s (IDNR 2006c), presumably due to pesticide (DDT) impacts. The population was classified as federally endangered and efforts were initiated to recover the species. Attempts to re-establish breeding peregrines in Iowa started in 1989 when young birds were released at urban "hacking sites" in various locations of the state. This method has continued since then and was successful in establishing low numbers (five to six pairs) of breeding peregrine falcons in Iowa. Peregrine falcons are no longer federally endangered but remain state-listed as endangered and are known to breed in Linn County. In 2002, in cooperation with Iowa's Peregrine Falcon Restoration Project, eight young peregrines were released at a hacking station on DAEC property.
This was attempted for only one year and the birds did not return to DAEC.SITE AND ENVIRONMENTAL INTERFACES 2.5-2 SITE AND ENVIRONMENTAL INTERFACES 2.5-2 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 2.5-1 PROTECTED SPECIES IN IOWA COUNTIES CONTAINING DUANE ARNOLD FACILITIES AND TRANSMISSION LINES Scientific Name Common Name Federal State County 2 Status' Status'Amphibians Ambystoma laterale Necturus maculosus Notophthalmus viridescens Birds Ammodramus henslowii Buteo lineatus Falco peregrinus Haliaeetus leucocephalus Fish Ammocrypta clara Esox americanus Etheostoma spectabile Lampetra appendix, Moxostoma duquesnei Notropis heterolepis Notropis texanus Freshwater Mussels Alasmidonta viridis Anodontoides ferussacianus Lampsilis teres Lasmigona compressa Strophitus undulates Tritogonia verrucosa Venustaconcha ellipsiformis Insects Euphydryas phaeton Problema byssus Mammals Perognathus flavescens Spilogale putorius Blue-spotted salamander Mudpuppy Central newt Henslow's sparrow Red-shouldered hawk Peregrine falcon Bald eagle Western sand darter Grass pickerel Orangethroat darter American brook lamprey-E-T-T-T-E-E DL E-T-T-T-T Black redhorse Blacknose shiner Weed shiner Slippershell mussel Cylindrical papershell Yellow sandshell Creek heelsplitter Creeper Pistolgrip Ellipse T T E E T E T T E E T T E E Black Hawk, Linn Black Hawk Black Hawk, Linn Linn Benton, Black Hawk Linn Benton, Black Hawk, Linn Black Hawk, Linn Linn Linn Benton, Black Hawk, Linn Benton, Linn Benton, Linn Benton, Linn Linn Black Hawk, Linn Linn Linn Linn Linn Linn Linn Linn Benton, Black Hawk, Linn Black Hawk Baltimore Byssus skipper Plains pocket mouse Spotted skunk SITE AND ENVIRONMENTAL INTERFACES 2.5-3 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 2.5-1 (CONTINUED)
PROTECTED SPECIES IN IOWA COUNTIES CONTAINING DUANE ARNOLD FACILITIES AND TRANSMISSION LINES Federal State County2 Scientific Name Common Name Status' Status 1 Plants Besseya bullii Betula pumila Botrychium simplex*Chimaphilla umbellate Comus canademsis Cypripedium reginae Dalea villosa Decodon verticillata Dichanthelium borealis Equisetum sylvaticum Gaylussacia baccata Hypericum boreale Ilex verticillata Lechea intermedia Lespedeza leptostachya Menyanthes trifoliate Mimulus glabratus Oenothera perennis Opuntia macrorhiza Platanthera flava Platanthera praeclara Platanthera psycoides Polygala incarnata Polygala polygama Salix pedicellaris Spiranthes ovalis Xyris torta Reptiles Clemmys insculpta Crotalus viridis Emydoidea blandingii Kitten tails Bog birch Little grape fern Prince's pine Bunchberry Showy lady's slipper Silky prairie clover Waterwillow Northern panic grass Woodland horsetail Black huckleberry Northern St. Johns wort Winterberry Narrowleaf pinweed Prairie bush clover Buckbean Yellow monkey flower Small sundrops Prickly-pear Tubercled orchid Western prairie fringed orchid Purple fringed orchid Pink milkwort Racemed willowort Bog willow Oval ladies-tresses Yellow-eyed grass Wood turtle Prairie rattle snake Blandings turtle T T T Benton, Black Hawk, Linn T Black Hawk T Black Hawk, Linn T Linn T Linn T Black Hawk E Black Hawk E Black Hawk E Linn T Black Hawk, Linn T Linn E Linn E Linn T Benton T Linn T Linn T Linn T Linn E Linn E Linn T Benton, Black Hawk, Linn T Linn T Black Hawk, Linn E Linn T Benton, Black Hawk T Linn E Benton, Linn E Benton, Black Hawk, E Benton T Black Hawk, Linn SITE AND ENVIRONMENTAL INTERFACES 2.5-4 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 2.5-1 (CONTINUED)
PROTECTED SPECIES IN IOWA COUNTIES CONTAINING DUANE ARNOLD FACILITIES AND TRANSMISSION LINES 0 Scientific Name Common Name Federal State Status 1 Status 1 County 2 Reptiles (continued)
Terrapene ornate Ornate box turtle -T Benton, Black Hawk, Linn Snails Vertigo meramecensis Bluff vertigo -T Linn 1 E = Endangered, T = Threatened, DL = de-listed (IDNR 2007c, USFWS 2007a).2 DAEC is located in Linn County; transmission line corridors associated with this facility are located in Linn, Benton, and Black Hawk Counties, Iowa.SITE AND ENVIRONMENTAL INTERFACES 2.5-5 Duane Arnold Energy Center License Renewal Application Environmental Report 2.6 DEMOGRAPHY
2.6.1 REGIONAL
DEMOGRAPHY The Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GELS) presents a population characterization method that is based on two factors: Itsparseness" and "proximity" (NRC 1996e). "Sparseness" measures population density and city size within 20 miles of a nuclear power plant and categorizes the demographic information as follows: Demographic Categories Based on Sparseness Sparseness Category Most sparse Less than 40 persons per square mile and no community with 25,000 or 1. more persons within 20 miles 2. 40 to 60 persons per square mile and no community with 25,000 or more persons within 20 miles 60 to 120 persons per square mile or less than 60 persons per square mile with at least one community with 25,000 or more persons within 20 miles 4. Greater than or equal to 120 persons per square mile within 20 miles Least sparse Source: NRC 1996e."Proximity" measures population density and city size within 50 miles of a nuclear power plant and categorizes the demographic information as follows: Demographic Categories Based on Proximity Proximity Category Not.in close 1. No city with 100,000 or more persons and less than 50 persons per square proximity mile within 50 miles 2. No city with 100,000 or more persons and between 50 and 190 persons per square mile within 50 miles One or more cities with 100,000 or more persons and less than 190 persons per square mile within 50 miles In close proxi 4. Greater than or equal to 190 persons per square mile within 50 miles proximity Source: NRC 1996e.SITE AND ENVIRONMENTAL INTERFACES 2.6-1 Duane Arnold Energy Center License Renewal Application.
Environmental Report The GElS then uses the following matrix to rank the population category as low, medium, or high.GElS Sparseness and Proximity Matrix Proximity 1 2 3 4 U) 1 11 12 2 2.1 2.2 M 3 31 3.2 CO 4 4.1 14.2 1 1.3 1.4 12.3 2.4 3 3.4.Low Medium High Population Population Population Area Area Area Source: NRC 1996e.FPL Energy Duane Arnold, LLC (FPL-DA) used Year 2000 census data from the U.S.Census Bureau (USCB) (TtNUS 2007a) with geographic information system software (ArcGIS) to determine most demographic characteristics in the DAEC vicinity.
The calculations (TtNUS 2007a) determined that 210,081 people live within 20 miles of DAEC, producing a population density of 167 persons per square mile. Applying the GElS sparseness measures results in a least sparse category, Category 4 (greater than or equal to 120 persons per square mile within 20 miles).To determine the proximity category, FPL-DA determined that 621,461 people live within 50 miles of DAEC, which equates to a population density of 79 persons per square mile (TtNUS 2007a). Applying the GElS proximity measures, DAEC is classified as Category 3 (one or more cities with 100,000 or more persons and less than 190 persons per square mile within 50 miles). Therefore, according to the GElS sparseness and proximity matrix, the DAEC ranks of Category 4 sparseness, and Category 3 proximity result in the conclusion that DAEC is located in a high population area.All or parts of 22 counties and 3 Metropolitan Statistical Areas (MSAs) are located within 50 miles of DAEC (Figure 2.1-2). The MSAs are Cedar Rapids, Waterloo-Cedar Falls, and Iowa City (USCB 2003a).DAEC is located in the Cedar Rapids MSA. The Cedar Rapids MSA had a 2000 population of 237,230. From 1990 to 2000, the population of the Cedar Rapids MSA increased from 210,640 to 237,230, an increase of 12.6 percent. The populations in other MSAs within 50 miles of DAEC also increased between 1990 and 2000. The population of the Waterloo-Cedar Falls MSA increased from 158,640 to 163,706, an SITE AND ENVIRONMENTAL INTERFACES 2.6-2 Duane Arnold Energy Center License Renewal Application Environmental Report.increase of 3.2 percent. The population of the Iowa City MSA increased from 115,731 to 131,676, an increase of 13.8 percent (USCB 2003a).The town of Palo (2 miles south-southeast of the site) is the nearest concentration of population to DAEC, with a 2000 population of 614. Cedar Rapids (5.7 miles southeast), Iowa City (32 miles southeast), and Waterloo (34 miles northwest), are the largest population centers within the 50-mile radius, with 2000 populations of: 120,758;68,747; and 62,220, respectively (USCB 2003b).Because approximately 83.7 percent of employees at DAEC reside in Linn and Benton Counties, Iowa, they are the counties with the greatest potential to be socioeconomically affected by license renewal at DAEC (see Section 3.4). Table 2.6-1 shows population counts and growth rates for these counties.
Values for the city of Cedar Rapids are provided to illustrate the fluctuations in population in the urban portion of Linn County. The values for the state of Iowa are also provided for comparison.
From 1970 to 1980, the state and Linn and Benton Counties experienced modest growth rates, while the population in the city of Cedar Rapids declined slightly.
From 1980 to 1990, the two counties, the city of Cedar Rapids, and the state experienced negative growth rates. From 1990 to 2000, the two counties, the city of Cedar Rapids, and the state have experienced positive growth rates. During the 1990 to 2000 period, the growth rates in Cedar Rapids and the two counties were more than double that of the state. Overall, Linn and Benton Counties, and the state have experienced positive growth rates and are projected to continue to grow during the license renewal period.2.6.2 MINORITY AND LOW-INCOME POPULATIONS The U.S. Nuclear Regulatory Commission (NRC) performed environmental justice analyses for previous license renewal applications and concluded that a 50-mile radius could reasonably be expected to contain potential environmental impact sites and that the encompassing state was appropriate as the geographic area for comparative analysis.
FPL-DA has adopted this approach for identifying the DAEC minority and low-income populations that could be affected by DAEC operations.
FPL-DA used ArcGIS geographic information system software to combine USCB TIGER line data with USCB 2000 census data to determine the minority characteristics by block group. FPL-DA included all block groups if any part of their area lay within 50 miles of DAEC. The 50-mile radius includes 512 block groups (Table 2.6-2).-2.6.2.1 Minority Populations The NRC Procedural Guidance for Preparing Environmental Assessments and Considering Environmental Issues defines a "minority" population as: American Indian or Alaskan Native; Asian; Native Hawaiian or other Pacific Islander; black races; all other single races; multi-racial; and Hispanic ethnicity (NRC 2004, Appendix D). The guidance indicates that a minority population exists if either of the following two conditions exists: SITE AND ENVIRONMENTAL INTERFACES 2.6-3 Duane Arnold Energy Center License Renewal Application Environmental Report* The minority population in the census block group or environmental impact site exceeds 50 percent.* The minority population percentage of the environmental impact area is significantly greater (typically at least 20 percentage points) than the minority population percentage in the geographic area chosen for comparative analysis.NRC guidance calls for use of the most recent USCB decennial census data. FPL-DA used 2000 census data from the USCB website (USCB 2000a and 2000b) to determine the percentage of the total population in Iowa of each minority category, and to identify minority populations within 50 miles of DAEC.FPL-DA divided USCB population numbers for each minority population within each block group by the total population of that block group to obtain the percent of the block group's population represented by each minorityl For each of the 512 block groups within 50 miles of DAEC, FPL-DA calculated the percent of the population in each minority category and compared the result to the corresponding geographic area's minority threshold percentages to determine whether minority populations exist (TtNUS 2007b). FPL-DA defines the geographic area for DAEC as the state of Iowa.USCB data (USCB 2000a) for Iowa characterizes 0.31 percent of the population as American Indian or Alaskan Native; 1.25 percent Asian; 0.03 percent Native Hawaiian or other Pacific Islander; 2.11 percent black races; 1.28 percent all other single minorities; 1.09 percent multi-racial; 6.07 percent aggregate of minority races; and 2.82 percent Hispanic ethnicity.
Table 2.6-2 presents the numbers of block groups in each county in the 50-mile radius that exceed the threshold for minority populations.
Figures 2.6-1 through 2.6-4 locate the minority block groups within the 50-mile radius.Fourteen census blocks within the 50-mile radius have black races populations that meet the NRC criteria for a minority population.
These block groups, shown in Figure 2.6-1, are concentrated in urban areas (Waterloo and Cedar Rapids) 10 or more miles from the DAEC site.Two census blocks within the 50-mile radius in Tama County have American Indian or Alaskan Native populations that meet the NRC criteria for a minority population (Figure 2.6-2). The Meskwaki Settlement of the Sac & Fox Tribe of the Mississippi is located in this county (EDA 2007).Twenty-three census blocks within the 50-mile radius have Aggregate Minority populations that meet the NRC criteria for a minority population.
These census blocks are shown in Figure 2.6-3.Two census blocks within the 50-mile radius in Muscatine County have Hispanic Ethnicity populations that meet the NRC criteria for a minority population.
These block SITE AND ENVIRONMENTAL INTERFACES 2.6-4 Duane Arnold Energy Center License Renewal Application Environmental Report Two census blocks within the 50-mile radius in Muscatine County have Hispanic Ethnicity populations that meet the NRC criteria for a minority population.
These block groups, shown in Figure 2.6-4, are near the town of West Liberty approximately 40 miles southwest of the DAEC site.2.6.2.2 Low-Income Populations NRC guidance defines low-income based on statistical poverty thresholds (NRC 2004, Appendix D). FPL-DA divided USCB low-income households in each census block group by the total households for that block group to obtain the percentage of low-income households per block group. USCB data (USCB 2000b) characterize 9.32 percent of Iowa as low-income households.
A low-income population is considered to be present if: 1. The low-income population in the census block group or the environmental impact site exceeds 50 percent.2. The percentage of households below the poverty level in an environmental impact area is significantly greater (typically at least 20 percentage points) than the low-income population percentage in the geographic area chosen for comparative analysis.Table 2.6-2 identifies the low-income block groups in the region of interest.
Figure 2.6-5 locates the low-income block groups.Fifteen census blocks within the 50-mile radius have low-income households that meet the NRC criteria.
These block groups, shown in Figure 2.6-5, are concentrated in urban areas (Waterloo and Iowa City) 30 or more miles from the DAEC site.DEMOGRAPHY Page 2.6-5 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 2.6-1 DECENNIAL POPULATIONS, PROJECTIONS, AND GROWTH RATES Linn County Benton County Cedar Rapids Iowa Year Number Percent Number Percent Number Percent Number Percent 1970 163,213 NA 22,885 NA 110,642 NA 2,825,368 NA 1980 169,775 4.0% 23,649 3.3% 110,243 -0.4% 2,913,808 3.1%1990 168,767 -0.6% 22,429 -5.2% 108,772 -1.3% 2,776,831
-4.7%2000 191,701 13.6% 25,308 12.8% 120,758 11.1% 2,926,324 5.4%2006 a 201,853 5.3% 26,962 6.5% 124,417 2.5% 2,982,085 1.9%2010 211,516 10:3% 28,513 12.7% NA NA 3,035,321 1.8%2020 237,116 12.1% 31,593 10.8% NA NA 3,181,466 4.8%2030 265,098 11.8% 34,990 10.8% NA NA 3,360,401 5.6%a. Growth for the 2000-2006 interval.
All other growth rates are based on decennial populations.
Source: USCB 1990; USCB 2003b; UISCB 2007a, 2007b; State Library of Iowa 2006a SITE AND ENVIRONMENTAL INTERFACES266 2.6-6 0 CU m z z 0 z 0 z z<0 m Z'TABLE 2.6-2 BLOCK GROUPS WITHIN 50 MILES OF DAEC WITH MINORITY OR LOW-INCOME POPULATIONS MORE THAN 20 PERCENT OVER THE STATE OR GREATER THAN 50 PERCENT Native American Hawaiian Number of Indian or or Other Some Low-Block Alaskan Pacific Other Multi- Income County Name Groups Black Native Asian Islander Race Racial Aggregate Hispanic Households Benton 21 0 00 12 0 0 0 0 0 1 0 8 Black Hawk 100 12 0 0 0 0 0 13 0 8 Bremer~Buchan Cedar Clayton Clinton Delaware Dubuque Fayette Grundv 10 19 20 6 4 18 15 14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0 0 0 0 0 0 0 0 0 0 O0 0 0 0 0 0 0 5 0 0 Jackson 3 0 0 0 0 0 0 0 0 0 Johnson 59 0 0 0 0 0 0 1 0 7 Jon~es;<v 19 ~ 0 0 ~ 0 0 0 0 0 0 ~ 0 Keokuk 7 0 0 0 0 0 0 Louisa 1 0 0 0 0 0 0 0 0 0 (DO m 0 CD M t 0 0O 0 = =,"- I"4 TABLE 2.6-2 (CONTINUED)
BLOCK GROUPS WITHIN 50 MILES OF DAEC WITH MINORITY OR LOW-INCOME POPULATIONS MORE THAN 20 PERCENT OVER THE STATE OR GREATER THAN 50 PERCENT Native American Hawaiian Number of Indian or or Other Some Low-Block Alaskan Pacific Other Multi- Income County Name Groups Black Native Asian Islander Race Racial Aggregate Hispanic Households Muscatine 7 0 0 0 0 0 0 2 2 0 Poweshiek 8 0 0 0 0 0 0 0 .0 0 Tama 21 0 2 0 0 0 0 2 0 0 Washington 8 0 0 0 0 0 0 0 0 0 TOTALS: 512 14 2 0 0 0 0 23 2 15 Native American Hawaiian Indian or or Other Some Low-Alaskan Pacific Other Multi- Income Black Native Asian Islander Race Racial Aggregate Hispanic Households Iowa Percentages 2.11 0.31 1.25 0.03 1.28 1.09 6.07 2.82 9.32 Highlighted counties are completely contained within the 50-mile radius.Source: TtNUS 2007b m 0 C (D 0)0 (= 0 Duane Arnold Energy Center License Renewal Application Environmental Report FIGURE 2.6-1 BLACK MINORITY POPULATION SITE AND ENVIRONMENTAL INTERFACES 2.6-9 SITE AND ENVIRONMENTAL INTERFACES 2.6-9 Duane Arnold Energy Center License Renewal Application Environmental Report FIGURE 2.6-2 AMERICAN INDIAN OR ALASKAN NATIVE MINORITY POPULATION SITE AND ENVIRONMENTAL INTERFACES 2.6-10 Duane Arnold Energy Center License Renewal Application Environmental Report FIGURE 2.6-3 AGGREGATE MINORITY POPULATION SITE AND ENVIRONMENTAL INTERFACES 2.6-11 Duane Arnold Energy Center License Renewal Application Environmental Report FIGURE 2.6-4 HISPANIC ETHNICITY POPULATION SITE AND ENVIRONMENTAL INTERFACES 2.6-12 SITE AND ENVIRONMENTAL INTERFACES 2.6-12 Duane Arnold Energy Center License Renewal Application Environmental Report FIGURE 2.6-5 LOW-INCOME POPULATION SITE AND ENVIRONMENTAL INTERFACES 2.6-13 SITE AND ENVIRONMENTAL INTERFACES 2.6-13 Duane Arnold Energy Center License Renewal Application Environmental Report 2.7 TAXES The owners of DAEC pay annual property taxes to Linn County. Linn County distributes them to other taxing authorities in the county. Table 2.7-1 presents the tax payments for fiscal years 2003 through 2007.Each year, Linn County collects property taxes for its operations and other taxing authorities within Linn County. A portion of the total is retained for county operations, including public safety and legal services, physical health and social services, mental health services, roads and transportation, administration, and other expenses.
Linn County forwards the remainder of the tax revenue collected to the townships, school districts, cities, and other taxing authorities in the county (Linn County 2006a and 2006b). From fiscal years 2003 through 2006, Linn County collected approximately
$213 to $245 million annually in property taxes (see Table 2.7-2). Of this, DAEC's property tax payments represented 0.26 to 0.43 percent of the total property tax revenues collected in Linn County and the approximately
$1.1 million taxes it paid in 2007 are expected to be less than one-half of a percent of the total based on the yearly average increase in tax collections from 2002 to 2006. Of the monies collected from 2002 to 2006, Linn County retained $35 to $41 million dollars each year for its operations.
Of this, DAEC's Linn County tax payments were approximately
$125,000 to$228,000,or less than 1 percent of Linn County's total operational costs. As shown in Table 2.7-1, more than 50 percent of DAEC tax payments go to Cedar Rapids Community School District.
The Cedar Rapids Community School District operates 34 schools and has an enrollment of approximately 17,800 students (CRCS 2005a). The District had expenditures of approximately
$169 million during the 2004-2005 school year (CRCS 2005b). DAEC property tax payments to the District would represent a small fraction of the operating budget.With respect to deregulation, the 1998 Iowa Legislature established the "Deregulation and Restructuring of the Electric Utility Industry Study Committee" to review restructuring activities and experiences in other states. At that time, the Committee did not make any formal recommendations.
In 1999, the Iowa Utilities Board undertook an extensive study of electricity restructuring and issued a number of reports. In 2000, bills related to the restructuring of the electric utility industry were introduced to the Iowa General Assembly in the legislative session. The legislative session ended with no further action on the bills. Currently, there has been no new action on the status of deregulating the electric power industry in Iowa (FEMP 2006).Should deregulation ever be enacted in Iowa, this could affect utilities' tax payments to counties.
However, any changes to DAEC property tax rates due to deregulation would be independent of license renewal.0 SITE AND ENVIRONMENTAL INTERFACES 2.7-1 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 2.7-1 DUANE ARNOLD ENERGY CENTER TAX PAYMENT INFORMATION FOR FISCAL YEARS 2003 -2007 2003 2004 2005 2006 2007 Cedar Rapids Community Schools $448,520 $362,854 $356,174 $607,007 $644,825 Linn County $157,059 $127,061 $124,728 $228,219 $254,401 Rural Services Basic $104,810 $84,762 $83,237 $146,603 $159,676 Kirkwood College $19,027 $15,393 $15,115 $25,821 $29,603 Fire District $17,280 $13,979 $13,728 $23,921 $25,958 County Assessor $6,760 $5,469 $5,374 $9,736 $11,673 Fayette Township $3,927 $3,177 $3,125 $4,816 $5,235 Other $2,165 $1,751 $1,683 .$3,064 $4,144 TOTAL $759,548 $614,446 $603,164 $1,049,187
$1,135,515 TABLE 2.7-2 DUANE ARNOLD ENERGY CENTER TAX PAYMENT COMPARISON WITH LOCAL TAX REVENUES Total Local Percent Property Tax Percent of of Linn Revenues (all DAEC Total Total Local DAEC Linn County Linn County Local Property Linn County County Property Fiscal taxing Property Tax Property Tax Property Tax Year authorities) 1 Taxes Paid Revenues Revenues 1 Taxes Paid Revenues 2003 $212,849,000
$759,546 0.36 $34,631,000
$157,059 0.45 2004 $220,780,000
$614,476 0.28 $36,019,000
$127,061 0.35 2005 $235,967,000
$603,164 0.26 $38,574,000
$124,728 0.32 2006 $245,310,000
$1,049,187 0.43 $40,720,000
$228,219 0.56 1 Source: Linn County 2006b SITE AND ENVIRONMENTAL INTERFACES 2.7-2 Duane Arnold Energy Center License Renewal Application Environmental Report 2.8 LAND USE This section focuses on Linn and Benton Counties because the majority of the permanent DAEC workforce (approximately 83.7 percent) lives in these counties (see Section 3.4) and because DAEC pays property taxes in Linn County.DAEC is located in Linn County, 2.5 miles from the Town of Palo which has an economy based on small retail and service industry businesses, and 5.7 miles from the outer boundary of the City of Cedar Rapids. As stated in Section 2.1, the DAEC property is a 500-acre tract, of which a small portion is used for power production.
The non-industrial portion of the DAEC property is leased for farming. DAEC's nearest neighbors are a dairy product distribution center, a horticulture nursery, and a strawberry farm.Linn County Linn County is 717 square miles (458,180 acres) (USCB 2003b, Linn County 2003) and had a 2000 population of 191,701 (USCB 2003b), with the largest concentration in the Cedar Rapids metropolitan area. Linn County is primarily rural outside of the Cedar Rapids metropolitan area. Cedar Rapids had a 2000 population of 120,758 and a total land area of approximately 64 square miles (USCB 2003b). Table 2.6-1 presents the historical population of Linn County and Cedar Rapids.From 1990 to 2000, Linn County's population grew 14 percent, while the population of the state of Iowa grew 5.4 percent. Over the same period, the number of housing units in Linn County increased by 17.8 percent (12,194 units), while the total number of units in the state increased by 7.8 percent (USCB 2003b). As shown in Table 2.8-1, more than one-half of the housing unit increases (6,767) were in the City of Cedar Rapids.The City of Marion, which is in the Cedar Rapids metropolitan area, gained 2,970 housing units from 1990 to 2000 (USCB 2003b). The Cities of Cedar Rapids and Marion accounted for nearly 80 percent of the housing unit growth, indicating that the pattern of development continued to be within incorporated areas. Furthermore, Linn County reported that single family housing permits for unincorporated areas averaged 114 permits per year from 1993 to 1998 and that zoning changes were having the effect of discouraging growth in the unincorporated areas of the county (Linn County 2003).The cities in Linn County comprise approximately 61,000 acres, or 13 percent of the'total acreage; the remaining 397,180 acres are unincorporated.
Of the acreage located in the unincorporated areas, approximately 16 percent is either developed, considered public lands or located in critical natural resource areas. The remaining 303,958 acres are in agricultural use or woodlands (Linn County 2003).In 1973, before DAEC began operations, the surrounding 10-mile area with the exception of the portion of the City of Cedar Rapids within the 10-mile radius was characterized as 90 percent farmland (AEC 1973). As indicated above, the current land use pattern is similar. Undeveloped land represents more than 84 percent of the land outside of incorporated areas. Of the remaining 16 percent of land, some of it is also SITE AND ENVIRONMENTAL INTERFACES 2.8-1 Duane Arnold Energy Center License Renewal Application Environmental Report undeveloped (i.e., public land such as parks and land that cannot be developed because it lies in critical natural resource areas).Linn County land use planning addresses the nature of the county, which is rural interspersed with metropolitan areas. The Linn County Regional Planning Commission coordinates land use planning, zoning, transportation improvements, water and sewer systems, and other issues among the municipalities and Linn County in the Cedar Rapids metropolitan area (LCRPC 2007). In addition, the City of Cedar Rapids has a Comprehensive Plan that addresses land use and other issues (Cedar Rapids 1999).DAEC lies outside of the Cedar Rapids metropolitan area.Linn County has a Rural Land Use Plan and Map that provides the land use policy for the rural portions of the county. The plan is reviewed annually and is intended to serve as guide for land use decision-making through the year 2020. The Linn County Rural Land Use Plan Map shows DAEC in an agricultural area near a Critical Natural Resource Area, which lies along the Cedar River (Linn County 2003 and 2006c).Benton County Benton is a rural county which covers 716 square miles (USCB 2003b) and has a population density of 35 persons per square mile. Farm acreage totals approximately 400,000 acres (USDA 2002), about 87 percent of the total land area of the county. In 2002, the county had approximately 1,200 farms with an average size of about 200 acres (USDA 2002).The County has several small towns and its county seat, the City of Vinton, has a population of approximately 5,100 (USCB 2003b). The Benton County Development Group works with the county and municipalities to promote Benton County for business development.
The County has industrial parks in Urbana and Van Horne (BDG 2007).Urbana and Van Horne had 2000 populations of 1,019 and 716, respectively (USCB 2003b).From 1990 to 2000, Benton County's population grew 13 percent, while the population of the state of Iowa grew 5.4 percent. Over the same period, 1990 to 2000, the number of housing units in Benton County increased by 13.7 percent, while the total number of units in the state increased by 7.8 percent (USCB 2003b). Table 2.6-1 presents the historical population of Benton County.Benton County has a Land Preservation and Use Plan that provides the land use policy for the unincorporated areas of the county. The plan ensures the protection and preservation of agricultural land and other limited natural resources, while providing for growth in those areas where it would be compatible with existing land uses and public facilities and services are available (Benton County 1986). The objectives of the plan are met through administration of the Benton County Agricultural Land Preservation Ordinance.
The plan and ordinance are reviewed and amended from time-to-time by the Benton County Board of Supervisors (Benton County 1994).SITE AND ENVIRONMENTAL INTERFACES 2.8-2 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 2.8.1 HOUSING TRENDS, 1990 TO 2005, IN LINN AND BENTON COUNTIES, CITY OF CEDAR RAPIDS, AND THE STATE OF IOWA Benton Linn County Cedar Rapids County Iowa Housing Units 1990 68,357 45,472 9,125 1,143,666 Housing Units 2000 80,551 52,240 10,377 1,232,511 Percent Change, 1990 to 2000 17.8% 14.9% 13.7% 7.8%Not 10,922 Housing Units 2005 89,570 available 1,306,943 Not 5.3%Percent Change, 2000 to 2005 11.2% applicable 6.0%Source: USCB 2003b; State Library of Iowa 2006b SITE AND ENVIRONMENTAL INTERFACES 2.8-3 Duane Arnold Energy Center License Renewal Application Environmental Report 2.9 SOCIAL SERVICES AND PUBLIC FACILITIES
2.9.1 PUBLIC
WATER SUPPLY This section focuses on Linn and Benton Counties because the majority of the permanent DAEC workforce (approximately 83.7 percent) lives in these counties (see Section 3.4). The public water supply systems of Linn and Benton Counties are listed in Table 2.9-1 along with their water supply sources and the approximate size of the population being served. All of the systems have groundwater as their sources.However, some of the systems have as their primary source groundwater that is under the influence of surface water. Table 2.9-2 lists the maximum capacity and average daily use of the larger public water supply systems, those serving a population of more than 1,000 persons.The largest water supply system in the two counties, the Cedar Rapids Water Department, which serves a population of approximately 122,633, has groundwater under the influence of surface water as its source (EPA 2007a). The Cedar Rapids Water Department operates a well system of shallow vertical and collector wells constructed in the sand and gravel deposits along the Cedar River. Because of continuous pumping of the City's wells, most of the water in the aquifer is pulled from the river. The well system consists of 4 well fields with a total of 4 collector wells and 45 vertical wells. Peak flow is 50 mgd with an average of 35 mgd. The system has a design capacity of 65 mgd. Local industries use 75 percent of the water and the remaining 25 percent is used by residential, commercial, and municipal customers (CRWD 2005, CRWD undated).2.9.2 TRANSPORTATION The local road system is shown on Figure 2.1-1. DAEC is accessed by DAEC Road, which intersects with a road that has two names. North of the intersection, the road is called McClintock Road. South of the intersection, the road is called Power Plant Road.McClintock/Power Plant Road forms a U and terminates in two locations on Palo Marsh Road/County Road W36. Palo Marsh Road/County Road W36 links Interstate 380 to the north and Palo to the south. County Road W36 continues southeast of Palo and terminates with an intersection with Interstate 380 in the center of Cedar Rapids.Employees commuting from Cedar Rapids could take County Road W36 as described above or take County Road E36 (also known as Blairs Ferry Road) which intersects with Palo Marsh Road/County Road W36. County Road E36 has an interchange with Interstate 380 at the northern edge of Cedar Rapids. Employees commuting from the north, such as Center Point, would travel south on County Road W36 and those coming from Palo would travel north on Palo Marsh Road/County Road W36. Employees from the west or southwest would travel to County Road E36 which then intersects with County Road W36 in Palo. Those traveling from the northwest would travel to Interstate 380 and exit at the County Road W36 interchange.
SITE AND ENVIRONMENTAL INTERFACES 2.9-1 SITE AND ENVIRONMENTAL INTERFACES 2.9-1 Duane Arnold Energy Center License Renewal Application Environmental Report Traffic counts are not available for the roads described above except for Interstate 380 at the interchanges with County Road E36 (Blairs Ferry Road,) and County Road W36 (F Avenue), both in Cedar Rapids. Annual average daily traffic counts were 28,800 and 24,100 at the Blairs Ferry Road and F Avenue interchanges, respectively (IDOT 2006).Level of Service (LOS) data is available only for Interstate 380 in the northern Cedar Rapids metropolitan area and at the Blairs.Ferry Road interchange.
LOS is a qualitative measure describing operational conditions within a traffic stream.and their perception by motorists.
Traffic congestion conditions are rated as A through F and are designated as follows: Level of Service Conditions A Free flow of the traffic stream; users are unaffected by the presence of others.B Stable flow in which the freedom to select speed is unaffected but the freedom to maneuver is slightly diminished.
C Stable flow that marks the beginning of the range of flow in which the operation of individual users is significantly affected by interactions with the traffic stream.D High-density, stable flow in which speed and freedom to maneuver are severely restricted; small increases in traffic will generally cause operational problems.E Operating conditions at or near capacity level causing low but uniform speeds and extremely difficult maneuvering that is accomplished by forcing another vehicle to give way; small increases in flow or minor perturbations will cause breakdowns.
F Defines forced or breakdown flow that occurs wherever the amount of traffic approaching a point exceeds the amount which can traverse the point. This situation causes the formation of queues characterized by stop-and-go waves and extreme instability.
The LOS for Interstate 380 in the northern Cedar Rapids metropolitan area is C and at the Blairs Ferry Road interchange the LOS is D.The area's long-range'transportation plans adopted by the Linn County Regional Planning Commission include improvements to Interstate 380 and Blairs Ferry Road.The planning area does not extend beyond the Cedar Rapids metropolitan area. DAEC is located outside of the planning area. (LCRPC 2005)Benton County does not have a transportation plan.SITE AND ENVIRONMENTAL INTERFACES 2.9-2 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 2.9-1 PUBLIC WATER SUPPLY SYSTEMS IN LINN AND BENTON COUNTIES Approximate Population Public Community Water System Served Primary Source Type-Linn County ABBE Center for Community Care Alburnett Water Supply ARC Cedar Terrace ARC Marion.Village Bertram Water Supply Big Creek Bluffs Blairs Ferry Manor Brittany Estates Homeowners Association Carlton Mobile Home Court Cedar Rapids Water Department Center Point Water Supply Central City Water Supply Chestnut Ridge Coggon Water Department Cono Christian School Country Estates Country Manor Estates Crestwood Acres D & M Addition Deer Ridge Homeowners Water Association Ely Water Supply Fairfax Water Supply Fairview Trailer Court Four Oaks Gaddis Estates Homeowners Association Glenbrook Cove Area Glenn Oaks Addition Hiawatha Water Department Hide-A-Way Manor 160 559 483 1,220 263 80 75 105 85 122,633 2,007 1,157 50 745 100 126 228 142 80 94 1,149 1,662 70 60 30 233 88 6,480 82 Groundwater Groundwater Purchased groundwater under influence of surface water Purchased groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater under influence of surface water Groundwater Groundwater Groundwater Groundwater Groundwater Purchased groundwater under the influence of surface water Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Purchased groundwater under the influence of surface water Groundwater Groundwater Groundwater SITE AND ENVIRONMENTAL INTERFACES 2.9-3 SITE AND ENVIRONMENTAL INTERFACES 2.9-3 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 2.9.1 PUBLIC WATER SUPPLY SYSTEMS IN LINN AND BENTON COUNTIES (CONTINUED)
Public Community Water System Lisbon Water Supply Marion Municipal Water Department Meadow Knolls Addition Midway Water and Lighting Mount Vernon Water Supply Oak Valley ORR Addition Pleasant Creek Estates -Palo Prairieburg Municipal Water Supply Spring Green Springville Water Supply Twin Knolls Fourth/Fifth Addition Twin Knolls Sixth Addition Vern Acres (Oliphant Addition)Vernon Heights Mobile Home Court Walker Water Works West Post Estates Addition Windy Ridge Well Association Benton County Atkins Municipal Water Works Belle Plaine Water Department Blairstown Water Supply Clover Ridge Subdivision Garrison Water Supply Keystone Water Supply Mount Auburn Water Supply Newhall Water Supply Approximate Population Served 1,898 25,984 68 72 4,171 154 40 45 175 52 1,101 144 45 150 120 754 93 45 1,297 2,878 682 432 413 687 160 886 Primary Source Type Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Norway City Water Supply Poweshiek Water Association Shellsburg Water Supply Terry Water Association Timber Ridge 601 2,000 938 46 238 Purchased groundwater under the influence of surface water Purchased groundwater under the.influence of surface water Groundwater Groundwater Groundwater SITE AND ENVIRONMENTAL INTERFACES 2.9-4 SITE AND ENVIRONMENTAL INTERFACES 2.9-4 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 2.9.1 PUBLIC WATER SUPPLY SYSTEMS IN LINN AND BENTON COUNTIES (CONTINUED)
Approximate Population Public Community Water System Served Primary Source Type Urbana Water Supply 1,019 Groundwater Purchased groundwater under the Van Horne Water Works 716 influence of surface water Vinton Municipal Water Department 5,102 Groundwater Source: EPA 2007a, 2007b SITE AND ENVIRONMENTAL INTERFACES 2.9-5 SITE AND ENVIRONMENTAL INTERFACES 2.9-5 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 2.9-2 PUBLIC WATER SUPPLY SYSTEMS IN LINN AND BENTON POPULATION OF MORE THAN 1,000 COUNTIES SERVING Total Design Capacity (GPD)Average Daily Production (GPD)Public Community Water System Linn County ARC Marion Village Cedar Rapids Water Department Center Point Water Supply Central City Ely Water Supply Fairfax Water Supply Hiawatha Water Department Lisbon Water Supply Marion Municipal Water Department Mount Vernon Water Supply Springville Water Supply NA 45,000,000 312,000 NA 288,000 144,000 155,000 250,000 6,500,000 900,000 288,000 71,000 39,400,000 162,000 155,846 92,560 119,000 785,000 136,000 2,579,000 412,000 124,000 Benton County Atkins Municipal Water Works 88,000 81,300 Belle Plaine Water Department 720,000 295,000 Poweshiek Water Association NA 252,200 Urbana Water Supply 288,000 118,142 Vinton Municipal Water Department 1,225,000 507,750 GPD = gallons per day Source: Lynam 2007.SITE AND ENVIRONMENTAL INTERFACES 2.9-6 Duane Arnold Energy Center License Renewal Application Environmental Report 2.10 METEOROLOGY AND AIR QUALITY DAEC is located in Linn County, Iowa. Iowa has a continental climate typical of the Great Plains with cold, dry winters and hot humid summers. Iowa's interior continental location within the middle latitudes strongly influences the state's seasonal variations.
During the six warmer months of the year, the prevailing moist, southerly flow from the Gulf of Mexico produces a summer rainfall maximum. The prevailing northwesterly flow of dry Canadian'air'in the winter causes a cold and relatively dry season. Iowa weather is also influenced by air masses from the Pacific Ocean, which produce comparatively mild and dry weather. Hot, dry winds from the desert southwest occasionally produce unusually high temperatures that desiccate crops. Thunderstorms, which are generally restricted to the spring and summer months, are accompanied by high winds and heavy rains, with occasional hail storms and tornados.
Tornado. frequency is highest in May and June. (NCDC 2006)The region surrounding DAEC experiences weather patterns similar to the rest of the state, and the climate can be described as sub-humid and continental (DAEC 2005a).Winter temperatures average 22.5°F with summer temperatures averaging 72.1OF (NCDC 2002). Average annual precipitation 33.27 inches, of which 70 percent falls during the months of April through September.
The average seasonal snowfall is approximately 31 inches (DAEC 2005a).Under the Clean Air Act, the U.S. Environmental Protection Agency (EPA) has established National Ambient Air Quality Standards (NAAQS), which specify maximum concentrations for carbon monoxide (CO), particulate matter with aerodynamic diameters of 10 microns or less (PM10), particulate matter with aerodynamic diameters of 2.5 microns or less (PM 2.5), ozone, sulfur dioxide (SO 2), lead, and nitrogen dioxide (NO 2). Areas of the United States having air quality as good as or better than the NAAQS are designated by EPA as attainment areas. Areas having air quality that is worse than the NAAQS are designated by EPA as non-attainment areas. Those areas that were previously designated non-attainment and subsequently re-designated to attainment due to meeting the NAAQS are maintenance areas. States with maintenance areas are required to develop an air quality maintenance plan as an element of the State Implementation Plan.Linn County, Iowa is part of the Northeast Iowa Intrastate Air Quality Control Region (AQCR) (40 CFR 81.256). The Northeast Iowa AQCR is in attainment for all air quality standards as are all counties in the state of Iowa (40 CFR 81.316). The nearest non-attainment area is the Metropolitan Chicago (Illinois-Indiana)
Interstate AQCR, approximately 160 miles east of DAEC, which is designated as a non-attainment area under the PM 2.5 and 8-hour ozone NAAQS (40 CFR 81.314).In October 2006, the EPA issued a final rule that revised the 24-hour PM 2.5 standard and revoked the annual PM 1 o standard (EPA 2006). Non-attainment designations for PM 1 0.are not affected by the new rule, but additional non-attainment areas could be designated under the new PM 2.5 standard (EPA 2007c).SITE AND ENVIRONMENTAL INTERFACES 2.10-1 Duane Arnold Energy Center License Renewal Application Environmental Report On March 12, 2008, the EPA issued a final rule that strengthens the 8-hour ozone standard (EPA 2008). Additional non-attainment areas could be designated under the new ozone standard.The Clean Air Act, as amended, established 156 Mandatory Class I Federal Areas where visibility is an important issue. There are currently no Class I areas located, within the state of Iowa or within 100 miles of DAEC. The closest Class I areas to DAEC are the Boundary Waters National Wilderness Area and Voyageurs National Park in Minnesota, Badlands National Wilderness Area in North Dakota, and Hercules-Glades and Mingo National Wilderness Areas in Missouri (40 CFR 81, Subpart D), all of which are in excess of 300 miles from DAEC On July 11, 2008, the U.S. Court of Appeals for the D.C. Circuit vacated the entire Clean Air Interstate Rule (CAIR). As of this writing, the impact of this decision is unknown..SITE AND ENVIRONMENTAL INTERFACES 2.10b-2 Duane Arnold Energy Center License Renewal Application Environmental Report 2.11 HISTORIC AND ARCHAEOLOGICAL RESOURCES Area History in Brief The Paleo-lndian period dates from approximately 9500 to 7500 B.C. Paleo-lndians in Iowa encountered different environments than those of the recent past; the climate was cooler and wetter than present day. The landscape was covered by boreal and conifer hardwood forest, changing through time to elm- and oak-dominated woodlands throughout most of the state; prairie landscapes were limited.The Early and Middle Archaic periods date from approximately 7500 to 2500 B.C. This period of history has been identified as a transitional time between cultures relying on hunting as the primary means of subsistence and cultures that were more adept at foraging for subsistence., The landscape changed to deciduous woodlands mixed with prairies.
Large game hunting was supplemented by smaller game and the increased use of plant foods. Arid conditions became more prevalent during the Middle Archaic period and populations trended to establish semi-permanent and seasonal camps in the river valley areas. By the Late Archaic period, 2500 to 500 B.C., population density in Iowa had increased substantially, more sedentary populations were established, and both positive and negative interaction between cultures became more commonplace.
The Woodland settlements date from approximately 100 B.C to 1000 A.D. This era was characterized by continuous improvements in technology and more production efficiency.
Hunter-gatherer adaptations were refined to include a greater reliance on aquatic species and dependence on cultivated plants. The production of ceramics and artwork increased.
Weapon and tool making skills improved.
Mound construction was generally simple during the Middle Woodland period but evolved into more-complex groups of linear, effigy, and conicalmounds for ritual and other purposes reflected in the Late Woodland period. The evolution of these, more complex, mound structures in northeast Iowa formed a distinctive element of seasonal settlement patterns of the Effigy Mound Culture, exploiting the vast array of seasonally available resources in the Mississippi valley regions.The Plains Village pattern appeared in the Late Prehistoric times, 1000 to 1650 A.D., marking the beginning of a distinctive adaptation to tall grass prairies and short grass plains. This era was representative of many well-known cultures and historical tribes such as the Great Oasis, Mill Creek, and Central Plains tribes, common in the present-day midwestern area of the United States. The Oneota culture dominated much of eastern Iowa during the Late Prehistoric period. Distinct Oneota villages occupied widely separated regions of Iowa, however, there was probably a great deal of interaction and socio-.political cooperation among them. Oneota complexes are ancestral'to several midwestern tribes such as the Iowa, Oto, Missouri, and Winnebago.
After 1650 A.D., European influence drastically changed the structure of relationships among Indian groups. Tribal populations declined and European dispossession of traditional territories became common. Most of Iowa's cities and towns were SITE AND ENVIRONMENTAL INTERFACES 2.11-1 Duane Arnold Energy Center License Renewal Application Environmental Report established by the mid-1800s.
Agricultural homesteads were widespread and industries such as lead and coal mining flourished across the state. (Schermer et al.1995)The Amana colonies arrived in Iowa near the mid-1800s, originating from German-speaking European settlers belonging to the church known as the Community of True Inspiration.
The religious group was a breakaway from the Lutheran Church consisting of parishioners who desired to focus more on the spiritual needs of the congregation rather than on intellectual debate and formalized worship ceremonies.
The Amana colonies flourished under an established communal system comprised self-sustaining village complexes.
In 1932, members of the community created a business enterprise to operate for profit (Amana Society, Inc.), providing a separation between the traditional church and the economic functions of the community.
Today, the Amana culture remains a stable and profitable community based on successful years in the fields of industry, textiles, and farming. The Amana Church continues to be a vital part of the community and the historic Amana Villages remain an important aspect of historical preservation efforts of local communities in Iowa"(NPS 2007a).Pre-Operation and Operational Historic/Archaeological[Analysis The Final Environmental Statement for the Duane Arnold Energy Center stated that no historic sites for Linn or Benton Counties were listed on the National Register of Historic Places. At that time, the State of Iowa was in the preliminary stages of developing listings of historic sites for the state but no specific details were yet available.
It was noted that some historic sites would probably be designated in Cedar Rapids, but they.would not be adversely affected by the DAEC. In addition, the Cedar River Valley was known to be rich in archaeological history, but inspections by the State Archaeologist revealed no archaeological or historic sites of significance in the area of the plant site.Correspondence with the Federal Advisory Council on Historic Preservation, United States Department of the Interior, and the State Historical Society of Iowa concluded that construction and operation of the DAEC would not affect historic or archaeological resources (AEC 1973).Three studies have been performed on DAEC property in the last six years to determine impacts to known archaeological sites or the presence of new archaeological sites. In 2001, the University of Iowa conducted a Phase I Intensive Survey in preparation for construction of the Independent Spent Fuel Storage Facility on 8.5 acres of land north of the plant (UI 2001). In 2005, Phase I studies were performed for a seven-acre parcel of land west of the plant for the construction of a communications tower (Higginbottom 2005). In 2006, Phase I studies were performed along 1.,350 feet (1.9 acres) of the Cedar River adjacent to the plant for a river bank stabilization project (SHPO 2006). In all three cases, there were no impacts to known archaeological sites, nor were there any new archaeological sites discovered.
The State Historical Society of Iowa concurred with each determination made of-"no historic properties affected" (UI 2001;, Higginbottom 2005; SHPO 2006).HISTORIC AND ARCHAEOLOGICAL RESOURCES Page 2.11-2 Duane Arnold Energy Center License Renewal Application Environmental Report Current Historic/Archaeological Analysis DAEC's excavation and trenching procedure (DAEC 2008) describes the environmental review of land-disturbing activities and accidental discovery of Archaeological, Cultural, and Historic Resources (AC&H Resources).
Environmental reviews are performed by the DAEC Environmental Coordinator (EC) who serves as the knowledgeable contact for AC&H Resources.
The EC coordinates communication between the plant owner representative, qualified archaeological contractors, and the State Historic Preservation Officer/State Archaeologists.
The EC is also responsible for making recommendations for completing a proposed project (DAEC 2008).As of 2007, 10 properties in Benton County and 75 properties in Linn County have been listed in the National Register of Historic Places. Of these 85 properties, 3 fall within a 6-mile radius of DAEC: Shellsburg Bridge, Chain Lakes Bridge, and Taylor-Van Note (NPS 2007b and 2007c).The only federally-recognized tribe in Iowa is the Sac & Fox Tribe of the Mississippi in Iowa (NCSL 2007). The tribe is located in Tama County on 4,300 acres in south central Iowa known as the Meskwaki Indian Settlement.
The Settlement is located 130 miles from the Mississippi River (Iowa's eastern border) and the Iowa River runs through the southeast portion of their land. All lands are commonly owned with no individual allotments (EDA 2007). The population of the Iowa tribe in 2000 was 761 (USCB 2000c). The Settlement is governed by a seven-member tribal council. The tribe's primary revenue source is gaming (bingo and casino); the tribe also leases 520 acres of farmland to farmers who raise corn and soybeans (EDA 2007).As stated in Section 2.1, Wickiup Hill is a 563-acre natural area located east of DAEC and the Cedar River which includes the 240-acre Wickiup Hill Outdoor Learning Area and 10,000 square-feet Learning Center. This learning center offers Native American and archaeological exhibits featuring replicas of prehistoric and historic artifacts excavated at Wickiup Hill. The learning center also offers an Archaeological Day Camp where students work with an archaeologist on the property (LCCD 2007b). The site is prehistoric, believed to be from the Woodland period. The site is utilized by numerous professional and amateur archeological associations, with particular interest in the artifacts of former Indian villages and the Indian Burial Mound structures (INHF 2004).One of the DAEC Transmission Lines (Hiawatha 161 kV Line), crosses the Wickiup Hill property just north of the Indian Burial Mound areas (AEC 1973 and WHT 2006). No archeological sites have been documented in this right-of-way.
SITE AND ENVIRONMENTAL INTERFACES 2.11-3 Duane Arnold Energy Center License Renewal Application Environmental Report 2.12 KNOWN OR REASONABLY FORESEEABLE PROJECTS IN THE DAEC VICINITY DAEC is located in Linn County approximately
2.5 miles
north-northeast of the Town of Palo, Iowa and approximately 3 miles east of Benton County, Iowa. Cedar Rapids is located approximately
5.7 miles
southeast of DAEC.Industries in the DAEC Vicinity Linn County is Iowa's largest manufacturing center (Linn County 2007). In March 2007, the "Envirofacts Warehouse" online database provided by the EPA listed a total of 790 EPA-regulated facilities in Linn County, concentrated in Cedar Rapids. The list included 445 industries that produce and release air pollutants; 57 facilities that reported toxic releases; 447 facilities that reported hazardous waste activities; and 57 facilities that are permitted to discharge to waters of the United States. There are 10 Superfund sites in Linn County: the 1st Avenue SE site, Brandy Wine Mercury, Cedar Rapids National Guard Target Range, Cedar Rapids Manufactured Gas Plant (former), Cedar Rapids Sewage Treatment Plant, Cedar Rapids Sludge Incinerator, Coggon Creamery, Electro Coatings of Iowa Inc., Ralston Site, and US Nameplate Company (EPA 2007d).A March 2007 search of the Envirofacts Warehouse for Benton County, Iowa determined that 31 industries produced and released air pollutants; 3 facilities reported toxic releases; 54 facilities reported hazardous waste activities; and 26 facilities were permitted to discharge to waters of the United States. There is one Superfund site in Benton County, the Belle Plaine Coal Gasification site. (EPA 2007e)Within six miles of DAEC (Figure 2.1-2), there are no manufacturing industries.
The six-mile vicinity has numerous service industry businesses such as hair salons and banks.There is also a large dairy product distribution center, horticulture nursery, and a strawberry farm. There are no known planned industries.
Federal Facilities in the Vicinity of DAEC There are no known federal facilities within fifty miles of DAEC.Energy Facilities in the Vicinity of DAEC There are no other energy facilities within the six-mile vicinity of DAEC. Within 50 miles of DAEC there are six fossil-fuel fired generating facilities.
Three are located in Cedar Rapids: the 6th Street Generating Station, the Prairie Creek Generating Station and the Archer Daniels Midland Cedar Rapids Plant. The other three fossil-fuel fired generating facilities are located in Black Hawk County: the Streeter Station, the Electrifarm Generating Station, and the Cedar Falls Gas Turbine Station (Walter 1988, IDNR 2005).In addition, Elk Run Energy Associates, LLC has proposed a new 750-megawatt coal-fired electric generating plant east of Waterloo in Black Hawk County (IUB 2007).SITE AND ENVIRONMENTAL INTERFACES 2.12-1 Duane Arnold Energy Center License Renewal Application Environmental-Report Iowa is the nation's leading producer of ethanol (EIA 2007a). Four ethanol production plants in Cedar Rapids, Blairstown, Fairbank, and Hopkinton are located within 50 miles of DAEC. Five other ethanol production plants in the planning or construction phase are also located within 50 miles of DAEC. Penford Corporation and Archer Daniels Midland plan to construct plants in Cedar Rapids; US Bio Energy/Big River Resources, LLC plans to construct a plant in Grinnell; Xethanol Biofuels, LLC plans to construct a plant in Blairstown; and Tama Ethanol, LLC plans to construct a plant in Tama (Iowa Corn 2007; ACE 2008).Independent Spent Fuel Storage Installation at DAEC DAEC has dry cask storage modules for radioactive, spent nuclear fuel located at the plant. The storage modules are operated in accordance with 10 CFR 72, Subpart K,"General License for Storage of Spent Fuel at Power Reactors." SITE AND ENVIRONMENTAL INTERFACES 2.12-2 Duane Arnold Energy Center License Renewal Application Environmental Report 3.0 PROPOSED ACTION NRC"...The report must contain a description of the proposed action, including the applicant's plans to modify the facility or its administrative control procedures....
This report must describe in detail the modifications directly affecting the environment or affecting plant effluents that affect the environment...." 10 CFR 51.53(c)(2)
FPL Energy Duane Arnold, LLC (FPL-DA) proposes that the U.S. Nuclear Regulatory Commission (NRC) renew the operating licenses for Duane Arnold Energy Center (DAEC) for an additional 20 years. Renewal would give FPL-DA and the State of Iowa the option of relying on DAEC to meet future electricity needs. Section 3.1 discusses the plant in general. Sections 3.2 through 3.4 address potential changes that could occur as a result of license renewal.3.1 GENERAL PLANT INFORMATION General information about DAEC is available in several documents.
In 1973, the U.S.Atomic Energy Commission (predecessor to the Nuclear Regulatory Commission) published the Final Environmental Statement Related to the Operation of Duane Arnold Energy Center (AEC 1973). The Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GELS) (NRC 1996e) describes DAEC features and, in accordance with, NRC requirements, FPL-DA maintains the Final Safety Analysis Report for DAEC (DAEC 2005a). FPL-DA has referred to each of these documents while preparing this environmental report for license renewal.3.1.1 REACTOR AND CONTAINMENT SYSTEMS DAEC is a single unit plant with a boiling water reactor (BWR). The nuclear steam.supply system (NSSS) and the turbine-generator were supplied by General Electric.The balance of plant was designed and constructed by Bechtel Power Corporation as architect-engineer and construction contractor.
The plant achieved initial criticality on March 23, 1974, and began commercial operation on February 1, 1975. (DAEC 2005a)The unit was originally designed, analyzed, and licensed for a rated core power of 1,658 megawatts-thermal (MWt), but the plant Technical Specifications restricted operations to a rated power of 1,593 MWt. Technical Specifications were amended in 1985 (License Amendment 115) and rated power (100 percent) became 1,658 MWt and the net electric output became 541 megawatts-electrical (MWe). In 2001, the rated power level was increased again to 1,912 MWt by the Extended Power Uprate (EPU) Project (License Amendment 243) (DAEC 2005a). Since 2001, the generating capacity has been incrementally increased to its present value of about 610 MWe (FPL 2007b).The nuclear steam supply system at DAEC is typical of General Electric BWRs. The reactor core produces heat that boils water. This creates steam which, after drying, is routed to the turbines.
The steam yields its energy to the turbines, which are connected PROPOSED ACTION Page 3.1 -1 Duane Arnold Energy Center License Renewal Application Environmental Report to the electrical generator.
DAEC uses a BWR/4 reactor design and a Mark I primary containment design (NRC 2007a).The DAEC reactor is on a 24-month refueling cycle (NRC 2001). The reactor fuel is uranium dioxide pellets sealed in Zircalloy-2 tubes. The number of fuel assemblies in the complete core is 368 (DAEC 2005a). The batch average burnup of the fuel assemblies is between 33,000 and 60,000 megawatt-days per metric ton uranium (MWd/MtU) due to the fuel consumption increase from the 2001 extended power uprate.To support the extended burnup, the U-235 enrichment level was increased to greater than 4 weight percent but less than 5 weight percent (NRC 2001).The primary containment for each unit consists of a drywell, a steel structure that encloses the reactor vessel and related piping; a pressure suppression chamber containing a large volume of water; and a vent system that connects the drywell to the suppression chamber. The concrete reactor building, which houses the primary containment, serves as a radiation shield and fulfills a secondary containment function.The containment systems and their engineered safeguards are designed to ensure that offsite doses resulting from postulated accidents are well below the guidelines in 10 CFR 100.3.1.2 COOLING AND AUXILIARY WATER SYSTEMS At DAEC, the Circulating Water and the Service Water Systems draw from the Cedar River. The cooling tower blowdown is discharged to the same river, downstream of the intake (DAEC 2005a). Groundwater is withdrawn from four wells for domestic use and for other industrial purposes including the makeup water treatment system and the plant ventilation cooling water (DAEC 2005a). The following subsections describe water systems at DAEC.3.1.2.1 Surface Water DAEC employs a closed-cycle heat dissipation system with cooling towers, designed to remove waste heat from the Circulating Water System which cools the main condensers (DAEC 2005a). Makeup water for the Circulating Water System is provided by the River Water Supply System, which includes the intake structure, intake pumps, and various features to control the amount of debris entering the system. The intake structure for the River Water Supply System-is also the intake for the residual heat removal service water (RHRSW) and emergency service water (ESW).The intake structure is located on the west bank of the Cedar River (Figure 2.1-3). This location was selected because the largest river flows occur near the west bank and lateral movement of the sediment is toward the east bank due to the secondary currents created by a bend upstream (DAEC 2005a). In order to maintain these conditions during very low flow, an overflow barrier across the river was constructed in accordance with Seismic Category I criteria to intercept the streambed flow and divert it to the intake structure.
This makes the entire flow of the river available (DAEC 2005a).PROPOSED ACTION.Page 3.1-2 Duane Arnold Energy Center License Renewal Application Environmental Report The intake structure is constructed of reinforced concrete.
The underground portions of the structure serve as channels for incoming water and the upper portions enclose the motors and controls (DAEC 2005a, page 1.2-6). River water enters the parallel pump pits of the Intake Structure by passing through trash bars, a sand control gate, and a traveling screen, located on both intake sides (DAEC 2006b, page 6).Cedar River water diverted into the Intake Structure passes through bar racks to two parallel intake channels within the intake structure.
A trash rake is located on the outdoor deck of the intake structure to remove debris accumulated on the bar racks.(DAEC 2005a)An electrically-operated gate is provided at the mouth of each intake channel to control the amount of sand traveling into the pump pits. These gates may also be raised or lowered by a hoist to maintain acceptable water differential.
A manually-operated gate is provided between the two pump pits so that either of the two traveling screens may serve either or both pump pits. A 24-inch line is provided to deliver warming water from either cooling tower blowdown or RHR Service Water or Emergency Service Water system output to flood the bar screens for de-icing in the winter months. (DAEC 2005a)At the inlet end of each channel, the water passes through traveling screens into a separate pump wet pit. Each traveling screen is operated individually under automatic control, but with manual override to permit continuous operation.
Wash water is supplied by a screen wash pump to release impinged aquatic organisms and debris from the screens. Traveling screen operation will cease upon failure of its screen wash supply. (DAEC 2005a)Each of the two pump wet pits contain two vertical turbine pumps rated at 6,000 gallons per minute (gpm) each. The two paired pumps of each pit discharge into an 18-inch pipe and then into a common 24-inch pipeline for each subsystem which, in turn, discharges into the stilling basin in the pump house. The stilling basin is configured to underflow to the RHRSW/ESW wet pits and overflow to the circulating water pit. The circulating water pit provides a source of water for the Circulating Water System,, the General Service Water System, and the Fire Water System (DAEC 2006b).Water is withdrawn from the cooling tower basins, circulated through the, main condensers, and returned to the cooling towers at the rate of 310,000 gpm (155,000 gpm per tower) (DAEC 2006c). Each of the two cross-flow forced draft' Cooling Towers is 60 feet tall with a base measuring 16,000 square feet (IELP 1971, DAEC 2006c).The maximum river water supply requirements are 8,100 gpm'for evaporative dissipation, including drift, and 3,100 gpm for blowdown (at 3.5 cycles of concentration) for a total withdrawal of 11,200 gpm (DAEC 2005a).The Iowa Department of Natural Resources (IDNR) has established a protected flow of 500 cubic feet per second (cfs) (269 million gallons per day) in the Cedar River as monitored at the official gage at Cedar Rapids. As a consequence, when the river flow is below 500 cfs an amount of water equal to the consumptive use of river water is discharged from the Pleasant Creek Recreational Reservoir to allow continued PROPOSED ACTION Page V' 1-3 Duane Arnold Energy Center License Renewal Application Environmental Report withdrawal by DAEC (IDNR 2004a). This 410-acre reservoir was jointly developed by the Iowa Conservation Commission and the Iowa Electric Light and Power Company to provide both a supplemental water supply for DAEC and regional recreation opportunities (IDNR 2007a). IDNR permits consumptive use of 16,000 acre-feet per year at a maximum rate of 15,000 gpm. Consumptive use of surface water, as well as water withdrawal, is monitored and data is provided to IDNR annually (IDNR 2004a).Finally, approved water treatment chemicals (e.g., sodium hypochlorite and sodium bromide, non-oxidizing biocides, scale inhibitors, etc.) are injected into the Circulating Water and Service Water Systems to minimize fouling in the pipes and condensers in accordance with the National Pollutant Discharge Elimination System (NPDES) permit (DAEC 2005a IDNR 2004c).3.1.2.2 Groundwater Resources The DAEC Well Water System consists of four independent groundwater wells. The wells are physically separated from one another by at least 720 feet to equalize drawdown and are at least 1,100 feet from the plant. (DAEC 2006a). The wells are sealed to prevent collection from shallow water sources (DAEC 2005a). All four wells tap deep Devonian/Silurian formations (DAEC 2005a). Groundwater from the plant flows away from the wells toward the river (DAEC 2005a).Well B (1 P-58B) is approximately 1,500 feet southwest of the reactor building.
Well A (1 P-58A) is approximately 2,000 feet north of Well B. Well C (1 P-58C) is approximately 720 feet south of Well B and Well D (1 P-58D) is approximately 1,500 feet northeast of the reactor building (DAEC 2005a) (See Figure 2.1-3). Wells B and D are protected from the weather by their own buildings and space heaters. The pumps for wells A and C are submersible and are installed at least 250 feet deep in their wells with well houses protecting above-ground equipment from the weather (DAEC 2006a).The four wells are connected to a 10-inch common header that provides the site with water for use as: potable and sanitary water, plant ventilation cooling water, circulating water pump seals, and circulating water and service water for chemical treatment systems. When general service water is not available, the Well Water System provides for an alternate source of water for emergency reactor injection, the Fire Protection System, and cooling to the Reactor Building Closed Cooling Water (RBCCW) heat exchangers (DAEC 2006a, DAEC 2006d). System needs are met by using well B or well D or wells A and C together. (DAEC 2006a).At DAEC, groundwater is lost by being: 1) discharged to the Cedar River through the station's Sewage Treatment Plant, 2) discharged to the river from the Cooling Tower basins via the blowdown line, 3) reused in the Circulating Water System back to the station forcooling, 4) evaporated through plant vents (demineralized water), or 5)evaporated to the atmosphere through the Cooling Towers. Consumptive use of groundwater, as well as water withdrawal, is permitted by the IDNR and monitoring data is provided to them annually (IDNR 2002).PROPOSED ACTION Page 3.1-4 PROPOSED ACTION Page 3.1-4 Duane Arnold Energy Center License Renewal Application Environmental Report 3.1.3 WASTEWATER TREATMENT Liquid effluents (including de-chlorinated cooling tower blowdown) are discharged to the Cedar River via an open canal (approximately 1,700 feet long) and a discharge structure located immediately downstream of the intake (Figure 2.1-3) (AEC 1973). The discharge structure consists of an 18-inch diameter pipe with a reducer at the outfall which results in a 15-inch discharge stream. The opening of the discharge pipe is oriented so that the discharge occurs at the bottom of the river (onthe western shore) in the downstream direction but pointing upward to the surface at an angle of 200 to the horizontal.
The discharge structure also includes a discharge weir above the level of the discharge pipe. When flow in the discharge canal goes above 4,000 gpm, such as during heavy rains, the flow goes over the weir and discharges into an open canal and then into the river (AEC 1973).The Sewage Treatment Facility (STF) was put into operation in 1988 with a design capacity of 54,000 gallons per day (based on a 30-day average).
Domestic wastewater from the energy, badging, and training centers is directed by gravity to a pumping station located west of the STF. The wastewater is then pumped to the STF, where it passes through the comminutor (grinder) before entering one of two sequencing batch aerobic digesters for processing.
Sludge is transferred to the aerobic digestion tank for stabilization and the wastewater is then disinfected by chlorination for discharge (DAEC 1988). Because water makes up the majority of the sewage processed by the STF, approximately 9,500 gallons per day (gpd) of water are discharged from the system, roughly approximating the sewage flow into the facility (DAEC 2005b). Effluent from the STF is discharged to the Cedar River within limits prescribed in the site NPDES permit.Discharge is via an open ditch to an outfall located approximately one-half mile upstream from the river intake and discharge structures (AEC 1973).3.1.4 RADIOACTIVE WASTE SYSTEM The radioactive waste systems are designed to collect, process, and dispose of potentially radioactive wastes produced during the operation of the plant. These wastes are grouped as liquid, gaseous, or solid.3.1.4.1 Liquid Waste System The liquid radioactive waste system is divided into several subsystems so that the liquid wastes from various sources can be kept segregated and processed separately.
Cross-connections between the subsystems provide additional flexibility for the processing of the wastes by alternative methods. The liquid wastes are classified, collected, and treated as high purity, low purity, chemical, detergent, sludge, or spent resins. The terms "high purity' and "low purity" refer to the conductivity and not the radioactivity.
The liquid waste system design provides for the filtration and demineralization of effluents.
Organics in the radioactive liquids may be processed by Ultra Violet Ozone (UV03) Treatment System. Radioactive liquids are recycled within the plant to the extent practicable.
Since 1985, the DAEC has not discharged liquid radioactive waste.PROPOSED ACTION Page 3.1-5 PROPOSED ACTION Page 3.1-5 Duane Arnold Energy Center License Renewal Application Environmental Report Expected annual liquid volume total for floor drain, detergent, and chemical wastes is 2,873,000 gallons. (DAEC 2005a)3.1.4.2 Gaseous Waste System The gaseous wastes are processed through a recombiner-charcoal delay system, monitored, and released to the atmosphere via the offgas stack. Solid wastes are packaged in suitable containers for offsite shipment and burial. The gaseous effluents from the treatment systems are continuously monitored and the discharges are terminated if the effluents exceed pre-set radioactivity levels. (DAEC 2005a)3.1.4.3 Solid Waste System The solid radioactive waste system processes wet and dry solid wastes. The wet solid wastes are the spent demineralizer resins and filter sludges that are byproducts of plant water treatment processes.
The dry solid wastes consist of other miscellaneous radioactive or contaminated solid wastes. Miscellaneous solid wastes result from operation and maintenance.
Air filters, contaminated clothing, and used reactor equipment are typical of these wastes. The estimated annual maximum weight and volume of solid waste processed in the radioactive waste system are 63,000 pounds and 2,200 cubic feet. (DAEC 2005a)Because of differences in radioactivity or contamination levels of the many wastes, various methods are-employed for processing and packaging.
The disposition of a particular item of waste is determined by its radiation level, type, presence of hazardous material and the availability of disposal space. Material that can be compressed is compacted into either 55-gallon drums by a hydraulic press or metal containers by a box trash compactor, both of which are located in the Low Level Radwaste Processing and Storage Facility.
Because of high activation and contamination levels, used reactor components are stored in the spent-fuel pool to allow for radioactive decay before removal to in-plant, onsite, or offsite storage and final offsite disposal.
Otherwise, the wastes are stored onsite only until quantities large enough for economical shipment are accumulated.
Mixed waste is stored in the Low Level Radwaste Processing and Storage Facility per DAEC's Treatment Storage and Disposal Permit. When sufficient quantities are amassed the material is, sent to a licensed processor who separates the hazardous material from the radioactive material.
The former is dispositioned by the processor while the radioactive component is sent for offsite burial (DAEC 2005a)Radioactive wastes are shipped to offsite facilities for treatment and/or disposal.
In the past, DAEC has shipped waste to facilities in Pennsylvania and Tennessee for treatment prior to disposal at a permitted radioactive waste landfill in South Carolina or Utah. DAEC primarily uses the Utah facility for disposal.
Shipments have been made in accordance with Department of Transportation requirements by truck and by rail. The numbers of shipments from 2002 through 2006 are presented in Table 3.1-1.PROPOSED ACTION Page 3.1-6 Duane Arnold Energy Center License Renewal Application Environmental Report 3.1.4.4 Non-Radioactive Solid Waste System DAEC generates nonradioactive solid waste such as office trash, break room waste, and packaging waste as well as industrial solid waste such as uncontaminated used equipment and maintenance waste. DAEC also collects certain materials for recycling such as batteries, oil, and cardboard.
These waste streams are collected and shipped offsite for recycling or disposal in local landfills.
DAEC is a small quantity generator of non-acute hazardous waste with an EPA issued generator ID number. These wastes are collected and stored in the Facilities Storage Area for no more than 180 days. The waste is sent to a licensed processor for final disposition.
3.1.5 TRANSMISSION
FACILITIES As described in the Final Environmental Statement (FES), five transmission lines were built to connect DAEC to the electric grid. Two 345 kV lines tie into an existing 345 kV line, and three 161 kV lines deliver power to three substations at Washburn; Bertram, and Hiawatha (AEC 1973). Since the FES was written, one additional 161 kV line connecting DAEC to the Sixth Street Generating Station substation was built in 1978.These lines not only disperse power from the site, but also meet the load demand of the growing grid system of the surrounding region in all directions.
Figure 3.1-1 is a map of the transmission system and is described below." Hills 345 kV Line -single circuit line which runs westward from DAEC in a 665-foot corridor shared with the Hazelton line, the Washburn Line, and for approximately 0.34 miles the Bertram line. After the Bertram line splits off, the corridor becomes 500 feet wide. The Hills line runs approximately
2.7 miles
where it turns south to the Hills substation feed, an existing 345 kV line (described below) which runs in the north-south direction approximately
3.5 miles
west of the site." Hazelton 345 kV Line -single circuit line which runs westward from DAEC in a 665-foot corridor shared with the Hills line, the Washburn Line, and for approximately 0.34 miles the Bertram line. After the Bertram line splits off, the corridor becomes 500 feet wide. This line runs approximately
2.7 miles
and turns north to the Hazelton substation to feed an existing 345 kV line (described below)which runs north-south direction approximately
3.5 miles
west of the site." Washburn 161 kV Line -single circuit line which shares the westward 500-665 foot corridor with the Hills and Hazelton lines and continues west 16 miles to the Garrison substation, then an additional 30 miles north to the Washburn substation.
PROPOSED ACTION Page 3.1-7 PROPOSED ACTION Page 3.1-7 DuaneArnold Energy Center License Renewal Application Environmental Report* Bertram 161 kV Line -single circuit line which shares the westward 665-foot corridor with the Hills-Hazelton lines for 0.34 miles then continues southeast in a 100-foot corridor to Bertram substation with a total distance of 28 miles." Hiawatha 161 kV Line -single circuit line which leaves the site in an easterly direction, crosses the Cedar River, and continues eight miles to the Hiawatha substation.
- Sixth Street 161. kV Line -single circuit line which leaves the site in a southwesterly direction around Palo then follows a railroad corridor 16 miles southeast to the center of Cedar Rapids proper (DAEC 1978).The Hazelton and Hills lines were tied into an existing line that pre-dates construction of DAEC. The pre-existing line, which crosses one arm of the Pleasant Creek Reservoir to the northwest of the site, was built in 1966 as part of the Twin Cities-Iowa-St.
Louis 345 Interconnection Transmission System. This 345 kV line was physically divided into two separate lines when the ties were made. The portion of the line that runs north from the DAEC tie point to the Hazelton substation became known as the Hazelton line. The portion of the line that runs south from the DAEC tie point to the Hills substation became known as the Hills line. The Twin Cities-Iowa-St.
Louis line was a pre-existing line and is not within the scope of interest of this Environmental Report because it was not constructed for the specific purpose of connecting DAEC to the transmission system (AEC 1973).The DAEC 345-161 kV substation is located approximately one-quarter mile west of the plant. The main transformer has a rating of 600,000 kilovolt-amps, is located on the east side of the turbine building and is approximately 550 feet away from the nearest cooling tower (IELP 1971). Other than the site substation, the Hiawatha substation was the only one constructed for the operation of DAEC. All other substations were already in service (AEC 1973).As stated in Chapter 1, the transmission assets connecting DAEC to the grid are owned by ITC Midwest LLC (ITC).- The transmission assets include 101 miles of corridor that occupy approximately 1,370 acres for the.specific purpose of connecting DAEC to the transmission system (AEC 1973). Of the 1,370 acres, approximately 460 were existing rights-of-way (AEC 1973, DAEC 1978). Of the 101 miles, 32 miles are along railroads, 2 miles are along secondary public roads, and 67 miles are over private property.
The corridors pass through land that is primarily agricultural or forest land (AEC 1973, DAEC 1978).All DAEC transmission lines were designed and constructed in accordance with industry standards that were current when the lines were built. Ongoing surveillance and maintenance of DAEC-related transmission facilities by Alliant ensures continued conformance to design standards.
These maintenance practices are described in Sections 4.13. Section 4.13 also examines the conformance of the lines with the National Electrical Safety Code requirements on line clearance to limit shock from induced currents.PROPOSED ACTION Page 3.1-8 PROPOSED ACTION Page 3.1-8 Duane Arnold Energy Center License Renewal Application Environmental Report These transmission lines, which are integral to the larger transmission system, are expected to be maintained indefinitely.
Except for the short ties, these transmission lines will remain a permanent part of the midwest transmission system even after DAEC is decommissioned.
Switchyard and Transmission Lines TABLE 3.1-1 DUANE ARNOLD ENERGY CENTER NUMBER OF RADIOACTIVE MATERIAL SHIPMENTS 2002 2003 2004 2005 2006 5 11 11 14 7 DAEC 2002, DAEC 2003, DAEC 2004b, DAEC 2005c, and DAEC 2006e PROPOSED ACTION Page 3.1-9 Duane Arnold Energy Center License Renewal Application Environmental Report FIGURE 3.1-1 TRANSMISSION SYSTEM PROPOSED ACTION Page 3.1-10 PROPOSED ACTION Page 3.1 -10 Duane Arnold Energy Center License Renewal Application Environmental Report 3.2 REFURBISHMENT ACTIVITIES NRC"... The report must contain a description of ... the applicant's plans to modify the facility or its administrative control procedures....
This report must describe in detail the modifications directly affecting the environment or affecting plant effluents that affect the environment...." 10 CFR 51.53(c)(2)
".,, The incremental aging management activities carried out to allow operation of a nuclear power plant beyond the original 40 year license term will be from one of two broad categories:
... and (2) major refurbishment or replacement actions, which usually occur fairly infrequently and possibly only once in the life of the plant for any given item...." NRC 1996e FPL-DA has addressed refurbishment activities in this environmental report in accordance with NRC regulations and complementary information in the NRC GElS for license renewal (NRC 1996e). NRC requirements for the* renewal of operating licenses for nuclear power plants include the preparation of an integrated plant assessment (IPA)(10 CFR 54.21). The IPA must identify and list systems, structures, and components subject to an aging management review. Items that are subject to aging -and might require refurbishment include, for example, the reactor vessel piping, supports, and pump casings (see 10 CFR 54.21 for details), as well as items that are not subject to periodic replacement.
In turn, NRC regulations for implementing the National Environmental Policy Act require environmental reports to describe in detail and- assess the environmental impacts of refurbishment activities such as planned modifications to systems, structures, and components or plant effluents
[10 CFR 51.53(c)(2)].
Resource categories to be evaluated for impacts of refurbishment include terrestrial resources, threatened and endangered species, air quality, housing, public utilities and water supply, education, land use, transportation, and historic and archaeological resources.
The GElS (NRC 1996e) provides helpful information on the scope and preparation of refurbishment activities to be evaluated in this environmental report. It describes major refurbishment activities that utilities might perform for license renewal that would necessitate changing administrative control procedures and modifying the facility.
The GElS analysis assumes that an applicant would begin any major refurbishment work shortly after NRC grants a renewed license and would complete the activities during five outages, including one major outage at the end of the 40th year of operation.
The GElS refers to this as the refurbishment period.GElS Table B.2 lists license renewal refurbishment activities that NRC anticipated generation companies might undertake.
In identifying these activities, the GElS intended to encompass actions that typically take place only once, if at all, in the life of a nuclear plant. The GElS analysis assumed that a generation company would undertake these activities solely for the purpose of extending plant operations beyond 40 years, and would undertake them during the refurbishment period. The GElS indicates that many plants will have undertaken various refurbishment activities to support the current PROPOSED ACTION Page 3.2-1 Duane Arnold Energy Center License Renewal Application Environmental Report license period, but that some plants might undertake such tasks only to support extended plant operations.
The DAEC IPA that FPL-DA conducted under 10 CFR 54 has not identified the need to undertake any major refurbishment or replacement actions to maintain the functionality of important systems, structures, and components during the DAEC license renewal period, or other facility modifications associated with license renewal that would affect the environment or plant effluents.
FPL-DA has included the IPA as part of its License Renewal application.
PROPOSED ACTION Page 3.2-2 Duane Arnold Energy Center License Renewal Application Environmental Report 3.3 PROGRAMS AND ACTIVITIES FOR MANAGING THE EFFECTS OF AGING NRC"...The report must contain a description of ... the applicant's plans to modify the facility or its administrative control procedures....
This report must describe in detail the modifications directly affecting the environment or affecting plant effluents that affect the environment...." 10 CFR 51.53(c)(2)
"...The incremental aging management activities carried out to allow operation of a nuclear power plant beyond the original 40 year license term will be from one of two broad categories:
(1) SMITTR actions, most of which are repeated at regular intervals
...." NRC 1996e (SMITTR is defined in NRC 1996 as surveillance, monitoring, inspections, testing, trending, and recordkeeping.)
The IPA required by 1OCFR 54.21 identifies the programs and inspections for managing aging effects at DAEC. These programs are described in the Duane Arnold Energy Center License Renewal Application, Appendix B, Aging Management Programs and Activities.
Other than implementation of the programs and inspections identified in the IPA, there are no planned modifications of DAEC administrative control procedures associated with license renewal.PROPOSED ACTION Paae 3.3-1 Duane Arnold Energy Center License Renewal Application Environmental Report 3.4 EMPLOYMENT Current Workforce FPL-DA employs a nuclear-related permanent workforce of approximately 669 employees; this is within the range of 600 to 800 personnel per reactor unit estimated in the GElS (NRC 1996e). Table 3.4-1 provides permanent employee data for DAEC.Approximately 70.1 percent of the permanent DAEC employees live in Linn County and 13.6 percent live in Benton County. About 9.0 percent of the permanent workforce is distributed across 14 additional counties in Iowa with numbers ranging from 1 to 25 employees per county. The remaining
7.3 percent
of the permanent workforce have permanent addresses distributed across 43 counties in 22 states.The DAEC reactor is on a 24-month refueling cycle. During refueling outages, site employment increases above the permanent workforce by as many as 1,000 workers for temporary duty (25 to 30 days).License Renewal Increment Performing the license renewal activities would necessitate increasing the DAEC staff workload by some increment.
The size of this increment would be a function of the schedule within which FPL-DA must accomplish the work and the amount of work involved.
Having determined that it would not undertake refurbishment (Section 3.2), FPL-DA focused its analysis of license renewal employment increment on programs and activities for managing the effects of aging (Section 3.3).The GElS (NRC 1996e) assumes that NRC would renew a nuclear power plant license for a 20-year period. The GElS further assumes that the utility would initiate surveillance, monitoring, inspection, testing, trending, and recordkeeping (SMITTR)activities at the time of issuance of the new license and would conduct license renewal SMITTR activities throughout the remaining life of the plant, sometimes during full-power operation, but mostly during normal refueling and the 5- and 10-year in-service refueling outages (NRC 1996e).FPL-DA has determined that the GElS scheduling assumptions provide a reasonable basis for estimating the incremental workload attributable to license renewal at DAEC.Many DAEC license renewal SMITTR activities would have to be performed during outages. Although some DAEC license renewal SMITTR activities would be one-time efforts, others would be recurring periodic activities that would continue for the life of the station.The GElS estimates that the most additional personnel needed to perform license renewal SMITTR activities would typically be 60 persons during the 3-month duration of a 10-year in-service refueling.
Having established this upper value for what would be a single event in 20 years, the GElS uses this number as the expected number of additional permanent workers needed per unit attributable to license renewal. GElS PROPOSED ACTION Page 3.4-1 Duane Arnold Energy Center License Renewal Application Environmental Report Section 4.7 uses this approach in order to "...provide a realistic upper bound to potential population-d riven impacts..." FPL-DA expects that existing fluctuations in worker population for routine activities, such as outages, will enable FPL-DA to perform the increased SMITTR workload without adding staff. Therefore, FPL-DA has no plans to add non-outage employees to support DAEC operations during the license renewal term. Nor does it have plans to increase the typical number of outage employees during the license renewal term.PROPOSED ACTION Page 3.4-2 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 3.4-1 RESIDENCE FOR PERMANENT WORKFORCE 0 COUNTIES OF County Linn Benton Johnson Buchanan Iowa Jones Cedar Scott Black Hawk Delaware Cerro Gordo Clayton Clinton Jasper Jefferson Mahaska Story Tama Out of State a State IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA Number of Employees 469 91 25 7 5 5 3 3 2 2 1 1 1 1 1 1 1 1 49 Percentage of Workforce 70.10%13.60%3.74%'1.05%0.75%0.75%0.45%0.45%0.30%0.30%0.15%0.15%0.15%0.15%0.15%0.15%0.15%0.15%7.32%County Population, 2000 b 191,701 25,308 111,006 21,093 15,671 20,221 18,187 158,668 128,012 18,404 46,447 18,678 50,149 37,213 16,181 22,335 79,981 18,103 Percentage of County Population 0.24%0.36%0.02%0.03%0.03%0.02%0.02%< 0.01%< 0.01%0.01%< 0.01%0.01%< 0.01%< 0.01%0.01%<0.01%< 0.01%0.01%a. Out of State employees are distributed across 43 counties in 22 states.b. Source: USCB 2003b PROPOSED ACTION Page 3.4-3 PROPOSED ACTION Page 3.4 Duane Arnold Energy Center License Renewal Application Environmental Report 4.0 ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS NRC"The report must contain a consideration of alternatives for reducing impacts.. .for all Category 2 license renewal issues...." 10 CFR 51.53(c)(3)(iii)"The environmental report shall include an analysis that considers..
the environmental effects of the proposed action.. .and alternatives available for reducing or avoiding adverse environmental effects." 10 CFR 51.45(c) as adopted by 10 CFR 51.53(c)(2)
The environmental report shall discuss the "...impact of the proposed action on the environment.
Impacts shall be discussed in proportion to their significance...." 10 CFR 51.45(b)(1) as adopted by 10 CFR 51.53(c)(2)"The information submitted...
should not be confined to information supporting the proposed action but should also include adverse information." 10 CFR 51.45(e) as adopted by 10 CFR 51.53(c)(2)
Chapter 4 presents an assessment of the environmental consequences associated with the renewal of the Duane Arnold Energy Center (DAEC) operating license. The U.S.Nuclear Regulatory Commission (NRC) has identified and analyzed 92 environmental issues that it considers to be associated with nuclear power plant license renewal and has designated the issues as Category 1, Category 2, or NA (not applicable).
NRC designated an issue as Category 1 if, based on the result of its analysis, the following criteria were met: " the environmental impacts associated with the issue have been determined to apply either to all plants or, for some issues, to plants having a specific type of cooling system or other specified plant or site characteristic;" a single significance level (i.e., small, moderate, or large) has been assigned to the impacts that would occur at any plant, regardless of which plant is being evaluated (except for collective offsite radiological impacts from the fuel cycle and from high-level waste and spent-fuel disposal);
and" mitigation of adverse impacts associated with the issue has been considered in the analysis, and it has been determined that additional plant-specific mitigation measures are not likely to be sufficiently beneficial to warrant implementation.
If the NRC analysis concluded that one or more of the Category 1 criteria could not be met, NRC designated the issue as Category 2. NRC requires plant-specific analyses for Category 2 issues.Finally, NRC designated two issues as NA, signifying that the categorization and impact definitions do not apply to these issues. One of these issues, environmental justice, is addressed in this document and treated as a Category 2 issue. In accordance with 10 ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.0-1 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report CFR 51 the other issue, chronic effects from electromagnetic fields, is not addressed in this environmental report.NRC rules do not require analyses of Category 1 issues that NRC resolved using generic findings (10 CFR 51) as described in the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GELS) (NRC 1996e). An applicant may reference the generic findings of GElS analyses for Category 1 issues. Appendix A of this report lists the 92 issues and identifies the environmental report section that addresses each issue.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.0-2 Duane Arnold Energy Center License Renewal Application Environmental Report CATEGORY 1 AND NA LICENSE RENEWAL ISSUES NRC"The environmental report for the operating license renewal stage is not required to contain analyses of the environmental impacts of the license renewal issues identified as Category I issues in Appendix B to subpart A of this part." 10 CFR 51.53(c)(3)(i)
"...[A]bsent new and significant information, the analyses for certain impacts codified by this rulemaking need only be incorporated by reference in an applicant's environmental report for license renewal ...." (NRC 1996a, pg. 28483)FPL Energy Duane Arnold, LLC (FPL-DA) has determined that 8 of the 69 Category 1 issues do not apply to DAEC because they are specific to design or operational features that are not found at the facility.
Because FPL-DA is not planning any refurbishment activities, 7 additional Category 1 issues related to refurbishment do not apply.Appendix Table A-1 lists the 69 Category 1 issues, indicates whether or not each issue is applicable to DAEC, and if inapplicable, provides the FPL-DA basis for this determination.
Appendix Table A-1 also includes references to supporting analyses in the GElS where appropriate.
FPL-DA has reviewed the NRC findings at 10 CFR 51 (Table B-i) and has not identified any new and significant information that would make the NRC findings, with respect to Category 1 issues, inapplicable to DAEC. Therefore, FPL-DA adopts by reference the NRC findings for these Category 1 issues."NA" License Renewal Issues NRC determined that its categorization and impact-finding definitions did not apply to Issues 60 and 92; however, FPL-DA included these issues in Table A-I. NRC noted that applicants currently do not need to submit information on Issue 60, chronic effects from electromagnetic fields (10 CFR 51). For Issue 92, environmental justice, NRC does not require information from applicants, but noted that it will be addressed in individual license renewal reviews (10 CFR 51). FPL-DA has included environmental justice demographic information in Sections 2.6.2 and 4.21.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.0-3 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report CATEGORY 2 LICENSE RENEWAL ISSUES NRC"The environmental report must contain analyses of the environmental impacts of the proposed action, including the impacts of refurbishment activities, if any, associated with license renewal and the impacts of operation during the renewal term, for those issues identified as Category 2 issues in Appendix B to subpart A of this part." 10 CFR 51.53(c)(3)(ii)"The report must contain a consideration of alternatives for reducing adverse impacts, as required by § 51.45(c), for all Category 2 license renewal issues...." 10 CFR 51.53(c)(3)(iii)
NRC designated 21 issues as Category 2. Sections 4.1 through 4.21 address the Category 2 issues, beginning with a statement of the issue. Six Category 2 issues apply to operational features that DAEC does not have. In addition, four Category 2 issues apply only to refurbishment activities.
If the issue does not apply to DAEC, the section explains the basis for inapplicability.
For the 11 Category 2 issues that FPL-DA has determined to be applicable to DAEC, the appropriate sections contain the required analyses.
These analyses include conclusions regarding the significance of the impacts relative to the renewal of the operating license for DAEC and, if applicable, discuss potential mitigative alternatives in proportion to the significance of the impact. FPL-DA has identified the significance of the impacts associated with each issue as either small, moderate, or large, consistent with the criteria that NRC established in 10 CFR 51, Appendix B, Table B-i, Footnote 3 as follows: SMALL -Environmental effects are not detectable or are so minor that they will neither destabilize nor noticeably alter any important attribute of the resource.
For the purposes of assessing radiological impacts, the Commission has concluded that those impacts that do not exceed permissible levels in the Commission's regulations are considered small.MODERATE -Environmental effects are sufficient to alter noticeably, but not to destabilize, any important attribute of the resource.LARGE -Environmental effects are clearly noticeable and are sufficient to destabilize important attributes of the resource.In accordance with National Environmental Policy Act (NEPA) practice, FPL-DA considered ongoing and potential additional mitigation in proportion to the significance of the impact to be addressed (i.e., impacts that are small receive less mitigative consideration than impacts that are large).ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.0-4 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report 4.1 WATER USE CONFLICTS (PLANTS WITH COOLING PONDS OR COOLING TOWERS USING MAKEUP WATER FROM A SMALL RIVER WITH LOW FLOW)NRC"If the applicant's plant utilizes cooling towers or cooling ponds and withdraws make-up water from a river whose annual flow rate is less than 3.15x101 2 ft 3 / year (9x10 1 0 m 3/year), an assessment of the impact of the proposed action on the flow of the river and related impacts on instream and riparian ecological communities must be provided.
The applicant shall also provide an assessment of the impacts of the withdrawal of water from the river on alluvial aquifers during low flow." 10 CFR 51.53(c)(3)(ii)(A)
"...The issue has been a concern at nuclear power plants with cooling ponds and at plants with cooling towers. Impacts on instream and riparian communities near these plants could be of moderate significance in some situations...." 10 CFR 51, Subpart A, Appendix B, Table B-I, Issue 13 The NRC made surface water use conflicts a Category 2 issue because consultations with regulatory agencies indicate that water use conflicts are already a concern at two closed-cycle plants and may be a problem in the future at other plants. In the GELS, NRC notes two factors that may cause water use and availability issues to become important for some nuclear power plants that use cooling towers. First, some plants equipped with cooling towers are located on small rivers that are susceptible to droughts or competing water uses. Second, consumptive water loss associated with closed-cycle cooling systems may represent a substantial proportion of the flows in small rivers (NRC 1996e).DAEC primarily uses a closed loop cooling system with mechanical draft cooling towers to dissipate heat. River water lost to cooling tower evaporation and blowdown is replaced by makeup water pumped from the Cedar River. A portion (up to 1,500 gallons per minute [gpm]) of the makeup water is pumped from the Silurian-Devonian aquifer, thus reducing the river water withdrawal and consumptive loss to evaporation.
The site's blowdown from both river and groundwater makeup is discharged to the river via a National Pollutant Discharge Elimination System (NPDES)-permitted ouffall (DAEC 2005a).Based on U.S. Geological Survey (USGS) records for water years 1903 through 2005, the annual mean flow of the Cedar River at the Cedar Rapids gauging station 20.8 river miles downstream from the site is 3,783 cubic feet per second (cfs) (Nalley et al. 2006).Records at this gauge can be considered as representative of site discharges as there is little additional inflow or outflow between the two points (DAEC 2005a). Further, the drainage area at the USGS gauging station (Nalley et al. 2006) is approximately four percent greater than the drainage area at DAEC (DAEC 2005a). The mean flow at the representative Cedar Rapids gauging station equals 1.19 x 1011 cubic feet per year, which means that the Cedar River at DAEC meets the NRC definition of a small river.Therefore, this issue applies to DAEC.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.1-1 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report At DAEC, the circulating water system draws water from the Cedar River at a design plant operating condition of approximately 11,000 gpm (24.5 cfs). This withdrawal represents approximately 0.65 percent of the average Cedar River flow (3,783 cfs).Maximum consumptive use is less than 7,000 gpm (15.6 cfs) (AEC 1973), which is approximately 0.41 percent of the average Cedar River flow. Under low river flow conditions, FPL-DA may release water from the Pleasant Creek Reservoir for low-flow augmentation purposes at a rate equal to the consumptive use of river water at DAEC and for recreational management purposes (Moeller 2005). Because consumptive loss is minimal relative to normal river flow and it would be replaced under drought conditions, downstream flow conditions are protected.
The rates of population and industrial growth in the Cedar River basin above the DAEC site are low, and the projection of these rates does not indicate a substantial increase in water demand. Therefore, adequate supply of makeup water from the Cedar River is ensured.Therefore, any impacts caused by DAEC makeup water withdrawal or consumptive use would be SMALL and would not warrant mitigation beyond that already provided by the Pleasant Creek Reservoir.
0 ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.1-2 Duane Arnold Energy Center License Renewal Application Environmental Report 4.2 ENTRAINMENT OF FISH AND SHELLFISH IN EARLY LIFE STAGES (PLANTS WITH ONCE-THROUGH COOLING OR COOLING PONDS)NRC"If the applicant's plant utilizes once-through cooling or cooling pond heat dissipation systems, the applicant shall provide a copy of current Clean Water Act 316(b) determinations...or equivalent State permits and supporting documentation.
If the applicant cannot provide these documents, it shall assess the impact of the proposed action on fish and shellfish resources resulting from.. .entrainment." 10 CFR 51.53(c)(3)(ii)(B)
"...The impacts of entrainment are small in early life stages at many plants but may be moderate or even large at a few plants with once-through and cooling-pond cooling systems. Further, ongoing efforts in the vicinity of these plants to restore fish populations may increase the numbers of fish susceptible to intake effects during the license renewal period, such that entrainment studies conducted in support of the original license may no longer be valid..." 10 CFR 51, Subpart A, Appendix B, Table B-I, Issue 25 The issue of entrainment of fish and shellfish in early life stages does not apply to DAEC because the station does not utilize once-through cooling or cooling pond heat dissipation systems. Nevertheless, the DAEC has a current NPDES permit which constitutes compliance with CWA Section 316(b).ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.2-1 Duane Arnold Energy Center License Renewal Application Environmental Report 4.3 IMPINGEMENT OF FISH AND SHELLFISH (PLANTS WITH ONCE-THROUGH COOLING OR COOLING PONDS)NRC"If the applicant's plant utilizes once-through cooling or cooling pond heat dissipation systems, the applicant shall provide a copy of current Clean Water Act 316(b) determinations...or equivalent State permits and supporting documentation.
If the applicant cannot provide these documents, it shall assess the impact of the proposed action on fish and shellfish resources resulting from.. .impingement
...." 10 CFR 51.53(c)(3)(ii)(B)
"...The impacts of impingement are small at many plants but may be moderate or even large at a few plants with once-through and cooling-pond cooling systems...." 10 CFR 51, Subpart A, Appendix B, Table B 1, Issue 26 The issue of impingement of fish and shellfish does not apply to DAEC because the station does not utilize once-through cooling or cooling pond heat dissipation systems.Nevertheless, the DAEC has a current NPDES permit which constitutes compliance with CWA Section 316(b).ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS ! ýPage 4.3-1 Duane Arnold Energy Center License Renewal Application Environmental Report 4.4 HEAT SHOCK (PLANTS WITH ONCE-THROUGH COOLING OR COOLING PONDS)NRC"If the applicant's plant utilizes once-through cooling or cooling pond heat dissipation systems, the applicant shall provide a copy of current Clean Water Act... 316(a) variance in accordance with 40 CFR Part 125, or equivalent State permits and supporting documentation.
If the applicant cannot provide these documents, it shall assess the impact of the proposed action on fish and shellfish resources resulting from heat shock ....." 10 CFR 51.53(c)(3)(ii)(B)
"...Because of continuing concerns about heat shock and the possible need to modify thermal discharges in response to changing environmental conditions, the impacts may be of moderate or large significance at some plants...." 10 CFR 51, Subpart A, Appendix B, Table B-I, Issue 27 The issue of heat shock does not apply to DAEC because the station does not utilize once-through cooling or cooling pond heat dissipation systems.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.4-1 Duane Arnold Energy Center License Renewal Application Environmental Report 4.5 GROUNDWATER USE CONFLICTS (PLANTS USING > 100 GPM OF GROUNDWATER)
NRC"If the applicant's plant...pumps more than 100 gallons (total onsite) of groundwater per minute, an assessment of the impact of the proposed action on groundwater use must be provided." 10 CFR 51.53(c)(3)(ii)(C)"Plants that use more than 100 gpm may cause groundwater use conflicts with nearby groundwater users." 10 CFR 51, Subpart A, Appendix B, Table B-I, Issue 33 NRC made groundwater use conflicts a Category 2 issue because, at a withdrawal rate of more than 100 gpm, a cone of depression could extend offsite. This could deplete the groundwater supply available to offsite users, an impact that could warrant mitigation.
Information to ascertain includes:
(1) DAEC groundwater withdrawal rate, (2)drawdown at offsite location, and (3) impact on neighboring wells.Based on information provided in Table 2.3-2, DAEC used an annual average of approximately 1,394 gpm of groundwater from 2001 through 2005. Therefore, the issue of groundwater use conflicts applies to DAEC.Under normal operation, two wells are used in tandem to supply the groundwater used at DAEC, while the remaining wells are maintained as backup.In 1972, pump tests were performed (DAEC 1972) simultaneously on two shallow DAEC site production wells (PW-1 and PW-2), which were approximately 1,350 feet apart and installed to depths of 120 and 132 feet, respectively.
The pump tests were monitored at three site observation wells. Production Well 1 was pumped at a rate of 730 gpm with a drawdown of approximately 17 feet. Production well 2 was pumped at a rate of 650 gpm with a drawdown of approximately 19 feet. The results of the test indicated drawdown in observation wells of approximately 3 to 7 feet. Drawdown in the production pumping wells would be greater than drawdown at other onsite or offsite locations.
Since 1972, two additional wells (B &D) have been bored and put into production, while the two original production wells were re-drilled to deeper levels and renamed (PW-1 became C and PW-2 became A). The four wells now tap into the deeper Sulirian-Devonian aquifer, rather than the shallow alluvial aquifer.In 2001, a pump test was performed (DAEC 2001) on Well A, which had been re-drilled to a depth of 375 feet. Well A was pumped at a rate of 750 gpm and drawdown in the pumping well stabilized at 13.25 feet after approximately 30 minutes of pumping. This drawdown was less than that from the 1972 tests. Additionally, a comparison of these results with the 1972 test results would suggest that drawdown of the potentiometric surface onsite and at potential offsite locations would also have been less in 2001, and would involve a different aquifer.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.5-1 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report Periodic pump tests have indicated that drawdown impacts have decreased'during the period of the current operating permit. It is not expected that changes in operational water needs would occur during the license renewal period. Therefore, DAEC concludes that impacts from onsite and offsite groundwater use over the license renewal period would be SMALL and would not warrant mitigation.
ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.5-2 Duane Arnold Energy Center License Renewal Application Environmental Report 4.6 GROUNDWATER USE CONFLICTS (PLANTS USING COOLING TOWERS WITHDRAWING MAKEUP WATER FROM A SMALL RIVER)NRC"If the applicant's plant utilizes cooling towers or cooling ponds and withdraws make-up water from a river whose annual flow rate is less than 3.15x1012 ft3 year...[t]he applicant shall also provide an assessment of the impacts of the withdrawal of water from the river on alluvial aquifers during low flow." 10 CFR 51.53(3)(ii)(A)
"...Water use conflicts may result from surface water withdrawals from small water bodies during low flow conditions which may affect aquifer recharge, especially if other groundwater or upstream surface water users come on line before the time of license renewal....." 10 CFR 51, Subpart A, Appendix B, Table B-1, Issue 34 NRC made this groundwater use conflict a Category 2 issue because consumptive use of withdrawals from small rivers could adversely impact aquatic life, downstream users of the small river, and groundwater aquifer recharge.
This is a particular concern during low-flow conditions and could create a cumulative impact due to multiple consumptive users.The issue of groundwater use conflicts applies because DAEC withdraws makeup water from a small river, the Cedar River, which has an annual mean flow of 3,783 cfs (1.19 xl011 cubic feet per year) at the USGS Cedar Rapids gauging station (Nalley et al. 2006). Records at this gauge can be considered as representative of site discharges as there is little additional inflow or outflow between the two points (DAEC 2005a).Further, the drainage area at the USGS gauging station (Nalley et al. 2006) is approximately four percent greater than the drainage area at DAEC (DAEC 2005a).As discussed in Section 3.1, DAEC utilizes a closed loop cooling system with.mechanical draft cooling towers to dissipate heat. Blowdown from the cooling towers is returned to the river via an NPDES outfall. Water lost to cooling tower blowdown and evaporation is replaced by makeup water pumped from the Cedar River.As discussed in Section 4.1, the circulating water system draws water from the Cedar River at a design plant operating condition of approximately 11,000 gpm (24.5 cfs).DAEC's water withdrawal from the Cedar River represents approximately 0.65 percent of the average river flow (3,783 cfs). Maximum consumptive use is less than 7,000 gpm (15.6 cfs) (AEC 1973), which is approximately 0.41 percent of the average Cedar River flow. Under low river flow conditions, FPL-DA may release water from the Pleasant Creek Reservoir for low-flow augmentation purposes at a rate equal to the consumptive use of river water at DAEC (7,000 gpm) and for recreational management purposes (Moeller 2005). Thus, DAEC withdrawals have little impact on flow in the Cedar River, even during low flow conditions, and therefore have little effect on recharge to the alluvial aquifer.Therefore, FPL-DA concludes that impacts of withdrawing water from the river on the alluvial aquifer would be SMALL and that mitigation measures would not be warranted.
ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.6-1 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report 4.7 GROUNDWATER USE CONFLICTS (PLANTS USING RANNEY WELLS)NRC"If the applicant's plant uses Ranney wells.. .an assessment of the impact of the proposed action on groundwater use must be provided." 10 CFR 51.53(c)(3)(ii)(C)
"...Ranney wells can result in potential ground-water depression beyond the site boundary.
Impacts of large ground-water withdrawal for cooling tower makeup at nuclear power plants using Ranney wells must be evaluated at the time of application for license renewal....'" 10 CFR 51, Subpart A, Appendix B, Table B-I, Issue 35 NRC made this groundwater use conflict a Category 2 issue because large quantities of groundwater withdrawn from Ranney wells could degrade groundwater quality at river sites by induced infiltration of poor-quality river water into an aquifer.The issue of groundwater use conflicts does not apply to DAEC because the plant does not use Ranney wells. As Section 3.1.2 describes, DAEC uses a closed cycle cooling system with cooling towers that remove makeup water from the Cedar River and discharge blowdown to the Cedar River.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.7-1 Duane Arnold Energy Center License Renewal Application Environmental Report 4.8 DEGRADATION OF GROUNDWATER QUALITY (PLANTS USING COOLING PONDS AT INLAND SITES)NRC"If the applicant's plant is located at an inland site and utilizes cooling ponds, an assessment of the impact of the proposed action on groundwater quality must be provided." 10 CFR 51.53(c)(3)(ii)(D)
"...Sites with closed-cycle cooling ponds may degrade ground-water quality. For plants located inland, the quality of the ground water in the vicinity of the ponds must be shown to be adequate to allow continuation of current uses...." 10 CFR 51, Subpart A, Appendix B, Table B 1, Issue 39 NRC made degradation of groundwater quality a Category 2 issue because evaporation from closed-cycle cooling ponds concentrates dissolved solids in the water and settles suspended solids. In turn, seepage into the water table aquifer could degrade groundwater quality.The issue of groundwater degradation does not apply to DAEC because the plant does not use cooling ponds. As Section 3.1 describes, DAEC uses a closed loop cooling system with mechanical draft cooling.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.8-1 Duane Arnold Energy Center License Renewal Application Environmental Report 4.9 IMPACTS OF REFURBISHMENT ON TERRESTRIAL RESOURCES NRC The environmental report must contain an assessment of "...the impacts of refurbishment and other license renewal-related construction activities on important plant and animal habitats ....." 10 CFR 51.53(c)(3)(ii)(E)
"...Refurbishment impacts are insignificant if no loss of important plant and animal habitat occurs. However, it cannot be known whether important plant and animal communities may be affected until the specific proposal is presented with the license renewal application...." 10 CFR 51, Subpart A, Appendix B, Table B-I, Issue 40"...If no important resources would be affected, the impacts would be considered minor and of small significance.
If important resources could be affected by refurbishment activities, the impacts would be potentially significant...." NRC 1996e NRC made impacts to terrestrial resources from refurbishment a Category 2 issue, because the significance of ecological impacts cannot be determined without considering site- and project-specific details (NRC 1996e). Aspects.of the site and project to be ascertained are: (1) the identification of important ecological resources, (2)the nature of refurbishment activities, and (3) the extent of impacts toplant and animal habitats.The issue of impacts of refurbishment on terrestrial resources is not applicable to DAEC because, as discussed in Section 3.2, FPL-DA has no plans for refurbishment or other license renewal-related construction activities at DAEC.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.9-1 Duane Arnold Energy Center License Renewal Application Environmental Report 4.10 THREATENED OR ENDANGERED SPECIES NRC"All license renewal applicants shall assess the impact of refurbishment and other license-renewal-related construction activities on important plant and animal habitats.
Additionally, the applicant shall assess the impact of the proposed action on threatened and endangered species in accordance with the Endangered Species Act." [10 CFR 51.53(c)(3)(ii)(E)]"Generally, plant refurbishment and continued operation are not expected to adversely affect threatened or endangered species. However, consultation with appropriate agencies would be needed at the time of license renewal to determine whether threatened or endangered species are present and whether they would be adversely affected." [10 CFR Part 51, Subpart A, Appendix B, Table B-I, Issue 49]The NRC made impacts to threatened and endangered species a Category 2 issue because the status of many species is being reviewed, and a site-specific assessment is required to determine whether any identified species could be affected by refurbishment activities or continued plant operations through the renewal period. In addition, compliance with the Endangered Species Act requires consultation with the appropriate federal agency (NRC 1996e). Information pertinent to this assessment includes: (a) actual or potential occurrence of threatened or endangered species on or in the vicinity of the DAEC site and associated transmission lines that are in the scope of DAEC license renewal, (b) impact initiators presented by continued operation of DAEC and these transmission lines that could affect threatened or endangered species that do or may occur, (c) controls established for impact initiators, and (d) industry and plant experience related to potential impacts.Section 2.2 of this Environmental Report describes the aquatic communities at the DAEC and in the adjacent Cedar River. Section 2.4 describes terrestrial habitats at DAEC and along the associated transmission corridors.
Section 2.5 discusses threatened or endangered species that occur or may occur in the vicinity of the DAEC and along FPL-DA associated transmission corridors.
With the exception of the species identified in Section 2.5, FPL-DA is not aware of any threatened or endangered terrestrial species that could occur at the DAEC or along the associated transmission corridors.
Current operations of DAEC and vegetation management practices along transmission line rights-of-way are not believed to affect any listed terrestrial or aquatic species or their habitat. Furthermore, plant operations and transmission line maintenance practices are not expected to change significantly during the license renewal term. Therefore, no adverse impacts to threatened or endangered terrestrial or aquatic species from current or future operations are anticipated.
FPL-DA wrote to the Iowa Department of Natural Resources and the U.S. Fish and Wildlife Service requesting information on any listed species or critical habitats that might occur on the DAEC or along the associated transmission corridors, with particular emphasis on species that might be adversely affected by continued operation over the ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.10-1 Duane Arnold Energy Center License Renewal Application Environmental Report license renewal period. Agency responses are. provided in Appendix C and indicate that license renewal is unlikely to affect any listed species as long as current vegetation management practices are followed.As discussed in Section 3.2, FPL-DA has no plans to conduct refurbishment or construction activities at DAEC during the license renewal term. Therefore, there would be no refurbishment-related impacts to special-status species and no further analysis of refurbishment-related impacts is applicable.
Furthermore, because FPL-DA has no plans to alter current operations, resource agencies contacted by FPL-DA evidenced no serious concerns about license renewal impacts. FPL-DA concludes that impacts to threatened or endangered species from license renewal Would be SMALL and do not warrant mitigation.
ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.10-2 Duane Arnold Energy Center License Renewal Application Environmental Report 4.11 AIR QUALITY DURING REFURBISHMENT (NONATTAINMENT AND MAINTENANCE AREAS)NRC"...If'the applicant's plant is located in or near a nonattainment or maintenance area, an assessment of vehicle exhaust emissions anticipated at the time of peak refurbishment workforce must be provided in accordance with the Clean Air Act as amended...." 10 CFR 51.53(c)(3)(ii)(F)
"...Air quality impacts from plant refurbishment associated with license renewal are expected to be small. However, vehicle exhaust emissions could be cause for concern at locations in or near nonattainment or maintenance areas. The significance of the potential impact cannot be determined without considering the compliance status of each site and the numbers of workers expected to be employed during the outage...." 10 CFR 51, Subpart A, Appendix B, Table B-I, Issue 50 NRC made impacts to air quality during refurbishment a Category 2 issue because vehicle exhaust emissions could be cause for some concern, and a general conclusion about the significance of the potential impact could not be drawn without considering the compliance status of each site and the number of workers expected to be employed during an outage (NRC 1996e). Information needed would include: (1) the attainment status of the plant-site area and (2) the number of additional vehicles as a result of refurbishment activities.
Air quality during refurbishment is not applicable to DAEC because, as discussed in Section 3.2, FPL-DA has no plans for refurbishment at DAEC.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.11-1 Duane Arnold Energy Center License Renewal Application Environmental Report 4.12 IMPACTS ON PUBLIC HEALTH OF MICROBIOLOGICAL ORGANISMS NRC"If the applicant's plant uses a cooling pond, lake, or canal or discharges into a river having an annual average flowrate of less than 3.15x1012 ft lyear (9x1010 m 3/year), an assessment of the impact of the proposed action on public health from thermophilic organisms in the affected water must be provided." 10 CFR 51.53(c)(3)(ii)(G)"These organisms are not expected to be a problem at most operating plants except possibly at plants using cooling ponds, lakes, or canals that discharge to small rivers. Without site-specific data, it is not possible to predict the effects generically." 10 CFR 51,Subpart A, Appendix B, Table B-1, Issue 57 Due to the lack of sufficient data from facilities using cooling ponds, lakes, or canals or discharging to small rivers, NRC designated impacts on public health from thermophilic organisms a Category 2 issue. Information to be determined is: (1) whether the plant discharges to a small river and (2) whether discharge characteristics (particularly temperature) are favorable to the survival of thermophilic organisms.
This issue is applicable to DAEC because the plant discharges to the Cedar River, with an average flow rate of 1.05 x1011 to 1.19 xl011 cubic feet per year at USGS gauging stations up- and downstream of the station (Nalley et al. 2006). It is also relevant because the Cedar River in the vicinity of DAEC is used by the public for recreation, including boating and fishing.Organisms.
of concern include the enteric pathogens Salmonella and Shigella, the Pseudomonas aeruginosa bacterium, thermophilic Actinomycetes
("fungi"), the many species of Legionella bacteria, and pathogenic strains of the free-living Naegleria amoeba.Bacteria pathogenic to humans have evolved to survive in the digestive tracts of mammals and accordingly have optimum temperatures of around 99'F (Joklik and Smith 1972). Many of these pathogenic microorganisms (e.g., Pseudomonas, Salmonella, and Shigella) are ubiquitous in nature, occurring in the digestive tracts of wild mammals and birds (and thus in natural waters), but are usually only a problem when the host is immunologically compromised.
Thermophilic bacteria generally occur at temperatures from 77 0 F to 176 0 F, with maximum growth at 122°F to 140°F (Joklik and Smith 1972).DAEC uses two mechanical draft Cooling Towers to transfer waste heat from the Circulating Water System which cools the main condensers to the atmosphere (see Section 3.1.2). Thermal modeling conducted for the Final Environmental Statement for operation of DAEC indicated that outside of a small (less than one acre).mixing zone, the plant's discharge would have a modest (0.1 to 0.5*F) effect on downstream river temperature in summer (AEC 1973).ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.12-1 ACTION AND MITIGATING ACTIONS.
Duane Arnold Energy Center License Renewal Application Environmental Report The DAEC NPDES permit (Number 5700104, issued July 6, 2004) does not contain a discharge temperature limit, but does require monitoring of discharge (blowdown) temperatures.
Blowdown temperatures (Outfall 001) are monitored daily and reported monthly to the Iowa Department of Natural Resources along with other Discharge Monitoring Report parameters.
The maximum daily discharge temperature was 89°F in 2001 (July and August), 90'F in 2002 (June and July), 89°F in 2003 (July), 89°F in 2004 (July and August), and 88°F in 2005 (June and August).Water at these temperatures could, in theory, allow limited survival of thermophilic microorganisms, but are well below the optimal temperature range for growth and reproduction of thermophilic microorganisms.
Another factor controlling the survival and growth of thermophilic microorganisms in the Cedar River is the disinfection of DAEC sewage treatment plant effluent.
This reduces the likelihood that a seed source or inoculant will be introduced into the Cedar River via the DAEC discharge.
In addition, DAEC chlorinates water in the circulating water system to minimize the growth of algae and other microorganisms in the system. This further reduces the likelihood that a seed source or inoculant will be introduced into the Cedar River. Water from the circulating water system is dechlorinated before being returned to the Cedar River to minimize effects on the environment.
Fecal coliform bacteria are regarded as indicators of other pathogenic microorganisms, and are the organisms normally monitored by state health agencies.
The present NPDES permit for DAEC requires monitoring of fecal coliforms in sewage treatment plant effluent.
During the cooling season (April 1 through October 31), samples are collected once every 3 months for fecal Coliform analysis and o ther parameters.
The DAEC NPDES permit imposes a limit of 200 fecal coliform cells (geometric average value) per 100 milliliter (ml) sample. The NPDES permit also stipulates that no more than 10 percent of samples tested may contain 1,000 cells. Based on samples taken between April 2001 and October 2005, the concentration of fecal coliforms in DAEC sewage treatment plant effluent is normally less than 2 cells per 100 ml.Given the thermal characteristics of the Cedar River at the DAEC thermal discharge, disinfection of the cooling tower blowdown, and disinfection of sewage treatment plant effluent, FPL-DA does not expect station operations to stimulate growth or reproduction of thermophilic microorganisms.
FPL-DA has written to the Bureau of Water Supply Management of the Iowa Department of Public Health (IDPH) requesting information on any concerns IDPH may have relative to these organisms.
Copies of the correspondence are included in Appendix E of this environmental report. FPL-DA, with concurrence from IDPH, is not aware of reported cases of illness caused by Naegleria or Legionella at, in the vicinity of, or downstream of the plant. Therefore, FPL-DA concludes that the impact of thermophilic organisms is SMALL and does not warrant mitigation, -particularly since there is no known swimming in the area.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.12-2 ACTION AND MITIGATING ACTIONS
-Duane Arnold Energy Center License Renewal Application Environmental Report 4.13 ELECTRIC SHOCK FROM TRANSMISSION-LINE INDUCED CURRENTS NRC The environmental report must contain an assessment of the impact of the proposed action on the potential shock hazard from transmission lines ". ...[i]f the applicant's transmission lines that were constructed for the specific purpose of connecting the plant to the transmission system do not meet the recommendations of the National Electric Safety Code for preventing electric shock from induced currents." 10 CFR 51.53(c)(3)(ii)(H)"Electrical shock resulting from direct access to energized conductors or from induced charges in metallic structures have not been found to be a problem at most operating plants and generally are not expected to be a problem during the license renewal term. However, site-specific review is required to determine the significance of the electric shock potential at the site." 10 CFR 51, Subpart A, Appendix B, Table B 1, Issue 59 NRC made impacts of electric shock from transmission lines a Category 2 issue because, without a review of each plant's transmission line conformance with the National Electrical Safety Code (NESC; IEEE 2006) criteria, NRC could not determine the significance of the electrical shock potential.
In the case of DAEC, there have been no previous NRC or NEPA analyses of transmission-line-induced current hazards.Therefore, this section provides an analysis of the plant's transmission lines'conformance with the NESC standard.
The analysis is based on computer modeling of induced current under the lines.Objects located near transmission lines can become electrically charged due to their immersion in the lines' electric field. This charge results in a current that flows through the object to the ground. The current is called "induced" because there is no direct connection between the line and the object. The induced current can also flow to the ground through the body of a person who touches the object. An object that is insulated from the ground can actually store an electrical charge, becoming what is called"capacitively charged." A person standing on the ground and touching a vehicle or a fence receives an electrical shock due to the sudden discharge of the capacitive charge through the person's body to the ground. After the initial discharge, a steady-state current can develop, the magnitude of which depends on several factors, including the following: " the strength of the electric field which, in turn, depends on the voltage of the transmission line as well as its height and geometry,* the size of the object on the ground, and* the extent to which the object is grounded.In 1977, the NESC adopted a provision that describes how to establish minimum vertical clearances to the ground for electric lines having voltages exceeding 98-kilovolt ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.13-1 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report alternating current to ground 1.The clearance must limit the induced current 2 due to electrostatic effects to five milliamperes if the largest anticipated truck, vehicle, or equipment were short-circuited to ground. By way of comparison, the setting of ground fault circuit interrupters used in residential wiring. is four to six milliamperes.
As described in Section 3.1.3, there are two 345-kilovolt and four 161-kilovolt lines that were specifically constructed to distribute power from DAEC to the electric grid FPL-DA calculated the electric field strength and the induced current for each line's limiting case (i.e. that configuration along the line where the potential for current-induced shock would be greatest).
These calculations were made using the EzEMF computer code. Input parameters included the design features of the limiting-case scenario, the NESC requirement that line sag be determined at 1201F conductor temperature, and the maximum vehicle size under the lines as a tractor-trailer truck.The analysis determined that the 345-kilovolt and 161-kilovolt lines that connect to DAEC have the capacity to induce up to 2.06 and 1.30 milliamperes, respectively.
None of the transmission lines has the capacity to induce five milliamperes in a vehicle parked beneath the lines (TtNUS 2007c). Therefore, the transmission line designs conform to the NESC provisions for preventing electric shock from induced current.The transmission service provider's surveillance and maintenance procedures provide assurance that design ground clearances will not change. These procedures include routine aerial inspection approximately every six months, which include checks for encroachments, broken conductors, broken or leaning structures, and signs of trees burning, any of which Would be evidence of clearance problems.
Ground inspections conducted once every two years include examination for clearance at questionable locations, integrity of structures, and surveillance for dead or diseased trees that might fall on the transmission lines. Problems noted during any inspection are brought to the attention of the appropriate organization(s) for corrective action.FPL's assessment under 10 CFR 51 concludes that electric shock is of SMALL significance for the DAEC transmission lines. Due to the small significance of the issue, mitigation measures are not warranted.
1 Part 2, Rules 232C1c and 232D3c.2 The NESC and the GElS use the phrase "steady-state current," whereas 10 CFR 51.53(c)(3)(ii)(H) uses the phrase "induced current.!'
The phrases mean the same here.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.13-2 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report 4.14 HOUSING IMPACTS NRC The environmental report must contain "...[a]n assessment of the impact of the proposed action on housing availability..." 10 CFR 51.53(c)(3)(ii)(I)
"...Housing impacts are expected to be of small significance at plants located in a medium or high population area and not in an area where growth control measures that limit housing development are in effect. Moderate or large housing impacts of the workforce associated with refurbishment may be associated with plants located in sparsely populated areas or areas with growth control measures that limit housing development...." 10 CFR 51, Subpart A, Appendix B, Table B-I, Issue 63"...[S]mall impacts result when no discernible change in housing availability occurs, changes in rental rates and housing values are similar to those occurring statewide, and no housing construction or conversion occurs...." (NRC 1996e, Section 4.7.1.1, pp. 4-101 to 4-102)NRC made housing impacts a Category 2 issue because impact magnitude depends on local conditions that NRC could not predict for all plants at the time of GElS publication (NRC 1996e). Local conditions that need to be ascertained are: (1) population categorization as small, medium, or high and (2) applicability of growth control measures.Refurbishment activities and continued operations could result in housing impactsrdue to increased staffing.
As described in Section 3.2, FPL-DA does not plan to perform refurbishment.
FPL-DA concludes that there would be no refurbishment-related impacts to area housing and no analysis is therefore required.
Accordingly, the following discussion focuses on impacts of continued operations on local housing availability.
As described in Section 2.6, DAEC is located in a high population area. As noted in Section 2.8, the area of interest is not subject to growth control measures that limit housing development.
FPL-DA estimates that no additional workers would be needed to support DAEC operations during the license renewal term (Section 3.4). FPL-DA concludes that since there is no increase in staffing, no housing impacts would be experienced and, therefore, the appropriate characterization of FPL-DA license renewal housing impacts is SMALL.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.14-1 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report 4.15 PUBLIC UTILITIES:
PUBLIC WATER SUPPLY AVAILABILITY NRC The environmental report must contain "...an assessment of the impact of population increases attributable to the proposed project on the public water supply." 10 CFR 51.53(c)(3)(ii)(I)
"...An increased problem with water shortages at some sites may lead to impacts of moderate significance on public water supply availability
....." 10 CFR 51, Subpart A, Appendix B, Table B-I, Issue 65"Impacts-on public utility services are considered small if little or no change occurs in the ability to respond to the level of demand and thus there is no need to add capital facilities.
Impacts are considered moderate if overtaxing of facilities during peak demand periods occurs. Impacts are considered large if existing service levels (such as quality of water and sewage treatment) are substantially degraded and additional capacity is needed to meet ongoing demands for services." (NRC, 1996e, Section 3.7.4.5, pg. 3-19)NRC made public utility impacts a Category 2 issue because an increased problem with water availability, resulting from pre-existing water shortages, could occur in conjunction with plant demand and plant-related population growth (NRC 1996e); Local information needed would include: (1) a description of water shortages experienced in the area and (2) an assessment of the public water supply system's available capacity.NRC's analysis of impacts to the public water supply system considered both plant demand and plant-related population growth demand on local water resources.
As stated in Section 3.4, "Employment," FPL-DA anticipates no additional employee hiring attributable to license renewal. As discussed in Section 3.2, no refurbishment is planned for DAEC and no refurbishment impacts are therefore expected.DAEC does not use water from a municipal system (see Section 3.1); therefore, DAEC operations do not affect local public water supplies.
FPL-DA has identified no changes during the DAEC license renewal term that would require the plant to use municipal water.Because DAEC does not use municipal water and because there is no anticipated increase in employment applicable to the license renewal process, FPL-DA concludes that impacts on public water systems would be SMALL and would not require mitigation.
ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.15-1 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report 4.16 EDUCATION IMPACTS FROM REFURBISHMENT NRC The environmental report must contain "...an assessment of the impact of the proposed action on public schools (impacts from refurbishment activities only)within the vicinity of the plant...." 10 CFR 51.53(c)(3)(ii)(I)
"...Most sites would experience impacts of small significance but larger impacts are possible depending on site- and project-specific factors...." 10 CFR 51, Subpart A, Appendix B, Table B-1, Issue 66"...[S]mall impacts are associated with project-related enrollment increases of 3 percent or less. Impacts are considered small if there is no change in the school systems' abilities to provide educational services and if no additional teaching staff or classroom space is, needed. Moderate impacts are associated with 4 to 8 percent increases in enrollment, and if a school system must increase its teaching staff or classroom space even slightly to preserve its pre-project level of service....
Large impacts are associated with enrollment increases greater than 8 percent...." NRC 1996e, Section 3.7.4.1 NRC made refurbishment-related impacts to education a Category 2 issue because site- and project-specific factors determine the significance of impacts (NRC 1996e).Local factors to be ascertained include: (1) project-related enrollment increases and (2)status of the student/teacher ratio.The issue of impacts to the local education system due to refurbishment is not applicable to DAEC because, as Section 3.2 discusses, FPL-DA has identified no refurbishment needs at DAEC.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.16-1 Duane Arnold Energy Center License Renewal Application Environmental Report 4.17 OFFSITE LAND USE 4.17.1 OFFSITE LAND USE -REFURBISHMENT NRC The environmental report must contain "... [a]n assessment of the impact of the proposed action on...land-use" 10 CFR 51.53(c)(3)(ii)(I)
"...Impacts may be of moderate significance at plants in low population areas...." 10 CFR 51, Subpart A, Appendix B, Table B-I, Issue 68"... [I]f plant-related population growth is less than 5 percent of the study area's total population, off-site land-use changes would be small, especially if the study area has established patterns of residential and commercial development, a population density of at least 60 persons per square mile (2.6 km 2), and at least one urban area with a population of 100,000 or more within 80 km (50 miles)...." (NRC 1996e, Section 3.7.5, pg. 3-21)NRC made impacts to offsite land use as a result of refurbishment activities a Category 2 issue because land use changes could be considered beneficial by some community members and adverse by others. Local conditions to be ascertained include: (1) plant-related population growth, (2) patterns of residential and commercial development, and (3) proximity to an urban area with a population of at least 100,000.This issue is not applicable to DAEC because, as Section 3.2 "Refurbishment Activities" discusses, FPL-DA has no plans for refurbishment due to license renewal at DAEC.0 ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.17-1 Duane Arnold Energy Center License Renewal Application Environmental Report 4.17.2 OFFSITE LAND USE -LICENSE RENEWAL TERM NRC The environmental report must contain "An assessment of the impact of the proposed action on...land-use..." 10 CFR 51.53(c)(3)(ii)(I)
".Significant changes in land use may be associated with population and tax revenue changes resulting from license renewal ....." 10 CFR 51, Subpart A, Appendix B, Table B-1, Issue 69"...[I]f plant-related population growth is less than 5 percent of the study area's total population, off-site land-use changes would be small...." (NRC 1996e, Section 3.7.5, pg. 3-21)"...[I]f the plant's tax payments are projected to be small relative to the community's total revenue, new tax-driven land-use changes during the plant's license renewal term would be small, especially where the community has preestablished patterns of development and has provided adequate public services to support and guide development...." (NRC 1996e, Section 4.7.4.1, pg. 4-108)NRC made impacts to offsite land use during the license renewal term a Category 2 issue, because land use changes. may be perceived as beneficial by some community members and adverse by others. Therefore, NRC could not assess the potential significance of site-specific offsite land use impacts (NRC 1996e). Site-specific factors to consider in an assessment of new tax-driven land use impacts include: (1) the size of plant-related population growth compared to the area's total population, (2) the size of the plant's tax payments relative to the community's total revenue, (3) the nature of the community's existing land use pattern, and (4) the extent to which the community already has public services in place to support and guide development.
The GElS presents an analysis of offsite land use for the renewal term that is characterized by two components:
population-driven and tax-driven impacts (NRC 1996e).Population-Related Impacts Based on the GElS case-study analysis, NRC concluded that all new population-driven land use changes during the license renewal term at all nuclear plants would be small.Population growth caused by license renewal would represent a "much smaller percentage" of the local area's total population than the percent change represented by operations-related growth (NRC 1996e). FPL-,DA agrees with the NRC conclusion that population-driven land use impacts would be SMALL. Mitigation would not be warranted.
Tax-Revenue-Related Impacts Determining tax-revenue-related land use impacts is a two-step process. First, the significance of the plant's tax payments on taxing jurisdictions' tax revenues is ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.17-2 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report evaluated.
Then, the impact of the tax contribution on land use within the taxing jurisdiction's boundaries is assessed.Tax Payment Significance NRC has determined that the significance of tax payments as a source of local government revenue would be large if the payments are greater than 20 percent of revenue, moderate if the payments are between 10 and 20 percent of revenue, and small if the payments are less than 10 percent of revenue (NRC 1996e).Land Use Significance NRC defined the magnitude of land use changes as follows (NRC 1996e): SMALL -very little new development and minimal changes to an area's land use pattern.MODERATE -considerable new development and some changes to land use pattern.LARGE -large-scale new development and major changes in land use pattern.NRC further determined that, if the plant's tax payments are projected to be small relative to the community's total revenue, new tax-driven land use changes during the plant's license renewal term would be small. This would be especially true where the community has pre-established patterns of development and has provided adequate public services to support and guide development in-the past (NRC 1996e).DAEC Tax Impacts Table 2.7-2 provides a comparison of the total property tax revenues of all Linn County taxing authorities vs. the payments made by DAEC to these same taxing authorities.
It also provides a comparison of the property tax revenue for Linn County operations vs.payments made by DAEC to support these operations.
For the fiscal years 2003 through 2006, DAEC's property taxes have represented less than one percent of Linn County's (all taxing authorities) total property tax revenues and less than one percent of Linn County's (only county operations) total property tax revenues.
Furthermore, as stated in Section 2.7, even though over half of the total annual tax payments made by DAEC went to the Cedar Rapids Community Schools, the payments represented a fraction (less than the 10 percent threshold established by NRC) of the school district's operating budget. Using NRC's criteria, DAEC's tax payments are of small significance to Linn County and the Cedar Rapids Community Schools.DAEC Land Use Impacts Land use patterns have remained largely unchanged since DAEC commenced operations.
Development and population continue to be concentrated in the incorporated areas, primarily in the Cedar Rapids metropolitan area, indicating that ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.17-3 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report DAEC tax payments have had minimal influence on the land use patterns.
As stated in Section 2.8, Linn County is primarily rural outside of the Cedar Rapids metropolitan area, with developed land outside of incorporated areas comprising less than 16 percent of the land. Linn County and Cedar Rapids have land use plans that designate which land parcels can be used for housing, commercial, industrial, and agricultural uses (Cedar Rapids 1999; Linn County 2003, 2006c). With these plans in place, DAEC-related land use impacts in Linn County or Cedar Rapids, if any, would be restricted to complying with the established land use policies.Conclusion As indicated by the assessment of DAEC's tax payments on local taxing authorities, DAEC is a small contributor (percentage-based) to the property tax revenues of Linn County and the Cedar Rapids Community Schools. License renewal would not generate additional tax revenues for Linn County or the Cedar Rapids Community Schools, but a continuation of DAEC's current tax payments would prolong the small beneficial impact on the County's revenues.Land use patterns have remained largely unchanged since DAEC commenced operations with developed land being concentrated in the incorporated areas and more than 84 percent of the land outside of incorporated areas being undeveloped.
Additionally, Linn County and Cedar Rapids have land use plans that direct growth.Therefore, the land use impacts of DAEC's license renewal term are expected to be SMALL, and mitigation would not be warranted.
ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.17-4 Duane Arnold Energy Center License Renewal Application Environmental Report 4.18 TRANSPORTATION NRC The environmental report must "...assess the impact of highway traffic generated by the proposed project on the level of service of local highways during periods of license renewal refurbishment activities and during the term of the renewed license." 10 CFR 51.53(c)(3)(ii)(J)
"...Transportation impacts...are generally expected to be of small significance.
However, the increase in traffic associated with additional workers and the local road and traffic control conditions may lead to impacts of moderate or large significance at some sites....2" 10 CFR 51, Subpart A, Appendix B, Table B-I, Issue 70 Small impacts would be associated with U.S. Transportation Research Board Level of Service A, having the following condition:
"...Free flow of the traffic stream;users are unaffected by the presence of others." and Level of Service B, having the following condition:
"...Stable flow in which the freedom to select speed is unaffected but the freedom to maneuver is slightly diminished...." (NRC 1996e, Section 3.7.4.2)NRC made impacts to transportation a Category 2 issue, because impact significance is determined primarily by road conditions existing at the time of license renewal, which NRC could not forecast for all facilities (NRC 1996e). Local road conditions to be ascertained are: (1) level of service conditions and (2) incremental increases in traffic associated with refurbishment activities and license renewal staff.As described in Section 3.2, no major refurbishment is planned and no refurbishment impacts to local transportation are therefore anticipated.
DAEC does not anticipate hiring any additional staff for continued operations during the renewal term. Therefore, the issue of transportation is not applicable for refurbishment and SMALL for continued operations.
ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.18-1 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report 4.19 HISTORIC AND ARCHAEOLOGICAL RESOURCES NRC The environmental report must "...assess whether any historic or archeological properties will be affected by the proposed project." 10 CFR 51.53(c)(3)(ii)(K)
"...Generally, plant refurbishment and continued operation are expected to have no more than small adverse impacts on historic and archeological resources.
However, the National Historic Preservation Act requires the Federal agency to consult with the State Historic Preservation Officer to determine whether there are properties present that require protection...." 10 CFR 51, Subpart A, Appendix B, Table B-I, Issue 71"...Sites are considered to have small impacts to historic and archeological resources if (1) the State Historic Preservation Officer (SHPO) identifies no significant resources on or near the site; or (2) the SHPO identifies (or has previously identified) significant historic resources but determines they would not be affected by plant refurbishment, transmission lines, and license-renewal-term operations and there are no complaints from the affected public about altered historic character; and (3) if the conditions associated with moderate impacts do not occur." (NRC 1996e, Section 3.7.7, pg. 3-23)NRC made impacts to historic and archaeological resources a Category 2 issue because determinations of impacts to historic and archaeological resources are site-specific in nature, and the National Historic Preservation Act mandates that impacts must be determined through consultation with the State Historic Preservation Officer (SHPO) (NRC 1996e).In the Final Environmental Statement for the Duane Arnold Energy Center, the Atomic Energy Commission (AEC) stated that the DAEC property had no known sites of historical significance and there were no national historic sites located in the immediate vicinity of the plant. After conferring with the State Historical Society of Iowa, the United States Department of the Interior, and the Federal Advisory Council on Historic Preservation, the AEC concluded that the construction and operation of DAEC would have no effect on cultural resources in the area (AEC 1973).As described in Section 2.11, as of 2007, 10 properties in Benton County and 75 properties in Linn County have been listed in the National Register of Historic Places.Three of these 85 properties, Shellsburg Bridge, Chain Lakes Bridge, and Taylor-Van Note fall within a 6-mile radius of DAEC.As discussed in Section 3.2, FPL-DA has no refurbishment plans and no refurbishment-related impacts are anticipated.
FPL-DA is not aware of any historic or archaeological resources that have been affected by DAEC operations, including operation and maintenance of transmission lines. Because FPL-DA has no plans to construct additional facilities at DAEC during the license renewal term and because any land-disturbing activities that may be required would be done under the auspices of FPL-DA procedures that insure the protection of cultural resources, FPL-DA concludes that ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.19-1 Duane Arnold Energy Center License Renewal Application Environmental Report operation of generation and transmission facilities over the license renewal term would have SMALL impacts to cultural resources; hence, no mitigation would be warranted.
ENVIRONMENTAL CONSEQUENCES' OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.19-2 Duane Arnold Energy Center License Renewal Application Environmental Report 4.20 SEVERE ACCIDENT MITIGATION ALTERNATIVES NRC The environmental report must contain a consideration of alternatives to mitigate severe accidents
"...if the staff has not previously considered severe accident mitigation alternatives for the applicant's plant in an environmental impact statement or related supplement or in an environment assessment..." 10 CFR 51.53(c)(3)(ii)(L)
"..The probability weighted consequences of atmospheric releases, fallout onto open bodies of water, releases to ground water, and societal and economic impacts from severe accidents are small for all plants. However, alternatives to mitigate severe accidents must be considered for all plants that have not considered such alternatives...." 10 CFR 51, Subpart A, Appendix B, Table B-I, Issue 76 This section summarizes FPL-DA's analysis of alternative ways to mitigate the impacts of severe accidents at DAEC. A detailed description of the severe accident mitigation alternatives (SAMA) analysis is provided in Appendix F.The term "accident" refers to any unintentional event (i.e., outside the normal or expected plant operation envelope) that results in the release or a potential for release of radioactive material to the environment.
NRC categorizes accidents as "design basis" or "severe." Design basis accidents are those for which the risk is great enough that NRC requires plant design and construction to prevent unacceptable accident consequences.
Severe accidents are those that NRC considers too unlikely to warrant design controls.NRC concluded in its license renewal rulemaking that the unmitigated environmental impacts from severe accidents met its Category 1 criteria.
However, NRC made consideration of mitigation alternatives a Category 2 issue because not all plants had completed ongoing regulatory programs related to mitigation (e.g., individual plant examinations and accident management).
Site-specific information to be presented in the license renewal environmental report includes:
(1) potential SAMAs; (2) benefits, costs, and net value of implementing potential SAMAs; and (3) sensitivity of analysis to changes in key underlying assumptions.
DAEC maintains a probabilistic risk assessment (PRA) model to use in evaluating the most significant risks of core damage and the resulting radiological release from the containment structures.
For the SAMA analysis, FPL-DA used the DAEC PRA model output as input to an NRC-approved methodology that calculates economic costs and dose to the public from hypothesized releases from the containment structure into the environment.
Then, using NRC regulatory analysis techniques, FPL-DA calculated the monetary value of the unmitigated severe accident risk for DAEC. The result represents the monetary value of the base risk of dose to the public and worker, offsite and onsite economic costs, and replacement power. This value became a cost/benefit-screening tool for potential SAMAs; a SAMA whose cost of implementation exceeded the base risk ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.20-1, ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report value could be rejected as being not cost-beneficial.
The following list summarizes the steps of this process:* DAEC PRA Model -Use the DAEC Internal Events PRA model as the basis for the analysis and incorporate external events contributions.
Level 3 PRA Analysis -Use DAEC Level 1 and 2 Internal Events PRA output and site-specific meteorology, demographic, land use, and emergency response data as input in performing a Level 3 PRA using the MELCOR Accident Consequences Code System Version 2 (MACCS2).Baseline Risk Monetization
-Use the analysis techniques specified in NEI 05-01, Revision A to calculate the monetary value of the unmitigated DAEC severe accident risk. This becomes the maximum averted cost-risk (MACR) that is possible.Phase I SAMA Analysis -Identify potential SAMA candidates based on the DAEC PRA, Individual Plant Examination (IPE), Individual Plant Examination for External Events (IPEEE), and documentation from the industry and NRC.Screen out Phase I SAMA candidates:
- 1) that are not applicable to the DAEC design or are of low benefit in boiling water reactors (BWRs) such as DAEC.2) that have already been implemented at DAEC or whose benefits have been achieved at DAEC using other means.3) whose estimated cost exceeds the possible MACR.* Phase II SAMA Analysis -Calculate the risk reduction attributable to each remaining SAMA candidate and compare to a more detailed cost analysis to identify the net cost-benefit.
PRA insights are also used to screen SAMA candidates in this phase." Sensitivity Analysis -Evaluate how changes in the SAMA analysis assumptions might affect the cost-benefit evaluation." Conclusions
-Summarize results and identify conclusions.
Using this process, FPL-DA incorporated industry, NRC, and plant-specific information to create a list of 166 SAMAs for consideration.
After Phase 1 screening, 23 candidate SAMAs remained for further consideration.
Phase 2 screening resulted in 2 SAMAs that are potentially cost beneficial for DAEC. Each of the 2 SAMAs candidates is described below.Implementation of SAMA 156 would involve the addition of a T-connection and valve to the pipe connecting the Residual Heat Removal Service Water and Emergency Service ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED Page 4.20-2 ACTION AND MITIGATING ACTIONS Duane Arnold Energy Center License Renewal Application Environmental Report Water (RHRSW/ESW) pit to the Circulating Water pit to allow for backflow from the Circulating Water pit to the RHRSW/ESW pit. This would improve the reliability of the RHRSW/ESW system through the addition of a redundant water source.Implementation of SAMA 166 would involve a modification to install panel modifications to allow bypass of failed Emergency Core Cooling System (ECCS) low reactor pressure permissive signals and develop emergency procedures for installation of the low reactor pressure permissive bypass. This would improve the reliability of the low pressure ECCS systems given a failure of the low reactor pressure permissives signals which was identified as a top risk contributor from the PRA model.Neither of these SAMAs is aging-related.
Therefore, they need not be implemented as part of license renewal pursuant to 10 CFR 54. FPL-DA is further evaluating these SAMA candidates and has not made any decision to implement them. Evaluation of plant risk reduction is part of an ongoing effort to improve operation at DAEC and implementation of these items will be considered as part of that effort.ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.20-3 Duane Arnold Energy Center License Renewal Application Environmental Report 4.21 ENVIRONMENTAL JUSTICE Executive-Order 12898, "Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations," 59 FR 7629 (1994), directs Federal agencies in the Executive Branch to "make achieving environmental justice part of its mission by identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects of its programs, policies, and activities" on minority and low-income populations.
Although an independent agency, the NRC has indicated its willingness to comply with the Executive Order.The Council on Environmental Quality (CEQ) developed guidelines to assist Federal agencies with integration of environmental justice into the NEPA process. The guidelines are contained in CEQ's'December 10, 1997, document, "Environmental Justice Guidance Under the National Environmental Policy Act." CEQ's guidance is not binding on NRC activities; however, NRC has voluntarily committed to conducting environmental justice reviews of actions under its jurisdiction and has issued a policy statement and procedural guidance.
Much of CEQ's guidance has been incorporated into NRC's environmental justice procedure (NRC 2004).The NRC procedure makes clear that if no potentially significant impacts are anticipated from the proposed action, then "...these results should be documented and the environmental justice review is complete." FPL-DA has reviewed and adopted by reference NRC findings for Category 1 issues that FPL-DA determined are applicable to DAEC (see Section 4.0). The NRC had concluded that environmental impacts for each of these issues would be SMALL.FPL-DA has addressed each Category 2 issue and has performed required analyses for those that FPL-DA determined are applicable to DAEC (see Chapter 4 and Appendix A). For each applicable Category 2 issue, FPL-DA has concluded that the environmental impacts would be SMALL. Based on FPL-DA review, DAEC license renewal and continued operations would result in no significant impacts. Therefore, there would be no disproportionately high and adverse impacts on any member of the public, including minority and low-income populations, and mitigation would not be warranted.
ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION AND MITIGATING ACTIONS Page 4.21-1 Duane Arnold Energy Center License Renewal Application Environmental Report 5.0 ASSESSMENT OF NEW AND SIGNIFICANT INFORMATION NRC"The environmental report must contain any new and significant information regarding the environmental impacts of license renewal of which the applicant is aware." 10 CFR 51.53(c)(3)(iv)
The U.S. Nuclear Regulatory Commission (NRC) licenses the operation of domestic nuclear power plants and provides for license renewal, requiring a license renewal application that includes an environmental report (10 CFR 54.23). NRC regulations at 10 CFR 51 prescribe the environmental report content and identify the specific analyses the applicant must perform. In an effort to streamline the environmental review, NRC has resolved most of the environmental issues generically (Category 1) and only requires an applicant's analysis of the remaining issues (Category 2).While NRC regulations do not require an applicant's environmental report to contain analyses of the impacts of Category 1 issues, the regulations
[10 CFR 51.53(c)(3)(iv)]
do require that an applicant identify any new and significant information of which the applicant is aware that would negate any of the generic findings that NRC has codified or evaluated in the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GELS) (NRC 1996e). The purpose of this requirement is to alert NRC staff to such information, so the staff can determine whether to seek the Commission's approval to waive or suspend application of the rule with respect to the affected generic analysis.
NRC has explicitly indicated, however,.that an applicant is not required to perform a site-specific validation of GElS conclusions (NRC 1996g).FPL Energy Duane Arnold, LLC (FPL-DA) expects that new and significant information would include: " Information that identifies a significant environmental issue not covered in the GElS and codified in the regulation, or* Information that was not covered in the GElS analyses of a particular environmental issue and that leads to an impact finding different from that codified in the regulation.
NRC does not define the term "significant", though for the purpose of its review, FPL-DA used guidance available in Council on Environmental Quality (CEQ) regulations.
The National Environmental Policy Act authorizes CEQ to establish implementing regulations for federal agency use. NRC requires license renewal applicants to provide NRC with input, in the form of an environmental report, that NRC will use to meet National Environmental Policy Act requirements as they apply to license renewal (10 CFR 51.10). CEQ guidance provides that federal agencies should prepare environmental impact statements for actions that would significantly affect the environment (40 CFR 1502.3), focus on significant environmental issues (40 CFR 1502.1), and eliminate from detailed study issues that are not significant
[40 CFR 1501.7(a)(3)].
The CEQ guidance includes a lengthy definition of "significantly" that requires consideration of the context of the action and the intensity or severity of the ASSESSMENT OF NEW AND SIGNIFICANT INFORMATION Page 5.0-1 Duane Arnold Energy Center License Renewal Application Environmental Report impact(s)
(40 CFR 1508.27).
FPL-DA expects that moderate or large impacts, as defined by NRC, would be significant.
Chapter 4 presents the NRC definitions of"moderate" and "large" impacts.The new and significant assessment process that FPL-DA used during preparation of this license renewal application includes: (1) interviews with Duane Arnold Energy Center (DAEC) staff with various responsibilities including environmental, engineering, radiological waste, chemistry, industrial health and safety, communications, and operations support and with Alliant Energy Group on information related to the conclusions in the GElS as they relate to DAEC, (2) review of FPL-DA's environmental management systems for how current programs manage potential impacts and/or provide mechanisms for DAEC staff to become aware of new and significant information, (3) correspondence with state and federal regulatory agencies to determine if the agencies had concerns, (4) review of documents related to environmental issues at DAEC and regional environs, (5) credit for oversight provided by inspections of plant facilities and environmental monitoring operations by state and federal regulatory agencies, (6) participation in review of other licensees' Environmental Reports, audits, and industry initiatives, and (7) independent review of plant-related information through FPL-DA contracts with industry experts on license renewal environmental impacts.FPL-DA is aware of no new and significant information regarding the environmental impacts of DAEC license renewal.ASSESSMENT OF NEW AND SIGNIFICANT INFORMATION Page 5.0-2 Duane Arnold Energy Center License Renewal Application Environmental Report 6.0
SUMMARY
OF LICENSE RENEWAL IMPACTS AND MITIGATING ACTIONS 6.1 LICENSE RENEWAL IMPACTS FPL Energy, LLC (FPL-DA) has reviewed the environmental impacts of renewing the Duane Arnold Energy Center (DAEC) operating license and has concluded that impacts would be small and would not require mitigation.
This environmental report documents the basis for FPL-DA's conclusion.
Chapter 4 incorporates by reference U.S. Nuclear Regulatory Commission (NRC) findings for the 57 Category 1 issues that apply to DAEC, all of which have impacts that are SMALL (Appendix A, Table A-i). The rest of Chapter 4 analyzes Category 2 issues, all of which are either not applicable or have impacts that would be SMALL. Table 6.5-1 identifies the impacts that DAEC license renewal would have on resources associated with Category 2- issues.
SUMMARY
OF LICENSE RENEWAL IMPACTS AND MITIGATING ACTIONS 6.1-1 Duane Arnold Energy Center License Renewal Application Environmental Report 6.2 MITIGATION NRC"The report must contain a consideration of alternatives for reducing adverse impacts...for all Category 2 license renewal issues..." 10 CFR 51.53(c)(3)(iii)"The environmental report shall include an analysis that considers and balances.. .alternatives available for reducing or avoiding adverse environmental effects..." 10 CFR 51.45(c) as incorporated by 10 CFR 51.53(c)(2) and 10 CFR 51.45(c)Impacts of license renewal are SMALL and would not require mitigation.
Current operations include monitoring activities that would continue during the license renewal term. FPL-DA performs routine monitoring to ensure the safety of workers, the public, and the environment.
These activities include the biological monitoring program, radiological environmental monitoring program, air monitoring, effluent chemistry monitoring, and effluent toxicity testing. These monitoring programs ensure that the plant's permitted emissions and discharges are within regulatory limits and any unusual or abnormal emissions/discharges would be quickly detected, mitigating potential impacts.
SUMMARY
OF LICENSE RENEWAL IMPACTS AND MITIGATING ACTIONS 6.2-1 Duane Arnold Energy Center License Renewal Application Environmental Report 6.3 UNAVOIDABLE ADVERSE IMPACTS NRC The environmental report shall discuss any "...adverse environmental effects which cannot be avoided should the proposal be implemented..." 10 CFR 51.45(b)(2) as adopted by 10 CFR 51.53(c)(2)
This environmental report adopts by reference NRC findings for applicable Category 1 issues, including discussions of any unavoidable adverse impacts (Appendix A, Table A-i). FPL-DA examined 21 Category 2 issues and identified the following unavoidable adverse impacts of license renewal:* The cooling tower vapor plumes are visible from offsite. This visual impact will continue during the license renewal term." Procedures for the disposal of sanitary, chemical, and radioactive wastes are intended to reduce adverse impacts from these sources to acceptably low levels.A small impact will occur as long as the plant is in operation.
Solid radioactive wastes are a product of plant operations and long-term disposal of these materials must be considered.
- Operation of DAEC results in a very small increase in radioactivity in the air and water. However, fluctuations in natural background radiation are expected to exceed the small incremental increase in dose to the local population.
Operation of DAEC also creates a very low probability of accidental radiation exposure to inhabitants of the area.a Operation of DAEC results in consumptive use of groundwater and Cedar River water. FPL-DA has plans for low-flow augmentation during drought conditions.
Limited numbers of adult and juvenile fish are impinged on the traveling screens at the cooling water River Intake Structure.
Very small numbers of larval fish are entrained at the cooling water River Intake Structure.
SUMMARY
OF LICENSE RENEWAL IMPACTS AND MITIGATING ACTIONS 6.3-1 Duane Arnold Energy Center License Renewal Application Environmental Report 6.4 IRREVERSIBLE AND IRRETRIEVABLE RESOURCE COMMITMENTS NRC The environmental report shall discuss any "...irreversible and irretrievable commitments of resources which would be involved in the proposed action should it be implemented..." 10 CFR 51.45(b)(5) as adopted by 10 CFR 51.53(c)(2)
Continued operation of DAEC for the license renewal term will result in irreversible and irretrievable resource commitments, including the following:
- nuclear fuel, which is used in the reactor and is converted to radioactive waste;land required to dispose of spent nuclear fuel, low-level radioactive wastes generated as a result of plant operations, and solid wastes generated from normal industrial operations; elemental materials that will become radioactive; and* materials used for the normal industrial operations of the plant that cannot be recovered or recycled or that are consumed or reduced to unrecoverable forms.
SUMMARY
OF LICENSE RENEWAL IMPACTS AND MITIGATING ACTIONS 6.4-1 Duane Arnold Energy Center License Renewal Application Environmental Report 6.5 SHORT-TERM USE VERSUS LONG-TERM PRODUCTIVITY OF THE ENVIRONMENT NRC The environmental report shall discuss the "...relationship between local short-term uses of man's environment and the maintenance and enhancement of long-term productivity..." 10 CFR 51.45(b)(4) as adopted by 10 CFR 51.53(c)(2)
The current balance between short-term use and long-term productivity at the DAEC site was established with the decision to construct the plant. The Final Environmental Statement related to the Duane Arnold Energy Center (AEC 1973) evaluated the impacts of constructing and operating DAEC in Linn County, Iowa. Short-term use of natural resources includes land and water. Much of the 500-acre site was under cultivation before its acquisition.
Approximately 100 acres were disturbed and modified by plant construction activities, and 40 acres are occupied by plant structures and related facilities.
Existing transmission corridors were used when feasible, reducing the need for new right-of-way acquisition to 939 acres, the majority of which was returned to agricultural use after construction.
Dredging of Cedar River due to construction of a weir, barrier wall, and discharge structures resulted in some disruption of aquatic environments in a limited area of the river. The cooling towers produced some on-site fogging and icing, particularly during winter months.After decommissioning, many environmental disturbances would cease and some restoration of the natural habitat would occur. Thus, the "trade-off' between the production of electricity and changes in the local environment is reversible to some extent.Experience with other experimental, developmental, and commercial nuclear plants has demonstrated the feasibility of decommissioning and dismantling such plants sufficiently to restore a site to its former use. The degree of dismantlement will take into account the intended new use of the site and a balance among health and safety considerations, salvage values, and environmental impact. However, decisions on the ultimate disposition of these lands have not yet been made. Continued operation for an additional 20 years would not increase the short-term productivity impacts described here.
SUMMARY
OF LICENSE RENEWAL IMPACTS AND MITIGATING ACTIONS 6.5-1 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 6.5-1 ENVIRONMENTAL IMPACTS RELATED TO LICENSE RENEWAL AT DUANE ARNOLD ENERGY CENTER No. Issue Environmental Impact Surface Water Quality, Hydrology, and Use (for all plants)13 Water use conflicts (plants Small. Consumptive use represents less than one percent of the mean annual with cooling ponds or flow of the Cedar River and would have little or no effect on the Cedar River and cooling towers using its riparian ecological communities.
makeup water from a small river with low flow)Aquatic Ecology (for plants with once-through and cooling pond heat dissipation systems)25 Entrainment of fish and Small. Though not applicable to plants with cooling towers, DAEC has a current shellfish in early life stages NPDES permit which constitutes compliance with CWA Section 316(b)requirements to provide best technology available to minimize entrainment.
26 Impingement of fish and Small. Though not applicable to plants with cooling towers, DAEC has a current shellfish NPDES permit which constitutes compliance with CWA Section 316(b)requirements to provide best technology available to minimize impingement.
27 Heat shock Small. Though not applicable to plants with cooling towers, DAEC discharges meet state water quality standards and have very little impact on local aquatic life.Groundwater Use and Quality 33 Groundwater use conflicts Small. Pump tests indicate that drawdown impacts have decreased during the (potable and service water, period of the current operating permit and no changes in operational water and dewatering; plants that needs would occur during the license renewal period.use > 100 gpm)34 Groundwater use conflicts Small. DAEC consumptive use has little impact on flow in the Cedar River, even (plants using cooling towers during low flow conditions, and therefore has little effect on recharge to the or cooling ponds alluvial aquifer.withdrawing makeup water from a small river)35 Groundwater use conflicts None. This issue does not apply because DAEC does not use Ranney wells.(Ranney wells)39 Groundwater quality None. This issue does not apply because DAEC does not use cooling ponds.degradation (cooling ponds at inland sites)Terrestrial Resources 40 Refurbishment impacts None. No impacts are expected because DAEC has no plans to undertake refurbishment.
Threatened or Endangered Species 49 Threatened or endangered species Small. Two federally-listed species are found in the general vicinity of DAEC, but neither is believed to have been affected by plant operation.
FPL-DA has no plans to change plant operations and transmission line maintenance practices, and resource agencies contacted by FPL-DA that responded expressed no concerns about operation on the threatened or endangered species in the vicinity.0
SUMMARY
OF LICENSE RENEWAL IMPACTS AND MITIGATING ACTIONS 6.5-2 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 6.5-1 (CONTINUED)
ENVIRONMENTAL IMPACTS RELATED TO LICENSE RENEWAL AT DAEC No. Issue Environmental Impact Air Quality 50 Air quality during None. No impacts are expected because DAEC has no plans to undertake refurbishment (non- refurbishment.
attainment and maintenance areas)Human Health 57 Microbiological organisms Small. The low temperatures in the Cedar River and the disinfection at the (public health) (plants using sewage treatment facility do not support the propagation of pathological lakes or canals, or cooling microbes.towers or cooling ponds that discharge to a small river)59 Electromagnetic fields, acute Small. The largest modeled induced current under the DAEC lines is effects (electric shock) substantially less than the 5-milliampere limit. Therefore, the DAEC transmission lines conform to the National Electrical Safety Code provisions for preventing electric shock from induced current.Socioeconomics 63 Housing impacts Small. NRC concluded that housing impacts would be small in medium and high population areas having no growth control measures.
DAEC is located in a high population area with no growth control measures.65 Public services:
public Small. Excess water capacity in the region of interest is more than sufficient to utilities handle the license renewal population growth.66 Public services:
education None. No impacts are expected because DAEC has no plans to undertake (refurbishment) refurbishment.
68 Offsite land use None. No impacts are expected because DAEC has no plans to undertake (refurbishment) refurbishment.
69 Offsite land use (license Small. -No plant-induced changes to offsite land use are expected from license renewal term) renewal. Impacts from continued operation would be positive.70 Public services:
Small. The capacities of area roads are more than adequate to accommodate transportation the operations workforce.
The increase in traffic flow as a result of license renewal, if any, would most likely be unnoticeable.
71 Historic and archeological Small. License renewal would have little or no effect on historic or resources archaeological resources.
DAEC has an excavation procedure in place to protect potential archaeological, historical, or cultural resources.
Postulated Accidents 76 Severe accidents Small. The benefit/cost analysis did not identify any cost-effective aging-related severe accident mitigation alternatives.
SUMMARY
OF LICENSE RENEWAL IMPACTS AND MITIGATING ACTIONS 6.5-3 Duane Arnold Energy Center License Renewal Application Environmental Report 7.0 ALTERNATIVES TO THE PROPOSED ACTION NRC The environmental report shall discuss "Alternatives to the proposed action ....." 10 CFR 51.45(b)(3), as adopted by reference at 10 CFR 51.53(c)(2).
"...The report is not required to include discussion of need for power or economic costs and benefits of ... alternatives to the proposed action except insofar as such costs and benefits are either essential for a determination regarding the inclusion of an alternative in the range of alternatives considered or relevant to mitigation
......10 CFR 51.53(c)(2)."While many methods are available for generating electricity, and a huge number of combinations or mixes can be assimilated to meet a defined generating requirement, such expansive consideration would be too unwieldy to perform given the purposes of this analysis.
Therefore, NRC has determined that a reasonable set of alternatives should be limited to analysis of single, discrete electric generation sources and only electric generation sources that are technically feasible and commercially viable..." (NRC 1996e)."...The consideration of alternative energy sources in individual license renewal reviews will consider those alternatives that are reasonable foe the region, including power purchases from outside the applicant's service area...." (NRC 1996c).Chapter 7 evaluates alternatives to Duane Arnold Energy Center (DAEC) license renewal. The chapter identifies actions that the owners of DAEC (i.e., FPL Energy Duane Arnold, LLC [FPL-DA], Central Iowa Power Cooperative, and Corn Belt Power Cooperative) might take, and associated environmental impacts, if the U.S. Nuclear Regulatory Commission (NRC) chooses not to renew the plant's operating license. The chapter also addresses DAEC actions that the owners of DAEC have considered, but would not take, and the basis for determining that such actions would be unreasonable.
FPL-DA divided its alternatives discussion into two categories, "no-action" and"alternatives that meet system generating needs." In considering the level of detail and analysis that it should provide for each category, FPL-DA relied on the NRC decision-making standard for license renewal: "...the NRC staff, adjudicatory officers, and Commission shall determine whether or not the adverse environmental impacts of license renewal are so great that preserving the option of license renewal for energy planning decision makers would be unreasonable." [10 CFR 51.95(c)(4)].
FPL-DA has determined that the environmental report would support NRC decision making as long as the document provides sufficient information to clearly indicate whether an alternative would have a smaller, comparable, or greater environmental impact than the proposed action. Providing additional detail or analysis serves no function if it only brings to light additional adverse impacts of alternatives to license renewal. This approach is consistent with regulations of the Council on Environmental ALTERNATIVES TO THE PROPOSED ACTION Page 7.0-1 Duane Arnold Energy Center License Renewal Application Environmental Report Quality, which provide that the consideration of alternatives (including the proposed action) should enable reviewers to evaluate their comparative merits (40 CFR 1500-1508). Chapter 7 provides sufficient detail about alternatives to establish the basis for necessary comparisons to the Chapter 4 discussion of impacts from the proposed action.In characterizing environmental impacts from alternatives, FPL-DA has used the same definitions of "SMALL," "MODERATE," and "LARGE" that are presented in the introduction to Chapter 4.ALTERNATIVES TO THE PROPOSED ACTION Page 7.0-2 ALTERNATIVES TO THE PROPOSED ACTION Page 7.0-2 Duane Arnold Energy Center License Renewal Application Environmental Report 7.1 NO-ACTION ALTERNATIVE FPL-DA uses "no-action alternative" to refer to a scenario in which NRC does not renew the DAEC operating license. Components of this alternative include replacing the generating capacity of DAEC and decommissioning the facility, as described below.FPL-DA is a wholesale supplier of electricity in Iowa, having purchased the majority share of DAEC in January 2006 from Interstate Power and Light (IPL). As part of the sale, the previous owners entered into power purchase agreements (PPAs) with FPL-DA to purchase the output from DAEC over the remaining term of its current license (IUB 2005). During the license renewal'term FPL-DA may sell DAEC's power on the open market or may renew the PPA with IPL.DAEC provides approximately 5.1 terawatt-hours of electricity to FPL-DA's customers annually (EIA 2007b). Currently DAEC is the only operating nuclear plant in the state.As shown in Figures 7.2-1 and 7.2-2, DAEC provides 5.2 percent ofIowa's total electricity capacity and 10.3 percent of its generation.
FPL-DA thinks that any alternative would be unreasonable if it did not include replacing the capacity of DAEC.Replacement could be accomplished by (1) building new generating capacity, (2)* purchasing power from the wholesale market, or (3) reducing power requirements through demand reduction.
Section 7.2.1 describes each of these possibilities in detail, and Section 7.2.2 describes environmental impacts from feasible alternatives.
The Generic Environmental Impact Statement (GELS) (NRC 1996e) defines decommissioning as the safe removal of a nuclear facility from service and the reduction of residual radioactivity to a level that permits release of the property for unrestricted use and termination of the license. NRC-evaluated decommissioning options include immediate decontamination and dismantlement, and safe storage of the stabilized and defueled facility for a period of time, followed by additional decontamination and dismantlement.
Regardless of the option chosen, decommissioning must be completed within a 60-year period. Under the no-action alternative, FPL-DA would continue operating DAEC until the existing license expires, then initiate decommissioning activities in accordance with, NRC requirements.
The GElS describes decommissioning activities based on an evaluation of a larger reactor (the "reference" boiling-water reactor is the 1,155-megawatt-electric
[MWe] Washington Public Power Supply System Nuclear Project 2). This description is applicable to decommissioning activities that FPL-DA would conduct at DAEC.As the GElS notes, NRC has evaluated environmental impacts from decommissioning.
NRC-evaluated impacts include: impacts of occupational and public radiation dose;impacts of waste management; impacts to air and water quality; and ecological, economic, and socioeconomic impacts. NRC indicated in the Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities, Supplement 1 (NRC 2002a) that the environmental effects of greatest concern (i.e., radiation dose and releases to the environment) are substantially less than the same effects resulting NO-ACTION ALTERNATIVE Page 7.1-1 Duane Arnold Energy Center License Renewal Application Environmental Report from reactor operations.
FPL-DA adopts by reference the NRC conclusions regarding environmental impacts of decommissioning.
FPL-DA notes that decommissioning activities and their impacts are not discriminators between the proposed action and the no-action alternative.
FPL-DA will have to decommission DAEC regardless of the NRC decision on license renewal; license renewal would only postpone decommissioning for another 20 years. NRC has established in the GElS that the timing of decommissioning operations does not substantially influence the environmental impacts of decommissioning.
FPL-DA adopts by reference the NRC findings (10 CFR 51, Appendix B, Table B-i, Decommissioning) that delaying decommissioning until after the license renewal term would have SMALL environmental impacts. The discriminators between the proposed action and the no-action alternative lie within the choice of generation replacement options to be part of the no-action alternative.
Section 7.2.2 analyzes the impacts from these options.FPL-DA concludes that the decommissioning impacts under the no-action alternative would not be substantially different from those occurring following license renewal, as identified in the GElS (NRC 1996e) and in the decommissioning generic environmental impact statement (NRC 2002a). These impacts would be temporary and would occur at the same time as the impacts from meeting system generating needs.ALTERNATIVES TO THE PROPOSED ACTION 7.1-2 ALTERNATIVES TO THE PROPOSED ACTION 7.172 Duane Arnold Energy Center License Renewal Application Environmental Report 7.2 ALTERNATIVES THAT MEET SYSTEM GENERATING NEEDS DAEC has a net capacity of about 610 MWe and, in 2006, generated approximately 5.1 terawatt-hours of electricity (FPL 2007b; EIA 2007b). This power, equivalent to the energy used by approximately 600,000 residential customers, would be unavailable to FPL-DA's customers in the event the DAEC operating license is not renewed. If the DAEC operating license was not renewed, the owners of DAEC would need to build new generating capacity, purchase power, or reduce power requirements through'demand reduction to ensure they meet the electric power requirements of their customers.
The current mix of power generation options in Iowa is one indicator of what the owners of DAEC consider to be feasible alternatives.
In 2005, electric generators in Iowa had a total generating capacity of 11,087 MWe. This capacity includes units fueled by coal (55.3 percent), natural gas (21.5 percent), oil (9.3 percent),, non-hydroelectric renewables (7.5 percent), nuclear (5.2 percent), and hydroelectric (1.2 percent).
In 2005, the electric industry in Iowa provided approximately 44.2 terawatt-hours of electricity.
Utilization of generating capacity in Iowa was dominated by coal (77.6 percent), followed by nuclear (10.3 percent), gas (5.6 percent), non-hydroelectric renewables (4.0 percent), hydroelectric (2.2 percent), and oil (0.3 percent).Figures 7.2-1 and 7.2-2 illustrate Iowa's electric industry generating capacity and utilization, respectively. (EIA 2007c)Comparison of generating capacity with actual utilization of this capacity indicates that coal and nuclear are used by electric generators in Iowa substantially more relative to their capacity than either oil-fired or gas-fired generation.
This condition reflects the relatively low fuel cost and baseload suitability for nuclear power and coal-fired plants, and relatively higher use of gas- and oil-fired units to meet peak loads. Comparison of capability and utilization for oil and gas-fired facilities indicates a strong preference of gas firing over oil firing, indicative of higher cost and greater air emissions associated with oil firing. Energy production from renewable sources is similarly preferred from a cost standpoint, but capacity is limited and utilization can vary substantially depending on resource availability.
ALTERNATIVES TO THE PROPOSED ACTION 7.2-1 ALTERNATIVES TO THE PROPOSED ACTION 7.2-1 Duane Arnold Energy Center License Renewal Application Environmental Report 0 Hydro 1.2r/-\Nuclear 5.2%r Renewable 7.5%Oil 9.3%Hydro 2.20% Renewable Oil 0.3%/ F 4.0%Nuclear 10.3%FIGURE 7.2-1. IOWA GENERATING CAPACITY BY FUEL TYPE, 2005 FIGURE 7.2-2. IOWA GENERATION BY FUEL TYPE, 2005 7.2.1 ALTERNATIVES CONSIDERED Technology Choices For the purposes of this license renewal environmental report, FPL-DA conducted evaluations of alternative generating technologies to identify candidate technologies that would be capable of replacing the net base-load capacity of the nuclear unit at DAEC.Based on these evaluations, it was determined that feasible new plant systems to replace the capacity of the DAEC nuclear unit are limited to supercritical pulverized-coal, gas-fired combined-cycle, and new nuclear units for base-load operation.
This conclusion is supported by the generation utilization information presented above that identifies coal and gas as the most heavily utilized non-nuclear generating technology in the state. FPL-DA would use natural gas as the primary fuel in its combined-cycle turbines because of the economic and environmental advantages of gas over oil.Manufacturers now have large standard sizes of combined-cycle gas turbines that are economically attractive and suitable for high-capacity base-load operation.
FPL-DA chose to evaluate combined-cycle turbines in lieu of simple-cycle turbines because the combined-cycle option is more economical.
The benefits of lower operating costs for the combined-cycle option outweigh its higher capital costs.Mixture NRC indicated in Section 8.1 of the GElS that, while many methods are available for generating electricity and a huge number of combinations or mixes can be assimilated to meet system needs, it would be impractical to analyze all the combinations.
ALTERNATIVES TO THE PROPOSED ACTION 7.2-2 Duane Arnold Energy Center License Renewal Application Environmental Report Therefore, NRC determined that alternatives evaluation should be limited to analysis of single discrete electrical generation sources and only those electric generation technologies that are technically reasonable and commercially viable (NRC 1996e).Consistent with the NRC determination, FPL-DA has not evaluated mixes of generating sources. The impacts from coal- and gas-fired generation presented in this chapter would bound the impacts from any combination of the two technologies.
Effects of Restructuring Nationally, the electric power industry has been undergoing a transition from a regulated industry to a competitive market environment.
Efforts to deregulate the electric utility industry began with passage of the National Energy Policy Act of 1992. Provisions of this act required electric utilities to allow open access to their transmission lines and encouraged development of a competitive wholesale market for electricity.
The Act did not mandate competition in the retail market, leaving that decision to the states (NEI 2000).In 1999, the Iowa Utilities Board commissioned a study on the possible outcomes of deregulating the electric utility industry in Iowa. During the 2000 legislative session, two bills that related to the restructuring of the electric industry were introduced to the Iowa General Assembly, but neither bill was acted on before the session adjourned.
No new legislation has been introduced since the 2000 session. The state is continuing to monitor restructuring efforts in other jurisdictions, but is not currently pursuing further action. (FEMP 2006)If the electric power industry in Iowa is deregulated in the future, electric retail competition would increase and electricity customers in the area would be able to choose among competing power suppliers, including those located outside the region.As such, electric generation would be based on the customers' needs and preferences, the lowest price, or the best combination of prices, services, and incentives.
Alternatives The following sections present fossil-fuel-fired generation (Section 7.2.1 .1) and advanced light water nuclear reactor (Section 7.2.1.2) as reasonable alternatives to license renewal. Section 7.2.1.3 considers the possibility of purchasing power from different electricity producers.
Section 7.2.1.4 discusses reduced demand and presents the basis for concluding that it is not a reasonable alternative to license renewal.Section 7.2.1.5 discusses other alternatives that FPL-DA has determined are not reasonable and FPL-DA basis for these determinations.
ALTERNATIVES TO THE PROPOSED ACTION 7.2-3 Duane Arnold Energy Center License Renewal Application Environmental Report 7.2.1.1 Construct and Operate Fossil-Fuel-Fired Generation FPL-DA analyzed locating'hypothetical new coal- and gas-fired units at the existing DAEC site and at an undetermined green field site. FPL-DA concluded that DAEC is the preferred site for new construction because this approach would minimize environmental impacts by building on previously disturbed land and by making the most use possible of existing facilities, such as transmission lines, roads and parking areas, office buildings, and components of the cooling system. Locating hypothetical units at the existing site has, therefore, been applied to the coal- and gas-fired units.Industry experience indicates that, although custom size units can be built, using standardized sizes is more economical.
For example, standard-sized units include a gas-fired combined-cycle plant of 562.5 MWe net capacity (Chase and Kehoe 2000).Though this standard-sized unit has a capacity less than the 610 MWe DAEC net capacity, FPL-DA selected this for comparison of alternatives.
The choice ensures against overestimating environmental impacts from the alternatives.
The shortfall in capacity could be replaced by other methods (see Mixture in Section 7.2.1).It must be emphasized, however, that these are hypothetical scenarios.
FPL-DA does not have plans for such construction at DAEC.Gas-Fired Generation FPL-DA has chosen to evaluate gas-fired generation with combined-cycle turbines because the technology is mature, has relatively low capital costs, and offers low environmental effects.FPL-DA used characteristics of available gas-fired units and other relevant resources in defining the DAEC gas-fired alternative.
FPL-DA assumes that the representative plant would be located at the DAEC site, which offers potential advantages of existing infrastructure (e.g., cooling water system, transmission, roads, and technical and administrative support facilities).
Table 7.2-1 presents the basic gas-fired alternative characteristics.
ALTERNATIVES TO THE PROPOSED ACTION 7.2-4 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 7.2-1 GAS-FIRED ALTERNATIVE Characteristic Basis Unit size = 562.5 MWe ISO rating net:a Manufacturer's standard size gas-fired combined-cycle plant that is < DAEC net capacity-610 MWe Unit size = 586 MWe ISO rating grossa Calculated based on 4 percent onsite power Number of units = 1 Assumed Fuel type = natural gas Assumed Fuel heating value = 1,007 Btu/ft 3 2005 value for gas used in Iowa (EIA 2006)Fuel SO), content = 0.00066 Ib/MMBtu (EPA 2000, Table 3.1-2a; INGAA 2000)NOx control = selective catalytic reduction (SCR) Best available for minimizing NOx emissions (EPA with steam/water injection 2000)Fuel NOx content = 0.0109 Ib/MMBtu Typical for large SCR-controlled gas fired units with water injection (EPA 2000)Fuel CO content = 0.00226 Ib/MMBtu Typical for large SCR-controlled gas fired units (EPA 2000)Fuel PM 1 0 content = 0.0019 Ib/MMBtu EPA 2000, Table 3.1-2a Heat rate = 5,940 Btu/kWh (Chase and Kehoe 2000)Capacity factor = 0.85 Assumed based on performance of modern plants a. The difference between "net" and "gross" is electricity consumed onsite.Btu = British thermal unit ft 3 = cubic foot lb = pound ISO rating = International Standards Organization rating at standard atmospheric conditions of 59°F, 60 percent relative humidity, and 14.696 pounds of atmospheric pressure per square inch kWh = kilowatt hour MM = million MWe = megawatt-electric NO, = nitrogen oxides SOx = oxides of sulfur PM1o = particulates having a diameter < 10 micron< =. less than or equal to ALTERNATIVES TO THE PROPOSED ACTION 7.2-5 ALTERNATIVES TO THE PROPOSED ACTION 7.2-5 Duane Arnold Energy Center License Renewal Application Environmental Report Coal-Fired Generation NRC has routinely evaluated coal-fired generation alternatives for nuclear plant license renewal. In the GElS Supplement for Oyster Creek Nuclear Station (NRC 2007b), NRC analyzed 600 MWe of coal-fired generation capacity.
FPL-DA has reviewed the NRC analysis, considers it to be sound, and notes that it analyzed more generating capacity than the 562.5 MWe discussed in this analysis.
In defining the DAEC coal-fired alternative, FPL-DA has used site- and Iowa-specific data and has applied the NRC analysis, where appropriate.
Table 7.2-2 presents the basic coal-fired alternative emission control characteristics.
FPL-DA based its emission control technology and percent control assumptions on alternatives that the U.S. Environmental Protection Agency (EPA) has identified as being available for minimizing emissions (EPA 1998). FPL-DA assumes that the representative plant would be located at the DAEC site, which offers potential advantages of existing infrastructure (e.g., cooling water system, transmission, roads, and technical and administrative support facilities).
For the purposes of analysis, FPL-DA has assumed that coal and lime (calcium oxide) would be delivered to DAEC via an existing rail spur.ALTERNATIVES TO THE PROPOSED ACTION 7.2-6 ALTERNATIVES TO THE PROPOSED ACTION 7.2-6 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 7.2-2 COAL-FIRED ALTERNATIVE Characteristic Basis Unit size = 562.5 MWe ISO rating neta Calculated to be < DAEC net capacity -610 MWe Unit size = 598 MWe ISO rating grossa Calculated based on 6 percent onsite power Number of units = 1 Assumed Boiler type = tangentially fired, dry-bottom Minimizes nitrogen oxides emissions (EPA 1998)supercritical steam system Fuel type = bituminous, pulverized coal Typical for coal used in Iowa Fuel heating value = 8,668 Btu/Ib 2005 value for coal used in Iowa (EIA 2006)Fuel ash content by weight = 5.19 percent 2005 value for coal used in Iowa (EIA 2006)Fuel sulfur content by weight = 0.42 percent 2005 value for coal used in Iowa (EIA 2006)Uncontrolled NOx emission = 10 lb/ton Typical for pulverized coal, tangentially fired, dry-bottom, NSPS (EPA 1998)Uncontrolled CO emission = 0.5 lb/ton Typical for pulverized coal, tangentially fired, dry-bottom, NSPS (EPA 1998)Heat rate = 8,568 Btu/kWh Typical for coal-fired, single-cycle supercritical steam turbines (Perrin Quarles 2001)Capacity factor = 0.85 Typical for large coal-fired units SOx control = Wet scrubber -lime (95 percent Best available for minimizing SOx emissions removal efficiency) (EPA 1998)NOx control = low NOx burners, overfire air and Best available and widely demonstrated for selective catalytic reduction (95 percent reduction) minimizing NOx emissions (EPA 1998)Particulate control = fabric filters (baghouse-Allowable bag house efficiency from Iowa DNR 95 percent removal efficiency) (IDNR 2007d)a. The difference between "net" and "gross" is electricity consumed onsite.Btu = British thermal unit ISO rating = International Standards Organization rating at standard atmospheric conditions of 59°F, 60 percent relative humidity, and 14.696 pounds of atmospheric pressure per square inch kWh = kilowatt hour NSPS = New Source Performance Standard lb = pound MWe = megawatt-electric NOx = nitrogen oxides SOx = oxides of sulfur<5 =. less than or equal to ALTERNATIVES TO THE PROPOSED ACTION 7.2-7 ALTERNATIVES TO. THE PROPOSED ACTION 7.2-7 Duane Arnold Energy Center License Renewal Application Environmental Report 7.2.1.2 Construct and Operate New Nuclear Reactor Since 1997, the NRC has certified four new standard designs for nuclear power plants under 10 CFR 52, Subpart B. These designs are the U.S. Advanced Boiling Water Reactor (10 CFR 52, Appendix A), the System 80+ Design (10 CFR 52, Appendix B), the AP600 Design (10 CFR 52, Appendix C), and the AP1000 Design (10 CFR 52, Appendix D). All of these plants are light-water reactors.
NRC evaluated 640 MWe of new nuclear generation capacity as an alternative for the Oyster Creek Nuclear Station (NRC 2007b). FPL-DA has reviewed the NRC analysis, believes it to be sound, and notes that it analyzed more generating capacity than the 562.5 MWe discussed in this analysis.
In defining the DAEC new nuclear reactor alternative, FPL-DA has used site-and Iowa-specific data and has scaled from the NRC analysis, where appropriate.
7.2.1.3 Purchase Power FPL-DA is a wholesale supplier of electric power in Iowa and sells all of its electricity to IPL under long term PPAs (IUB 2005). Therefore, it would not be economical for FPL-DA to purchase power on the market and resell it, nor does it have any requirement to do so. Therefore, FPL-DA does not consider such power purchases feasible.7.2.1.4 Demand-Side Management Demand-side management (DSM) is a utility program that seeks to reduce consumer energy consumption through conservation, efficiency measures, and load management.
DSM efforts can help minimize environmental effects by avoiding the construction and operation of new generation facilities.
The impacts that would result from the construction of the proposed facility, or from the supply of the additional power through other means, would be avoided if DSM were sufficient to reduce the need for additional power.Because FPL-DA is a merchant generator and does not have a retail customer base in Iowa, it does not have demand-side management programs in Iowa. Also, as an operator of a base-load plant with PPAs to sell all its electricity, FPL-DA has no financial interest in reducing demand. Therefore, DSM is not considered a reasonable alternative to renewal of the DAEC operation license.7.2.1.5 Other Alternatives This section identifies generating alternatives that FPL-DA has determined are not reasonable and the FPL-DA bases for these determinations.
FPL-DA accounted for the fact that DAEC is a base-load generator and that any feasible alternative to DAEC would also need to be able to generate base-load power. In performing this evaluation, FPL-DA relied heavily upon NRC's GElS (NRC 1996e).ALTERNATIVES THAT MEET SYSTEM GENERATING NEEDS Page 7.2-8 Duane Arnold Energy Center License Renewal Application Environmental Report Wind Wind power, by itself, is not suitable for large base-load generation.
As discussed in Section 8.3.1 of the GELS, wind has a high degree of intermittence, and average annual capacity factors for wind plants are relatively low (less than 30 percent)'
Wind power, in conjunction with energy storage mechanisms, might serve as a means of providing base-load power. However, current energy storage technologies are too expensive for wind power to serve as a large base-load generator.
Based on National Renewable Energy Laboratory 2005 estimates, Iowa's technical potential (the upper limit of renewable electricity production and capacity that could be brought online, without regard to cost, market acceptability, or market constraints) is nearly 155,000 MWe of wind energy capacity (NREL 2005). The full exploitation of wind energy is constrained by a variety of factors including land availability and land-use patterns, surface topography, infrastructure constraints, environmental constraints, wind turbine capacity factor, wind turbine 'availability, and grid availability.
When these constraints-on wind energy development are considered, the achievable wind energy potential is expected to fall in the range of 20-40 percent of technical potential estimates or 31,000 -62,000 MWe.By September of 2006, a total of 837 MWe of wind energy capacity had been developed in Iowa. This ranks Iowa third in the nation in terms of total installed wind capacity.Projected new capacity in various stages of review within Iowa includes an additional 836 MWe of wind energy. Most of these existing and proposed wind farms are located in north or northwest Iowa where the best wind resources are located. (IUB 2006)Wind farms, the most economical wind option, generally consist of 10-50 turbines in the 1-3 MWe range. Estimates based on existing installations indicate that a utility-scale wind farm would occupy about 50 acres per MWe of installed capacity.
The amount of land actually occupied by the wind farm facilities is 3 to 5 percent of the wind farm's total acreage. (McGowan and Connors 2000) Therefore, the replacement of DAEC generating capacity with wind power, assuming ideal wind conditions and a wind farm capacity factor of 35 percent, would require about 130 square miles with a physical footprint of 2,537 acres (4 square miles). Based on the amount of land neede6d to replace DAEC, the wind alternative would require a large greenfield site, which Would result in a large environmental impact. Additionally, wind plants have aesthetic impacts, generate noise, and can harm flying birds and bats.The scale of this technology is too small to directly replace a power plant of the size of DAEC, capacity factors are low (30 to 40 percent), and the land requirement (130 square miles) is large. Therefore, FPL-DA has concluded that wind power is not a reasonable alternative to DAEC license renewal.Solar By its nature, solar power is intermittent.
In conjunction with energy storage mechanisms, solar power might serve as a means of providing base-load power.ALTERNATIVES TO THE PROPOSED ACTION 7.2-9 Duane Arnold Energy Center License Renewal Application Environmental Report However, current energy storage technologies are too expensive to permit solar power to serve as a large base-load generator.
Even without storage capacity, solar power technologies (photovoltaic and thermal) cannot currently compete with conventional nuclear or fossil-fueled technologies in grid-connected applications, due to high costs per kilowatt of capacity (NRC 1996e).The average amount of solar radiation suitable for photovoltaic collection that falls on Iowa annually ranges from 4.5 to 5.0 kilowatt hours per square meter per day. The solar radiation suitable for thermal collection increases across the state from east to west with a range of 3.0 to 4.5 kilowatt hours per square meter per day (EERE 2006a).Estimates based on existing installations indicate that utility-scale plants would occupy about 7.4 acres per MWe for photovoltaic and 4.9 acres per MWe for solar thermal systems (DOE 2004). Utility-scale solar plants have only been used in regions, such as southern California, that receive high concentrations (average 5.5 to 7.5 kilowatt hours per square meter per day for both photovoltaic and solar thermal systems) of solar radiation (EERE 2006b). FPL-DA believes that a utility-scale solar plant located in Iowa would occupy about 9.3 acres per MWe for photovoltaic and 9.1 acres per MWe for solar thermal systems and have capacity factors of 24 and 32 percent respectively.
Therefore, replacement of the generating capacity of a baseload plant such as DAEC with solar power would require dedication of about 23,000 acres (36 square miles) for photovoltaic and 17,000 acres (26 square miles) for solar thermal systems. The existing DAEC site is approximately 500 acres (less than 1 square mile). Neither type of solar electric system would fit on the DAEC site nor both would have large environmental impacts at a greenfield site.FPL-DA has concluded that due to the high cost, limited availability of sufficient incident solar radiation, and amount of land needed, solar power is not a reasonable alternative to DAEC license renewal.Hydropower According to the U.S. Hydropower Resource Assessment for Iowa, there are no single sites in Iowa that would be environmentally suitable for a large hydroelectric facility.The total of all the undeveloped hydropower potential in the entire state equals 305 MWe. This capacity is spread over 79 different locations; the majority of the potential capacity is at sites with some type of damming structure but without developed hydropower generating capability (Francfort 1995). To develop this hydropower would require a large amount of resources spread over many different locations.
In addition this potential capacity is considerably less than needed to replace the 610 MWe capacity of DAEC. As the GElS points out in Section 8.3.4, hydropower's proportion of United States generating capacity is expected to decline because hydroelectric facilities have become difficult to site as a result of public concern over flooding, destruction of natural habitat, and alteration of natural river courses.The GElS estimates land use of 1,553 square miles per 1,000 MWe for hydroelectric power. Based on this estimate, replacement of DAEC generating capacity would ALTERNATIVES TO THE PROPOSED ACTION 7.2-10 Duane Arnold Energy Center License Renewal Application Environmental Report require flooding approximately 919 square miles, resulting in a very large impact on land use. Further, operation of a hydroelectric facility would alter aquatic habitats above and below the dam, which would impact existing aquatic communities.
FPL-DA has concluded that due to the lack of suitable sites in Iowa for a large hydroelectric facility and the amount of land needed (approximately 919 square miles)hydropower is not a reasonable alternative to DAEC license renewal.Geothermal As illustrated by Figure 8.4 in the GElS (NRC 1996e), geothermal plants might be located in the western continental United States, Alaska, and Hawaii, where hydrothermal reservoirs are prevalent.
Therefore, because there are no high-temperature geothermal sites in Iowa, FPL-DA concludes that geothermal is not a reasonable alternative to DAEC license renewal.Wood Energy As discussed in, the GElS (NRC 1996e), the use of wood waste to generate electricity is largely limited to those states with significant wood resources.
The pulp, paper,.and paperboard industries in states with adequate wood resources generate electric power by consuming wood and wood waste from the mills for energy. This produces a benefit from the use of waste materials that could otherwise represent a disposal problem.National Renewable Energy Laboratory (NREL 2005) estimates the technical potential of biomass residues to be about 1675 MWe, with 90 percent produced from crop residues.
This total does not-include residues already used except wood mill residues most of which are already being used. Additionally, this technical potential does not consider the economic viability of using these resources for electricity generation.
The costs of using wood waste as a fuel are highly variable.
Costs can be very low if they are a byproduct of another process, as in the case with mill residues.
Costs become higher if the wood must be collected and transported, as in the case with crop residues.
Crop residues would be an inadequate fuel source for base-load applications because of it would be difficult to harvest, haul, store and handle. Wood has a low heat content that makes it unattractive for base-load applications.
Further, as discussed in Section 8.3.6 of the GElS (NRC 1996e), construction of a wood-fired plant would have an environmental impact that would be similar to that for a coal-fired plant, although facilities using wood waste for fuel would be built on a smaller scale. Like coal-fired plants, wood-waste plants require large areas for fuel storage, processing, and ash waste disposal.
Additionally, operation of wood-fired plants has environmental impacts, including impacts on the aquatic environment and air.FPL-DA has concluded that due to lack of an environmental advantage, 10w heat content, handling difficulties, and high transportation costs, wood energy is not a reasonable alternative to DAEC license renewal.ALTERNATIVES TO THE PROPOSED ACTION 7.2-11 Duane Arnold Energy Center License Renewal Application Environmental Report Municipal Solid Waste As discussed in Section 8.3.7 of the GElS (NRC 1996e), the initial capital costs for municipal solid waste plants are greater than comparable steam turbine technology at wood-waste facilities.
This is due to the need for specialized waste separation and handling equipment.
The decision to burn municipal solid waste to generate energy is usually driven by the need for a landfill alternative, rather than by energy considerations.
Although the amount of waste entering landfills is likely to continue increasing in the near term, it is unlikely that many landfills will begin converting waste to energy because of unfavorable economics, particularly the decline of electricity prices.Estimates in the GElS suggest that the overall level of construction impacts from a waste-fired plant should be approximately the same as those for a coal-fired plant.Additionally, waste-fired plants have the same or greater operational impacts (including impacts on the aquatic environment, air, and waste disposal).
Some of these impacts would be moderate, but still larger than the environmental effects of DAEC license renewal.FPL-DA has concluded that, due to the high'costs and lack of environmental advantages, burning municipal solid waste to generate electricity is not a reasonable alternative to DAEC license renewal.Other Biomass-Derived Fuels In addition to wood and municipal solid waste fuels, there are several other concepts for fueling electric generators, including burning energy crops, converting crops to a liquid fuel such as ethanol (ethanol is primarily used as a gasoline additive), gasifying energy crops (including wood waste), and utilizing the methane from biodegradation of landfill or livestock waste. As discussed in the GELS, none of these technologies has progressed to the point of being competitive on a large scale or of being reliable enough to replace a base-load plant such as DAEC.Further, estimates in the GElS suggest that the overall level of construction impacts from a crop-fired plant should be approximately the same as those for a wood-fired plant. Additionally, crop-fired plants would have similar operational impacts (including impacts on the aquatic environment and air). These systems also have large impacts on land use, due to the acreage needed to grow the energy crops.FPL-DA has concluded that, due to the high costs and lack of environmental advantage, burning other biomass-derived fuels is not a reasonable alternative to DAEC license renewal.ALTERNATIVES TO THE PROPOSED ACTION 7.2-12 ALTERNATIVES TO THE PROPOSED ACTION 7.2-12 Duane Arnold Energy Center License Renewal Application Environmental Report Petroleum Iowa has a few petroleum oil-fired power plants and from 1990 to 2005 the percentage share of power generated by oil-fired electricity plants in the state increased from 0.18 percent to 0.34 percent (EIA 2007c).Oil-fired generation represents the smallest portion of the overall generation mix in Iowa and is more expensive than nuclear, gas-, or coal-fired generation.
Future increases in petroleum prices are expected to make oil-fired generation increasingly more expensive than gas- or coal-fired generation.
Also, construction and operation of an oil-fired plant would have environmental impacts. Based on Section 8.3.11 of the GElS (NRC 1996e), building an oil-fired plant with a net capacity equal to DAEC would require approximately 70 acres. Operation of oil-fired plants would have aquatic and air impacts similar to those from a coal-fired plant.FPL-DA has concluded that, due to the high costs and lack of obvious environmental advantage, oil-fired generation is not a reasonable alternative to DAEC license renewal.Fuel Cells Fuel cell power plants are in the initial stages of commercialization.
While more than 810 large stationary fuel cell systems have been built and operated worldwide, the global stationary fuel cell electricity generating capacity in 2006 was only 105 MWe (FCT 2006). In addition, the largest stationary fuel cell power plant built was only 11-MWe (FCT 2003). Recent estimates suggest that, in order to be profitable, product costs need to be in the range of $2,000 to $4,000 per kW depending on local electricity and fuel prices, However, the current large stationery fuel cell designs are approximately
$4,300 per kW (FCT 2006). FPL-DA thinks that this technology has not matured sufficiently to support production for a facility the size of DAEC. FPL-DA has concluded that, due to cost and production limitations, fuel cell technology is not a reasonable alternative to DAEC license renewal.Delayed Retirement As the NRC noted in the GElS (NRC 1996e), extending the lives of existing non-nuclear generating plants beyond the time they were originally scheduled to be retired represents another potential alternative to, license renewal. FPL-DA is unaware of any retired plants or plans to retire any plants in Iowa.Nationally, fossil plants slated for retirement tend to be ones that are old enough to have difficulty in meeting today's restrictions on air contaminant emissions.
In the face of increasingly stringent restrictions, delaying retirement in order to compensatefor a plant the size of- DAEC would appear to be unreasonable without major construction to upgrade or replace plant components.
FPL-DA concludes that the environmental impacts of such a scenario are bounded by its coal- and gas-fired alternatives.
For these reasons, the delayed retirement of non-nuclear generating units is not considered a reasonable alternative to DAEC license renewal.ALTERNATIVES THAT MEET SYSTEM GENERATING NEEDS Page 7.2-13 P Duane Arnold Energy Center License Renewal Application Environmental Report 7.2.2 ENVIRONMENTAL IMPACTS OF ALTERNATIVES This section evaluates the environmental impacts of alternatives that FPL-DA has determined to be reasonable alternatives to DAEC license renewal: gas-fired generation, coal-fired generation, and a new nuclear plant.7.2.2.1 Gas-Fired Generation NRC evaluated environmental impacts from gas-fired generation alternatives in the GELS, focusing on combined-cycle plants. Section 7.2.1.1 presents FPL-DA's reasons for defining the gas-fired generation alternative as a combined-cycle plant on the DAEC site.In the GElS Supplement for Oyster Creek Nuclear Station (NRC 2007b), NRC evaluated the environmental impacts of constructing and operating two 300 MWe combined-cycle, gas-fired units as an alternative to a nuclear power plant license renewal. FPL-DA has reviewed the NRC analysis, believes it to be sound, and notes that it analyzed more generating capacity than the 562.5 MWe of net power discussed in this analysis.
In defining the DAEC gas-fired alternative, FPL-DA has used site- and Iowa-specific data and has scaled from the NRC analysis, where appropriate.
Air Quality Natural gas is a relatively clean-burning fossil fuel, but the emissions from an electric generating plant would be an issue of concern. Natural gas primarily emits nitrogen oxides (NOx), a regulated pollutant, during combustion.
A natural gas-fired plant would also emit small quantities of sulfur oxides (SOx), particulate matter, and carbon monoxide, all of which are regulated pollutants.
Control technology for gas-fired turbines focuses on NOx emissions.
FPL-DA estimates the gas-fired alternative emissions to be as follows:* SOx = 9 tons per year* NOx = 141 tons per year* Carbon monoxide = 29 tons per year* Filterable Particulates
= 61 tons per year (all particulates are PM2.5)In 2005, Iowa was ranked as the 20th largest emitter of sulfur dioxide nationally (EIA 2007c). The acid rain requirements of the Clean Air Act Amendments capped the nation's SO 2 emissions from power plants. Each company with fossil-fuel-fired units was allocated SO 2 allowances.
To be in compliance with the Act, the companies must hold enough allowances to cover their annual SO 2 emissions.
FPL-DA would need to obtain SO 2 credits to operate a fossil-fuel-burning plant at the DAEC site.While gas-fired turbine emissions are less than coal-fired boiler emissions, and regulatory requirements are less stringent, they are still substantial.
FPL-DA concludes that emissions from the gas-fired alternative at DAEC would noticeably alter local air ALTERNATIVES THAT MEET SYSTEM GENERATING NEEDS Page 7.2-14 Duane Arnold Energy Center License Renewal Application Environmental Report quality, but would not destabilize regional resources (i.e., air quality).
Air quality impacts would therefore be MODERATE.Waste Management Due to the clean nature of natural gas, the solid waste generated (e.g., ash) from this type of facility would be minimal. There would be a small amount of solid waste from spent selective catalytic reduction (SCR) catalyst used for NO, control. The SCR process for a 2,400 MWe plant would generate approximately 1,500 cubic feet of spent catalyst per year (NRC 2002b). Based on this estimate, a 562.5 MWe plant would generate approximately 350 cubic feet of spent catalyst per year. FPL-DA concludes that gas-fired generation waste management impacts would be SMALL.Other Impacts Land-use impacts from gas-fired units on DAEC would be less than those from the existing plant. Reduced land requirements, due to a smaller facility footprint, would reduce impacts to ecological, aesthetic, and cultural resources.
The ability to construct the gas-fired alternative on the existing DAEC site would reduce construction-related impacts. Water usage for a similar sized gas-fired plant would likely be the same magnitude or less than DAEC. A smaller workforce could have adverse socioeconomic impacts. Human health effects associated with air emissions would be of concern.Aquatic biota losses due to cooling water withdrawals would be offset by the concurrent shutdown of the nuclear generators.
A new gas pipeline would be required for the gas turbine generators in this alternative.
To the extent practicable, FPL-DA would route the pipeline along existing, previously disturbed, rights-of-way to minimize impacts. Approximately 15 miles of new pipeline construction would be required to connect DAEC to an existing pipeline near the plant (Bodine 2003). A 20-inch diameter pipeline would necessitate a 75-foot-wide corridor, resulting in the disturbance of as much as 136 acres. FPL-DA estimates that 24 acres would be needed for a plant site; this much previously disturbed acreage is available at DAEC, reducing loss of terrestrial habitat. Aesthetic impacts, erosion and sedimentation, fugitive dust, and construction debris impacts would be noticeable, but SMALL. FPL-DA estimates a peak construction and average workforce of 361 and 146, respectively.
Consequently, socioeconomic impacts of construction would be SMALL.However, FPL-DA estimates a workforce of 20 persons for gas operations and this reduction in work force would result in adverse socioeconomic impacts. FPL-DA concludes these impacts would be MODERATE and would be mitigated by the site's proximity to the Cedar Rapids and.Waterloo metropolitan areas.Impacts to aquatic resources and water quality would be similar to, but smaller than, the impacts of DAEC, due to the plant's use of the existing cooling water system that withdraws from and discharges to Cedar River, and would be offset by the concurrent shutdown of DAEC. The additional stacks and boilers would increase the visual impact ALTERNATIVES TO THE PROPOSED ACTION 7.2-15 ALTERNATIVES TO THE PROPOSED ACTION 7.2-15 Duane Arnold Energy Center License Renewal Application Environmental Report of the existing site. Impacts to cultural resources would be unlikely, due to the previously disturbed nature of the site.FPL-DA estimates that other construction and operation impacts would be SMALL. In most cases, the impacts would be detectable, but they would not destabilize any important attribute of the resource involved.
Due to the minor nature of these other impacts, mitigation would not be warranted beyond that previously mentioned.
7.2.2.2 Coal-Fired Generation NRC evaluated environmental impacts from coal-fired generation alternatives in the GElS (NRC 1996e). NRC concluded'that construction impacts could be substantial, due in part to the large land area required (which can result in natural habitat loss) and the large workforce needed. NRC pointed out that siting a new coal-fired plant where an existing nuclear plant is located would reduce many construction impacts. NRC identified major adverse impacts from operations as human health concerns associated with air emissions, waste generation, and-losses of aquatic biota due to cooling water withdrawals and discharges.
The coal-fired alternative that FPL-DA has defined in Section 7.2.1.1 would be located at DAEC.Air Quality A coal-fired plant would emit SO,, NO,, particulate matter, and carbon monoxide, all of which are regulated pollutants.
As Section 7.2.1.1 indicates, FPL-DA has assumed a plant design that would minimize air emissions through a combination of boiler technology and post-combustion pollutant removal. FPL-DA estimates the coal-fired alternative emissions to be as follows:* SOx = 879 tons per year* NOx = 551 tons per year" Carbon monoxide = 551 tons per year* PM 1 0 (particulates having a diameter of less than 10 microns) = 571 tons per year" PM 2.5 (particulates having a diameter of less than 2.5 microns) = 57 tons per year The Section 7.2.2.1 discussion of regional air quality is applicable to the coal-fired generation alternative.
In addition, NRC noted in the GElS that adverse human health effects from coal combustion have led to important federal legislation in recent years and that public health risks, such as cancer and emphysema, have been associated with coal combustion.
NRC also mentioned global warming and acid rain as potential impacts. FPL-DA concludes that federal legislation and large scale concerns, such as global warming and acid rain, are indications of concerns about destabilizing important attributes of air resources.
However, SO 2 emission allowances, low NOx burners, ALTERNATIVES TO THE PROPOSED ACTION 7.2-16 Duane Arnold Energy Center License Renewal Application Environmental Report overfire air, fabric filters or electrostatic precipitators, and scrubbers are regulator-imposed mitigation measures.
As such, FPL-DA concludes that the coal-fired alternative would have MODERATE impacts on air quality; the impacts would be noticeable and greater than those of the gas-fired alternative, but would not destabilize air quality in the region.Waste Management FPL-DA concurs with the GElS assessment that the coal-fired alternative would generate substantial amounts of solid waste. The coal-fired plant would annually consume approximately 2,200,000 tons of coal with an ash content of 5.19 percent.After combustion, approximately 40 percent of this ash, 46,400 tons per year, would be marketed for beneficial reuse (ACAA 2005): The remaining ash, approximately 66,800 tonsper year, would be collected and disposed of onsite. In addition, approximately 22,700 tons of scrubber sludge would be disposed of onsite each year. This is based on an annual limestone usage of nearly 28,800 tons and a recycling rate of approximately 34 percent (ACAA 2005). FPL-DA estimates that ash and scrubber waste disposal over a 40-year plant life would require approximately 54 acres (2,371,600 square feet). While only half this waste volume and acreage would be attributable to the 20-year license renewal period alternative, the total numbers are pertinent as a cumulative impact.FPL-DA contends that, with proper siting and current waste management and monitoring practices, waste disposal would not destabilize any resources.
There would be space within-the DAEC property for this disposal.
After closure of the waste site and revegetation, the land would be available for other uses. For these reasons, FPL-DA contends that waste disposal for the coal-fired alternative would have MODERATE impacts; the impacts of increased waste disposal would be noticeable, but would not destabilize any important resource, and further mitigation would be unwarranted.
Other Impacts FPL-DA estimates that construction of the powerblock and coal storage area would affect approximately 96 acres of land and associated terrestrial habitat. Because most of this construction would be on previously disturbed land, impacts at the DAEC site would be SMALL to MODERATE, but would be somewhat'less than the impacts of using a greenfield site. Upgrades to an existing rail spur Would be required for coal and lime deliveries under this alternative.
Visual impacts would be consistent with the industrial nature of the site. As with any large construction, project, some erosion and sedimentation and fugitive dust emissions could be anticipated, but would be minimized by using best management practices.
Debris from clearing and grubbing could be disposed of onsite. FPL-DA estimates a peak construction and average workforce of 984 and 532 persons, respectively.
Socioeconomic impacts from the construction workforce would be SMALL, because worker relocation would not be expected due to the site's proximity to the Cedar Rapids metropolitan area. FPL-DA estimates an, operational workforce of 69 persons for the coal-fired alternative and this reduction in ALTERNATIVES TO THE PROPOSED ACTION 7.2-17 Duane Arnold Energy Center License Renewal Application Environmental Report workforce would result in adverse socioeconomic impacts. FPL-DA contends these impacts would be MODERATE and would be mitigated by DAEC's proximity to the Cedar Rapids and Waterloo metropolitan areas.Impacts to aquatic resources and water quality would be similar to impacts of DAEC, due to the plant's use of the existing cooling water system, and would be offset by the concurrent shutdown of DAEC. The additional stacks, boilers, and rail deliveries would increase the visual impact of the existing site. Impacts to cultural resources would be unlikely, due to the previously disturbed nature of the site.FPL-DA estimates that other construction and operation impacts would be SMALL. In most cases, the impacts would be detectable, but they would not destabilize any important attribute of the resource involved.
Due to the minor nature of these other impacts, mitigation would not be warranted beyond that previously mentioned.
7.2.2.3 New Nuclear Reactor As discussed in Section 7.2.1.2, under the new nuclear reactor alternative FPL-DA would construct and operate a single unit nuclear plant using one of the four NRC certified standard designs for nuclear power plants.Air Quality Air quality impacts would be minimal. Air emissions are primarily from non-facility equipment and diesel generators and are comparable to those associated with the continued operation of DAEC. Overall, emissions and associated impacts would be considered SMALL.Waste Management High level radioactive wastes would be similar to those associated with the continued operation of DAEC. Low level radioactive waste impacts from a new nuclear plant would be slightly less, but similar to the continued operation of DAEC. The overall impacts are characterized as SMALL.Other Impacts FPL-DA estimates that construction of the reactor and auxiliary.
facilities would affect approximately 320 to 620 acres of land and ,associated terrestrial habitat. Because most of this construction would be on previously disturbed land, impacts at the DAEC site would be SMALL to MODERATE.
For the purposes of analysis, FPL-DA has assumed that the existing rail line would be used for reactor vessel and other deliveries under this alternative.
Visual impacts would be consistent with the industrial nature of the site. As with any large construction project, some erosion and sedimentation and fugitive dust emissions could be anticipated, but would be minimized by using best management practices.
Debris from clearing and grubbing could be disposed of onsite.ALTERNATIVES TO THE PROPOSED ACTION 7.2-18 Duane Arnold Energy. Center License Renewal Application Environmental Report FPL-DA estimates a peak construction work force of 1,600 persons. The surrounding communities would experience moderate to large demands on housing and public services.
After construction, the communities would be impacted by the loss of jobs as construction workers moved on. Long-term job opportunities would be comparable to continued operation of DAEC; therefore FPL-DA concludes that the socioeconomic impacts during operation would be SMALL.Impacts to aquatic resources and water quality would be similar to impacts of DAEC, due to the plant's use of the existing cooling water system that withdraws from and discharges to Cedar River, and would be offset by the concurrent shutdown of DAEC.FPL-DA estimates that other construction and operation impacts would be SMALL. In most cases, the impacts would be detectable, but they would not destabilize any important attribute of the resource involved.
Due to the minor nature of these other impacts, mitigation would not be warranted beyond that previously mentioned.
ALTERNATIVES TO THE PROPOSED ACTION 7.2-19 Duane Arnold Energy Center License Renewal Application Environmental Report 8.0 COMPARISON OF ENVIRONMENTAL IMPACTS OF LICENSE RENEWAL WITH THE ALTERNATIVES NRC"To the extent practicable, the environmental impacts of the proposal and the alternatives should be presented in comparative form..." 10 CFR 51.45(b)(3) as adopted by 51.53(c)(2)
Chapter 4 analyzes environmental impacts of Duane Arnold Energy Center (DAEC)license renewal and Chapter 7 analyzes impacts from renewal alternatives.
Table 8-1 summarizes environmental impacts of the proposed action (license renewal) and the alternatives, for comparison purposes.
The environmental impacts compared in Table 8-1 are those that are either Category 2 issues for the proposed action, license renewal, or are issues that the Generic Environmental Impact Statement (GELS)(NRC 1996e) identified as major considerations in an alternatives analysis.
For example, although the U. S. Nuclear Regulatory Commission (NRC) concluded that air quality impacts from the proposed action would be small (Category 1), the GElS identified major human health concerns associated with air emissions from alternatives (Section 7.2.2). Therefore, Table, 8-1 compares air impacts among the proposed action and the alternatives.
Table 8-2 is a more detailed comparison of the alternatives.
COMPARISON OF ENVIRONMENTAL IMPACTS OF LICENSE RENEWAL WITH THE ALTERNATIVES Page 8.0-1 m z m T I m;--I z m C/)TABLE 8.0-1 IMPACTS COMPARISON
SUMMARY
No-Action Alternative Proposed Action (License Base With Coal-Fired With Gas-Fired With New Nuclear Impact Renewal) (Decommissioning)
Generation Generation Generation Land Use SMALL SMALL SMALL to SMALL to SMALL to MODERATE MODERATE MODERATE Water Quality SMALL SMALL SMALL SMALL SMALL Air Quality SMALL SMALL MODERATE MODERATE SMALL Ecological Resources SMALL SMALL SMALL to SMALL to SMALL to MODERATE MODERATE MODERATE Threatened or Endangered Species SMALL SMALL SMALL SMALL SMALL Human Health SMALL SMALL MODERATE SMALL SMALL Socioeconomics SMALL SMALL SMALL SMALL to SMALL MODERATE Waste Management SMALL SMALL MODERATE SMALL SMALL Aesthetics SMALL SMALL SMALL SMALL SMALL Cultural Resources SMALL SMALL SMALL SMALL SMALL SMALL -Environmental effects are not detectable or are so minor that they will neither destabilize nor noticeably alter any important attribute of the resource.
MODERATE -Environmental effects are sufficient to alter noticeably, but not to destabilize, any important attribute of the resource.
10 CFR 51, Subpart A, Appendix B, Table B-i, Footnote 3.m 0 X 0 CD 90 mzo X-0 7-O HZ 10 r-n M0> M H C/,--t ml-0 M Z C--m 03 C P TABLE 8.0-2 IMPACTS COMPARISON DETAIL No-Action Alternative Proposed Action Base With Coal-Fired With New Nuclear (License Renewal) (Decommissioning)
Generation With Gas-Fired Generation Generation DAEC license renewal for 20 years, followed by decommissioning Decommissioning following expiration of current DAEC license.Adopting by reference, as bounding DAEC decommissioning, GElS description (NRC 1996e, Section 7.1)Alternative Descriptions New construction at the NeA DAEC site. sit Use existing rail spur Con construction at the DAEC e.struct up to 15 miles of gasin a 75-foot-wide rridor, disturbing as much as 6 acres. May require grades to existing pipelines.
existing switchyard and nsmission lines 562.5-MW (net) combined-cle turbine; capacity factor ting DAEC intake/ discharge nal system ural gas, 1,007 Btu/ft3; 5,940 u/kWh; 0.00066 lb Ifur/MMBtu; 0.0109 lb)x/MMBtu; 25,735,422,356 ft 3 s/yr New construction at the DAEC site Use existing rail spur for delivery of reactor vessel and other large equipment during construction.
Use existing switchyard and transmission lines Existing DAEC intake/discharge canal system Use existing switchyard and transmission lines One 562.5-MW (net)tangentially-fired, dry bottom unit; capacity factor 85%Existing DAEC intake/discharge canal system Pulverized bituminous coal, 8,668 Btu/pound; 8,568 Btu/kWh; 5.19%ash; 0.42% sulfur;10 lb/ton nitrogen oxides; 2,202,157 tons coal/yr Low NOx burners, overfire air and selective catalytic reduction (95% NOx reduction efficiency).
Selective catalytic reduction with steam/water injection (D I CD == 0 0 CD~5'-M W mro qzK 10-nm m mz C,,->.m 0"11 I--0 m z mC>m 0 Cn CD PO TABLE 8.0-2 (CONTINUED)
IMPACTS COMPARISON DETAIL No-Action Alternative Proposed Action Base With Coal-Fired With New Nuclear (License Renewal) (Decommissioning)
Generation With Gas-Fired Generation Generation Wet scrubber -lime/limestone desulfurization system (95% SOx removal efficiency);
28,844 tons limestone/yr Fabric filters or electrostatic precipitators (95%.particulate removal efficiency) 670 permanent workers 69 workers 20 workers (Section 3.4) (Section 7.2.2.2) (Section 7.2.2.1)SMALL -Adopting by reference Category 1 issue findings (Attachment A, Attachment A, Table A-i, Issues 52, 53)SMALL -Not an impact evaluated by GElS (NRC 1996e)Land Use Impacts SMALL to MODERATE -96 acres required for the powerblock and associated facilities.(Section 7.2.2.2)SMALL to MODERATE -24 acres for facility at DAEC location; 136 acres for pipeline (Section 7.2.2.1).
New gas pipeline would be built to connect with existing gas pipeline corridor.SMALL to MODERATE -320 to 620 acres required for the powerblock and associated facilities.(Section 7.2.2.3)(DW (DS= 0 00 M S C rno X 0 HZ-0-rm mz HiZ r-Z-0>C/)0-n r-m Z Clo CD PO I?TABLE 8.0-2 (CONTINUED)
IMPACTS COMPARISON DETAIL No-Action Alternative Proposed Action Base With Coal-Fired With New Nuclear (License Renewal) (Decommissioning)
Generation With Gas-Fired Generation Generation Water Quality Impacts SMALL -Adopting by SMALL -Adopting by SMALL -Construction SMALL -Reduced cooling water SMALL -Construction reference Category 1 issue reference Category 1 impacts minimized by demands, inherent in combined-impacts minimized by findings (Attachment A, issue finding (Attachment use of best cycle design (Section 7.2.2.1) use of best management Attachment A, Table A-i, A, Attachment A, management practices.
practices.
Operational Issues 5-11 and 32). Two Table A-1, Issue 89). Operational impacts impacts minimized by Category 2 groundwater minimized by use of the use of the existing issues not applicable existing cooling water cooling water system (Section 4.7, Issue 35; and system that withdraws that withdraws from and Section 4.8, Issue 39). from and discharges to discharges to Cedar SMALL -Less than 1 Cedar River. Rapids. (Section 7.2.2.3)percent of Cedar River is (Section 7.2.2.2)withdrawn and used onsite (Section 4.1, Issue 13;Section 4.6, Issue 34)SMALL -An average of 1,384 gpm of ground water is used (Section 4.5, Issue 33)Air Quality Impacts SMALL -Adopting by reference Category 1 issue finding (Attachment A, Table A-i, Issue 51). Category 2 issue not applicable (Section 4.11, Issue 50).SMALL -Adopting by reference Category 1 issue findings (Attachment A, Table A-i, Issue 88)MODERATE -879 tons SOx/yr 551 tons NOx/yr 551 tons CO/yr 571 tons PMio/yr 57 tons PM 2.5/yr (Section 7.2.2.2)MODERATE -9 tons SOx/yr 141 tons NOx/yr 29 tons CO/yr 61 tons PM 2.5/yra (Section 7.2.2.1)SMALL -Air emissions would be comparable to those associated with the continued operation of DAEC. (Section 7.2.2.3)M 0 >0 0 0 ma-0 Im mz H>_<o HZ--~0>:;r0 0 r-0;UZ z C,>m~0 0).0 U)"1_0 TABLE 8.0-2 (CONTINUED)
IMPACTS COMPARISON DETAIL No-Action Alternative Proposed Action Base With Coal-Fired With New Nuclear (License Renewal) (Decommissioning)
Generation With Gas-Fired Generation Generation Ecological Resource Impacts SMALL- Adopting by SMALL- Adopting by SMALL to MODERATE --SMALL to MODERATE -SMALL to MODERATE -reference Category 1 issue reference Category 1 54 acres of forested Construction of the pipeline could 320 to 620 acres findings (Attachment A, issue finding (Attachment land could be required alter habitat. (Section 7.2.2.1) required for the Table A-i, Issues 15-24, A, Table A-i, Issue 90) for ash/sludge disposal powerblock and 41-48). Four Category 2 over 20-year license associated facilities with issues not applicable renewal term. subsequent loss of (Section 4.2, Issue 25; (Section 7.2.2.2) terrestrial habitat.Section 4.3, Issue 26; (Section 7.2.2.3)Section 4.4, Issue 27, and Section 4.9, Issue 40).SMALL -No Federally threatened or endangered species are known along the transmission corridors.
SMALL -Not an imp evaluated by GElS 1996e)Threatened or Endangered Species Impacts act SMALL -Federal and SMALL -Federal and state laws (NRC state laws prohibit prohibit destroying or adversely destroying or adversely affecting protected species and affecting protected their habitats species and their habitats SMALL -Federal and state laws prohibit destroying or adversely affecting protected species and their habitats W(D fu 0 0EE o *r0ll rno z I0 Im mz zi<H 0-n H r'n 0 X Z m z C')m CfD 0"M TABLE 8.0-2 (CONTINUED)
IMPACTS COMPARISON DETAIL No-Action Alternative Proposed Action Base With Coal-Fired With New Nuclear (License Renewal) (Decommissioning)
Generation With Gas-Fired Generation Generation SMALL -Adopting by reference Category 1 issues (Attachment A, Table A-i, Issues 54-56, 58, 61, and 62).SMALL -The low temperatures in the Cedar River, and the disinfection at the sewage treatment facility do not support the propagation of pathological microbes (Section.4.12, Issue 57)SMALL -Risk due to transmission-line induced currents minimal due to conformance with consensus code (Section 4.13, Issue 59)SMALL -Adopting by reference Category 1 issue finding (Attachment A, Table A-i, Issue 86)Human Health Impacts MODERATE -Adopting by reference GElS conclusion that risks such as cancer and emphysema from emissions are likely (NRC 1996e)SMALL -Adopting by reference GElS conclusion that some risk of cancer and emphysema exists from emissions (NRC 1996e)SMALL -Impacts would be comparable to those associated with the continued operation of DAEC. (Section 7.2.2.3)M'0 0 .-(0 C M C D X z"1--I m I-" m z m M'TABLE 8.0-2 (CONTINUED)
IMPACTS COMPARISON DETAIL No-Action Alternative Proposed Action Base With Coal-Fired With New Nuclear (License Renewal) (Decommissioning)
Generation With Gas-Fired Generation Generation Socioeconomic Impacts SMALL -Adopting by SMALL -Adopting by SMALL to MODERATE -SMALL to MODERATE -SMALL -Impacts would reference Category 1 issue reference Category 1 Reduction in permanent Reduction in permanent work be comparable to those findings (Attachment A, issue finding work force at DAEC force at DAEC could adversely associated with the Table A-i, Issues 64, 67, (Attachment A, could adversely affect affect surrounding counties, but continued operation of 91). Two Category 2 Table A-i, Issue 91) surrounding counties, would be mitigated by DAEC's DAEC. (Section 7.2.2.3)issues are not applicable but would be mitigated proximity to Cedar Rapids (Section 4.16, Issue 66 and by DAEC's proximity to (Section 7.2.2.1)Section 4.17.1, Issue 68). Cedar Rapids Location in high population (Section 7.2.2.2).area with limited growth controls minimizes potential for housing impacts. Section 4.14, Issue 63).Plant property tax payment represents less than 1 percent of Linn county's total tax revenues (Section 4.17.2, Issue 69).SMALL- DAEC does not use municipal water (Section 4.15, Issue 65 and Section 4.18, Issue 70)SMALL -Adopting by reference Category 1 issue findings (Attachment A, Table A-i, Issues 77-85)SMALL -Adopting by reference Category 1 issue finding (Attachment A, Table A-1, Issue 87)Waste Management Impac MODERATE -66,800 tons of coal ash and 22,700 tons of scrubber sludge would require 54 acres over 20-year license renewal term.Industrial waste generated annually (Section 7.2.2.2)SMALL -Almost no waste generation (Section 7.2.2.1)SMALL -Impacts would be comparable to those associated with the continued operation of DAEC.(Section 7.2.2.3)M >S0 t~o 0 0 9I CD co 0, X0 mro Z>_I0 z 0 mr-C-, M0--j r-0 m z CI)m 0)ED CD (0 TABLE 8.0-2 (CONTINUED)
IMPACTS COMPARISON DETAIL No-Action Alternative Proposed Action Base With Coal-Fired With New Nuclear (License Renewal) (Decommissioning)
Generation With Gas-Fired Generation Generation Aesthetic Impacts SMALL -Adopting by SMALL -Not an impact SMALL -The coal-fired SMALL -Steam turbines and SMALL -Impacts would reference Category 1 evaluated by GElS power blocks and the stacks would create visual be comparable to those issue findings (Attachment (NRC 1996e) exhaust stacks would impacts comparable to those associated with the A, Table A-i, Issues 73, be visible from a from existing DAEC facilities continued operation of 74) moderate offsite (Section 7.2.2.1) DAEC. (Section 7.2.2.3)distance (Section 7.2.2.2)Cultural Resource Impacts SMALL -SHPO consultation SMALL -Not an impact SMALL -Impacts to SMALL -15 miles of pipeline SMALL -Impacts to minimizes potential for evaluated by GElS cultural resources construction could affect some cultural resources would impact (Section 4.19, (NRC 1996e) would be unlikely due to cultural resources be unlikely due to Issue 71) developed nature of the (Section 7.2.2.1) developed nature of the site (Section 7.2.2.2) site (Section 7.2.2.3)a.All particulate matter for gas-fired alternative is PM 2.5.SMALL -Environmental effects are not detectable or are so minor that they will neither destabilize nor noticeably alter any important attribute of the resource.MODERATE -Environmental effects are sufficient to alter noticeably, but not to destabilize, any important attribute of the resource.
10 CFR 51, Subpart A, Appendix B,Table B-i, Footnote 3.Btu = British thermal unit NO% = nitrogen oxide ft 3= cubic foot PM 2.5 = particulates having diameter < 2.5 microns GElS = Generic Environmental Impact Statement (NRC 1996e) PM 1 0 = particulates having diameter < 10 microns kWh = kilowatt hour SHPO = State Historic Preservation Officer lb = pound SOx = sulfur dioxide MM = million yr = year MW = megawatt CD,= 0*0 (CD 0) (-0=0 0 r#CD Duane Arnold Energy Center License Renewal Application Environmental Report 9.0 STATUS OF COMPLIANCE
9.1 PROPOSED
ACTION NRC"The environmental report shall list all federal permits, licenses, approvals and.other entitlements which must be obtained in connection with the proposed action and shall describe the status of compliance with these requirements.
The environmental report shall also include a discussion of the status of compliance with applicable environmental quality standards and requirements including, but not limited to, applicable zoning and land-use regulations, and thermal and other water pollution limitations or requirements which have been imposed by Federal, State, regional, and local agencies having responsibility for environmental protection...." 10 CFR 51.45(d), as adopted by 10 CFR 51.53(c)(2)
9.1.1 GENERAL
Table 9-1 lists environmental authorizations for current Duane Arnold Energy Center (DAEC) operations.
In this context "authorizations" includes any permits, licenses, approvals, or other entitlements.
FPL Energy Duane Arnold, LLC (FPL-DA) expects to continue renewing these authorizations during the current license period and through the U.S. Nuclear Regulatory Commission (NRC) license renewal period. Based on the new and significant information identification process described in Chapter 5, FPL-DA concludes that DAEC is currently in compliance with applicable environmental standards and requirements.
Table 9-2 lists additional environmental authorizations and consultations related to FPL-DA renewal of the DAEC license to operate. As indicated, FPL-DA anticipates needing relatively few such authorizations and consultations.
Sections 9.1.2 through 9.1.5 discuss some of these items in more detail.9.1.2 THREATENED OR ENDANGERED SPECIES Section 7 of the Endangered Species Act (16 USC 1531 et seq.) requires federal agencies to ensure that agency action is not likely to jeopardize any species that is listed or proposed for listing as endangered or threatened.
Depending on the action involved, the Act requires consultation with the U.S. Fish and Wildlife Service (FWS)regarding effects on non-marine species, the National Marine Fisheries Service (NMFS)for marine species, or both. FWS and NMFS have issued joint procedural regulations at 50 CFR 402, Subpart B, that address consultation, and FWS maintains the joint list of threatened and endangered species at 50 CFR 17.Although not required of an applicant by federal law or NRC regulation, FPL-DA has chosen to invite comment from both federal and state agencies regarding potential effects that DAEC license renewal might have on threatened and endangered species.Attachment C includes copies of FPL-DA correspondence with FWS and the Iowa Department of Natural Resources.
FPL-DA did not consult with NMFS because species under the auspices of NMFS are not known to be in the DAEC vicinity.STATUS OF COMPLIANCE Page 9.1 -1 Duane Arnold Energy Center License Renewal Application Environmental Report 9.1.3 COASTAL ZONE MANAGEMENT PROGRAM COMPLIANCE The Federal Coastal Zone Management Act (16 USC 1451 et seq.) imposes requirements on applicants for a federal license to conduct an activity that could affect a state's coastal zone (NRC 2004). The Act requires the applicant to certify to the licensing agency that the proposed activity would be consistent with the state's federally approved coastal zone management program [16 USC 1456(c)(3)(A)].
The National Oceanic and Atmospheric Administration has promulgated implementing regulations indicating that the requirement is applicable to renewal of federal licenses for activities not previously reviewed by the state [15 CFR 930.51(b)(1)].
The regulation requires that the license applicant provide its certification to the federal licensing agency and a copy to the applicable state agency [15 CFR 930.57(a)].
Iowa is not included in the coastal zone management program and therefore this requirement is not applicable to DAEC.9.1.4 HISTORIC PRESERVATION Section 106 of the National Historic Preservation Act (16 USC 470 et seq.) requires federal agencies having the authority to license any undertaking, prior to issuing the license, to take into account the effect of the undertaking on historic properties and to afford the Advisory Committee on Historic Preservation an opportunity to comment on the undertaking.
Committee regulations provide for establishing an agreement with any State Historic Preservation Officer (SHPO) to substitute state review for Committee review (35 CFR 800.7). Although not required of an applicant by federal law or NRC regulation, FPL-DA has chosen to invite comment by the Iowa SHPO. Attachment D includes copies of FPL-DA correspondence with the SHPO regarding potential effects that DAEC license renewal might have on historic or cultural resources.
9.1.5 WATER
QUALITY (401) CERTIFICATION Federal Clean Water Act Section 401 requires applicants for a federal license to conduct an activity that might result in a discharge into navigable waters to provide the licensing agency a certification from the state that the discharge will comply with applicable Clean Water Act requirements (33 USC 1341). NRC has indicated in its Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants (GELS) that issuance of a National Pollutant Discharge Elimination System (NPDES)permit implies certification by the state (NRC 1996e). The U.S. Environmental Protection Agency granted the State of Iowa authority to issue NPDES permits.FPL-DA is applying to NRC for license renewal to continue DAEC operations.
Appendix B contains the DAEC NPDES permit, which authorizes plant discharges.
Consistent with the GELS, DAEC is providing evidence of its NPDES permit as evidence of state water quality (401) certification.
FPL-DA has received correspondence from the State of Iowa stating that there were no concerns caused by the renewal of the DAEC operating license regarding Clean Water Act requirements (Ford-Shivvers 2007).STATUS OF COMPLIANCE Page 9.1-2 Cf)i C cf, 0 0 I-Z 0 m TABLE 9.1-1 ENVIRONMENTAL AUTHORIZATIONS FOR CURRENT DAEC OPERATIONS Issue or Expiration Agency Authority Requirement Number Date Activity Covered Federal and State Requirements U.S. Nuclear Regulatory Commission U.S. Department of Transportation U.S. Environmental Protection Agency Iowa Department of Natural Resources Iowa Department of Natural Resources Iowa Department of Natural Resources Atomic Energy Act (42 USC 2011, et seq.), 10 CFR 50.10 49 USC 5108 Federal Resource Conservation and Recovery Act (42 USC 6912)Code of Iowa 455B and IAC 567:71 Code of Iowa 455B and IAC 567:50-51 License to operate DPR-49 Issued: 02/21/1974 Expires: 02/21/2014 Issued: 07/09/2008 Expires: 06/30/2011 Operation of DAEC Registration 070908 550 040QS IAD984566133 Notification of Regulated Waste Activity Permit for water intake and discharge structures and low head dam on Cedar River Permit to store water in Pleasant Creek Reservoir and withdraw water from ,Cedar River Water Quality Certification NA Hazardous materials shipments Hazardous Waste Generation/Transport Cooling water system Cooling water system 71-192 Issued: 08/06/1971 3533-R3 Issued: 03/14/2004 Expires:03/13/2014 Clean Water Act Section 401 (33 U.S.C. 1341)05-1-113-08-02-S Issued: 08/26/2005 Dredging for/constructing spur dikes and subsequent maintenance' dredging S0 5, 0 0C 4 = -(D 5D Co CI)CI 0-n 0-0 Z-7 z 0 m TABLE 9.1-1 (CONTINUED)
ENVIRONMENTAL AUTHORIZATIONS FOR CURRENT DAEC OPERATIONS Issue or Expiration Agency Authority Requirement Number Date Activity Covered Federal and State Requirements U.S. Army Corps of Engineers Rivers and Harbors Act of 1899 Section 10 (33 U.S.C.403)Clean Water Act Section 404 (33 U.S.C. 1344)Marine Protection, Research and Sanctuaries Act of 1972 Section 103 (33 U.S.C. 1413)Linn County Flood Plain Management Regulations Code of Iowa Chapter 461A Dredging Permit CEMVR-OD-P-2005-1016 Issued: 09/20/2005 Expires: 12/31/2010 Dredging for spur dikes and subsequent maintenance dredging Linn County Iowa Department of Natural Resources Iowa Department of Natural Resources Iowa Department of Natural Resources Iowa Department of Natural Resources Linn County Code of Iowa Chapter 461A Flood Plain Development Permit Sovereign Lands Construction Permit Sovereign Lands Construction Permit Operator certification NPDES Permit Air Operation Permit 06-141 PF07-015 07-175 Issued: 12/04/2007 Expires: 12/04/2008 Issued: 10/10/2006 Expires: 12/31/2008 Issued: 11/07/2007 Expires: 12/31/2009 Issued: 08/29/2007 Expires: 06/30/2009 Issued: 07/06/2007 Expires: 07/05/2009 Expires 11/10/2008 Reinforcing river bank and adding rock Place rock along shoreline of Cedar River Repair existing rock along shoreline of Cedar River Drinking water system operation certification Discharges to Cedar River from cooling tower, stormwater, and WWTP Air emissions from a boiler, diesel generators, and diesel USTs Code of Iowa 455B and IAC 567:50-51 Clean Water Act (33 USC Section 1251 et seq.), Iowa Code 455B. 174, IAC 567-64.3 Federal Clean Air Act (42 USC 7661-7671), Iowa Code 455B:567, IAC 20-31, LCCO 10.5 Operator ID# 6007 57-00-1-04 IA0003727 4863,4864,4865, 4866,4867, 4868,4869, 4870 M 0 >0 0 r8 C(D co2 0 C,, o H C,, 0 0 z 0 m CD"0 TABLE 9.1-1 (CONTINUED)
ENVIRONMENTAL AUTHORIZATIONS FOR CURRENT DAEC OPERATIONS Issue or Expiration Agency Authority Requirement Number Date Activity Covered Federal and State Requirements Iowa Department Iowa Homeland Security Transportation NA Issued: 06/25/2007 Transportation of of Public Health Emergency Management Service Expires: 06/30/2009 radioactive waste License Iowa Department Code of Iowa Chapter 455B Permit to ID# IA5715150 Issued: 11/21/2006 Non-transient non-of Natural and part 567 operate Expires: 12/31/2009 community water supply.Resources public water registration for DAEC system Iowa Department Code of Iowa 455B and IAC Permit to 3046-MR5 Issued: 07/01/2002 Water use permit of Natural 567:50-51 operate 4- SDWIS Well ID#s: Expires: 06/30/2012 Resources well system WL04, WL05, for potable -W06, WL07 water Iowa Department IAC 467-135.1(3)c Deferral of NA NA Underground storage tanks of Natural UST Resources regulation to NRC Tennessee Tennessee Code Annotated License to ship T-IA-001-L08 Expires: 12/31/2008 Shipments of radioactive Department of 68-202-206 radioactive material to processing Environment and material facility in Tennessee Conservation Utah Department Utah Rule 313-26 License to ship 0210001768 Expires: 10/27/2008 Shipments of radioactive of Environmental radioactive material to disposal Quality material facility in Utah NA- Not Applicable NRC -Nuclear Regulatory Commission US- United States Code IAC -Iowa Administrative Code LCCO -Linn County Code of Ordinances NPDES -National Pollutant Discharge Elimination System UST -Underground Storage Tank m 0 (D 0 0 q F= g Duane Arnold Energy Center License Renewal Application Environmental Report TABLE 9.1-2 ENVIRONMENTAL AUTHORIZATIONS FOR DAEC LICENSE RENEWAL Agency Authority Requirement Remarks U.S. Nuclear Atomic Energy Act License renewal Environmental Report submitted Regulatory (42 USC 2011 in support of license renewal Commission et seq.) application U.S. Fish and Wildlife Endangered Species Consultation Requires federal agency issuing Service Act Section 7 a license to consult with the (16 USC 1536) EWS (Appendix C)Iowa Department of Endangered and Endangered Review explains what rare Natural Resources Threatened Resources Review species, natural communities, Species Laws or natural features tracked in (State Statute the Natural Heritage Inventory 29.604 & database are found in or near Administrative Rule the proposed project area. And NR 27) any additional steps to assure compliance with the Iowa endangered species protection laws and regulations.(Attachment C)Iowa Department of Clean Water Act Certification Requires State certification that Natural Resources Section 401 proposed action would comply (33 USC 1341) with Clean Water Act standards Iowa Historic National Historic Consultation Requires federal agency issuing Preservation Office Preservation Act a license to consider cultural Section 106 impacts and consult with State (16 USC 470f) Historic Preservation Officer (Attachment 0)STATUS OF COMPLIANCE Page 9.1-6 Duane Arnold Energy Center License Renewal Application Environmental Report 9.2 ALTERNATIVES NRC"...The discussion of alternatives in the report shall include a discussion of whether the alternatives will comply with such applicable environmental quality standards and requirements." 10 CFR 51.45(d), as required by 10 CFR 51.53(c)(2)
The coal and gas alternatives discussed in Section 7.2.2.1 can be constructed and operated to comply with all applicable environmental quality standards and requirements.
STATUS OF COMPLIANCE Page 9.2-1 Duane Arnold Energy Center License Renewal Application Environmental Report
10.0 REFERENCES
Note to reader: Some web pages cited in this document are no longer available, or are no longer available through the original URL addresses.
Hard copies of cited web pages are available in FPL-DA files. Some sites, for example the census data, cannot be accessed through their URLs. The only way to access these pages is to follow queries on previous web pages. The complete URLs used by FPL-DA have been given for these pages, even though they may not be directly accessible.
ACAA (American Coal Ash Association).
2005. Coal Combustion Product (CCP)Production and Use Survey Results. Available on line at: http :/acaa.affiniscape.com/associations/8003/files/2005-CCP-Production-and-Use-Fig uresReleased_byACAA.pdf.
Accessed July 6, 2007.ACE (American Coalition for Ethanol).
2008. Ethanol Facilities.
Available on line at: http://ethanol.org/index.php?id=37&parentid=8#U SEthanolFacilities.
Accessed March 6, 2008.AE (Alliant Energy). Undated. Transmission Vegetation Management Program.AEC (U.S. Atomic Energy Commission) 1973. Final Environmental Statement Related to the Operation of Duane Arnold Energy Center. Docket No. 50-331, Directorate of Licensing, U.S. Atomic Energy Commission.
Washington DC. March.BDG (Benton Development Group). 2007. Benton County, Iowa. Available on line at: http://www.bentoncountyiowa.com/economicdevelopment/index,.html.
Accessed July 6, 2007.Benton County 1986. Land Preservation and Use Plan for Benton County, Iowa (Unincorporated Areas). July.Benton County 1994. Benton County, Iowa, Agricultural Land Preservation Ordinance.
November.Bodine, F. 2003. Facts Conceming the Consumption and Production of Electric Power in Iowa. Iowa Utilities Board. Department of Commerce.
Des Moines, IA.December.
Available on line at: http://www.state.ia.
us/government/com/util/docs/reports/ElectricFacts_2003.pdf.
Accessed March 6, 2008.Cedar Rapids. 1999. Comprehensive Plan for Cedar Rapids. Available on lithe at: http://www.cedar-rapids.org/development/documents/compplan/comp_plan.pdf.
Accessed July 6, 2007.Cedar Rapids. 2007. Community
-List of Local Attractions.
Available on line at: http://www.cedar-rapids.org/community/NewsDetail.asp?NewslD=208.
Accessed June 2007.REFERENCES Page 10.0-1 Duane Arnold Energy Center License Renewal Application Environmental Report Chase, D. L. and P. T. Kehoe. 2000. GE Combined-Cycle Product Line and Performance.
GER-3574G.
GE Power Systems. Schenectady, NY. October.Available on line at: http://www.gepower.com/prodserv/products/techdocs/en/downloads/ger3574g.pdf.
Accessed March 4, 2008.Collins, F. W. and D. B. McDonald.
1972. Terrestrial Fauna Determination:
Duane Arnold Energy Center Site Environs.
Report to Iowa Electric Light and Power Company. October.CRCS (Cedar Rapids Community Schools).
2005a. About Us. Available on line at: http://www.cr.kl2.ia.us/aboutus/index.html.
Accessed July 5, 2007.CRCS (Cedar Rapids Community Schools).
2005b. Cedar Rapids Community Schools Annual Report to the Community 2004-2005.
Available on line at: http://www.cr.k12.ia.us/aboutUs/supportDocs/04-05/%2OAnnual%20Report.pdf.
Accessed July 5, 2007.CRWD (Cedar Rapids Water Department).
2005. 2005 Water Quality Report. Available on line at: http://www.cedar-rapids.org/water/documents/waterquality2005.pdf.
Accessed July 6, 2007.CRWD (Cedar Rapids Water Department).
Undated. Cedar Rapids Utility Energy Efficiency Management Program -Meeting the Demands of Industrial and Residential/Commercial Customers.
Available on line at: http://www.iamu.orgl services/electric/resources/appadeed/CRWaterDepartment.pdf.
Accessed July 6, 2007.Curtland, D. 2006. "2005 Annual Water Use Report." Letter to Michael Anderson (Iowa Department of Natural Resources).
Duane Arnold Energy Center. Palo, IA. January 12.CVRC&D (Cedar Valley Resource Conservation
& Development, Inc.). 2002.Freshwater Mussels of Iowa. Prepared by the Iowa Mussel Team in cooperation with Iowa Department of Natural Resources and the U.S. Environmental Protection Agency. Charles City, IA. Available online at: http://www.fws.gov/midwest/mussel/documents/freshwatermussels-of iowa.pdf.Accessed.
March 4, 2008.DAEC (Duane Arnold Energy Center). 1972. Pump Test: Production Wells 1 and 2.Performed by Bechtel Company and Wylder-Green Engineering Company.November.DAEC (Duane Arnold Energy Center). 1978. Design Change Request DAEC -Sixth Street 161 kV Line Project. DCR No. 624A, Revision 1. May 22.REFERENCES Page 10.0-2 REFERENCES Page 10.0-2 Duane Arnold Energy Center License Renewal Application Environmental Report DAEC (Duane Arnold Energy Center). 1988. Operations Guidelines
-Wastewater Treatment System. October.DAEC (Duane Arnold Energy Center). 2001. Pump Test: WellA. Performed by Northway Well and Pump Company. Marion, IA. November.DAEC (Duane Arnold Energy Center). 2002. 2002 Annual Radioactive Material Release Report. NRC ADAMS Accession Number ML031270496.
DAEC (Duane Arnold Energy Center). 2003. 2003 Annual Radioactive Material Release Report. NRC ADAMS Accession Number ML041260054.
DAEC (Duane Arnold Energy Center). 2004a. Water Supply Sanitary Survey. October.DAEC (Duane Arnold Energy Center). 2004b. 2004 Annual Radioactive Material Release Report. NRC ADAMS Accession Number ML051310248.
DAEC (Duane Arnold Energy Center). 2005a. Updated'Final Safety Analysis Report, Revision 18. October.DAEC (Duane Arnold Energy Center). 2005b. Monthly Discharge Reports for Cooling Tower Blowdown and Sequenced Batch Reactor Sewage Treatment Plant.January-December.
DAEC (Duane Arnold Energy Center). 2005c. 2005 Annual Radioactive Material Release Report. NRC ADAMS Accession Number ML061230201.
DAEC (Duane Arnold Energy Center). 2006a. System Description, Well Water System.SD-408. Revision 10. October.DAEC (Duane Arnold Energy Center). 2006b. System Description, River Water Supply System. SD-410. Revision 6. November.DAEC (Duane Arnold Energy Center). 2006c. System Description, Cooling Towers and Circulating Water System. SD-442. Revision 5. October.DAEC (Duane Arnold Energy Center). 2006d. System Description, General Service Water System. SD-41 1. Revision 5. October.DAEC (Duane Arnold Energy Center). 2006e. 2006 Annual Radioactive Material Release Report. NRC ADAMS Accession Number ML071290410.
DAEC (Duane Arnold Energy Center). 2008. Excavation
& Trenching Controls.Administrative Control Procedure.
ACP 1408.29. Revision 7. February.REFERENCES Page 10.0-3 Duane Arnold Energy Center License Renewal Application Environmental Report DOE (U.S. Department of Energy). 2004. PV FAQs -How much.land will PV need to supply our electricity?.
DOE/GO-1 02004-1835.
Office of Energy Efficiency and Renewable Energy. Washington DC. February.
Available on line at: http://www.nrel.gov/docs/fy04osti/35097.pdf.
Accessed June 6, 2007.EDA (Economic Development Administration).
2007. Iowa -Sac and Fox Reservation.
U.S. Department of Commerce.
Available on line at: http://www.eda.gov.
Accessed June 2007.EERE (Energy Efficiency and Renewable Energy). 2006a. Alternative Energy Sources in Iowa. October. Available on line at: http://www.eere.energy.gov/states/alternatives/resourcesia.cfm.
Accessed June 13, 2007.EERE (Energy Efficiency and Renewable Energy). 2006b. Alternative Energy Sources in California.
October. Available on line at: http://www.eere.energy.gov/states/alternatives/resourcesca.cfm.
Accessed June 13, 2007.EIA (Energy Information Administration).
2006. Cost and Quality of Fuels for Electric Plants 2004 and 2005. Tables 14.A and 15.A. Available on line at http://www.eia.doe.gov/cneaf/electricity/cq/cqsum.html.
Accessed on June 5, 2007.EIA (Energy Information Administration).
2007a. State Energy Profile -Iowa. May.Available on line at: http://tonto.eia.doe.gov/state/state_energyprofiles.cfm?sid=IA.
Accessed June 1, 2007.EIA (Energy Information Administration).
2007b. Monthly Nuclear Utility Generation by State and Reactor. Available on line at: http://www.eia.doe.gov/cneaf/nuclear/page/nucgeneration/usreactors20O6.xls.
Accessed July 27, 2007.EIA (Energy Information Administration).
2007c. State Electricity Profiles 2005.DOE/EIA-0348(01)/2.
March. Available on line at: http://www.eia.doe.gov/cneaf/electricity/stprofiles/sep2005.pdf.
Accessed May 31, 2007.Encyclopedia Britannica (Enclopedia Britannica Online). Undated. Cedar River.Available online at: http://www.britannica.com/eb/article-9021974/Cedar-River.
Accessed March 4, 2008.EPA (U.S. Environmental Protection Agency). 1998. Air Pollutant Emission Factors.Vol. 1, Stationary Point Sources and Area Sources.:
Section 1.1, Bituminous and Subbituminous Coal Combustion.
AP-42. September.
Available on line at: http://www.epa.gov/ttn/chief/ap42/chO1/final/cO1sO1.pdf.
Accessed June 5, 2007.REFERENCES Page 10.0-4 REFERENCES Page 10.0-4 Duane Arnold Energy Center License Renewal Application
-Environmental Report EPA (U.S, Environmental Protection Agency). 2000. Air Pollutant Emission Factors.Vol. 1, Stationary Point Sources and Area Sources. Section 3. 1, Stationary Gas Turbines.
AP-42.. April. Available on line at: http://www.epa.govlttn/chief/ap42/chO3/final/cO3sO1.pdf.
Accessed June 5, 2007.EPA (US Environmental Protection Agency). 2006. National Ambient Air Quality Standards for Particulate Matter; Final Rule. Federal Register Vol. 71, No. 200 (October 17, 2006): 61144-61233.
EPA (US Environmental Protection Agency). 2007a. Safe Drinking Water Information System, Query Results for Linn County, Iowa. Available on line at: http://www.epa.gov/enviro/html/sdwis/sdwisquery.html.
Accessed July 6, 2007.EPA (US Environmental Protection Agency). 2007b. Safe Drinking Water Information System, Query Results for Benton County, Iowa. Available on line at: http://www.epa.gov/enviro/html/sdwis/sdwisquery.html.
Accessed July 6, 2007.EPA (U.S. Environmental Protection Agency)..
2007c. PM Standards Revision -2006.August. Available on line at: http://www.epa.gov/oar/particlepollutior/naaqsrev2006.html.
Accessed March 4, 2008.EPA (Environmental Protection Agency). 2007d. Envirofacts Data Warehouse for Linn County, Iowa. Available on line at: http://www.epa.gov/enviro/html/multisystem_queryjava.html.
Accessed on March 16, 2007.EPA (Environmental Protection Agency). 2007e. Envirofacts Data Warehouse for Benton County, Iowa. Available on line at: http://www.epa.gov/enviro/html-multisystemqueryjava.html.
Accessed March 15, 2007.EPA (Environmental Protection Agency). 2008. National Ambient Air Quality Standards for Ozone; Final Rule. Federal Register Vol. 73, No. 60 (March 27, 2008): 16436-16514.FCT (Fuel Cell Today). 2003. Fuel Cells Market Survey: Large Stationary Applications 2003. Available on line at: http://www.fuelcelltoday.com.
Accessed September 7, 2004.FCT (Fuel Cell Today). 2006. Fuel Cells Market Survey: Large Stationary Applications 2006. Available on line at: http://www.fuelcelltoday.com.
Accessed June 1, 2007.FEMP (Federal Energy Management Program).
2006. Restructuring Status of Electric Markets, Iowa. U.S. Department of Energy. December.
Available on line at: http://wwwl.eere.energy.gov/femp/program/utility/utilityman_elec_ia.html.
Accessed July 5, 2007.REFERENCES Page 10.0-5 REFERENCES Page 10.0-5 Duane Arnold Energy Center License Renewal Application Environmental Report Ford-Shivvers, D. 2007. "NRC Informal Consultation Preparation for Threatened and Endangered Species and Water Usage." Letter to Gary Van Middlesworth (FPL Energy Duane Arnold, LLC). Iowa Department of Natural Resources.
Conservation and Recreation Division.
Palo, IA. November 7.FPL (Florida Power and Light). 2006. FPL Energy Completes Purchase of Majority Interest in Duane Arnold Energy Center. Available on line at: http://www.fplenergy.com/news/contents/2006/012706.shtml.
Accessed July 2007.FPL (Florida Power and Light). 2007a. FPL -About Duane Arnold Energy Center.Available on line at: http://www.fpl.com/environment/nuclear/aboutduanearnold.shtml.
Accessed June 2007.FPL (Florida Power and Light). 2007b. Duane Arnold Energy Center Fact Sheet.Available on line at: http://www.fpl.com/environmentlnuclear/aboutduanearnold.shtml.
Accessed December 27, 2007.Francfort, J. E. 1995. U.S. Hydropower Resource Assessment for Iowa. Prepared for the U.S. Department of Energy. DOE/ID-10430(IA).
December.
Available on line at: http://hydro2.inel.gov/resourceassessment/pdfs/states/ia.pdf.
Accessed June 6, 2007.Helms (Helms & Associates).
2003. Mussel Survey Near the Duane Arnold Energy Center Intake in the Cedar River near Palo, Iowa. Prepared for the Nuclear Management Company, Duane Arnold Energy Center. Bellevue, Iowa. January.Higginbottom, D. K. 2005. "FCC-Linn County-City of Palo-Interstate Power and Light Co.-Construction of a New Communication Facility-3200 Block DAEC Road-Sec.
9, T84N-R8W-Phase IA Cultural Resources Investigation
[LBG Letter Report]." Letter to J. Archie, (Alliant Energy). Iowa State Historic Preservation Office. Des Moines, IA.June 24.IDNR (Iowa Department of Natural Resources).
2002. Duane ArnoldEnergy Center Water Use. Permit No. 3046-MR5.
July 1.IDNR (Iowa Department of Natural Resources).
2004a. Duane Arnold Energy Center Water Use. Permit No. 3533-R3. March 14.IDNR (Iowa Department of Natural Resources).
2004b. Duane Arnold Energy Center Water Supply Sanitary Survey. October 11.IDNR (Iowa Department of Natural Resources).
2004c. DuaneArnold Energy Center National Pollutant Discharge Elimination System (NPDES) Permit. July 6.REFERENCES Page 10.0-6 Duane Arnold Energy Center License Renewal Application Environmental Report IDNR (Iowa Department of Natural Resources).
2005. Iowa DNR Proposed CAIR &CAMR Rules -Technical Support Documents, Allocation Tables -Name Matching.Available on line at: http://www.iowadnr.gov/air/prof/wg/caircamr/index.html.
Accessed March 11, 2008.IDNR (Iowa Department of Natural Resources).
2006a. Osprey Facts. October.Available on line at: http://www.iowadnr.com/wildlife/files/ospreyfacts.html.
Accessed November 14, 2007.IDNR (Iowa Department of Natural Resources).
2006b. Osprey Will Be Banded On July 5 At Jester Park. Iowa Outdoors July 3, 2006. Available on line at: http://www.iowadnr.gov/news/io/06jul03io.pdf.
Accessed November 14, 2007.IDNR (Iowa Department of Natural Resources).
2006c. Trends in Iowa Wildlife Populations and Harvest: 2005. Des Moines, Iowa. December.
Available on line at: http://www.iowadnr.com/wildlife/pdfs/Trends-inIowaWildlife_2005.pdf.
Accessed March 4, 2008.IDNR (Iowa Department of Natural Resources).
2007a. Pleasant Creek State Recreational Area. Available on line at: http://iowadnr.com/parks/pleasantcreek/
index.html.
Accessed June 8, 2007.IDNR (Iowa Department of Natural Resources).
2007b. Fishing Forecast 2007: Summer.Iowa Outdoors July/August 2007: 32-38. Available online at: http://www.iowadnr.com/fish/news/forecast3.pdf.
Accessed June 8, 2007.IDNR (Iowa Department of Natural Resources).
2007c. Summary Distinct Species Report by County. Available on line at: http://programs.iowadnr.com/NaturalAreas Inventory/pages/Query.aspx.
Accessed June 8, 2007.IDNR (Iowa Department of Natural Resources).
2007d. Iowa Title V Operating Permit Control Efficiency Table. Available on line at: http://www.iowadnr.com/air/prof/oper/
tech/control.pdf.
Accessed July 30, 2007.IDOT (Iowa Department of Transportation).
2006. 2006 Traffic Book: Volume of Traffic on the Primary Road System, Linn County. Available on line at: http://www.transdata.dot.
state. ia. us/transdataapps/b 1530140/routesframe.
asp?yea r=2006. Accessed July 6, 2007.IEEE (Institute of Electrical and Electronics Engineers).
2006. National Electrical Safety Code. C2-2007. Institute of Electrical and Electronics Engineers Inc. New York, NY.August.IELP (Iowa Electric Light and Power). 1971. Duane Arnold Energy Center Environmental Report. Docket 50-331. April.REFERENCES Page 10.0-7 REFERENCES Page 10.0-7 Duane Arnold Energy Center License Renewal Application Environmental Report INGAA (Interstate Natural Gas Association of America).
2000. Implications of Reduced Gas Use on Emissions from Power Generation.
Arlington, VA. Available on line at: http://www.ingaa.org/File.aspx?id=282.
Accessed July 30, 2007.INHF (Iowa Natural Heritage Foundation).
2004. Archeology Day at the Wickiup Hill Outdoor Learning Center. Available on line at: http://www.inhf.org/25event21 .htm.Accessed July 2007.Iowa Corn. 2007. Iowa Ethanol Plants. Available on line at: http://www.iowacorn.org/
ethanol/documents/EthanolMapfortheWebl 0-07.pdf.
Accessed March 6, 2008.IUB (Iowa Utilities Board). 2005. News & Information:
Split Decision Allows IPL to Proceed with Sale of Duane Arnold Energy Center. Des Moines, IA. November 22.Available on line at: http://www.state.ia.us/government/com/util/docs/news_
releases/2005/1122_DAEC.pdf.
Accessed March 6, 2008.IUB (Iowa Utilities Board). 2006. A Proposal for a Study of Iowa's Electric Transmission System. Des Moines, IA. December 27. Available on line at: http://www.state.ia.us/
government/com/util/docs/reports/TransmissionReport_2006.pdf.
Accessed July 13, 2007.IUB (Iowa Utilities Board) 2007. 2006 Annual Report. Des Moines Iowa. December 27.Available on line at: http://www.state.ia.us/government/com/util/docs/reports/AnnualReportCY2006.pdf.
Accessed March 6, 2008.Joklik, W. K. and D. T. Smith. 1972. Microbiology.
15th Edition. Meredith Corporation.
LCCD (Linn County Conservation Department).
2007a. Parks and Outdoor Recreation.
Available on line at: http://www.linncountyparks.com/parksDirectory.asp.
Accessed June 8, 2007.LCCD (Linn County Conservation Department).
2007b. Wickiup Hill Outdoor Learning Center. Available on line at: http://www.linncountyparks.com/Attraction.asp?AttractionlD=37.
Accessed June 8, 2007.LCRPC (Linn County Regional Planning Commission).
2005. 2040 Transportation Plan for the Cedar Rapids Iowa Metropolitan Area. Cedar Rapids, IA. July. Available on line at: http:/lwww.cedar-rapids.org/rpc/lrtp.pdf.
Accessed July 6, 2007.LCRPC (Linn County Regional Planning Commission).
2007. Linn County Regional Planning Commission.
Available on line at: http://www.cedar-rapids.org/rpc/history.html Accessed July 6, 2007.REFERENCES Page 10.0-8 Duane Arnold Energy Center License Renewal Application Environmental Report Lee, D. S., C. R. Gilbert, C. H. Hocutt, R. E. Jenkins, D. E. McAllister, and J. R. Stauffer.1980. Atlas of North American Freshwater Fishes. North Carolina State Museum of Natural History. Raleigh, NC.Linn County. 2003. Linn County, Iowa Rural Land Use Plan. Cedar Rapids, IA. May.Available on line at: http://www.co.linn.ia.us/content.asp?Page_ld=783&Deptld=25.
Accessed July 6, 2007.Linn County. 2006a. Linn County Audit Report Released for Fiscal Year 2005.Available on line at: http://www.co.linn.ia.
us/newsdetails.asp?Contentld=
1 033&Newsld=634.
Accessed July 3, 2007.Linn County. 2006b. County of Linn, Iowa Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2006. Available on line at: http://www.co.linn.ia.us/department.asp?Pageld=401&Deptld=15.
Accessed July 3, 2007.Linn County. 2006c. Linn County, Iowa, Rural Land UsePolicy Plan Map. Available on line at: http://www.co.linn.ia.us/content.asp?Pageld=783&Dept-ld=25.
Accessed July 6, 2007, Linn County. 2007. About Linn County. Available on line at: http://www.co.linn.ia.us/content.asp?Pageld=230.
Accessed March 15, 2007.Loan-Wilsey, A. K., R. L. McNeely, P. D. Brown, K. L. Kane, and C. L. Pierce. 2005.Iowa Aquatic Gap Analysis Project: Stream Fish Atlas. Ames, IA. Available on line at: http://maps.gis.iastate.edu/iris/links/.
Accessed March 5, 2008.Lynam, A. 2007. "Re: Data request for selected water suppliers in Linn and Benrton Counties." Email with attachment, to M. Hoganson, (TtNUS). Iowa Department of'Natural Resources, Des Moines, Iowa. August 7.McDonald, D. B. 2000. Cedar River Operational Ecological Study AnnualReport, January 1999-December 1999. Prepared for Alliant Energy. Iowa City, IA. 'April.McGowan, J. G. and S. Connors. 2000. Windpower:
A Turn of the Century Review.Annual Review of Energy and the Environment, Volume 25: 147-1 97.Moeller, M. 2005. "Re: Water Use Permit Numbers 3533-R3 and 3046-MR5 transfer of ownership." Letter to D. Siegfried (FPL Energy, LLC). Iowa Department of Natural Resources.
Water Supply Section. Des Moines, IA. October 31.REFERENCES Page 10.0-9 REFERENCES Page 10.0-9*
Duane Arnold Energy Center License Renewal Application Environmental Report Nalley, G.: M., J. G. Gorman, R. D. Goodrich, G. R. Littin, S. M. Linhart, V. E. Miller, and K. S. Housel. 2006. Water Resources Data, Iowa, Water Year 2005. Water-Data Report IA-05-01.
U.S. Geological Survey. Iowa City, IA. Available on line at: http://pubs.usgs.gov/wdr/2005/wdr-ia-05-1/pdf/wdriaO5-1.pdf.
Accessed March 5, 2008.NCDC (National Climatic Data Center). 2002. Temperature Summaries for Stations 131314 Cedar Rapids AP, Iowa, 131319 Cedar Rapids No. 1, Iowa, and 138568 Vinton, Iowa. Available on line at: http://mcc.sws.uiuc.edu/climatemidwest/mwclimatedatasummaries.htm.
Accessed March 5, 2008.NCDC (National Climatic Data Center). 2006. Climate of Iowa. Asheville, NC. Available on line at: http://cdo.ncdc.noaa.gov/climatenormals/clim60/states/ClimIA 01.pdf.Accessed March 5, 2008.NCSL (National Conference of State Legislatures).
2007. Federally Recognized Tribes.Available on line at: http://www.ncsl.org/programs/statetribe/tribes.htm.
Accessed June 2007.NEI (Nuclear Energy Institute).
2000. Restructuring the U.S. Electric Power Industry.Available on line at: http://www.nei.org/index.asp?catnum=3&catid=621.
Accessed June 5, 2007.Niemann, D. and D. B. McDonald.
1972. An Ecological Study of the Terrestrial Plant Communities in the Vicinity of the Duane Arnold Energy Center. Prepared for Iowa Electric Light and Power Company. August.NPS (National Park Service).
2007a. The Amana Colonies, A National Register of Historic Places Travel Itinerary of a Unique Historic Communal Society in Eastern Iowa. Available on line at: www.nr.nps.gov.
Accessed November 15, 2007.NPS (National Park Service).
2007b. National Register of Historic Places Information System, Benton County. Available on line at: www.nr.nps.gov.
Accessed March 12, 2007.NPS (National Park Service).
2007c. National Register of Historic Places Information System, Linn County. Available on line at: www.nr.nps.gov.
Accessed March 12, 2007.NRC (U.S. Nuclear Regulatory Commission).
1996a. Environmental Review for Renewal of Nuclear Power Plant Operating Licenses.
Federal Register Vol. 61, No. 109 (June 5, 1996): 28467-28497.
NRC (U.S. Nuclear Regulatory Commission).
1996b. Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction.
Federal Register Vol. 61, No. 147 (July 30, 1996): 39555-39556.
REFERENCES Page 10.0-10 Duane Arnold Energy Center License Renewal Application Environmental Report NRC (U.S. Nuclear Regulatory Commission).
1996c. Environmental Review for Renewal of Nuclear Power Plant Operating Licenses.
Federal Register Vol. 61, No. 244 (December 18, 1996): 66537-66554.
NRC (U.S. Nuclear Regulatory Commission);
1996d. Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction.
Federal Register Vol. 61, No. 251 (December 30, 1996): 68543.NRC (U.S. Nuclear Regulatory Commission).
1996e. Generic Environmental Impact Statement for License Renewal of Nuclear Plants. Volumes 1 and 2. NUREG-1437, Office of Nuclear Regulatory Research.
Washington DC. May. NRC ADAMS Accession Numbers ML040690705 and ML040690738.
NRC (U.S. Nuclear Regulatory Commission).
1996f. Regulatory Analysis for Amendments to Regulations for the Environmental Review for Renewal of Nuclear Power Plant Operating Licenses.
NUREG-1440, Office of Nuclear Regulatory Research.
Washington DC. May. NRC ADAMS Accession Number 9606180288.
NRC (U.S. Nuclear Regulatory Commission).
1996g. Public Comments on the Proposed 10 CFR Part 51 Rule for Renewal of Nuclear Power Plant Operating Licenses and Supporting Documents:
Review of Concerns and NRC Staff Response.
Volumes 1 and 2. NUREG-1529, Office of Nuclear Regulatory Research.Washington DC. May. NRC ADAMS Accession Number 9606180325.
NRC (U.S. Nuclear Regulatory Commission).
1999a. Changes to Requirements for Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Final Rule. Federal Register Vol. 64, No. 171 (September 3, 1999): 48495-48507.
NRC (U.S. Nuclear Regulatory Commission).
1999b. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Section 6.3 -Transportation and Table 9-1, Summary of findings on NEPA issues for license renewal of nuclear power plants. NUREG-1437 Volume 1, Addendum 1, Office of Nuclear Regulatory Research.
Washington DC. August. NRC ADAMS Accession Number ML040690720.
NRC (U.S. Nuclear Regulatory Commission).
2000. Preparation of Supplemental Environmental Reports for Applications to Renew Nuclear Power Plant Operating Licenses.
Supplement 1 to Regulatory Guide 4.2, Office of Standards Development.
Washington DC. September.
NRC ADAMS Accession Number ML003710495.
NRC (US Nuclear Regulatory Commission).
2001. Duane Arnold Energy Center Environmental Assessment and Finding of No Significant Impact Related to a Proposed License Amendment To Increase the Maximum Rated Thermal Power Level. Federal Register Vol. 66, No. 213 (November 2, 2001): 55703-55709.
REFERENCES Page 10.0-11 REFERENCES Page 10.0-11, Duane Arnold Energy Center License Renewal Application Environmental Report NRC (U.S. Nuclear Regulatory Commission).
2002a. Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities; Supplement 1;Regarding the Decommissioning of Nuclear Power Reactors.
N U REG-0586 Supplement 1, Office of Nuclear Reactor Regulation.
Washington DC. November.NRC ADAMS Accession Number ML023470316.
NRC (U.S. Nuclear Regulatory Commission).
2002b. Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding McGuire Nuclear Station, Units I and 2. Chapter 8, Environmental Impacts of Alternatives to Operating License Renewal. NUREG-1437 Supplement 8, Office of Nuclear Reactor Regulation.
Washington DC. December.
NRC ADAMS Accession Number ML021290287.
NRC (U.S. Nuclear Regulatory Commission).
2004. Procedural Guidance for Preparing Environmental Assessments and Considering Environmental Issues. Revision 1.NRR Office Instruction No. LIC-203. June 21. NRC ADAMS Accession Number ML062560327.
NRC (U.S. Nuclear Regulatory Commission).
2006. Duane Arnold Energy Center -Issuance of Conforming Amendment Re: Transfer Of The Facility Operating License and Operating Authority.
TAC NO. MC9610. January 27. NRC ADAMS Accession Number ML060260357.
NRC (US Nuclear Regulatory Commission).
2007a. Duane Arnold -Boiling Water Reactor. Available on line at: http://www.nrc.gov/info-finder/reactor/duan.html.
Accessed June 2007.NRC (U.S. Nuclear Regulatory Commission).
2007b. Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Oyster Creek Nuclear Generating Station. NUREG-1437 Supplement 28, Office of Nuclear Reactor Regulation.
Washington DC. January. NRC ADAMS Accession Number ML070100234.
NREL (National Renewable Energy Laboratory).
2005. Iowa Renewable Resource Assessment.
September.
Available on line at: http://www.iowadnr.com/energy/renewable/files/05rra.pdf.
Accessed on June 5, 2007.Patterson, R. 2007. Eastern Iowa's best smallmouth bassin. Iowa Game & Fish 2007.Available on line at: http://www.iowagameandfish.com/fishing/bass-fishing/IA_0407_02/.
Accessed March 5, 2008.Perrin Quarles (Perrin Quarles Associates, Inc.). 2001. Review of Potential Efficiency Improvements at Coal-Fired Power Plants. Prepared for the Clean Air Markets Division, U.S. Environmental Protection Agency. April 17. Available on line at: http://www.cier.umd.edu/RGGI/documents/Stakeholder`/o20Comments/Datacoaleff_
epa_2001.pdf.
Accessed March 7, 2008.REFERENCES Page 10.0-12 Duane Arnold Energy Center License Renewal Application Environmental Report Schermer, S. J., W. Greene, and J. M. Collins. 1995. A Brief Culture History of Iowa.The University of Iowa. Iowa City, IA. Available on line at: http://www.uiowa.edu/-osa/learn/prehistoric/overview.lhtm.
Accessed March 5, 2008.Scott, W. B. and E. J. Crossman.
1973. Freshwater Fishes of Canada. Bulletin 184.Fisheries Research Board of Canada. Ottawa, Ontario.SHPO (State Historical Preservation Office of Iowa). 2006. Archaeological Survey Short Report Form. Phase I Archaeological Survey for Cedar River Rip-Rap, Linn County, Iowa Duane Arnold Energy Center. October 16.State Library of Iowa. 2006a. Projections of Total Population:
2005-2030.
Adapted from Woods & Poole Economics,.
Inc. 2006. 2006 State Profile: Iowa. Available on line at http://data.iowadatacenter.org/browse/projections.html.
Accessed on July 20, 2007.State Library of Iowa. 2006b. Housing Units and Numeric and Percent Change for Iowa's Counties:
2000-2005.
Available on line at: http://data.iowadatacenter.org/browse/estimates.html#Housing.
Accessed July 20, 2007.Sullivan, D. J. 2000. Fish Communities and Their Relation to Environmental Factors in the Eastern Iowa Basins in Iowa and Minnesota, 1996. U.S. Geological Survey, National Water-Quality Assessment Program. Iowa City, IA. Available on line at: http://pubs.usgs.gov/wri/2000/wri004194/pdf/wri00_4194 .pdf. Accessed March 5, 2008.Trautman, M. B. 1957. The Fishes of Ohio. The Ohio State University Press.Columbus, OH.TtNUS (Tetra Tech NUS, Inc.). 2007a. Calculation Package for Population Projections included in Severe Accident Mitigation Analysis (SAMA). Aiken, SC. April 16.TtNUS (Tetra Tech NUS, Inc.). 2007b. Calculation Package forDuane Arnold Environmental Justice. Aiken, SC. July 31.TtNUS (Tetra Tech NUS, Inc.). 2007c. Calculation Package for Duane Arnold Induced Current Analysis.
Aiken, SC. August 3.UI (University of Iowa). 2001. Phase I Intensive Archaeological Survey of a Proposed Dry Spent Fuel Storage Facility, Alliant Energy Corporation, Section 9, T83N-R8W, Linn County, Iowa. Office of the State Archaeologist.
Iowa City, IA. December 4.USCB (US Census Bureau). 1990. 1990 Census of Population and Housing United States, Population and Housing Unit Counts., U.S. Bureau of the Census.Washington DC. Available on line at: http://www.census.gov/prod/cen1 990/Cph2/cph-2-1
-1.pdf. Accessed July 6, 2007.REFERENCES Page 10.0-13 Duane Arnold Energy Center License Renewal Application Environmental Report USCB (U.S. Census Bureau). 2000a. Census 2000. Summary File 1. For Iowa: U.S.Census Bureau. Washington DC. Available on line at: http://www2.census.gov/
census_2000/datasets/SummaryFile_l/Iowa/.
Accessed March 5, 2008.USCB (U.S. Census Bureau). 2000b. Census 2000. Summary File 3. For Iowa. U.S.Census Bureau. Washington DC. Available on line at: http://www2.census.gov/census_2000/datasets/SummaryFile_3/1owa/.
Accessed March 5, 2008.USCB (U.S. Census Bureau). 2000c. DP-1. Profile of General Demographic Characteristics:
2000: Summary File (SF)-I. For Sac and Fox/Meskwaki Reservation and Off-Reservation Trust Land. U.S. Census Bureau. Washington DC.Available on line at: http://factfinder.census.gov/home/aian/sflsf3.html.
Accessed June 2007.USCB (U.S. Census Bureau). 2003a. Table 2b. Population in Metropolitan and Micropolitan Statistical Areas Sorted Separately and Their Geographic Components in Alphabetical Order and Numerical and Percent Change for the United States and Puerto Rico: 1990 and 2000. U.S. Census Bureau. Washington DC. Available on line at: http://www.census.gov/population/cen2000/phc-t29/tabO2b.pdf.
Accessed July 2007..USCB (U.S. Census Bureau). 2003b. Iowa: 2000 Census of Population and Housing, Population and Housing Unit Counts. U.S. Department of Commerce.
Economics and Statistics Administration.
Washington DC. July. Available on line at http:/lwww.census.gov/prod/cen2000/phc-3-1 7.pdf. Accessed July 2007.USCB (U.S. Census Bureau). 2005. Economic Characteristics:
2005. For Linn County, Iowa. U.S. Census Bureau. Washington DC. Available on line at: http://factrinder.census.gov/servlet/AdvSearchByPlacenameServlet?_lang=en.
Accessed August 2007.USCB (U.S. Census Bureau). 2007a. Table 2. Cumulative Estimates of Population Change for Counties of Iowa and County Rankings:
April 1, 2000 to July 1, 2006.U.S. Census Bureau. Washington DC. Available on line at http://www.census.gov/popestlcounties/CO-EST2006-02.html.
Accessed July 2007.USCB (U.S. Census Bureau). 2007b. Table 2. Cumulative Estimates of Population Change for Incorporated Places Over 100,000, Ranked by Percent Change: April 1, 2000 to July, 1, 2006. U.S. Census Bureau. Washington DC. Available on line at: http://www.census.gov/popest/cities/SUB-EST2006.html.
Accessed July 2007.USDA (US Department of Agriculture).
2002. Statistics From the Census of Agriculture (5-Year Cycle) For Benton County, Iowa. Marketing Service Branch. Available on line at: http;//www.ams.usda.gov/statesummaries/IA/County/County.pdf/Benton.pdf.
Accessed July 5, 2007.REFERENCES Page 10.0-14 REFERENCES Page 10.0-14 Duane Arnold Energy Center License Renewal Application Environmental Report USFWS (U.S. Fish and Wildlife Service).'
1996. Western Fringed Orchid Recovery Plan, Platanthera Praeclara.
U.S. Fish and Wildlife Service. Fort Snelling, MN. Available on line at: http://science.nature.
nps.gov/im/units/htln/library/monitoring/reports/WPFORecovery.pdf. Accessed March 5, 2008.USFWS (U.S. Fish and Wildlife Service).
2000. Endangered Species: Prairie Bush Clover (Lespedeza Leptostachya)
Fact Sheet. U.S. Fish and Wildlife Service. Fort Snelling, MN. Available on line at: http://www.fws.gov/midwest/endangered/plants/prairieb.html.
Accessed June 4, 2007.USFWS (U.S. Fish and Wildlife.
Service).
2007a. Endangered Species in Iowa: County Distribution of Federally Threatened, Endangered, Proposed and Candidate Species.U.S. Fish and Wildlife Service. Fort Snelling, MN. Available on line at: http://www.fws.gov/midwest/endangered/lists/iowa-cty.html.
Accessed June 8, 2007.USFWS (U.S. Fish and Wildlife Service).
2007b. Endangered and Threatened Wildlife and Plants: Removing the Bald Eagle in the Lower 48 States From the List of Endangered and Threatened Wildlife; Final Rule. Federal Register Vol. 72, No. 130 (July 9, 2007): 37345-37372.
Walter, C. M. 1988. "Proposed Boiler Project, Cedar Rapids Iowa." Letter to M. E.Calmes (Archer Daniels Midland Company).
Iowa Department of Natural Resources.
July 21. Available on line at: http://aq48.dnraq.state.ia.us:8080/psd/5701080/PSDPN_86E002/NOTICE-letter.pdf.
Accessed March 11, 2008.WHT (Wickiup Hill Trails). 2006. Site Map of the Various Trails at Wickiup Hills.Wickiup Hill Outdoor Learning Center. November.REFERENCES Page 10.0-15 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX A NRC NEPA ISSUES FOR LICENSE RENEWAL OF NUCLEAR POWER PLANTS FPL Energy Duane Arnold, LLC (FPL-DA) has prepared this environmental report in accordance with the requirements of U.S. Nuclear Regulatory Commission (NRC)regulation 10 CFR 51.53. NRC included in the regulation a list of National Environmental Policy Act (NEPA) issues for license renewal of nuclear power plants.Table A-i lists these 92 issues and identifies the section in which FPL-DA addressed each applicable issue in the environmental report. For organization and clarity, FPL-DA has assigned a number to each issue and uses the issue numbers throughout the environmental report.APPENDIX A Page A--I Duane Arnold Energy Center License Renewal Application Environmental Report TABLE A-1 DAEC ENVIRONMENTAL REPORT DISCUSSION OF LICENSE RENEWAL NEPA ISSUESa Section of this Environmental GElS Cross Referenceb Issue Category Report (Section/Page)
Surface Water Quality, Hydrology, and Use (for all plants)1. Impacts of refurbishment on surface water quality 2. Impacts of refurbishment on surface water use 3. Altered current patterns at intake and discharge structures
- 4. Altered salinity gradients 5. Altered thermal stratification of lakes 6. Temperature effects on sediment transport capacity 7. Scouring caused by discharged cooling water 8. Eutrophication
- 9. Discharge of chlorine or other biocides 10. Discharge of sanitary wastes and minor chemical spills 11. Discharge of other metals in waste water 12. Water use conflicts (plants with once-through cooling systems)13. Water use conflicts (plants with cooling ponds or cooling towers using make-up water from a small river with low flow)14. Refurbishment impacts to aquatic resources NA NA 4.0 NA NA 4.0 4.0 4.0 4.0.4.0 4.0 NA Issue applies to an activity, refurbishment, which DAEC does not.plan to conduct.Issue applies to an activity, refurbishment, which DAEC does not plan to conduct.4.2.1.2.1/4-5 Issue applies to a plant feature, discharge to saltwater, which DAEC does not have.Issue applies to a plant feature, discharge to a lake, which DAEC does not have.4.2.1.2.3/4-8 4.2.1.2.3/4-6 4.2.1.2.3/4-9 4.2.1.2.4/4-10 4.2.1.2.4/4-10 4.2.1.2.4/4-10 Issue applies to a plant feature, once-through cooling system, which DAEC does not have.4.2.1.3/4-13 Issue applies to an activity, refurbishment, which DAEC does not plan to conduct.1 2 4.1 1 NA APPENDIX A Page A-2 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE A-1 DAEC ENVIRONMENTAL REPORT DISCUSSION OF LICENSE RENEWAL NEPA ISSUESa (CONTINUED)
Section of this Environmental GElS Cross Referenceb Issue Category Report (Section/Page)
Aquatic Ecology (for all plants)15. Accumulation of contaminants in 1 4.0 4.2.1.2.4/4-10 sediments or biota 16. Entrainment of phytoplankton and 1 4.0 4.2.2.1.1/4-15 zooplankton
- 17. Cold shock 1 4.0 4.2.2.1.5/4-18
- 18. Thermal plume barrier to migrating 1 4.0 4.2.2.1.6/4-19 fish 19. Distribution of aquatic organisms 1 4.0 4.2.2.1.6/4-19
- 20. Premature emergence of aquatic 1 4.0 4.2.2.1.7/4-20 insects 21. Gas supersaturation (gas bubble 1 4.0 4.2.2.1.8/4-21 disease)22. Low dissolved oxygen in the 1 4.0 4.2.2.1.9/4-23 discharge 23. Losses from predation, parasitism, 1 4.0 4.2.2.1.10/4-24 and disease among organisms exposed to sub-lethal stresses 24. Stimulation of nuisance organisms 1 4.0 4.2.2.1.11/4-25 (e.g., shipworms)
Aquatic Ecology (for plants with once-through and cooling pond heat dissipation systems)25. Entrainment of fish and shellfish in 2 Identified as Issue applies to a once-through early life stages for plants with NA in 4.2 and cooling pond heat once-through and cooling pond dissipation system, which heat dissipation systems DAEC does not have.26. Impingement of fish and shellfish 2 Identified as Issue applies to a once-through for plants with once-through and NA in 4.3 and cooling pond heat cooling pond heat dissipation dissipation system, which systems DAEC does not have.27. Heat shock for plants with once- 2 Identified as Issue applies to a once-through through and cooling pond heat NA in 4.4 and cooling pond heat dissipation systems dissipation system, which DAEC does not have.Aquatic Ecology (for plants with cooling-tower-based heat dissipation systems)28. Entrainment of fish and shellfish in 1 4.0 4.3.3/4-33 early life stages for plants with cooling-tower-based heat dissipation systems APPENDIX A Page A-3 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE A-1 DAEC ENVIRONMENTAL REPORT DISCUSSION OF LICENSE RENEWAL NEPA ISSUESa (CONTINUED)
Section of this Environmental GElS Cross Referenceb Issue Category Report (SectionlPage)
- 29. Impingement of fish and shellfish 1 4.0 4.3.3/4-33 for plants with cooling-tower-based heat dissipation systems 30. Heat shock for plants with cooling- 1 4.0 4.3.3/4-33 tower-based heat dissipation systems Ground-water Use and Quality 31. Impacts of refurbishment on 1 NA Issue applies to an activity, groundwater use and quality refurbishment, which DAEC does not plan to conduct.32. Groundwater use conflicts (potable 1 NA Issue applies to a plant and service water; plants that use < operating parameter, 100 gpm) groundwater use less than 100 gpm, which is not applicable to DAEC.33. Groundwater use conflicts (potable, 2 4.5 4.8.1.1 service water, and dewatering; plants that use> 100 gpm)34. Groundwater use conflicts (plants 2 4.6 4.8.1.3/4-117 using cooling towers withdrawing make-up water from a small river)35. Groundwater use conflicts (Ranney 2 Identified as Issue applies to a feature, wells) NA in 4.7 Ranney wells, which DAEC does not have.36. Groundwater quality degradation 1 NA Issue applies to a feature, (Ranney wells) Ranney wells, which DAEC does not have.37. Groundwater quality degradation 1 NA Issue applies to plants located (saltwater intrusion) in a coastal area, and DAEC is not located in such an area.38. Groundwater quality degradation 1 NA Issue applies to a feature, (cooling ponds in salt marshes) cooling ponds, which DAEC does not have.39. Groundwater quality degradation 2 Identified as Issue applies to a feature, (cooling ponds at inland sites) NA in 4.8 cooling ponds, which DAEC does not have.APPENDIX A Page A-4 APPENDIX A Page A-4 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE A-1 DAEC ENVIRONMENTAL REPORT DISCUSSION OF LICENSE RENEWAL NEPA ISSUESa (CONTINUED)
Section of this Environmental GElS Cross Referenceb Issue Category Report (SectionlPage)
Terrestrial Resources 40. Refurbishment impacts to terrestrial 2 Identified as Issue applies to an activity, resources NA in 4.9 refurbishment, which DAEC does not plan to conduct.41. Cooling tower impacts on crops 1 4.0 4.3.4/4-34 and ornamental vegetation
- 42. Cooling tower impacts on native 1 4.0 4.3.5.1./4-42 plants 43. Bird collisions with cooling towers 1 4.0 4.3.5.2/4-45
- 44. Cooling pond impacts on terrestrial 1 NA Issue applies to a feature, resources cooling ponds, which DAEC does not have.45. Power line right-of-way 1 4.0 4.5.6.1/4-71 management (cutting and herbicide application)
- 46. Bird collisions with power lines 1 4.0 4.5.6.2/4-74
- 47. Impacts of electromagnetic fields 1 4.0 4.5.6.3/4-77 on flora and fauna (plants, agricultural crops, honeybees, wildlife, livestock)
- 48. Floodplains and wetlands on power 1 4.0 4.5.7/4-81 line right-of-way Threatened or Endangered Species (forall plants)49. Threatened or endangered species 2 4.10 4.1/4-1 Air Quality 50. Air quality during refurbishment 2 Identified as Issue applies to an activity, (non-attainment and maintenance NA in 4.11 refurbishment, which DAEC areas) does not planto conduct.51. Air quality effects of transmission 1 4.0 4.5.2/4-62 lines Land Use 52. Onsite land use 1 4.0 3.2/3-1 53. Power line right-of-way land use 1 4.0 4.5.3/4-62 impacts APPENDIX A Page A-S APPENDIX A Page A-5 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE A-1 DAEC ENVIRONMENTAL REPORT DISCUSSION OF LICENSE RENEWAL NEPA ISSUESa (CONTINUED)
Section of this Environmental GElS Cross Referenceb Issue Category Report (Section/Page)
Human Health 54. Radiation exposures to the public 1 NA Issue applies to an activity, during refurbishment refurbishment, which DAEC does not plan to conduct.55. Occupational radiation exposures 1 NA Issue applies to an activity, during refurbishment refurbishment, which DAEC does not plan to conduct.56. Microbiological organisms 1 4.0 4.3.6/4-48 (occupational health)57. Microbiological organisms (public 2 4.12 4.3.6/4-48 health) (plants using lakes or canals, or cooling towers or cooling ponds that discharge to a small river)58. Noise 1 4.0 4.3.7/4-49
- 59. Electromagnetic fields, acute 2 4.13 4.5.4.1/4-66 effects (electric shock)60. Electromagnetic fields, chronic NA Identified as NA -Not applicable.
The effects NA in 4.0 categorization and impact finding definitions do not apply to this issue.61. Radiation exposures to public 1 4.0 4.6.2/4-87 (license renewal term)62. Occupational radiation exposures 1 4.0 4.6.3/4-95 (license renewal term)Socioeconomics
- 63. Housing impacts 2 1 4.14 4.0 64. Public services:
public safety, social services, and tourism and recreation 3.7.2/3-10 (refurbishment) 4.7.1/4-101 (renewal term)Refurbishment 3.7.4/3-14 (public services)3.7.4.3/3-18 (safety)3.7.4.4/3-19 (social)3.7.4.6/3-20 (tour, rec)Renewal Term 4.7.3/4-104 (public services)4.7.3.3/4-106 (safety)4.7.3.4/4-107 (social)4.7.3.6/4-107 (tour, rec)APPENDIX A Page A-6 APPENDIX A Page A-6 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE A-1 DAEC ENVIRONMENTAL REPORT DISCUSSION OF LICENSE RENEWAL NEPA ISSUESa (CONTINUED)
Section of this Environmental GElS Cross Referenceb Issue Category Report (Section/Page)
- 65. Public servi6es:
public utilities 2 4.15 3.7.4.5/3-19 (refurbishment) 4.7.3.5/4-107 (renewal term)66. Public services:
education 2 Identified as Issue applies to an activity, (refurbishment)
NA in 4.16 refurbishment, which DAEC does not plan to conduct.67. Public services:
education (license 1 4.0 4.7.3.1/4-106 renewal term)68. Offsite land use (refurbishment) 2 Identified as 3.7.5/3-20 NA in 4.17.1 69. Offsite land use (license renewal 2 4.17.2 4.7.4/4-107 term)70. Public services:
transportation 2 4.18 3.7.4.2/3-17 (refurbishment) 4.7.3.2/4-106 (renewal term)71. Historic and archaeological 2 4.19 3.7.7/3-23 (refurbishment) resources 4.7.7/4-114 (renewal term)72. Aesthetic impacts (refurbishment) 1 NA Issue app!ies to an activity, refurbishment, which DAEC does not plan to conduct.73. Aesthetic impacts (license renewal 1 4.0 4:7.6/4-111 term)74. Aesthetic impacts of transmission 1 4.0 4.5.8/4-83 lines (license renewal term)Postulated Accidents 75. Design basis accidents 1 4.0 5.3.2/5-11 (design basis)5.5.1/5-114 (summary)76. Severe accidents 2 4.20 5.3.3/5-12 (probabilistic analysis)5.3.3.2/5-19 (air dose)5.3.3.3/5-49 (water)5.3.3.4/5-65 (groundwater) 5.3.3.5/5-96 (economic) 5.4/5-106 (mitigation) 5.5.2/5-114 (summary)Uranium Fuel Cycle and Waste Management
- 77. Offsite radiological impacts 1 4.0 6.2/6-8 (individual effects from other than the disposal of spent fuel and high-level waste)APPENDIX A Page A-7 Duane Arnold Energy Center License Renewal Application Environmental Report TABLE A-1 DAEC ENVIRONMENTAL REPORT DISCUSSION OF LICENSE RENEWAL NEPA ISSUESa (CONTINUED)
Section of this Environmental GElS Cross Referenceb Issue Category Report (Section/Page)
- 78. Offsite radiological impacts 1 4.0 Not-in GELS.(collective effects)79. Offsite radiological impacts (spent 1 4.0 Not in GELS.fuel and high-level waste disposal)80. Nonradiological impacts of the 1 4.0 6.2.2.6/6-20 (land use)uranium fuel cycle 6.2.2.7/6-20 (water use)6.2.2.8/6-21 (fossil fuel)6.2.2.9/6-21 (chemical)
- 81. Low-level waste storage and 1 4.0 6.4.2/6-36 (low-level definition) disposal 6.4.3/6-37.(low-level volume)6.4.4/6-48 (renewal effects)82. Mixed waste storage and disposal 1 4.0 6.4.5/6-63
- 83. Onsite spent fuel 1 4.0 6.4.6/6-70
- 84. Nonradiological waste 1 4.0 6.5/6-86 85. Transportation 1 4.0 6.3/6-31, as revised by Addendum 1, August 1999.Decommissioning
- 86. Radiation doses 1 4.0 7.3.1/7-15 (decommissioning)
- 87. Waste management 1 4.0 7.3.2/7-19 (impacts)(decommissioning) 7.4/7-25 (conclusions)
- 88. Air quality (decommissioning) 1 4.0 7.3.3/7-21 (air)7.4/7-25 (conclusion)
- 89. Water quality (decommissioning) 1 4.0 7.3.4/7-21 (water)7.4/7-25 (conclusion)
- 90. Ecological resources 1 4.0 7.3.5/7-21 (ecological)(decommissioning) 7.4/7-25 (conclusion)
- 91. Socioeconomic impacts 1 4.0 7.3.7/7-24 (socioeconomic)(decommissioning) 7.4/7-25 (conclusion)
Environmental Justice 92. Environmental justice NA 4.21 NA -Not applicable.
The categorization and impact finding definitions do not apply to this issue.a. Source: 10 CFR 51, Subpart A, Appendix A, Table B-I. (Issue numbers added to facilitate discussion.)
- b. Source: Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437).
NEPA = National Environmental Policy Act.APPENDIX A Page A-8 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX B NPDES PERMIT APPENDIX B Page B-1 Duane Arnold Energy Center License Renewal Application Environmental Report IOWA DEPARTMENT OF NATURAL RESOURCES National Pollutant Discharge Elimination.
System (NPDES) Permit OWNER NAME & ADDRESS INTERSTA TE.POWER&
LIGHT COMPANY 200 1ST STREET SE CEDAR RAPIDS, IA 52406 -0000 FACILITY NAME AND ADDRESS[P&L-DUANE ARNOLD ENERGY CENTER 3277 DAEC ROAD PALO, IA 52324 -0000 Section 9, T 84N, R 08W LINN County YOU ARE REQUIRED TO FILE FOR RENEWAL OF THIS PERMIT BY: l/6/2009 IOWA NPDES PERMIT NUMBER.DATE OF ISSUANCE: DATE OF EXPIRATION:
5700104.7/6f2004 7/5J2009 EPA NUMBER: EA0003727 This permit is issued pursuant to the authority of section 402(b) of the Clean Water Act (33 U.S.C 1342(b)), Iowa Code section 455B.174, and nule 567-64.3, Iowa Administrative Code. You are authorized to operate the disposal system and to discharge the pollutants specified in this permit in accordance with the effluent limitations, monitoring requirements and other terms set forth in this permni.You may appeal any condition of this permit by filing awritten notice of appeal and request.for administrative hearing with the director of this department within:30 days of yourreceipt of this permiL Any existing, unexpired Iowa operation permit or Iowa NPDES permit previously issued by the department for the facility identified above is revoked by the issuance of this permit This provision does not apply to any authorization to discharge under the terms and conditions of a general permit issued by the department or to any permit issued exclusively for the discharge of stormwater.
FOR THE DEPARTIENT OF NATURAL RESOURCES By Wayne Farmd, Superorw " Wastewater Section ENVIRONMENTAL SERVICES DIVISION Page I APPENDIX B Page B-2 m M 'FacilityName.%_2F&L-DUANE ARNOLD ENERGY CENTER CJ'Permit Number: 5700104 Outfall 03 Number Outfall Description 001 DISCHARGE OF COOLING TOWER BLOWDOWN FROM THE RECIRCULATING WATER SYSTEM AND STORM WATER RUNOFF.Receiving Stream: CEDAR RIVER ROute of Flow: Class A waters are protected-for primaty~contact recreation in which recreational or other uses may result in prolonged and direct contact with thewater, involving considerable risk of ingesting water in quantities sufficient to pose a health hazard. Such activities would include, but not be limited to, swimming; diving, water skiing and water contact recreational canoeing..
Class B(WW) waters are significant resource warm waters in.which temperature, flow, and other habitat characteristics are suitable for the maintenance of a wide variety of reproducing populations of warm water fish and associated aquatic communities, including sensitive species.002 STORM WATER RUNOFF AND DISCHARGES FROM A SEQUENCING BATCH REACTOR WASTEWATER TREATMENT PLANT TREATING DOMESTIC WASTEWATER.
Receiving Stream: CEDAR RIVER Route of Flow: Class A waters are protected for, primary contact recreation in which recreational or other uses may result in prolonged and direct contact with the water, involving considerable risk of ingesting water in quantitiessufficient to pose a health hazard. Such activitieswould include, but not be limited to, swimming, diving, water skiing and water contact recreational caioceing.
Class B(WW) waters are significant resource warm waters-in which temperature, flow, and other habitat characteristics are suitable for the maintenance of a wide variety of reproducing populations of warm water fish and associated aquatic communities, including sensitive species.W (Dt M >=0=L M (D 0-Page2 (D (cDD M m 0 X Facility Name:*,,.._&L-DUANE ARNOLD ENERGY CENTER Permit Number: 5700104 Effluent Limitations Outfall No.:. ! 001 ,,DISCHAROE OF COOLING TOWER BLOWDOWN FROM THE RECIRCULATING WATER SYSTEM AND STORM WATER RUNOFF.You areprohibited from'discharging pollutants except in compliance with the following effluent limitations:
EFFLUENT LIMITATIONS Type _______ Concentration Mass of I% 7 Day 30 Day Daily 7 Day 30Day Daily Wastewater Parameter Season Limit R al Average/Min Average Maximum units Average Average Maximum Units P1 (MINIHUN-MAXIMUM .YEARLY FINAL 6.0 9.0 $" UNI" CHLORBS(ETOTAL RESSIDUAL Y*EARLY FINAL 0.2 0.3 NI/L CH5ONIU(M,T0TAL (AS CK) YEARLY FINAL 0.2 0.2 HQO/I INC,,TOTAL (AS YEARLY FINAL 1.6 2.0 toll.DURATION OF CHLORINE DISCHARGE YRnLY FINAL 2.0 K0WW(DAY ACUTE TOKICITY, CERIODAPiNIA YEARLY FINJAL 1. 0 Ho ACUTE TOKICITY, PIMEPRALES YEARLY, FINAL lo No Toicity ( 0-(D t 00 0 Note. flatr ul Nlt~applyi summer " fm April t through etober 31j and winter Is from November I through March 31.0) page 3 --(aac (0 lD0 CCD-L9 m z 0 X M Facility Name:ýL&L-DUANE ARNOLD ENERGY CENTER .,.Permit Nwumber: 5700104 Effluent Limitations Outfall No.: 002 STORM WATER RUNOFF AND DISCHARGES FROM A SEQUENCING BATCH REACTORWASTEWATER TREATMENT PLANT TREATING DOMESTIC WASTEWATER.
You are prohibited from discharging pollutants except in compliance with the following effluent limitations:
EFFLUENT LIMITATIONS Concentration Mass of 7 Day. .30 Day Daily 7 Day 30 Day Daily Wastewater Parameter Season Limit Average/Min Average Maximum Units Average Average Maximum Units CBODS yaFAR,, FlNAL. 40.0 -25.0 9 ,/I 18.0 11.0 LBX/DAY TOTAL SUSPENtDED SOLIDS YEARLY FINAL 45.0 30,0 -Kul&. 20.0 14.0 198/MY Pa (MINIMUM 4 MmI4AXIMM)
YEARLY FINAL 6.0 9.0 STo USISYS CHLORANeTOTAL RESIDUAL S '"' MER. FINAL 3.4 3.4 0/0. 1. 6 1.6 4.9/MY COLIrORk4.TECAL SUMM4ER FINAL 200.0. 11/100 N44 CflD= 0 CDýý'Nke: Ifseasonat limits is'from Aprjl I through'October31, and winter is rom November I through Miarh 31. -, Page 4 (00 (D Cx' 00 m z 0"X FaeflltyName:K.-
&L-DUANE ARNOLD ENERGY CENTER Permit Number: 5700104 Monitoring and Reporting Requirements (a) Samples and measurements taken shall be representative of the volume and nature of the monitored wastewater.(b) Analytical and samplingmethods specified in 40 CFR Part 136 or other methods approved in writing by the department shall beutilized.(c) Chapter 63: of the iowa Administrative Code provides you with further explanation of your monitoring requirements.(d) You are required to report all data including.calculated results needed to determine compliance with the limitations contained in this permit This Includes daily maximums and minimums, 30-day averages and 7-dayaverages for all parameters that have concentration (mg/l) and mass (lbstday) limits. Also, flow data shall be reported in million gallons per day (MOD), (e) Results:of all monitoring shall be recorded on forms provided by, or approved by, the department, and shall be submitted to the department by the fifteenth day following the close of the reporting period. Your reporting period is on a monthly basis, ending on the last day of each I rep6rting period.Outlfll Sample Sample Number Wastewater Parameter
'Frequency Type Monitoring Location*001 FLOW 7/WEEK OR DAILY 24 HOUR TOTAL FINAL EFFLUENT 001 PH (MINIMUM -MAXIMUM) I TIME PER WEEK GRAB COOLING TOWER BLOWDOWN PRIOR TO MIXING WITH OTHER_______WASTESTREAMS 001 CHLORINEJOTAL RESIDUAL I EVERY.2 WEEKS GRAB COOUINO TOWER BLOWDOWN PRIOR TO MIXINO WITH OTHER 001 CHROMIUWTOTAL (AS CR) I EVERY 6 MONTHS GRAB COOLING TOWER BLOWDOWN PRIOR TO MIXINO WITH OTHER___________________________WASTESTREAMS 001 TEMPERATURE 7/WEEK OR DAILY ORAB FINAL EFFLUENT 001 ZINCTOTAL (AS ZN) I EVERY MONTH GRA COOLING TOWER BLOWDOWN PRIOR TO MIXING WITH OTHER________________________
_________
___________WAMTSTREAMS 001 .DURATION OF CHLORINE DISCHARGE 7/WEEK OR DAILY MEASUREMENT MONTHLY REPORT.001 ACUTE TOXICITY, CERIODAPHNIA I EVERY 12 MONTHS 24 HOUR COMPOSITE FINAL.EFFLUENT 001 ACUTE TOMCrrY, PDrIEPHALES, I EVERY 12 MONTHS 24 HOUR COMPOSITE FINAL EFFLUENT 001 VISUAL OBSERVATION QUARTERLY VISUAL FINAL EFFLUENT S00,2 CBODS. I ' TIME PER WEEK 24 HOUR COMPOSITE RAW WASTE 002 TOTAL SUSPENDE1D SOLIDS I EVERY 3 MONTHS 24 HOUR COMPOSITE
.RAW WASTE OM PH (MINIMUM -MAXIMUM) I TrMPER WEEK GRAB RAW WASTE 002 TEMPERATURE I TIME PER WEFK GRAB RAW WASTE 002 FLOW 7/WEEK OR DAILY 24 HOUR TOTAL FINAL EFFLUENT M~ 0 (D 0)0g>ID-0 to 0)Page5 m Z X 00 Facility Namne.\_ t&L-DUANE ARNOLD ENERGY CENM R .Permit Number: 5700104 Monitoring and Reporting Requirements (a) Samples and measurements-taken shall be representative.of the volume and nature of the monitored wastewater.(b) Analytical ansd sampling methods specified in 40 CFR Part 136 or other methods approved in writing by the department shall be. utilized.(c) Chapter 63 of the Iowa Administrative Code provides you with further explanation of your monitoring requirements.(d) YOu are'equired to report ail data including calculated results needed to determine compliancewith the limitations contained in this permit.I"is includes daily maximums and minimums, 30.day averages and 7-day averages for alparameters that have concentration (mg/I) and mass (lbs/day) limits. Also, flow data shall be reported in million gallons per day (MGD).(e) of all monitoring sha.be recorded on forms provided by, or approved by, the deparbnent.and shall be submitted to the department by* the fifteenth day following the close of the reporting period. Your reporting period is ona monthly basis, ending on the last day of each* reporting period.Outfall Sample. Sample NUmber Wastewater Parameter Frequency Type Monitoring Location 002 CBOD5 I TIME PER WEEK 24 HOUR COMPOSITE FINAL EFFLUENT 002 TOTAL SUSPENDED SOLIDS I EVERY 3 MONTHS. 24 HOUR COMPOSITE FINAL EFFLUENT 002 PH (MINIMUM. -MAXIMUM)
I TIME PER WEEK GRAB FINAL EFFLUENT 00.2 CHLORINE.TOTAL RESIDUAL 2 TIMES PER WEEK GRAB SAMP'LING TO OCCUR DURING PERIOD OF CHLORINg ADITIflON 002 COLUPORMXFECAL I EVERY 3 MONTHS GRAB SAMPLINO IS REQUIRED ONLY PROM APRIL I THROUGH OCTOBER 31 AT__ THE FINAL EFFLUENT o2 SETrLEABLE SOLIDS .2 TME PERWEEK. GRAB FINAL EFFLUENT 002 TEMPERATURE I TIME PER WEEK GRAB FINAL EFFLUENT 002 VISUAL OBSERVATION
-QUARTERLY VISUAL FINAL EFFLUENT'002 DISSOLVED OXYOEN (MINIMUM)
I TIME PER WEEK GRAB DIGESTER CONTENTS 002 DISSOLVED OXYGEN (MINIMUM) 2 TIMES PER WEEK ORAB WEST AERATION BASIN 002, SOLIDS.MIXED LIQUOR SUSPENDED I TIME PER WEEK GRAB WEST AERATION BASIN 002 .TEMPERATURE:.*
2 TIMES PER WEEK GRAB WEST AERATION BASIN O 0-MINMUT SETILEABILITY
.TIMES PER WEEK GRAB WEST AERATION BASIN 002 DISSOLVED OXYGEN (MINIMUM) 2TIMES PER WEEK GRAB EAST AERATION BASIN.002 SOLIDS;MIXED LIQUOR SUSPENDED I TIME PER WEEK GRAB EAST AERATION BASIN M >0O 0 -I"v Page 6 (D-.o m Facility Nsme& _R&L-DUANE ARNOLD ENERGY CENTER z_ .PermitNumber:
5700104 X Monitoring and Reporting Requirements (a) Samples andimeasurements taken shall be representative of the volume andnature of the monitoredwastewater.(b) Analytical and sampling methods specified in 40 CFRPart 136 or other methods approved in writing by the department shall be utilized.-(c) Chapter 63 of the Iowa Administrative Code provides you with further explanation of your monitoring requirements.(d) You are required to reportall data including calculated results needed to determine compliance with the limitations contained in this permit.This includes daily maxLmums and minimums, 30-day averages and 7-day averages for all parameters that have concentration r(mg/I) and mass (lbs/day) limits. Also, flow data shall be reported in million gallons per day (MOD).(e) -Results of~dl monitoringshall berecorded on forms provided by, or approved by, the department, and shall be submitted to the department by the fifteenth day following the close of the reporting period. Your reporting period: is on a monthly basis, ending qnithe last day of each reporting period, Outfall 1 Sample Sample Number Wastewater Parameter Frequency Type Monitoring Location 002 TEMPERATURE 2 TIMES PERt.WEEK GA ATARTO AI 002 30-M. UM .... 2 TIMES PER W K GRAB ...TA.RATION BASIN to M-01 M M (D-~ Page 7 0U 0 0 m Ir Faclty Name. IP&L-DUANS ARNOLD ENERGY CENTER z S.Permit Number. 5700104 o Outfall Number: 001'.Ceriodapinia and'Pimephales Toxicity Effluent Testing.1. For ftcilities that have not bees. required to conduct toxicity testing by a previous.
NPDES permit, the initial annual toxicity test shall be -conducted within three (3.) months of permit issuance.
For facilities that have been required to conduct toxicity testing by a previous NPDES permit, the initial annual toxicity test shall be conducted within twelve months (12) of the last toxicity test.2. The test organisms that are to be used for acute toxicity testing shall be Ceriodapimia dubia and Pimephales promelas.
The acute toxicity testing procedures used to demonstrate compliance with permit limits shall be those listed in 40 CFR Part 136 and adopted by reference in rule 567-63.1(1).
The method for measuring acute t6xicity is specified in USEPA, October 2002, Methods for Measuring the Acute Toxicity of Effluents and Receiving Waters to Freshwater and Marine Organisms, Fifth Edition. U.S. Environmental Protection Agency, Office of Water, Washington, D0C., E"A 821-R-02-012.
- 3. The diluted effluent sample must contain a minimum of 4.40 % effluent and no more than 95.60 % of culturewater." 4. One valid positive toxicity result will require quarterly testing for effluent toxicity.5. Two successive valid positive toxicity results or three positive results out of five successive valid effluent toxicity tests will require a toxic reduction evaluation to be completed to eliminate the toxicity.6. A non-toxic test result shall be indicated as a'! " on the monthly operation report. A toxic test result shall be indicated as a "2" on the monthly operation report, DNR Form 542-1381 shall also be submitted to the DNR field office along with the monthly operation report.Ceriodaphnia and Pimephales Toxicity Effluent Limits The 30 day average mass~limit of "I" for the parameters Acute Toxicity, Certodaphnia andAcute Toxicity.
Pimephales means no positive toxicity results..Defirition: "Positive toxicity result" means a statistical difference of mortality rate between the control and the diluted effluent sample. For more-information see USEPA. October 2002, Methods for Measuring the Acute Toxicity of Effluents and Receiving Waters to Freshwater and Marine Organisms, Fifth Edition, U.S. Environmental Protection Agency, Office of Water. Washington, D.C.EPA821-R-01-012.
" CDA 0 0 OCD Pageg 8CO) 'CDD m o Facility Name. IP&LýDUAINE ARNOLD ENERGY CENTER X Permit Numbern 5700104 Go PROHIITONS
- 1. There shall be no discharge of polychlorlnatedbýiphenyl compounds such as those used for transformer fluid.,2. There shall be no discharge of the 126.priority.
pollutants listed in Appendix "A!' of.40 CFR Part 423 discharged in cooling tower blowdown as a result of~the use of cooling tower mainteniance chemicals, except that chromium and zinc may be discharged subject to the effluent limitations and monitoring requirements specified on pages 03. and #5 of this permit.3. Neither free available ch .lorinre nor total residual chlorine may be discharged from any unit for more than two hours in any one day and not more than one unit in any plant may discharge free available or~total residual chlorine at any one time.4.. There shall be no chemicals atdded to the circulating water system during off-line conditions;.
0 0D 0)0 CD 00mi A)be: 5701D w0 0~)0oho 0 2 hr hl oadshroo h 2.roiypluat itdi pedx""o.0CRPr 2 icagdi oln oe m Z Faclity Name: IP&L-DUANE ARNOLD ENERGY CENTER X .Permit Number: 5700104 ADDITIONAL MONrIORING AND REPORTING REQUIREMENTS Compliance with the prohibition on discharging priority pollutants in cooling.tower blow4own (page 9, #2) may be demonstrated either by sampling and analysis of the cooling tower blowdown or by certification that the discharge complies with this requirement as follows;a. -If compliance is to be demonstrated by sampling and analysis, the permittee shall analyze a sample of cooling tower blowdown at least once every six (6)monsha for each of the 126 priority pollutants listed in Appendix "A' of 40 CFR Part 423. These samples shall consist of cooling tower blowdown collected at a point prior to its mixing with any other water or wastewater and at a time that is representative of normal facility operations.
Results of this monitoring shall be submitted with the monthly operation reporL b. As an alternative to the monitoring specified in part "a!" the permittee may submit an evaluation that demonstrates that thee. is no detectable amount of any of the. 126 priority pollutants, except chromium and zinc, in coolingtower blowdown resulting from chemicals used for cooling ower maintenance.
JIfthe evaluation is approved by the department, the permitiee may certify compliance by submitting the following statunentat least once each six (6)months with the monthly operation report: 1I certijfy to the best of my knowledge and belief that no detectable concentrations of the 126 priority pollutants listed In Appensdx "A " of4O CFR Part 423, except as sjpecoilcal.
authorized by the were discharged in cooling tower blowdown as a result of the use of cooling tower maintenance chemicals since filing the last report."'M >0 tCo<CDD-0 00 z Z Facility Name: IP&L-DUAk ARNOLD ENERGY CENTER X Permit Number: 5700104 SPECIAL CONDITIONS APPLICABLE TO THE ZEBRA MUSSEL CONTROL PROGRAM 1. You must comply at all times with the effluent limitations, monitoring and reporting requirements and all other requirements specified in this NPDES permit and any amendments therto.2. Each molluscicide treatment is limited to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.3. The maximum number of moihuscicide trealtment each year is 4. Each treatment must be separated by at least 45 days. Treatments.should be planned to occur immediately before and after the zebra mussel spawning period and at 1-2 times throughout the remainder of the year.4. The concentration of quaternary ammonium compounds in the effluent shall not exceed 50 gg/L as measured at the end of the discharge pipe whenever a nonoxidizing molluscicida is used.5. Detoxification with bentonite clay or another absorptive medium is required whenever a nonoxidizing molluscicide is used~unless you can demonstrate that the active ingidient concentration in any single outfall will not exceed the level specified in #4 above.6. At least one acute toxicity test on the final discharge must be conducted annually and at the time that the molluscicide is being used. Test conditions must conform to those specified on page #8 of the permit.'7. As new information is received and reviewed, and the results of the approved treatments evaluated, previously unanticipated environmental impacts might be detected.
This permit may be amended, or revoked and reissued, if unanticipated environmental or human health impacts occur or are reported from other locations in scientific literature.
You are encouraged to continually evaluate alternative methods of zebra mussel control and to investigate innovative, non-chemical methods of preventing zebra mussels from interfering with facility operations.
.The concentration of free available chlorine indthe discharge shall not exceed.0,50 mg/L at any time as specified on page #3 of the permit (D U)((D o 0== =CDl (DO0~00 M
_0*z W =Facility Name: IP&L.-DUANE ARNOLD ENERGY CENTER Permit Number: 5700104 SEWAGE SLUDGE HANDLING AND DISPOSAL REQUIREMENTS"Sewagvsludge":
is solid, semisolid, or liquid residue generated during the treatment of domestic sewage in a treatment works. Sewage sludge does not include the grit and scrcenings genemred during preliminary treatment.
.1. The permittee shall complyWith all existing Federal and State laws and regulations that applyto the use and disposal of sewage sludge, not including sludge from the ash pond, and with technical staadards developed pursuant to Section 405(d) of the Clean Water Act when such standards are promulgated.
If an applicable numerical limit or management practice for pollutants in sewage sludge is promulgated aftei issuance of this p'rmit that is more stringent than a sludge pollutant limit or -management practice specified in existing Federal or State, laws or regulations, this permit shall be modified, or revoked and reissued, to conform to the regulations promulgated under.Section 405(d) of the Clean Water Act. The pennitfe shall comply with the limitation no later than the compliance deadline specified in the applicable regulations..
- 2. The pernittee shall provide written notice to the Department of Natural Resourc s prior to any planned changes in sludge disposal practices.
- 3. Land application of sewage sludge shall be conducted in accordance with criteria established rule IAC 567-67.1 through 67.11(455B).
M >-. Page 12 -(a 000~-0 0O Duane Arnold Energy Center License Renewal Application Environmental Report~0 STORM WATER DISCHARGES COVERED UNDER THIS PERMIT PART I. DESCRIPTION OF STORM WATER DISCHARGES A. DISCHARGES COVERED UNDER TIs PERMIT This permit authorizes the discharge of storm water associated with industrial activity from outfails 001 and 002 identified on page #2 of this permit.B. STORM WATER DISCHARG E NOT ASSOCIATED WmT INDuSTRIAL ACTIVITY Storm water discharge associated with industrial activity (as defined in chapter 567w60 of the .o~waa Administrative Code) authorized by this permit may be combined with other sources of storm water that are not classified as associated with industrial activity pursuant to 40 CFR 122:26(b)(14)or with wastewater from outfalls defined elsewhere in this permit C. UwTrATIoN ON COVERAGE* Unless specifically identified elsewhere in this permit, the following discharges.are not authorized by this permit-non-storm water discharges except those listed elsewhere in this permit,-the discharge of substances resulting from an on-site spill;-storm water discharge associated with industrial activity from construction activity, specifically any land disturbing activity of one or more acres;-washwaters from material handling and processing areas,-washwaters from drum, tank, or container rinsing and cleaning, and-vehicle and equipment washwaters.D. NON-STORM WATER DISCHARGES The following non-storm water discharges may. be authorized by this permit provided the non-storm water component of the discharge is in compliance with the conditions listed in the storm water portion of this permit: discharges from fire fighting activities, fire hydrant flushingi potable water sources Including waterline flushing, drinldng fountain water, uncontaminated compressor condensate, irrigation drainage, lawn watering, routine external building washdown that does not use detergents or other compounds, pavement washwaters where spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed)and where detergents are not used, air conditioning condensate, uncontaminated springs, uncontaminated ground water, and foundation or footing drains where flows are not contaminated with process materials such as solvents.PART II. SPECIAL CONDITIONS
- -.ADDmONAL REQUIREMENTS FOR FACILMES WITH SALT STORAGE'.Storage piles of salt used for deicing or other commercial or industrial purposes.and that generate a storm water discharge to waters of the United States shall: be enclosed or covered to prevent exposure to precipitation, except for exposure resulting from adding or removing materials from the pile.PART III. STORM WATER POLLUTION PREVENTION PLAN The storm water pollution prevention plan as described and required in the pernmitpreviously issued to this facility must continue to be implemented.
The plan must Identify potential sources of polfition that may reasonably be expected to affect the quality of storm water discharge associated with industrial activity from the-facility.
In addition, the plan must describe and ensure the implementation of practices that are us~d tio. educe dite pollutants in storm water discharge associated with industrial act at the facility and to ensure compliance with the terms and conditions of this permit Thepermittee must continue to implement the provisions of the stonh water pollution prevention plan required under the previous penTrt Page 13 0 APPENDIX B Page B-14 Duane Arnold Energy Center License Renewal Application Environmental Report The plan shall be amended whenever there Is a change in design, construction, operation, or maintenance, that has a significant effect on the potential for the discharge of pollutants to the waters of the United States or if the storm water pollution prevention plan proves to be ineffective In eliminating or significantly minimizing the discharge of pollutants or in otherwisee achieving the general objectives of controlling pollutants in storm water discharges associated with industrial activity.
New owners shall review the existing plan and make appropriate changes.The storm water pollution prevention plan required by this permit must be modified within 14 calendar days of the occurrence of any 'hazardous condition*
to provide a description of the release, the circumstances leading to the release, and the date of the release. In addition, the plan must be reviewed by the permittee to identify measures to prevent the reoccurrence of such a condition and to respond to such discharges, and the plan must be modified where. appropriate.
PART IV. DEFINITIONS 1.2.,a.b.d.e.*h.I.Storm water means storm water runoff, snow meitrunoff, and surface runoff and drainage.Waters of the United States means all waters that are currently used, were used in the past, or may be susceptible to use in interstate or foreign commerce, including all waters that are subject to the ebb and flow of the tide;All interstate waters, including interstate wetlands;All other waters such as interstate lakesT rivers, streaams (including Intermittent streams), mudflats, sandflats, wetIands , sloughs_ praideppotholes, wet meadows, playa lakes, or natural ponds the use, degradation, or destruction of which would affect or could affect interstate or foreign commerce including any such waters: That are or could be used by interstate or foreign travelers for recreational or other purposes;From which fish or shellfish are or could be taken and sold in interstate or foreign~commerCe; or That are used or could be used for industrial purposes by industries in interstate commerce;All impoundment of waters otherwise defined as waters of the United States under this definition; Tributaries of waters identified in paragraphs.(a) through (d).of this definition; The territorial sea; and Wetlands adjacent:to waters (other than waters that are themselves wetlands) identified in paragraphs (a) through (f) Of this definition, Page 14 APPENDIX B Page B-1 5 Duane Arnold Energy Center License Renewal Application Environmental Report QUARTERLY VISUAL EXAMiNATION OF STORM WATER QUALITY.You shall perform and document a quarterly, visual examination of storm water discharge associated with industrial actity from outfalls 001 and 002. The examination must be made at least once in each of the following periods: January through March; April through June; July through September, and October through December during daylight hours unless there is insufficient rainfall or snow melt to produce a runoff event Each examination shall be made a minimum of 30 days from the last examination at the same outfall, Examinations shall be made within the first 30 minutes (or as soon thereafter as practical, but not to exceed 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) of when the runoff or snowmelt begins discharging.
The examinations shall document observations of color, odor, clarity, floating solids, settled solids, suspended soids, foam, oil sheen, and other obvious indicators of storm water pollution.
The examination must be conducted in a well-lit area. No analytical tests are required to be performed.
All examinations.shall be made of the discharge resulting from a storm event that is greater than 0.1 inches In magnitude and.that occurs at least 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the previously measurable (greater than.0.1 inch rainfall) storm event Where practicable, the same individua should carry out the examination of discharges for the entire permit term.Visual examination reports must be maintained on-site In the pollution prevention plan. Do not submit-the results of the visual observations to the Department unless they have been reguested.
The report shall include the examination date and time, examination personnel, the nature of the discharge (i.e., runoff or snow melt), visual quality of the storm water discharge (including observations of colot, odor, clarityj floating solids, settWed solids, suspended solids, foam, oil sheen, and other obvious indicators of storm water pollution), and probable sources of any observed storm water contamination.
If you have two or more outfalls that, based on a consideration of industrial activity, significant materials, and management practices and activities within the area drained by the outfall, the permittee reasonably believes discharge substantially identical effluents, you may conduct an examination of effluent from one of such outfalls.and report that the observations also apply to the substantially identical outfall(s).
You must then Include in the storm water pollution prevenlion plan a description.
of the location of the oulfalLs and explain in detail why the) outfalls are expected to discharge substantially identical effluents.
In addition, for each outfall that you believe is representative, an estimate of the size of the drainage area (in square feet) and an estimate of the runoff coefficient of the drainage area [e.g., low (under 40 percent), medium (40 to 65 percent), or high (above.65 percent)]
shall be provided in the plan.Pago 15 APPENDIX B Page B-16 Duane Arnold Energy Center License Renewal Application Environmental Report STANDARD CONDITIONS
- 1. DEFINITIONS (a) 7 day average means the sum ofthe total. daily discharges by m=, volume or'ooncentratio ring a 7 consecutive day period, divided by the total number of days during the period that measurements were made. Four 7 consecutive day periods shall be used each month to calculaft the 7-day average. The first 7-day period shall begin with the first day ofthe mondt (b) 30 day average means the sum of the total daily discharges by mass, volume or concentration during a calendar month, divided by the total number of, days during the month that measurements were made.(c) daily maximum means the total discharge bymass, volume or concentration during a twenty-four hour period.2,. DUTY TO COMPLY You must comply with all conditions of this petmit Any permit nontompliance constitutes a violation of the Clean Water Act and is grounds for enforcement action; .permit termination, revocation and reissuance, or modification; or denial of a permit renewal application.
Is of this permit does not relieve you of the responsibility to comply with all local, state and federal laws, ordinances, regulations or other legal requirements applying to the operation of your facility.am 40 CFR 121.41(a) wad 5676.3.(!1) fAL 3.DUTY TO REAPPLY Ifyou wish to continue to discharge after the expiration daft of this permit you must-file an application forxeissuance.Iast 180 days prior to the expiration date ofthis permni zee 567-.64.8(1)
L4q You are required to notify the new owner of th requirnents of this pernit in Writn prior to any transfer of title. The Director shall be notified in writing.within 30 days of the transfer..PROPER OPERATION AND MAINTENANCE All .facilities, and control systems shall be operated as efficiently as possibleaand maintained in,goodworking order.A sufficient number of staff; adequately trained and knowledgeable in the operation of your hacility shall be retained at. all times and adequate laboratory controls and appropriate quality assurance procedures shall be provided to maintain compliance with the conditions ofthis permit g~et 40 CFR 122.41(4) and 567 64. 7(50J L4q 9. DUTY TO PROVIDE INFORMATION You must firnish to the Director, within a reasonable tijme any information the Director may request to determine:
whether cause exists for modifying, revoking and reissuing.
or terminating this permit or to determine contpliancerwith this permit. You must also furtish to the Director, upon request, copies of any records required to be kept by this permi 10. MAINTENANCE OF RECORDS You ar required to maintain records of your operation in aceordance with 567-63.2 IAC.11. PERMIT MODIFICATION; SUSPENSION OR REVOCATION (a) This permit may be modified, suspended, or revoked and reissued for cause including but not limited to those specified in 567-64.3(11)
IAC.(b)This permit may be modified due to conditions or.information on which this permit is based, including any new standard the departnent may adopt that would change the required 9Me 567-64.30(11)
L4CJ (c)If a toxio:pollutant is present in your discharge arId mom stringent standards for toxic pollutants are establishid under Section 307(a) of the Clean Water Act. this permit will be modified in accordance with the new standards.
The filing of a request fora permit modification, revocation or suspension, or a notificationof planned dianges or ant e noncompliance does not stay any permit condition.
, 17- SEVERABILITY The provisions ofthis permit a- stetable and if any prtvision or application of My provision to any drcumsta is found to be invalid by this department or a odurt of law, the application of such provision to other OiTCSWcS, aMid the rad of hs permi, shaU nt be affect by h tinding.4. NEED TO HALT OR REDUCE ACTIVITY It shall not be a defense for a permittc in. an enforcement action that it would have been necessary to halt or reduce the pennitted activity in order to maintain compliance with the.conditions ofthis pemit..5 e67-6 47(s)0 L4q.5. DUTY TO MITIGATE You shall take all reasonable steps to minimnze or prevent any.discharge-in violation of this pennit which has a reasonable likelihood of adversely affecting human health. or the envtiment.
567-0.7(5)(4Q
- 6. PROPERTY RIGHTS This permit does not convey any property rights of any sort or any exclusive privileges.
- 7. TRANSFER OF TITLE if title to your facility.
orany partof it, is transfered the new owner shall be suJect to this permit AWe567-64.14Mq.
V APPENDIX B Page B-1 7 Duane Arnold Energy Center License Renewal Application Environmental Report.srANDARD coNDiTIONS
- 13. INSPECTION OF- PREMISES, RECORDS, EQUIPMENT, METHODS AND DISCHARGES You are required to permit authorized personnel to..(a)Enter upon the premises where a regulated facility or activity is located or conducted or where records ae kept under conditions of this permit.(b) Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit. -(c) Inspect, at reasonable times, any facilities, equipmrent practices or operations regulated or required under this permit.(d)Sample or monitor, at reasonable times, for the purpose of* assuring compliance or.as otherwise authorized, by the* Clean Water Act.14. TWENTY-FOUR HOUR REPORTING You shall report any noncompliance that may endanger human health or the environment.
Information shall be provided orally within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from the time you become aware of the circumstances.
A written submission that includes a description:
of noncompliance and its cause; the period of noncompliance including exact dates and times, whether the noncompliance has been corrected or the anticipated time it is expected to continue; and the step taken or planned to reduce, eliminate, and prevent a reournence of the noncompliance must be provided within 5 days of the, occurrence.
The following' instances of noncompliance must b reported within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of oceurrence: (a) Any unanticipated bypass which exceeds any effluent limitation in the permit (See 40 CSR 12244()1 (b) ny upset which exceeds any effluent limitation.
in the pemt.1sJ40 CaR 1ZL44(0))(c)Any violation of a maximum daily discharge limit for any of the pollants listed by the Director in the permit to be reported within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.(Sec 40 CFR 122.4(9))15. OTHER NONCOMPLIANCE You shall report all instances of noncompliance not reported under Condition
- 14. at the time monitoring reports are submitted.
16 ADMINISTRATIVE RULES Rules of this Department which gover the operation of your facility in connection with this permit are published in Part 567 of the Iowa Adminislrative.Code (IAC) in Chapters 60-64 and 121-122. Reference to the term "rule"in this permit means the designated provision of Paut 567 of the Iowa Administrative Code.17. NOTICE OF CHANGED CONDITIONS You ar required to report any changes in existing conditions or information on wiuch this permit is based: (a) Facility expansions, productio increases or process modifications which may result in new or Increased discharges of pollutants must be reported to the Director in advance. If such disc will exceed, effluent limitations, your report must. include an application for a new permit (b)If any modification of, addition to, or construction of a disposal systim is to be made, you must first obtain a written permit from this Department.
r--e 567-6"2 Lq (c)If your acility is a publicly owned treatment works or otherwise may accept waste for treatment from industrial contributors see 567-.643(5)
IAC for frther notice requiremenL (d)You shall notify the Director as soon as you kmow or have reason to believe that any activity has occurred or will occur which would result in the discharge of any toxic polubtant which is not limited in this permit.get 40 CF7 12Z42(7"J You must also notify the Director if you have begun or will begin to use or manufacture as an intermediate or final product or byproduct any toxic pollutant which was not reported in the permit application.
18& OTHER INFORMATION Where you become aware that. you failed to submit any relevant factsfin a p"mit applicatlion, or submitted incorrect" information in a pernutapplication or In any report, you must promptly submit such facts or information.
APPENDIX B Page B-18 Duane Arnold Energy Center License Renewal Application Environmental Report STANDARD CONDMTONS 19. UPSET PROVISION (a) Definition
-"Upset means an exceptionial incident in which ther is unintentional and temporary noncomplianc with technology based permit effluent limitations because of factors beyond the reasonable control of. the permitee.
An upset does not inclde noncompliance to the exem caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or. Improper operation.(b)Effect of an upset An upset constitutes an affimative defense in an action brought for noncompliance with such technoiogy based permit effluent limitations if the reqwirements:of paragraph "c" of this condition am met.No determination made during administrative review of claims noncomppiance~was caused by upset, and before an action for noncompliance, is final administrative action subject to judicial review.(c) Conditions nooessary for demonstration of an upset. A pemnittee who wishes to establish the affirmative defense of. upset shall demorstrate through properly signed, Scoatemporaneou operating logs, or other relevant*evidence that;(1) An upset occured and that the pernumt can idatify the casegs) of the upset (2) The permitted facility was at the time being properly operted; and (3). The permittee submitted notice of the upset, to the Depatmnent in accordance with 40 CFR 122.4IX6XtO)(i
)., (4): The parmittee:complied with any remedial measures required by Item #5.,of the Standard Conditions of this permit (d)Burden of Proof; In any enforcement proceeding, the permittee seeking to establish the ocaurrece of an upset hasthe burdenoforoctl
- 20. FAILURE TO SUBMIT FEES This permit may-be revoked; in whole or in part, if the appropriate permit fees are not submitted within thirty (30)4. days ofthe date oftnotification that such fees ar due.21. BYPASSES " (a)Defliitdon
-Bypass means the intentional diversion of waste streams from any portion ofa facility.(b)Prohibition of. bypass, Bypass is prohibited and the depatment may take entfrcement action against a permittne for bypass unless: (1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage (2) Them were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipmenf downtime.
This condition is not satisfied if adequate backup equipment should have beeninstalled in the exercise of reasonable engineering judgement to prevent a bypass which occurred during normal periods of equipment downtime or preentive maintenance; (3) Th7 permitdee submitted notices as required by paragraph
'd* of this section.(6)The Director may approve an anticipated bypass alter considering its adverse effects if the Director detenrines that it will meet the three cociditim listed above..(d.)Reportingi bypasses.
Bypasses-shall be reported in accordatce with 567-63.6 IAC.22. SIGNATORY REQUIREMENTS Applications, report or other information submitted to the Depaurnecntin connection with thiis permit must be signed'and certified as required by 567-64.3(8)
IAC;23. USE OF CERTIFIED LABORATORIES Effective October I, 1996, anayses of waitwatdm groundwater or: sewage sludge that are required to be submitted to the departmnet as a result. of tiis permit must be perfirmned by a laboratory catified:by the State of Iowa.Routine, on-site monitoring for pH, temperatur, dissolved oxygen,.total residual chlorine and other pollutants that must be analyzed immediately.
upon. sample collctioni wgpleable solids, physical measurements, and operational monitoring tests specified in 567-633(4) are excluded from this requirenment*
)APPENDIX B Page B-19 Duane Arnold Energy Center License Renewal Application Environmental Report National Pollutant Discharge Elimination System Notice Date: 05/21/2004 The Iowa Department of Natural Resources is proposing to approvean application for. reissuance of an.NPDES (National Pollutant Discharge Elimination System) permit for the discharges described below: DISCHARGER NAME AND ADDRESS: IP&L-DUANE ARNOLD ENERGY CENTER 3277 DAEC ROAD PALO, IA 52324 -0000 LOCATION:, Township:84N Range 08W Section 9 County: LINN RECEIVING STREAM:- CEDAR RIVER Class A waters are protected for primary contact recreation in which recreational or other uses may result in prolonged and direct contact with the water, involving considerable risk of ingestingwater in quantities sufficient to pose a health hazard. Such activities.would include., but not be limited to, swimming, diving, water skiing and water contact ecreationalcanoeing.
Class BCWW) waters are signikfipant.resource warm 'waters in. which temperature, flow, and other habitat.characteristics are suitable for the maintenance of a Wide variety of reproducing populations-of warm water fish and associated aquatic communities, including sensitive species.DESCRIPTION OF DISCHARGES.
Z 001 DISCHARGE OF COOLING TOWER BLOWDOWN FROM THE RECIRCULATING WATER.SYSTEM AND STORM WATER RUNOFF."002 STORM WATER RUNOFF AND DISCHARGES FROM A SEQUENCING BATCH REACTOR'WASTEWATER.
TREATMENT PLANT TREATING DOME STI C WASTEWATER..
Anyone wishing to comment on or object to the proposed issuance of this permit must do so in wr'iting.within forty-five (45) days of the date shown-at the top, of this notice. All comm.ents received will be considered in the final determination.
If no objectionsare received within forty-five.
(45) days, the Department will issue a final permit. You may request the Department hold a public hearing by submittinga written request stating specific reasons why a hearing should be held.Comments, objections, and requests for hearings must be addressed to the: IOWA DEPARTMENT OF NATURAL RESOURCES, Environmental Services Division, Wastewater Section, 502 East 9th Stree, Des Moines, iA 50319..Copies of this notice, the proposed permit and other information are on file and available for public inspection from 8:00 AM to 4:30 PM Monday through Friday at the above address. Copies of this information mayb e requested by calling JohnWarren at 515-242-6146 orE-mail at..john.warren@dnr.state.ia.us) ,1.Y. ., ..APPENDIX B Page B-20 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX C SPECIAL-STATUS SPECIES CORRESPONDENCE Table of Contents, Letter Page Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Robin Thorson C-2 (U.S. Fish and Wildlife Service)Richard C. Nelson (U.S. Fish and Wildlife Service) to Gary Van Middlesworth C-8 (FPL Energy Duane Arnold, LLC)Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Richard Leopold C-1 0 (Iowa Department of Natural Resources)
Diane Ford-Shivvers (Iowa Department of Natural Resources) to Gary Van C-16 Middlesworth (FPL Energy Duane Arnold, LLC)APPENDIX C Page C-i APPENDIX C Page C-1 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane Amold Energy Center Apri13, 2007 NG-07-0236 Robyn Thorson, Regional Director Region 3,. U.S. Fish and Wildlife Service I Federal Drive.BHW Federal Building Fort Snelling, MN 55111.
Subject:
FPL Energy Duane Arnold LLC License Renewal Project NRC Informal Consultation Preparation
Dear Ms Thorson:
FPL Energy Duane Arnold, LLC is preparing an application to the U.S. Nuclear Regulatory Commission (NRC) to renew theoperating license of the facility for an additional twenty years. We intend the application to be consistent with your agencies' interests and the priorities of our community.
Although Duane Arnold's current operating
!lcensedoes not expire until February 2014, the.NRC's rigorous license renewal process and other regulatory reviews make it prudent for us to submit this application for license renewal to the NRC in late 2008.As a part of the license renewal process, the Nuclear Regulatory Commission (NRC)requires that applicants identify adverse impacts to rare and endangered species resulting from continued operation of the facility or refurbishment activities associated with the license renewal. This assessment, which will be contained in the Environmental Report submitted as part of the application, will address specific environmental issues related to the continued operation of the Station during the license renewal period. Following our submission of the application, the NRC will request an informal consultation with your office with respect to the matters referenced in this letter.It is our intent that, by contacting you at this point In the process, we can identify any deficiencies, concerns, or data needed so that those areas identified can be addressed to assure that the consultation process proceeds smoothly and efficiently, It is FPL Energy Duane Arnold's conclusion that operation of the Station does not have an adverse impact on any rare or endangered species. In addition, there are neither operational refurbishments.
nor major replacement activities planned as a result of this license renewal action that will invalidate that conclusion.
After your review, we would appreciate a letter affirming FPL Energy Duane Arnold's conclusion.
To assist you in responding to this request, I have enclosed a site description and figures depicting the site and the associated transmission lines.APPENDIX C Page C-2 Duane Arnold Energy Center License Renewal Application Environmental Report If you have any comments or questions, seek any specific data or desire a presentation to further explain the license renewal process, please contact: Herb Giorglo 3277 DAEC Rd Palo, IA 52324 Herb Giorgiorfpl.com (319) 851.7264 Sincerely yours, Gary Van Middlesworth Vice President FPL Energy Duane Arnold
Enclosures:
Duane Arnold Site Description Duane Arnold Site Figure Duane Arnold 6 Mile Vicinity Map Duane Arnold Transmission System FPL Energy Duane Arnold LLC is a Delaware Limited Liability Company, acting for itself and as agent for Central Iowa Power Cooperative and Corn Belt Power Cooperative.
APPENDIX C Page C-3 Duane Arnold Energy Center License Renewal Application Environmental Report Duane Arnold Site Description SITE DESCRIPTION The Duane Arnold Energy Center (DAEC) site is located on the western side of a north-south reach of the Cedar River, approximately
2.5 miles
north-northeast of the Village of Palo, Iowa, in Unn County (T-84N, R-8W, Sections 9 and 10). The closest city is Cedar Rapids with its outer boundary being 8 miles to the southeast The site is approximately 500 acres on a flat strip of land running northeast and parallel to the Cedar River. The distance from the plant stack to the nearest site boundary is approximately 440 m. A paved county highway provides access to the site.TOPOGRAPHY A relatively flat plain at approximate elevation 750 ft above mean sea level (msl) extends from the site toward the Villageof Palo on the southwest, and most of this land is now being farmed. At Palo, the elevation is 747 to 750 ft.Across the river from the site, the land rises from an elevation of 750 ft to an elevation of about 900 ft within a horizontal distance of appro imately 2000 ft. These slopes are rather heavily wooded with only an occasional field or pasture dotting the landscape.
Beyond this rise, the land is gently rolling farmland.To the northwest, the land rises to an elevation of 850 ft.Adjacent to the east is another heavily wooded low area that constitutes the current flood plain.. This area is very fiat and extends approximately 1500 ft to the west bank of the river.The general topographical features in this portion of the Cedar River consist of broad valleys with relatively narrow flood plains. In many places, these broad valleys merge almost imperceptibly into the adjacent uplands. Away from the immediate vicinity of the river, the land is gently rolling farmland.TRANSMISSION LINE CORRIDORS Five transmission-line systems extend westward in a 665-ft corridor from the southwest edge of the plant site for a distance of one mile to arnorth-south county road. Near this road, two 161-kV lines depart and continue within a corridor of 100-ft basic width (generally narrower along railroad and public rights-of-way) in a southerly direction.
At the village of Palo, one of these lines follows a railroad right of way southeasterly to the Sixth Street substation in Cedar Rapids. The total distance of this line is 11.2 miles.The other 161 kV line continues in a southerly direction west of Cedar Rapids and then eastward, via Fairfax, to the Bertram substation.
The total distance is 28 miles. The.remaining 161-kV line and two 345-kV lines continue in a 500-ft corridor for a distance of 1.7 miles beyond the county road in a westerly direction.
There, one 345 line turns south to the Hills substation, the other 345 line turns north to the Hazelton substation.
The 161-kV line continues for a distance of 16.miles to the Garrison substation and then an.additional 30 miles to the Washburn substation.
A sixth transmission line leaves the plantsite in a generally easterly direction, crowsesthe Cedar River, and continues for a distance of 8 miles to the Hiawatha substation.
APPENDIX C Page C-4 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX C Pg -Page C-5 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX C Page C-6 APPENDIX C Page C-6 Duane Arnold Energy Center License Renewal Application Environmental Report,. .........N i.........
APPENDIX C Page C-7 APPENDIX C Page C-7 Duane Arnold Energy Center License Renewal Application Environmental Report United States Department of the Interior FISH AND WILDLIFE SERVICE Rock Island Field Office 1511 4 7'b Avenue Moline, llinois 61265 Phbne: (309) 757-5800 Fax (309) 757-5807 July3, 2007 TOFWS/RIFO ISCEOVE JUL 1 1 2007[7 Mr. Gary Van Middlesworth Vice President FPL Energy Duane Arnold, LLC.3277 DAEC Road Palo, Iowa 52324
Dear Mr. Middlesworth:
We have reviewed your April 13, 2007, request for information concerning any impacts to federally listed threatened or endangered species as a result of a proposed license renewal project at the FPL Energy Duane Arnold, facility for an additional twenty years. The. project site is located near Cedar Rapids, Linn County, Iowa..To facilitate compliance with Section 7(6) of the Endangered Species Act of 1973, as amended, Federal agencies are required to obtain from the Fish and Wildlife Service information concerning any species, listed or proposed to be listed, which may be present in the area of a proposed action. Therefore, we are. furnishing you the following list of species which may be present in the concerned area: Classification Common Name Scientific Name Habitat 0 Threatened Bald eagle Haliaeetus.
leucocephalus Threatened.
Prairie bush clover Threatened Western prairie fringed orchid Lespedeza leptostdchya Platanthera praeclara Wintering, Breeding Dry to mesic prairies with gravelly soil Mesic to wet prairies The threatened~bald eagle (Haliaeetus leucocephalus) is listed as breeding in Linn County, Iowa, It is also listed as wintering along large rivers, lakes, and reservoirs in Linn County. During the winter, this species feeds on fish in the open water areas created by dam tailwaters, the warm water effluents of power plants, and municipal and. industrial discharges, or in power plant cooling ponds. .The more severe the win ier, the greater the ice coverage and the more concentrated the eagles bedokie. They'roost at night in groups:in largetreesadjacentto the river in areas that are protected from the harsh winter elements.
They perch in large shoreline trees to rest or feed on fish. There is no critical habitat: APPENDIX C Page C-8 Duane Arnold Energy Center License Renewal Application Environmental Report Mr.. Gary Van Middlesworth 2 designated for this species; The eagle may not be harassed, harmed, or disturbed when present nor may nest trees be cleared.The prairie bush clover (Lespedeza leptostahya) is listed as threatened and is considered to potentially occur statewide in Iowa based on historical habitat. It occupies dry to mesic prairies with gravelly soil.There is no critical habitat designated for this species. Federal regulations prohibit any commercial activity involving this species or the destruction, malicious damage or removal of this species from Federal land or any other lands in knowing violation of State law or regulation, including State criminal trespass law. This species should be searched for whenever prairie remnants are encountered.
The western prairie fringed orchid (Pazanthena praeclara) is listed as threatened and is considered to potentially occur statewide in Iowa based on historical records and habitat distribution.
It occupies wet grassland habitats.
There is no critical habitat designated for this species; Federal regulations prohibit any commercial activity involving this species or the destruction, malicious damage or removal of this species from Federal land or any other, lands in knowing violation of State law or regulation, including State criminal trespass law. This species should be searched for whenever wet prairie remnants are encountered.
The Corps of Engineers is the Federal agency responsible for wetland regulation, and we recommend that you contact them for assistance in delineating the wetland types and acreage within the project boundary.
Priority consideration should be given to avoid impacts to wetland areas, Any future activities in the study area that would alter wetlands may require a Section 404 permitý Unavoidable impacts will require a mitigation plan to compensate for any losses of wetland functions, and values.The U. S. Army Corpsof Engineers, Clock Tower Building, P.O. Box 2004, Rock Island,-Illinois 61201, should be contacted for information about the permit process.These comments provide technical assistance only and do not constitute the report of the Secretary of the Interior on the project within the meaning of Section 2(b) ofthe Fish and Wildlife Coordination, Act, do not fulfill the requirements under Section. 7 of the Endangered Species Act, nor do they represent the review comments of the U.S. Department of the Interior on any forthcoming.
environmental statement.
Thank you .for the opportunity'to provide comments early in tlhe planning process. If you have any additional questions or. concerns, please. contact Heidi. Wobeb of my staff.]Sincerel Field Supervisor S:\Office UsersU-eidiUinncoFPLENERGY-.doc APPENDIX C Page C-9 Duane Arnold Energy Center License Renewal Application Environmental Report 0 FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane Arnold Energy Center April 13, 2007 NG-07-0233 Richard Leopold, Director Iowa Department of Natural Resources 502 E. 9th Street Des Moines, IA 50319-0034
Subject:
FPL Energy'Duane Arnold LLC*License Renewal Project NRC Informal[Consultation Preparation for Threatened
& Endangered Species and Water Usage
Dear Mr. Leopold:
FPL Energy Duane Arnold, LLC is preparing an application to the U.S. Nuclear Regulatory Commission (NRC) to renew the operating license of the facility for an additional twenty years. We intend the application to be consistent with your agencies'interests and the priorities of our community.Although Duane Arnold's current operating license does not expire until February 2014, the NRC's rigorous license renewal process and other regulatory reviews make it prudent for us to submit this application for license renewal to the NRC in late 2008.As a part of the license renewal process, the Nuclear Regulatory Commission (NRC)requires that applicants identify impacts to rare and endangered species resulting from continued operation of the facility or refurbishment activities associated with the license renewal. In addition, NRC will review water usage and compliance with applicable portions of the Clean Water Act (CWA). This assessment, which will be contained in the Environmental Report submitted as part of the application, will address specific environmental issues related to the continued operation of the Station during the license renewal period. Following our submission of the application, the NRC may request an informal consultation with your office with respect to the matters: referenced in this letter.The NRC may also ask you to conflrmthe exempt status of FPL Energy Duane Arnold from the applicability of 316(b).It is our Intent that, by contacting.
you at this point in the process, we can identify any deficiencies, concerns, or data needed so that those areas Identified can be addressece to assure that the consultation process proceeds smoothly and efficiently.
It is FPL Energy Duane Arnold's conclusion that operation of the Station does not have an adverse impact on any rare or endangered species. In addition, there are neither operational, refurbishments nor major replacement activities planned:as a result of this license renewal action that will invalidate that conclusion.
APPENDIX C Page C-1 0 Duane Arnold Energy Center License Renewal Application Environmental Report After your review, we would appreciate a letter affirming FPL Energy Duane Arnold's conclusion.
To assist you in responding to this request, I have enclosed a site description and figures depicting the site and the associated transmission lines.If you have any comments or questions, seek any specific data or desire a presentation to further explain the license renewal process, 'please contact: Herb Giorgio 3277 DAEC Rd Palo IA 52324 HerbGiorgio@fpl.com
-(319) 851.7264.Sincerely yours.Ga~ VanMdewot Vice President FPL Energy Duane Arnold, LLC
Enclosures:
Duane Arnold Site Description Duane Arnold Site Figure Duane Arnold 6 Mile Vicinity Map Duane Arnold Transmission System FPL. Energy Duane.Amold LLC is a Delaware Limited ULability Company, acting for itself and as agent for Central Iowa Power Cooperative and Corn Belt Power Cooperative.
APPENDIX C Page C-1 1 Duane Arnold Energy Center License Renewal Application Environmental Report Duane Arnold Site Description SITE DESCRIPTION The Duane Arnold Energy Center (DAEC) site is located on the western side of a north-south reach of the Cedar River, approximately
2.5 miles
north-northeast of the Village of Palo, Iowa, in Linn County (T-84N, R-8W, Sections 9 and 10). The closestcity is Cedar Rapids with its outer boundary being 8 miles to the southeast, The site is approximately 500 acres on a fiat strip of land running northeast and parallel to the Cedar River. The distance from the plant stack to the nearest site boundary is approximately 440 m. A paved county highway provides access to the site.TOPOGRAPHY A relatively fiat plain at approximate elevation 750 ft above mean sea level (msl) extends from the site toward-theVillage of Palo on the southwest, and most of this land is now being farmed. At Palo, the elevation is 747 to 750 ft.Across the river from the site, the land rises from an elevation of 750 ft to an elevation:of about 900 ft within a horizontal distance of approximately 2000 ft. These slopes are rather heavily wooded with only an occasional field or pasture dotting the landscape..
Beyond this rise, the land is gently rolling farmland.To the northwest, the land rises to an elevation of 850 ft.Adjacent to the east is another heavily.wooded low area that constitutes the current flood plain. This area is very flat and extends approximately 1500 ft to the west bank of the river.The general topographical features in this portion of the Cedar River consist of broad valleys with relatively narrow flood plains. In many places, these broad valleys merge almost imperceptibly into the adjacent uplands. Away from the immediate vicinity of the" river, the land is gentiy rolling farmland.TRANSMISSION LINE CORRIDORS Five transmission-line systems extend westward in a 665-ft corridor from the southwest edge of the plant site for a distance of one mile to a north-south county road. Near this road, two 161-kV lines depart and continue within a corridor of 100-ft basic width (generally narrower along railroad and public rights-of-way) in a southerly direction.
At the village of Palo, one of these lines follows a railroad right of way southeasterly to the Sixth Street substation in Cedar Rapids. The total distance of this line is 11.2 miles.The other 161 kV line continues in a southerly direction west of Cedar Rapids and then eastward, via Fairfax, to the Bertram substation.
The total distance is 28 miles. The remaining 161-kV line and two 345-kV lines continue in a 500-ft corridor for a distance of 1.7 miles beyond the county road in a westerly direction.
There, one 345.1ine turns south to the Kills substation, the other 345 line turns north to the Hazelton substation.
The 161,kV line continues for a distance of 16 miles to the Garrison substation and then an additional 30 miles to the Washburn substation.
A sixth transmission line leaves the plant site in a generally easterly direction, crosses the Cedar River, and continues for a distance of 8 miles to the Hiawatha substation.
APPENDIX C Page C-12 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX C Page C-1 3 Duane Arnold Energy Center License Renewal Application Environmental Report NI APPENDIX C Page C-14 APPENDIX C Page C-14 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX C Page C-1 5 Duane Arnold Energy Center License Renewal Application Environmental Report FIds of opportunit STATE OF IOWA CHES-ER J. CULVER. GOVERNOR DEPARTMENT OF NATURAL RESOURCES PATTY JUDGE. LT. GOVERNOR RICHARD A. LEOPOLD. DIRECTOR November 7, 2007 Gary Van Middlesworth.
FPL Energy DuaneArnold, LLC 3277 DAEC Road Palo, IA 52324 RE: Environmental Review for Natural Resources License renewal project NRC informal consultation preparation for Threatened and Endangered Species and Water Usage Palo, Linn County, IA S9, 10/T84N/R8W
Dear Van Middlesworth:
Thank you for inviting our comments onthe impact of the above referenced project. A review by Department staff of the Environmental.
Report Preliminary Draft, August 2007, submitted October 10, 2007, did not generate any water use concerns for the project. In addition, we have searched our records of the project area and found no site-specific records of rare species or significant natural communities that would be impacted by this project. However, our data are not the result of thorough field surveys. 'If Jisted species or rare communities are found during the planning or construction phases, additional studies and/or mitigation maybe required.This letter is a record of review for protected species, rare natural communities, state lands and waters in the project area, including review by personnel representing state parks, preserves, recreation areas;,fisheries and wildlife but does not include any potential comment from the Environmental Services Division of this Department.
This letter does not constitute a permit and before proceeding.
withthis project, permits may be needed'from this Department or from other state or federal agencies.Any construction activity that bares the soil of an area greater than or equal to 1 acre including clearing, grading or excavation may require a storm water discharge permit from the Department..
Construction activities may include the temporary or permanent storage of dredge.material.
For more information regarding this matter, please contact Ruth Rosdail at (515) 281-6782.TDD 515-242-5967 www.iowadnr.gov APPENDIX C Page C-16 Duane Arnold Energy Center License Renewal Application Environmental Report The Department administers regulations that pertain to fugitive dust lAW Iowa Administrative Code 567-23.3(2)c".
All persons shall take reasonable precautions to prevent the discharge of visible emissions of fugitive dusts beyond the lot line of property during construction, alteration, repairing or demolishing of buildings, bridges or other vertical structures or haul roads. All questions regarding fugitive .dust regulations should be addressed to Jim McGraw at (515) 242Z 5167.If you have any questions about this letter or require further information, please contact me at (515) 281-6341.Diane Ford-Shivvers Deputy Division Administrator Conservation and Recreation Division FILE COPY, Inga Foster Tracking Number: 1803 APPENDIX C Page C-1 7 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX D CULTURAL RESOURCES CORRESPONDENCE Table of Contents Letter Pagie Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Stephen C. D-3 Lensink (Office of.the State Archaeologist)
Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Gordon D-5 Hendrickson (State Historical Society of Iowa)Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to June Strand D-7 (Iowa State Historic Preservation Office)Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Cathy Noe Got D-8 (Meskwaki Sac and Fox Tribal Offices)Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Jonathan D-10 Buffalo (Meskwaki Sac and Fox Tribal Offices)Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to DeAnne Bahr D-12 (Kansas and Nebraska Sac and Fox Tribal Offices)DeAnne Bahr (Sac and Fox Nation of Missouri in Kansas and Nebraska) to D-14 Herb Giorgio (FPL Energy Duane Arnold, LLC)Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Sandra Massie D-1 5 (Oklahoma and Nebraska Sac and Fox Tribal Offices)Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Pat Murphy D-17 (Iowa Tribe of Kansas and Nebraska)Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Joyce Miller D-1 9 (Iowa Tribe of Oklahoma)Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Sam Allen D-21 (Nebraska Flambeau Santee Sioux Tribal Office)Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Roger Trudell D-23 (South Dakota Santee Sioux Tribal Office)Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Richard D-25 Goulden (Otoe-Missouria Tribal Offices)Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Larry Garvin D-27 (Wisconsin Ho-Chunk Cultural Preservation Tribal Office)APPENDIX D Page D-1 Letter
Enclosure:
Duane Arnold Site Description
Enclosure:
Duane Arnold Site Boundary Map
Enclosure:
Duane Arnold Six Mile Vicinity Map
Enclosure:
Duane Arnold Transmission System Duane Arnold Energy Center License Renewal Application Environmental Report Page D-29 D-30 D-31 D-32 0 0 APPENDIX D Page D-2 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold, LILC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane ArnoldEnergy Center April 13, 2007 NG-07-0234 Stephen C. Lensink Interim State Archaeologist Office of the State Archaeologist 700 South Clinton:Street Building University ofIowa Iowa City. iA 52242-1030 Subject FPL Energy Duane Arnold, LLC *License Renewal Project NRC Informal Consultation Preparation for Cultural Resources
Dear Mr. Lensink:
FPL Energy Duane Arnold, LLC is preparing an application to the U.S. Nuclear Regulatory Commission (NRC) to renew the operating license of the facility for an additional twenty years..We intend the application to be consistent with your agency's interests.and the priorities of our community.
Although Duane Arnold's current operating license does not expire until February ?014, the NRC's rigorous license renewal process and other regulatory.
reviews make it prudent for us to submit this application for license renewal to* the NRC in late 2008.As part of the license renewal process, the NRC requires license applicants to assess the impact :of the proposed action on cultural resources.
This assessment, which will be .contained in the: Environmental Report submitted as part of the application, will address specific environmental issues related to the continued Operation of the Station during the license renewal period. Following our submission of the application, the NRC may request an informal consultation with your office with.respect to the matters referenced in this letter.It is our-intent that, by contacting you at this point in the process, we can identify any.deficiencies,.
concerns, or data needed so that those areas identified can be addressed to assure that the consultation process proceeds smoothly and efficiently, Neither operational, refurbishment.nor major replacement activities are planned as a result of this license renewal action that will impact previously undisturbed land. Therefore, FPL Energy Duane Arnold believes there will be no cultural resource Impacts from license renewal activities.
After your review, we would appreciate a letter affirming FPL Energy Duane Arnold's conclusion.
To assist you in responding .to this request, I have enclosed a site description and a pertinent figure of the area.APPENDIX D Page D-3 Duane Arnold Energy Center License Renewal Application Environmental Report If you have any comments or questions, seek any specific data or desire a presentation to further explain the license renewal process, please contact Herb Giorgio 3277 DAEC Rd Palo IA 52324 HerbGiorgio@fpl.com (319) 851.7264.Sincerelyyor Gary Van Middlesworth Vice President FPL Energy Duane Arnold, LLC
Enclosures:
Duane Arnold Site Description Duane Arnold Site Boundary Map Duane Arnold 6 Mile Vicinity Map.Duane Arnold Transmission System FPL Energy Duane Arnold LLC is a Delaware Umited Uability Company, acting for itself and as agent for Central Iowa Power Cooperative and Corn Belt Power Cooperative.
APPENDIX D Page D-4 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy DuMane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy Duane Arold Energy Cencer April 13, 2007 NG-07-0235 Gordon Hendrickson Divsion Administrator State Historic Society of Iowa 600 E, Locust Street Des Moines, IA 50319
Subject:
FPL Energy Duane Arnold, LLC *License Renewal Project NRC Informal Consultation Preparation for Cultural Resources
Dear Mr. Hendrickson:
FPL Energy Duane Arnold, LLC is preparing an application.to the U.S: Nuclear Regulatory Commission (NRC) to renew the operating license of the facility for an additional twenty years. We intend the application to be consistent with your agency's interests and the.priorities of our community.
Although Duane Arnold's current operating license does not expire until February 2014, the NRC's rigorous license renewal process and other regulatory reviews make it prudent for us to submit this application for license renewal to the NRC in late 2008.As part of the license renewal process, the NRC requires license applicants to assess the impact of the proposed action on cultural resources.
This assessment, which will be contained in the Environmental Report submitted aspart of the application, will address specific environmental issues related to the continued operation of the Station during the license renewal period. Following our submission of the application, the NRC may request an informal consultation with your office with respect to the matters referenced in. this letter.It is our intent that, by contacting you at this point in the process, we can identify any deficiencies, concerns, or data needed so that those areas identified can be addressed to assure that the consultation process proceeds smoothly and efficiently.
Neither operational, refurbishment nor major replacement activities are planned as a result.of this license renewal action that will impact previously undisturbed land. Therefore, FPL Energy Duane Arnold believes there will be no cultural resource impacts from license renewal actities.After your review, we would appreciate a letter affirmingTFPL.
Energy Duane Arnold's conclusion.
To assist you in responding to this request, I.have, enclosed a site description and pertinent figures of the area.* APPENDIX D Page D-5 Duane Arnold Energy Center License Renewal Application Environmental Report 0 If you have any comments, concerns or questions, seek any specific data or desire a presentation to further explain the license renewal process, please contact Herb Giorgio 3277 DAEC Rd Palo IA 52324 Herb Giorgio@fpl.com (319):851.7264.
Sincerely yours, GarVan Middlesworth Vice President FPL Energy Duane Arnold, LLC
Enclosures:
Duane Arnold Site Description Duane Arnold Site Boundary Map Duane Arnold 6 Mile Vicinity Map Duane Arnold Transmission System FPL Energy Duane Arnold LLC is a Delaware Limited Liability Company, acting for itself and as agent for Central Iowa Power Cooperative and Corn Belt Power Cooperative.
APPENDIX D Page D-6 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane Arnold Energy Center Oct 2,2007 DAEC-07-0847 June Strand Review and Compliance Program Iowa State Historic Preservation Office Capital Complex 600 E. Locust St Des Moines, IA 50319-0290
Subject:
FPL Energy Duane Amold LLC License Renewal Project NRC Informal Consultation Preparationfor Cultural Resources
Dear Ms. Strand:
In April 2007 we informed your office that FPL Energy Duane Arnold, LLC was preparing an application to the US Nuclear Regulatory Commission (NRC) to renew the operating license of the facility for an additional twenty years. Our intent was to assure that your office knew of the undertaking and to make ourselves available for discussions if so desired.Since that time, we have completed the preliminary draft and are enclosing a copy for your review. In it we have concluded that operation of the Station does not have an adverse impact on cultural resources.
In addition, there are neither operational, refurbishments nor major replacement activities planned as a result of this license renewal action that Will invalidate that conclusion.
After your review, we Would appreciate a letter affirming FPL Energy Duane Arnolds conclusions.
For us to stay on schedule, we request receipt of your response by November 15, 2007.Following our submission of the application, the NRC may request an informal consultation with your office with respect to the matters referenced in this letter.If you have any comments or questions, seek any specific data or desire a presentation to further explain the license renewal process, please contact: Herb Giorgio 3277 DAEC Rd Palo IA 52324 Herb Giorgio@fpl.com (319) 851.7264 Si, FrelY you .. /Ga Van Middlesworth Vice President FPL Energy Duane Arnold Enc: Applicants.
Environmental Report -Operating License Renewal Stage Preliminary draft August 2007 APPENDIX D Page D-7 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane Arnold Energy Center.May 1, 2007 NG-07-399 Ms. Cathy Noe Got, Acting-Natural Resource Director Sac and Fox Trbal Offices 349 Meskwaki Rd Tama, IA 52339
Subject:
FPL Energy Duane Arnold, LLC*License Renewal Project -Cultural Resources
Dear Ms. Noe Got,
.This letter is being sent to you to inform you that FPL Energy Duane Arnold, LLC located in Palo, Iowa is preparing an application to the U.S. Nuclear Regulatory Commission (NRC) to renew the operating license of the facility for an additional twenty years.As part of the license renewal process,, we are contacting nearby Native American Tribal officials who may have an interest in the cultural resources at the site. To assist you, we have enclosed a site description and two appropriate site figures.Because neither major replacement activities nor actions are planned during the license.renewal term that will Impact previously undisturbed land, FPL Energy Duane Arnold believes there will be no cultural resource impacts from license renewal activities.
The Duane Arnold facility has a procedure in place to control and monitor excavation activities on previously undisturbed site property should excavation become necessary.
If you have any comments or questions, seek any specific data or desire a presentation to further explain the license renewal process; please contact Herb Giorgio'Environmental Lead, Ucense Renewal Duane Arnold Energy Center 3277 DAEC Rd, Palo, IA 52324 (319) 851.7164 Sincerely yours, Gar Van Middlesworth Vice President FPL Energy Duane Amold, LLC APPENDIX D Page D-8 Duane Arnold Energy Center License Renewal Application Environmental Report Enclosure-:
Duane Arnold Site Description Duane Arnold.Site Boundary Map Duane Arnold Six Mile VicinityMap
- FPL Energy. Duane Arnold LLC is a Delaware ULmited Liability Company, acting for itself and as agent for Central Iowa Power Cooperative.
and Corn Belt Power Cooperative.
APPENDIX D Page D-9 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold. LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane Arnold Energy Center May 1, 2007 NG-07-400 Jonathan Buffalo, Historic Preservation Director Sac and Fox Tribal Offices 349 Meskwaki Rd Tama, IA 52339 Subject FPL Energy Duane Arnold, LLC*ULcense Renewal Project -Cultural Resources
Dear Mr. Buffalo,
This letter is being sent to you to inform you that FPL Energy Duane Arnold, LLC located in Palo, Iowa is preparing an application to the U.S. Nuclear Regulatory Commission,(NRC) to renew the operating license of the facility for an additional twenty years.As part of the license renewal process, we are contacting nearby Native American Tribal officials who may haveanlinterest in the cultural resources at the'site.
To assist you, we 0 have enclosed a site description and two appropriate site figures.Because neither major replacement activities nor actions are planned the license renewal term that will impact previously undisturbed land, FPL Energy Duane Arnold believes there will be no cultural resource impacts from riicense;renewal activities.
The Duane Arnold facility has a procedure in place to control and monitor excavation activities on previously undisturbed site property should excavation become necessary.
If you have any comments or questions, seek any specific data or desire a presentation to further explain the license renewal process, please contact Herb-Giorgio Environmental-Lead, License Renewal Duane Arnold Energy Center 3277 DAEC Rd Palo, IA 52324 (319) 851.7164 Sincerely you Gary Van Middlesworth Vice President FPL Energy Duane Arnold, LLC APPENDIX D Page D-1 0 Duane Arnold Energy Center License Renewal Application Environmental Report
Enclosure:
Duane Arnold Site Description Duane Arnold Site Boundary Map Duane Arnold Six. Mile Vicinity Map*FPL Energy Duane Arnold LLc is a Delaware Limited Liability Company, acting for itself and as agent for Central Iowa Power Cooperative and Corn Belt Power Cooperative.
APPENDIX D Page D-1 1 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane Arnold Energy Center May 1, 2007 NG-07-393 Ms. DeAnne Bahr, Historic Preservation Kansas and Nebraska Sac and Fox Tribal Offices 305 North Maine Reserve, KS 66434 Subject FPL Energy Duane Arnold, LLC*License Renewal Project -Cultural Resources
Dear Ms. Bahr,
This letter is being sent to you to inform you that FPL Energy Duane Arnold, LLC located in Palo, Iowa is preparing an application to the U.S. Nuclear Regulatory Commission (NRC) to renew the operating license of the facility for an additional twenty years.As part of the license renewal process, we are contacting nearby Native American Tribal officials who may have an interest in the cultural resources at the site. To assist you, we have enclosed a site description and two appropriate site figures,.Because neither major replacement activities nor actions are planned during the license renewal term that will impact previously undisturbed land, FPL Energy Duane Arnold believes there will be no cultural resource impacts from license renewal activities.
The Duane Arnold facility has-a procedure in place to control and monitor excavation activities on previously undisturbed site property should excavation become necessary.
If you have any comments or questions, or seek any specific data to further explain the license renewal process, please contact Herb Giorgio Environmental Lead, License Renewal Duane Arnold Energy Center 3277 DAEC Rd Palo, IA 52324 (319) 851.7164 4Sincery yours, G'Van Middlesworth Vice President FPLEnergy Duane Arnold, LLC APPENDIX D Page D-12 Duane Arnold Energy Center License Renewal Application Environmental Report
Enclosure:
Duane Arnold Site Description Duane Arnold Site Boundary Map: Duane Arnold Six Mile Vicinity Map FPL Energy Duane Arnold, LLC is a Delaware.
Umited Liability Company, acting for itself and as agent for Central Iowa Power Cooperative and Corn Belt Power Cooperative.
APPENDIX D Page D-1 3 Duane Arnold Energy Center License Renewal Application Environmental Report Sac and Fox Nation of Missouri in Kansas and Nebraska 305 North Main Street
- Reserve, Kansas 66434 Phone (785) 742-7471 .Fax (785) 742-3785 August 8, 2007 Herb Giorgio Environmental Lead, Ucense Renewal Duane Arnold Energy Center 3277 DAEC Rd Palo IA 52324
Dear Mr. Giorgio:
Thank you for your letter, which is in compliance with Section 106 of the National Historic Preservation Act, and Section 110.Project: FPL Energy Duane Arnold Ucense Renewal: The Sac and Fox Nation of Missouri in Kansas andNebraska NAGPRA department have determined the above project as: No objections.
However, if human skeletal remains and/or any objects failing under NAGPRA are uncovered during construction, please stop immediately and notify NAGPRA representative, Johnathan L.Buffalo, at the address below.There are two other bands of Sac and. Fox that also need to be contacted, the Sac and Fox Nation of Oklahoma and the Sac and Fox of the Mississippi in Iowa.Johnathan Buffalo, NAGPRA Representative Sac and Fox of the Mississippi in Iowa: 349 Meskwakl Rd.Tama, IA 52339-9629 Sandra Massey, NAGPRA Representative Sac and Fox Nation of Oklahoma Rt. 2, Box 246 Stroud, OK 74079 If you have any questions, please contact me at the number or address above.sincerely,.Deanne Bahr Sac and Fox Nation of Missouri In Kansas and Nebraska NAGPRA Contact Representative APPENDIX D Page D-14 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane Arnold Energy Center May 1, 2007 NG-07-398 Ms. Sandra Massie, NAGPRA Coordinator Oklahoma and Nebraska Sac and Fox Tribal Offices RR2 Box 246 Stoud, OK 74079 Subject FPL Energy Duane Arnold, LLC*License Renewal Project -Cultural Resources
Dear Ms. Massie,
This letter is being sent to you to.inform you that FPL Energy Duane Arnold, LLC located in Palo, Iowa is preparingan applicationto the U.S. Nuclear Regulatory Commission (NRC) to renew the operating license of the facility for an additional twenty years.As part of the license renewal process, we are contacting nearby Native American Tribal officials who may have an interest in the cultural resources at the site. To assist you, we have enclosed a site description and two appropriate site.flgures.
Because neither major replacement activities nor actions are planned during the license renewal term that will impact previously undisturbed land, FPL Energy Duane Arnold believes there will be no cultural resource impacts from license renewal activities.
The Duane Arnold facility has a procedure in place to controland monitor excavation activities on previously undisturbed.site property should excavation become necessary.
If you have any comments or questions, or seek any specific data to further explain the license renewal process, please contact Herb Giorgio Environmental Lead, License Renewal.Duane Arnold Energy Center 3277 DAEC Rd Palo. IA 52324 (319) 851.7164 Sincerely yours, a"an M~iddlesworth Vice President FPL Energy Duane Arnold, LLC APPENDIX D Page D-15 Duane Arnold Energy Center License Renewal Application Environmental Report
Enclosure:
Duane Arnold Site Description Duane Arnold Site Boundary Map Duane Arnold Six Mile Vicinity Map*FPL Energy Duane Arnold LLC is a Delaware Limited Liability Company, acting for itself and as agent for Central Iowa Power Cooperative and Cam Belt Power Cooperative.
APPENDIX D Page D-1 6 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane Arnold Energy Center May 1, 2007 NG-07-394 Mr. Pat Murphy, Cultural Coordinator Iowa Tribe of Kansas and Nebraska 206 S. Buckeye Abilene, KS 67410
Subject:
FPL Energy Duane Arnold. LLC*License Renewal Project -Cultural Resources
Dear Mr. Murphy,
This letter is being sent to you to inform you that FPL Energy Duane Arnold, LLC located in Palo, Iowa is preparing an application to the U.S. Nuclear Regulatory Commissionm(NRC) to renew the operating license of the facility for an additional twenty years.As part of the license renewal process, we are contacting nearby Native American Tribal officials who may have an interest in the cultural resources at the site. To assist.you, we have enclosed.a site description and two appropriate site figures., Because neither major replacement activities nor actions are planned during the license renewal term that will impact previously undisturbed land, FPL Energy Duane Arnold believes there will be no cultural resource impacts from license renewal activities.
The Duane Arnold facility has a procedure in place to.control and monitor excavation activities on previously undisturbed site property should excavation become necessary.
' If you have any comments or questions, or seek any specific data to further explain the license renewal process, please contact Herb Giorgio Environmental Lead, License Renewal Duane Arnold Energy Center 3277 DAEC Rd Palo, IA 52324 (319) 851.7164 Sincerely yours, Ganan Middlesworth Vice President FPL Energy Duane Arnold, LLC APPENDIX D Page D-1 7 Duane Arnold Energy Center License Renewal Application Environmental Report Encdosure:
Duane Arnold Site Description Duane Arnold Site Boundary Map Duane Arnold Six Mile Vicinity Map* FPL Energy Duane Arnold LLC is a Delaware Limited Liability Company, acting for itseff and as agent for Central Iowa Power Cooperative and Corn Belt Power Cooperative.
APPENDIX D Page D-1 8 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane Arnold Energy Center May 1, 2007 NG-07-396 Ms. Joyce Miller, Cultural Preservation Specialist Iowa Tribe of Oklahoma RR 1, Box 721 Perkins, OK 74059 Subject FPL Energy DuaneAmold, LLC*License Renewal Project -Cultural Resources
Dear Ms.. Miller,
This letter is being sent to you to inform you that FPL Energy Duane Arnold, LLC located in Palo, Iowa is preparing an application to the U.S. Nuclear Regulatory Commission (NRC) to renew the operating license of the facility for an additional twenty years.As part of the license renewal process, we are contacting nearby Native American Tribal officials who may have an interest in the cultural resources at the site. To assist you, we have enclosed a site description and two appropriate site figures.Because neither major replacement activities nor actions are planned during the license renewal term that will impact.previously undisturbed land, FPL Energy Duane Arnold believes there will be no cultural resource impacts from license renewal activies.
The Duane Arnold facility has a procedure in place to control and monitor excavation activities on previously undisturbed site.property should excavation become necessary.
If you have any comments or questions, or seek any specific data to further explain the license renewal process, please contact Herb Giorgio Environmental Lead, License Renewal Duane Arnold Energy Center 3277 DAEC Rd Palo, IA 52324 (319) 851.7164 Sincerely yours, Ga Va~n Middlesworth Vice President FPL Energy Duane Arnold, LLC APPENDIX D Page D-1 9 Duane Arnold Energy Center License Renewal Application Environmental Report 0
Enclosure:
Duane Arnold Site Description Duane Arnold Site Boundary Map Duane Arnold Six Mile Vicinity Map FPL Energy Duane Arnold LLC is a Delaware Limited Liability Company, acting for itself and as agent for Central Iowa Power Cooperative and Corn Belt Power Cooperative.
APPENDIX D Page D-20 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold; LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane Arnold Energy Center May 1. 2007 NG-07-395 Mr. Sam Allen, Cultural Preservation Officer Nebraska Flandreau Santee Sioux Thbal Office P0 Box 283 Flandreau, SD 57028
Subject:
FPL Energy Duane Arnold, LLC*License Renewal Project -Cultural Resources
Dear Mr. Allen,
This letter is being sent to you-to inform you~that FPL Energy Duane Arnold, LLC located in Palo, Iowa is preparing an application to the U.S. Nuclear Regulatory Commission (NRC)to renew the operatinglicense of the facility for. an additional twenty years.As part of the license renewal process;.we are contacting nearby Native American.Tribal officials who may have an interest in the cultural resources at the site. To assist you, we have enclosed a site. description and two appropriate site figures.Because neither major replacement activities nor actions are planned during the license renewal term that will impact previously undisturbed land, FPL Energy Duane Arnold:.believes there will be no cultural resource impacts. from licenserenewal activities.
The Duane Arnold facility.
has a procedure in place to control and monitor excavation actMties on previously undisturbed site property shouldexcavation become necessary.
If you have any comments or questions, or seek any specific data to further explain the license renewal process, please, contact Herb .Giorgio Environmental Lead, Ucense Renewal Duane Arnold Energy Center 3277 DAEC Rd Palo, IA 52324 (319) 851.7164 Sincerely yours,~an Middlesworth Vi~ President FPL Energy Duane, Arnold, LLC APPENDIX D Page D-21 Duane Arnold Energy Center License Renewal Application Environmental Report
Enclosure:
Duane Arnold Site Description Duane Arnold Site Boundary Map Duane Arnold Six Mile Vicinity Map* FPL Energy Duane Arnold, LLC is a Delaware Limited Liability Company, acting for itself and as agent for Central Iowa Power Cooperative and Corn Belt Power Cooperative.
APPENDIX D Page D-22 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane Arnold Energy Center May 1, 2007 NG-07-401 Mr. Roger Trudell, Tribal Chairman South Dakota Santee Sioux Tribal Office 108 Spirit Lake Avenue-W Niobrara, SD 68760-7219 Subject! FPL Energy Duane Arnold, LLC*License Renewal Project -Cultural Resources
DearMr. Trudell,
This letter is being sent to you to inform you that FPL Energy Duane Arnold, LLC located in Palo, Iowa is preparing an application to the U.S. Nuclear Regulatory Commission (NRC)to renew the operating license of the facility for an additional twenty years.As part of the license renewal process, we are contacting nearby Native American Tribal officials who may have an Interest in the cultural resources at the site. To assist you, we have enclosed a site description and two appropriate site.figures.
Because neither major replacement activities nor actions are planned during the license renewal term that will impact previously undisturbed land, FPL Energy Duane.Amold believes there will be no.cultural resource impacts from license renewal activities.
The Duane Arnold facility has a procedure in place to control and monitor excavation activities on previously undisturbed site.property should excavation become necessary.
If you haveany comments or questions, or seek any specific data to further explain the license renewal process, please contact Herb Giorgio EnvironmentalLead, License Renewal Duane Arnold Energy Center 3277 DAECýRd Palo, IA 52324 (319) 851.7164 Sincly yours, Gar(Van Middlesworth Vice President FPL Energy Duane Arnold, LLC APPENDIX D Page D-23 Duane Arnold Energy Center License Renewal Application Environmental Report 0
Enclosure:
Duane Arnold Site Description Duane Arnold Site Boundary Map Duane Arnold Six Mile Vicinity Map*FPL Energy Duane Arnold LLC is a Delaware Limited Uabillty Company, acting for itself and as agent for Central Iowa Power Cooperative and Corn Belt Power'Cooperative.
APPENDIX D Page D-24 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy, Duane Arnold Energy Center May 1, 2007 NG-07-397 Mr. Richard Goulden, Director of Tribal Energy Development Otoe-missouria Tribal Offices 8151 Highway 177 Red Rock, OK 74651 Subject *FPL Energy Duane Arnold, LLC*License Renewal Project- Cultural Resources
Dear Mr. Goulden,
This letter is being sent to you to inform you that FPL Energy Duane Arnold, LLC located in.Palo, Iowa is preparingan application to the U.S. Nuclear Regulatory Commission (NRC) to renew the operating license of the facility for an additional twenty years.As part of the license renewal process, we are contacting nearby Native American Tribal officials who may have an interest in the cultural.
resources at the site. To assist you, we have enclosed a site description and two appropriate site figures.Because neither major replacement activities nor actions are planned during the license renewal term that will impact previously undisturbed land, FPL Energy Duane Arnold believes there will be no cultural resource impacts from license renewal activities.
The Duane Arnold facility has a procedure in place to control and monitor excavation activities.
on previously undisturbed site property should excavation become necessary.
If you have any comments or questions, or seek any specific datato further explain the license renewal process,.please contact HerbGlorgio.,Environmental Lead, License Renewal Duane Arnold Energy Center 3277 DAEC Rd Palo, IA 52324 (319) 851.7164 Sincerely yours, Van Middlesworth Vice President FPL Energy Duane Arnold, LLC APPENDIX D Page D-25 Duane Arnold Energy Center License Renewal Application Environmental Report
Enclosure:
Duane Arnold Site Description Duane Arnold Site Boundary Map Duane ArnoldSix Mile Vicinity Map*FPL Energy Duane Arnold LLC Is a Delaware Limited Uability Company, acting for Itself and as agent for Central Iowa Power Cooperative and Corn BeltPower Cooperative.
APPENDIX D Page D-26 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, lowa52324 FPL Energy.Duane Arnold Energy Center May 1, 2007 NG-07-392 Mr. Larry Garvin, Director Heritage Preservation Wisconsin Ho-Chunk Cultural Preservation Tribal Office W9814 Airport Road Black River Falls, WI 54615 Subject- FPL Energy Duane Arnold, LLC*License Renewal Project -Cultural Resources
Dear Mr. Garvin,
This letter is being sent to you to inform you that FPL Energy Duane Arnold, LLC located in Palo, Iowa is preparing an application to the U.S. Nuclear Regulatory Commrission.(NRC) to renew the operating license of the facility for an additional twenty years.As part of the license renewal process, we are contacting nearby Native American Tribal officials who may have an interest in the cultural resources at the site. To assist.you, we have endosed a site descrinon and two appropriate site figures.Because neither major replacement activities nor actions are planned during the license renewal term that will impactpreviously undisturbed land, FPL Energy Duane Arnold believes there will be no cultural resource impacts from Ucense. renewal activities.
The Duane Arnold facility has a procedure in place to:control and~monitor excavation activities on previously undisturbed site property should excavation become necessary.
If you have any comments or questions, or seek any specific data to further explain the license renewal process,.please contact Herb Giorgio Environmental Lead, Ucense:Renewal Duane Arnold Energy Center 3277 DAEC Rd Palo, IA 52324 (31.9) 851.7164.4Sinere yours, Ga. an Middlesworth Vice President FPL Energy Duane Arnold, LLC APPENDIX D Page D-27 Duane Arnold Energy Center License Renewal Application Environmental Report 0
Enclosure:
Duane Arnold Site Description Duane Arnold Site Boundary Map Duane Arnold Six Mile Vicinity Map*FPL Energy Duane Arnold LLC is a Delaware Limited Liability Company; acting for itself and as agent for Central Iowa Power Cooperative and Corn Belt Power Cooperative.
APPENDIX D Page D-28 Duane Arnold Energy Center License Renewal Application Environmental Report
Enclosure:
Duane Arnold Site Description Duan Arnold Energy Center Site Description SITE DESCRIPTION The Duane Arnold Energy Center (DAEC) site is located on the western side of a north-south reach of the Cedar River, approximately
2.5 miles
north-northeast of the Village of Palo, Iowa, in Linn County (T-84N, R-8W, Sections 9 and 10). The closest city is Cedar Rapids with its outer boundary being S miles to the southeast.
The site is approximately 500 acres. on a flat strip of land running northeast and parallel to the Cedar River. The distance from the plant stack to the nearest site boundary is approximately 440 m. A paved county highway provides access.to the site.TOPOGRAPHY A relativelyflat plain at approximate elevation 750 ft above mean sea level'(msl) extends~from the site toward the Village of Palo on the southwest, and most of this land is now being farmed.At Palo, the elevation is 747 to 750 ft.Across the river from the site, the land rises from an elevation of 750 ft to an elevation of about 900 ft within a horizontal distance of approximately 2000 ft. These slopes are rather heavily wooded with only an occasional fielder pasture dotting the landscape.
Beyond this rise, the land.is gently rolling farmland.To the northwest, the land rises to an elevation of 850 t Adjacent to the east is another heavily wooded low area that constitutes the current flood plain.This area is very flat and extends approximately 1500 ft to the west bank of the river..The general topographical features in this portion of the Cedar River consist of broad valleys with relatively narrow flood plains. In many places, these broad valleys merge almost imperceptibly into the adjacent uplands. Away from the immediate vicinity of the river, the land is gently rolling farmland.TRANSMISSION LINE CORRIDORS Five transmission-line systems extend westward in a 665-fl corridor from the southwest edge of the plant'site for a distance ofene a.north-south county road. Near thisroad, two 161-kV lines departs and continue Within a corridor oa 100-fl basic width (generally narrower along railroad and public rights-of-way) in a southerly direction.
At the village of Palo, one of these lines follows a railroad right of way southeastly to the Sixth Streetlsubstation in Cedar Rapids The total distance of this line is 11.2 miles. The.other 1161 kv line continies inra southerly direction west of'Cedar Rapids and then eastwardvia Fairfax, to the Bertram substation.
The total distance is 28 miles. The remaining 1617kV line and two 345-kV lines continue in a 500-ft corridor for a distance of 1.7 miles beyond the county road in a westerly direction.
There, one 345 line tunis south to the Hills substation, the other 345 line turns north to the Hazelton substation.
The 161-kV line continues for a distance of.16 miles to the Garrison substation and then an additionial 30 miles to the Washburn substation.
A sixth transmission line leaves the plant site in a generally easterly direction, crosses. the Cedar River, andcontinues fbr a distance of 8 miles to the Hiawatha substation.
APPENDIX D Page D-29 Duane Arnold Energy Center License Renewal Application Environmental Report 0.eISFSl i Training Su pIport Administrative
..Guard Faci 0 Well B WellIA 0 OWell C Roads Legend rl-+---- Railroad I Cedar River L Facilities Area* Wells Duane Arnold Energy Center License Renewal Environmental Report Figure 2.1-3 Site Boundary Map m Wing Dams 0 APPENDIX D Page D-30 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX D Page D-31 APPENDIX D Page D-31 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX D Page D-32 APPENDIX D Page D-32 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX E PUBLIC HEALTH AGENCY CORRESPONDENCE Table of Contents Letter Paqe Gary Van Middlesworth (FPL Energy Duane Arnold, LLC) to Mary E-2 Mincer Hansen RN PhD (Iowa Department of Public Health)Ken Sharp (Iowa Department of Public Health) to Gary Van E-8 Middlesworth (FPL Energy Duane Arnold, LLC)APPENDIX E Page E-1 Duane Arnold Energy Center License Renewal Application Environmental Report FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane Arnold Energy Center April 13, 2007 NG-07-0231 Mary Mincer Hansen RN PhD, Director Iowa Department of Public Health 321 E. 12th Street Des Moines, Iowa 50319-0075 Subject FPL Energy Duane Arnold, LLC*License Renewal Project NRC Informal Consultation Preparation
Dear Dr. Mincer Hansen:
FPL Energy Duane Arnold, LLC is preparing an application to the U.S. Nuclear Regulatory Commission (NRC) to renew the operating license of the facility for an additional twenty years. We intend the application to be consistent with your agencies' interests and the priorities of our community.
Although Duane Arnold's current operating license does not expire until February 2014, the NRC's rigorous license renewal process and other regulatory reviews make it prudent for us to submit this application for license renewal to the NRC in late 2008.As a part of the license renewal process, the Nuclear Regulatory Commission (NRC)requires that applicants identify impacts to public health resulting from the continued operation of the plant and cooling towers. Potential impacts may include: microorganisms associated with cooling tower and thermal discharges, and radiological health. This assessment, which will be contained in the Environmental Report submitted as part of the application, will address specific environmental issues related to the continued operation of.the Station during the license renewal period. Following our submission of the application, the NRC will request an informal consultation with your office with respect to the matters referenced in this letter.It is our intent that, by contacting you at this point in the process, we can identify any deficiencies, concerns, or data needed so that those areas identified can be addressed to assure that the consultation process proceeds smoothly and efficiently.
Based on our preliminary assessment, the continued operation of Duane Arnold during the license renewal period would not be expected to adversely affect the environment within the vicinity of the station. FPL Energy Duane Arnold currently has no plans to alter operations over the license renewal period and any maintenance activities necessary to support license renewal would be limited to previously disturbed areas on-site. Finally, no expansion of existing facilities is planned and no additional land disturbance is anticipated in support of license renewal.APPENDIX E Page E-2 APPENDIX E Page E-2 Duane Arnold Energy Center License Renewal Application Environmental Report After your review, we would appreciate a letter affirming FPL Energy Duane Arnold's conclusion.
To assist you in responding to this request, I have enclosed a site description and figures depicting the site and near vicinity.If you have any comments or questions, seek any specific data or desire a presentation to further explain the license renewal process, please contact Herb Giorgio 3277 DAEC Rd Palo IA 52324 HerbGiorgio@fpl.com (319) 851.7264.Sincerely yours, Gary Van Middlesworth Vice President FPL Energy Duane Arnold, LLC
Enclosures:
Duane Arnold Site Description Duane Arnold Site Boundary Map Duane Arnold 6 Mile Vicinity Map Duane Arnold Transmission System* FPL Energy Duane Arnold LLC is a Delaware Limited Liability Company, acting for itself and as agent for Central Iowa Power Cooperative and Corn Belt Power Cooperative.
APPENDIX F Page E-3 APPENDIX E Page E-3 Duane Arnold Energy Center License Renewal Application Environmental Report Duane Arnold Site Description SITE DESCRIPTION The Duane Arnold Energy Center (DAEC) site is located on the western side of a north-south reach of the Cedar River, approximately
2.5 miles
north-northeast of the Village of Palo, Iowa, in Linn County (T-84N, R-8W, Sections 9 and 10). The closest city is Cedar Rapids with its outer boundary being 8 miles to the southeast.
The site is approximately 500 acres on a flat strip of land running northeast and parallel to the Cedar River. The distance from the plant stack to the nearest site boundary is approximately 440 m. A paved county highway provides access to the site.TOPOGRAPHY A relatively flat plain at approximate elevation 750 ft above mean sea level (msl) extends from the site toward the Village of Palo on the southwest, and most of this land is now being farmed. At Palo, the elevation is 747 to 750 ft.Across the river from the site, the land rises from an elevation of 750 ft to an elevation of about 900 ft within a horizontal distance of approximately 2000 ft. These slopes are rather heavily wooded with only an occasional field or pasture dotting the landscape.
Beyond this rise, the land is gently rolling farmland.To the northwest, the land rises to an elevation of 850 ft.Adjacent to the east is another heavily wooded low area that constitutes the current flood plain. This area is very flat and extends approximately 1500 ft to the west bank of the river.The general topographical features in this portion of the Cedar River consist of broad valleys with relatively narrow flood plains. In many places, these broad valleys merge almost imperceptibly into the adjacent uplands. Away from the immediate vicinity of the river, the land is gently rolling farmland.TRANSMISSION LINE CORRIDORS Five transmission-line systems extend westward in a 665-ft corridor from the southwest edge of the plant site for a distance of one mile to a north-south county road. Near this road, two 161-kV lines depart and continue within a corridor of 100-ft basic width (generally narrower along railroad and public rights-of-way) in a southerly direction.
At the village of Palo, one of these lines follows a railroad right of way southeasterly to the Sixth Street substation in Cedar Rapids. The total distance of this line is 11.2 miles.The other 161 kV line continues in a southerly direction west of Cedar Rapids and then eastward, via Fairfax, to the Bertram substation.
The total distance is 28 miles. The remaining 161 -kV line and two 345-kV lines continue in a 500-ft corridor for a distance of 1.7 miles beyond the county road in a westerly direction.
There, one 345 line turns south to the Hills substation, the other 345 line turns north to the Hazelton substation.
The 161-ky line continues for a distance of 16 miles to the Garrison substation and then an additional 30 miles to the Washburn substation.
A sixth transmission line leaves the plant site in a generally easterly direction, crosses the Cedar River, and continues for a distance of 8 miles to the Hiawatha substation.
APPENDIX E Page E-4 APPENDIX E Page E-4 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX E Page E-5 Duane Arnold Energy Center License Renewal Application Environmental Report N E28 Linn E34 oor r 0 APPENDIX E Page E-6 APPENDIX E Page E-6 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX E Page E-7 Duane Arnold Energy Center License Renewal Application Environmental Report Iowa Department of Public Health Advancing Health Through the Generations Chester J. Culver Patty Judge Thomas Newton, MPP, REHS Governor Lt. Governor Director November 1, 2007 Gary Van Middlesworth Vice President FPL Energy Duane Arnold 3277 DAEC Road Palo, IA 52324
Dear Mr. Van Middlesworth:
We have reviewed the "Environmental Report, Preliminary Draft, August 2007," an enclosure to your letter, dated October 2, 2007, to Tom Newton, Director, Iowa Department of Public Health. In that letter you requested that we review the draft report and affirm via letter whether we agree with FPL Energy Duane Arnold's conclusions.
We agree, provided that no substantive changes are made to the draft document, the "operation of the Station or use of the cooling towers" does not negatively impact public health.If you have any questions, please contact Melanie Rasmusson (515-281-3478) or me.Sincerely, Ken Sharp, Division Director Environmental Health Division Iowa Dept of Public Health (515) 281-5099 Lucas State Office Building, 321 E. 12th Street, Des Moines, IA 50319-0075 W 515-281-7689 N www.idph.state.ia.us DEAF RELAY (Hearing or Speech Impaired) 711 or 1-800-735-2942 APPENDIX E Page E-8 Duane Arnold Energy Center License Renewal Application Environmental Report APPENDIX F SAMA ANALYSIS APPENDIX F Page F-i APPENDIX F Page F-1 Duane Arnold Energy Center License Renewal Application Environmental Report EXECUTIVE
SUMMARY
This report provides an analysis of the Severe Accident Mitigation Alternatives (SAMAs)that were identified for consideration by the Duane Arnold Energy Center (DAEC). This analysis was conducted on a cost/benefit basis. The benefit results are contained in Section 4 of this report. Candidate SAMAs that do not have benefit evaluations have been eliminated from further consideration for any of the following reasons: " The cost is considered excessive compared with benefits.* The improvement is not applicable to DAEC." The improvement has already been implemented or the intent of the improvement is met for DAEC.After eliminating a portion of the SAMAs for the preceding reasons, the remaining SAMAs were evaluated from a cost-benefit perspective.
In general, the SAMAs were examined using a bounding analysis approach to determine whether the expected cost would exceed a conservative approximation of the actual expected benefit. In most cases, therefore, a detailed risk evaluation in which a specific modification/procedure change is evaluated would indicate a smaller benefit than calculated in this evaluation.
Major insights from this benefit evaluation process included the following:
- If all core damage risk is eliminated, then the benefit in dollars over 20 years is$2,261,022." The largest contributors to the total benefit estimate are from offsite costs.* A large number of SAMAs had already been addressed by existing plant features, modifications to improve the plant, existing procedures, or procedure changes to enhance human performance.
The following SAMAs were identified as potentially cost beneficial.
DAEC Potential Improvement Discussion SAMA Number 156 Provide an alternate source of water for the RHRSW/ESW Decrease the contribution to risk due to failure of the RWS pit. system.166 Increase the reliability of the low pressure ECCS RPV low Decreased risk due to failures of the low pressure ECCS systems.pressure permissive circuitry.
Install manual bypass of low (High PRA importance list.)pressure permissive.
II APPENDIX F Page F-2 Duane Arnold Energy Center License Renewal Application Environmental Report.TABLE OF CONTENTS SECTION PAGE APPENDIX F SAMA ANALYSIS ...................................................
... ......................
1 EXECUTIVE
SUMMARY
...... ...............
I .......................
2 ACRONYMS AND ABBREVIATIONS
........................................................................
5 1 INTRODUCTION
.................................................
7 1.1 PURPOSE .......................
- ...............
.................
7 1.2 R E Q U IR E M E N T S ............................................................................................
..7 2 M E T H O D ........................
- ..............................................................................................
7 3 SEV ER E A C C ID ENT R ISK .....................................................................................
9 3.1 LEV EL 1 PRA M O D EL .....................................................................................
10 3 .1.1 Inte rna l E ve nts ........................................................................................
..10 3.1.2 External Events ...........................................
15 3.2 LEV EL 2 PRA M O D EL .................................................................................
22 3.2.1 Description of Level 2 PRA Model .............................................................
22 3.2.2 Level 2 PRA Model Changes Since IPE Submittal
....................
..... 25 3.3 M O DEL REV IEW SUM M A RY ............................................
.1 .................................
25 3.4 LEV E L 3 P RA M O D E L ........................................................................................
29 3.4.1 Population D istribution
.... .........................................................................
29 3.4.2 Economic Data ...........................................
29 3.4 .3 N uclide R elease ......................................................................................
30 3.4.4 Emergency Response .........................
....................
33 3.4.5 M eteorological D ata ................................................................................
34 3.5 SEVEREACCIDENT RISK RESULTS ...........................................................
35 4 COST OF SEVERE ACCIDENT RISK / MAXIMUM BENEFIT ...............................
35 4.1 OFF-SITE EXPOSURE COST ......................
...................................................
37 4.2 OFF-SITE ECONOM IC COST ......................................................................
37 4.3 ON-SITE'EXPOSURE COST .......................................
38 4.4 O N-SITE ECO NO M IC COST ..........................................................................
40 4.5 TOTAL COST OF SEVERE ACCIDENT RISK / MAXIMUM BENEFIT ............
42 5 S A M A ID E N T IFIC A T IO N ........................................................
.4 .................................
43 5.1 PRA IM PO RTA N C E .......................................................................................
43 5 .2 P LA N T IP E ...... * ............................................
...............................................
..4 6 5 .3 P LA N T IP E E E ............................................
...................................................
..4 6 5.4 INDUSTRY SAMA CANDIDATES
..................................................................
46 5.5 LIST OF PHASE I SAMA CANDIDATES
..........................................................
46 6 PHASE I ANALYSIS ..............................................
63 7 PHASE II SAMA ANALYSIS .................................................................................
83 7.1 SAMA BENEFIT ....... ......................................
83 7.1.1 Severe Accident'Risk With SAMA Implemented
....................
83 7.1.2 Cost of Severe Accident Risk with SAMA Implemented
...........
84 7.1.3 SAMA Benefit ............................................
84 7.2 COST OF SAMA IMPLEMENTATION
.............................................................
84 APPENDIX F Page F-3 Duane Arnold Energy Center License Renewal Application Environmental Report 8 SENSITIV ITY A NA LY SES ...................................................................................
91 8.1 PLA NT M O D IFICATIO NS ..............................................................................
91 8.2 U N C E R TA IN TY ..............................................................................................
91 8:3 PEER REVIEW FACTS/OBSERVATIONS
......................................................
91 8.4 LEVEL 3 SENSITIVITIES
...........................................
91 8.5 DISCOUNT RATE ................................................
92 8.6 A N A LY S IS P E R IO D .............................................
t ..............................................
92 9 CONCLUSIONS
...........
- .................................
............
97 10 R E FE R E N C E S ..................................................................................................
..98 APPENDIX F Page F-4 Duane Arnold Energy Center License Renewal Application Environmental Report.ACRONYMS AND ABBREVIATIONS ADS AOV ATWS CDF CRD DAEC ED EDG EOP EPZ FIVE FHA GSW HCLPF HEP HPCI LPCI IORV ISLOCA IPE IPEEE LERF LOCA LOOP MCC MOV MSIV NEI NUMARC PRA RCIC RBCCW RHR RHRSW RPV RRW Automatic Depressurization System Air Operated Valve Anticipated Transient Without Scram Core Damage Frequency Control Rod Drive Duane Arnold Energy Center Emergency Depressurization Emergency Diesel Generator Emergency Operating Procedure Emergency Planning Zone Fire-Induced Vulnerability Evaluation Fire Hazard Analysis General Service Water High Confidence Low Probability Of Failure Human Error Probabilities High Pressure Coolant Injection Low Pressure Coolant Injection Inadvertent Open Relief Valve Interfacing System loss of Coolant Accident Individual Plant Examination Individual Plant Examination For External Events Large Early Release Frequency Loss Of Coolant Accident Loss Of Off-Site Power Motor Control Center Motor Operated Valve Main Steam Isolation Valve Nuclear Energy Institute National Water Quality Assessment Probabilistic Risk Assessment Reactor Core Isolation Cooling Reactor Building Closed Cooling Water Residual Heat Removal Residual Heat Removal Service Water Reactor Pressure Vessel Risk Reduction Worth APPENDIX F Page F-5 APPENDIX F Page F-5 Duane Arnold Energy Center License Renewal Application Environmental Report ACRONYMS AND ABBREVIATIONS (CONTINUED)
RWCU Reactor Water Cleanup SAMA Severe Accident Mitigation Alternatives SBDG Standby Diesel Generators SBLC Standby Liquid Control SBO Station Blackout SQUG Seismic Qualification Utility Group SMA Seismic Margins Assessment SORV Stuck Open Relief Valve SSEL Seismic Safe Shutdown Equipment List TAF Top of Active Fuel VDC Volts DC APPENDIX F Page F-6 APPENDIX F Page F-6 Duane Arnold Energy Center License Renewal Application Environmental Report 1 INTRODUCTION
1.1 PURPOSE
The purpose of the analysis is to identify SAMA candidates at DAEC that have the potential to reduce severe accident risk and to determine whether implementation of the individual SAMA candidate would be cost beneficial.
NRC license renewal environmental regulations require SAMA evaluation.
1.2 REQUIREMENTS
- 10 CFR 51.53(c)(3)(ii)(L) o The environmental report must contain a consideration of alternatives to mitigate severe accidents
"...if the staff has not previously considered severe accident mitigation.
alternatives for the applicant's plant in an environmental impact statement or related supplement or in an environment assessment..."* 10 CFR 51, Subpart A, Appendix B, Table B-i, Issue 76 o "...The probability weighted consequences of atmospheric releases, fallout onto open bodies of water, releases to ground water, and societal and economic impacts from severe accidents are small for all plants.However, alternatives to mitigate severe accidents must be considered for all plants that have not considered such alternatives...." 2 METHOD The SAMA analysis approach applied in the DAEC assessment consists of the following steps.* Determine Severe Accident Risk Level I and 2 Probabilistic Risk Assessment (PRA) Model The DAEC PRA (FPL 2007b) model (Section 3.1 -3.2) was used as input to the DAEC Level 3 PRA analysis (Section 3.4).The Level 1 PRA results include the risk from internal and external events. The external hazards evaluated in the PRA are internal fires and seismic events only; this evaluation was done for the IPEEE program. High winds and tornadoes, external floods, and transportation and nearby facility accidents are not included in the results since they were screened from the IPEEE submittal because their individual CDF fell below the cutoff criteria of 1.OE-06 per year. The external events are not propagated through the Level 2 analysis.APPENDIX F Page F-7 Duane Arnold Energy Center License Renewal Application Environmental Report Level 3 PRA Analysis The Level 1 and 2 PRA output and site-specific meteorology, demographic, land use, and emergency response data was used as input for the DAEC Level 3 PRA (Section 3). This combined model was used to estimate the severe accident risk, i.e., off-site dose and economic impacts of a severe accident.* Determine Cost of Severe Accident Risk / Maximum Benefit The NRC regulatory analysis techniques to estimate the cost of severe accident risk were used throughout this analysis.
These techniques were used to estimate the maximum benefit that a SAMA could achieve if it eliminated all risk, i.e., the maximum benefit (Section 4).0 SAMA Identification In this step potential SAMA candidates (plant enhancements that reduce the likelihood of core damage and/or reduce releases from containment) were identified by DAEC plant staff, from the PRA model, Individual Plant Examination (IPE), IPE -External Events (IPEEE) recommendations, and industry documentation (Section 5). This process included consideration of the PRA importance analysis because SAMA candidates are not likely to prove cost-beneficial if they only mitigate the consequences of events that present a low risk to the plant.* Preliminary Screening (Phase I SAMA Analysis)Because many of the SAMA candidates identified in the previous step are from the industry, it was necessary to screen out SAMA candidates that were not applicable to the DAEC design, candidates that had already been implemented or whose benefits have been achieved at the plant using other means, and candidates whose first level cost estimate exceeded the maximum benefit. Additionally, PRA insights (specifically, importance measures) were used directly to screen SAMA candidates that did not address significant contributors to (Section 6).* Final Screening (Phase II SAMA Analysis)The benefit of severe accident risk reduction was estimated for each of the remaining SAMA candidates and compared to an implementation cost estimate to determine net cost-benefit (Section 7). The benefit associated with each SAMA was determined by the reduction in severe accident risk from the baseline derived by modifying the plant model to represent the plant after implementing the candidate.
In general, the modeling approach used was a bounding approach to first determine a bounding value of the benefit. If this benefit was determined to be smaller than the expected cost, no further modeling detail was conducted.
If the benefit was found to be greater than the estimated cost, the modeling was refined to remove conservatism and a more accurate benefit was determined for comparison with the estimated cost.APPENDIX F Page F-8 Duane Arnold Energy Center License Renewal Application Environmental Report Similarly, the initial cost estimate used in this analysis was obtained from an Expert Panel consisting of plant staff familiar with design, construction, operation, training and maintenance.
All costs associated with a SAMA were considered, including design, engineering, safety analysis, installation, and long-term maintenance, calibrations, training, etc. If, after removing the conservatism in the benefit calculation, the estimated cost and benefit were still close, then the cost estimate was reviewed by a member of Design Engineering to assure it was sufficiently accurate to justify further consideration of the SAMA via the Corrective Actions Request process.* Sensitivity Analysis The next step in the SAMA analysis process involved evaluating the impact of changes in SAMA analysis assumptions and uncertainties in the cost-benefit analysis (Section 8)., Identify Conclusions The final step involved summarizing the results and conclusions (Section 9).3 SEVERE ACCIDENT RISK The DAEC PRA models describe the results of the first two levels of the PRA for the plant. Level 1 determines CDFs based on system analyses and human reliability assessments; while Level 2 evaluates the impact of severe accident phenomena on radiological releases and quantifies the condition on the containment and the characteristics of the release of fission products to the environment.
The DAEC models use PRA techniques to:* Develop an understanding of severe accident behaviors,* Understand the most likely severe accident consequences," Gain a quantitative understanding of the overall probabilities of core damage and fission product releases, and* Evaluate hardware and procedure changes to assess the overall probabilities of core damage and fission product releases.The DAEC PRA program was initiated in response to Generic Letter 88-20 (NRC 1988), which resulted in the DAEC Independent Plant Examination (IPE) (IELP 1992) and IPE for External Events (IPEEE) (IES 1995) analyses.
DAEC has a Level 1 Internal Events PRA model, a Level 2 Internal Events model and a Level 1 External Events model.Internal flooding is considered in the Level 1 and Level 2 models. Fire and Seismic initiated events are considered external events. Potential impact from other external events, such as high winds and tornadoes, external floods, and offsite facilities were determined to be non-risk significant in the Individual Plant Examination for External Events.APPENDIX F Page F-9 Duane Arnold Energy Center License Renewal Application Environmental Report The PRA models used to calculate severe accident risk are described in this section.The Level 1 PRA model (internal and external), the Level 2 PRA model, the PRA model review history, and the consolidated Level 3 PRA model are described in Section 3.1, 3.2, 3.3 and 3.4 respectively.
All results are based on sequence by sequence runs using PRAQuant (EPRI 2005).3.1 LEVEL I PRA MODEL The Level 1 PRA model used for the SAMA analysis was Revision 5C. As part of the DAEC design process, plant modifications are screened for impact on the PRA. If necessary, the PRA model is upgraded to include the plant modification.
This screening process identified no modifications which would affect the results of the SAMA study.Thus, no changes were made to the current Level 1 PRA model to accommodate the SAMA analysis.3.1.1 Internal Events 3.1.1.1 Description of Level 1 Internal Events PRA Model The Level 1 Internal Events PRA model uses the PRAQuant batch processor and the FORTE quantification engine to quantify individual accident sequences.
In the case of the Level 1 PRA, the ONE4ALL utility code was used to also develop a single-top model. These are all members of the EPRI R&R Workstation suite of PRA codes.The total internal events CDF for DAEC is calculated to be 1.08E-05 per year using the single top model and a truncation limit of 1 E-1 1. The top six initiating events based on the Fussell-Vesely importance measure are: 1. Loss of Offsite Power (37%)2. Turbine Trip with Bypass (15%)3. MSIV Closure (13%)4. Inadvertent Open Relief Valve (11%)5. Loss of Condenser Vacuum (6%)6. Loss of Div 2 125 Volt DC Power (3%)Anticipated Transient Without Scram (ATWS) is not treated as an initiating event in the DAEC PRA model. Rather, it is treated as a potential consequence of other initiating events. ATWS accident sequences account for 29% of the total internal events CDF.The top 10 risk significant systems based on the Fussell-Vesely importance measure are: 1. Normal AC Power 2. Emergency AC Power 3. CRD Hydraulic
/ RPS 4. 125 Volt DC Power APPENDIX F Page F-10 Duane Arnold Energy Center License Renewal Application Environmental Report 5. Standby Liquid Control 6. Reactor Core Isolation Cooling 7. River Water Supply 8. High Pressure Coolant Injection 9. Residual Heat Removal'10. RHR Service Water The top 10 risk significant operator actions based on the Fussell-Vesely importance measure are:'1. Operator Fails to Inject SBLC Early (Within 4 Minutes).2. Operator Fails to Bypass MSIV, Isolation Interlocks (ATWS)..3. Operator Fails to Vent Containment Per EOPs 4. Operator Fails to Prevent Overfilling RPV 5. Operator Fails to Recover Torus Cooling 6. Operator Fails to Lower, RPV Level to TAF for ATWS Pwr Cntrl 7. Operator Fails to Inhibit ADS (ATWS with High Press Inj)8. Operator Fails to RestoreRPV Level Post ED (ATWS)9. Operator Fails to Recover Main Condenser 10. Operator Fails to Manually Initiate ADS (Non-Med LOCA)Table 3.1.1.1-1 providesthe list of PRA contributors that are most important from the perspective of risk reduction.
This table includes all those contributors having a risk reduction worth of 1.005 or greater.APPENDIX F Page F-lI APPENDIX F Page F-1 1 Duane Arnold Energy Center License Renewal Application Environmental Report Table 3.1.1.1-1 Dominant Contributors to Risk Reduction Contributor RRW Description B-OPSLCE---U 1.099 Operator Fails to Inject SBLC Early (Within 4 Minutes)FTPE-Q4--Q4-1.059 Operator Fails to Bypass MSIV Isolation Interlocks (ATWS)PD11947 1.053 This represents failure of the RHRSW Loop 'B HX Diff Press Indicator V-OPTORVENTU 1.053 Operator Fails to Vent Containment Per EOPs FTPE-L---L--
1.053 Operator Fails to Prevent Overfilling RPV L2OPNOREC--U 1.049 Operator Fails to Recover Torus Cooling FTPE-L1--L1-1.042 Operator Fails to Lower RPV Level to TAF for ATWS Pwr Cntrl E/P4914 1.033 Control Air Supply E/P converter for CV4914 CB8490 1.033 This term represents failure of Switchyard Control Breaker "M".SAMAs 11, 14, 15, 17, 20, 24, and 26 evaluate improvements in the AC power system that would reduce the risk of loss of power to/from the switchyard.
FTPE-X---X--
1.031 Operator Fails to Inhibit ADS (ATWS with High Press Inj)FTPE-L2--L2-1.030 Operator Fails to Restore RPV Level Post ED (ATWS)C-OPNOREP--U 1.029 Operator Fails to Recover Main Condenser 1G031 1.029 This represents failure of the Div 1 Standby Diesel Generator.
SAMAs 11, 14, 15, 17, 20, 24, and 26 evaluate improvements in the AC power system that would reduce the risk of loss of power to/from the switchyard.
E/P4915 1.028 Control Air Supply E/P converter for CV4915 1 G021 1.028 This represents failure of the Div 2 Standby Diesel Generator.
SAMAs 11, 14, 15,17, 20, 24, and 26 evaluate improvements in the AC power system that would reduce the risk of loss of power to/from the switchyard.
1P216 1.025 This represents failure of the HPCI Pump/Turbine.
SAMAs 27, 28, 29, 31, 33, 34 evaluate improvements that would reduce the risk of high pressure injection failures.O-OPMANDEP-U 1.023 Operator Fails to Manually Initiate ADS (Non-Med LOCA)FTPE-LA--LA-1.023 Operator Fails to Prevent Overfilling RPV FTPE-TR--TR-1.018 Operator Fails to Bypass HPCI/RCIC Low RPV Press Trip L-OPCHRTRNSY 1.017 Operator Fails to Follow EOPs for Cont. Ht. Removal V-OPVENTTRNY 1.017 Operator Fails to Vent Torus (Transients/LOCA)
C-OPCDO3---U 1.017 Operator Fails to Open an MSIV and/or Bypass Valve B-OPSLCLAT3U 1.016 Operator Fails to Inject SBLC Early (Within 14 Minutes)PS4529 1.016 RPV Low Pressure Permissive for LPCI/CS PS4545 1.016 RPV Low Pressure Permissive for LPCI/CS FTPE-Q3--Q3-1.014 Operator Fails to Bypass MSIV Isolation Interlocks (ATWS)1A311 1.013 This represents failure of the SBDG 1G031 to Bus 1A3 Circuit Breaker. SAMAs 11, 14, 15, 17, 20, 24, and 26 evaluate improvements in the AC power system that would reduce the risk of loss of power to/from the switchyard.
SAMA 23 evaluates the risk due to breaker failures.1A411 1.013 Failure of the SBDG 1G021 to Bus 1A4 Circuit Breaker. SAMAs 11, 14, 15,17, 20, 24, and 26 evaluate improvements in the AC power system that would reduce the risk of loss of power to/from the switchyard.
SAMA 23 evaluates the risk due to breaker failures.APPENDIX F Page F-12 Duane Arnold Energy Center License Renewal Application Environmental Report Table 3.1.1.1-1 Dominant Contributors to Risk Reduction (Cont.)Contributor RRW Description C-OPALTINJ-U 1.013 Operator Fails to Initiate Condensate for Alt Inj W-OPWS04---U 1.013 Operator Fails to Open CV4914 W-OPWS02---U 1.012 Operator Fails to Open CV4915 FTPE-XA-XA-1.012 Operator Fails to Inhibit ADS (ATWS with No High Press Inj)I-OPLRESPERX 1.011 Miscalibration of Low Press Permiss Instrumentation H-OP14 ----- U 1.011 Operator Fails to Shutoff HPCI or RCIC 1T218 1.011 Failure of the SBLC Storage Tank. SAMAs 118, 119 evaluate alternate means of boron injection in ATWS.1 P226 1.010 Failure of the RCIC Turbine/Pump.
SAMAs 27; 28, 29, 31, 33, 34 evaluate improvements that would reduce the risk of high pressure injection failures.PS4530 1.010 RPV Low Pressure Permissive for LPCI/CS PS4548 1.010 RPV Low Pressure Permissive for LPCI/CS Q-OPLEVEL-TT 1.009 Operator Fails to Cntrl Rx Level Following Scram Z-OPWELLWTRU, 1.009 Operator.
Fails to Maximize Well Water to Circ Pit FTPE-XI--X1-1.008 Operator Fails to Manually Depressurize RPV (ATWS)L-OPCHRATWSY 1.008 Operator Fails to Follow EOPs for Cont. Ht. Removal Q-OPFW99--LU 1.008 Operator Fails to Initiate Feedwater (Large LOCA/ATWS)
P-OPBCREC--Y 1.007 Operator Fails to Recover Battery Charger O-OPMNDPML-U 1.006 Operator.Fails to Manually Initiate ADS (Medium LOCA)U-OP2NOREPRS 1.006 Operator Fails to Repressurize RPV for HPCI W-OPFFWS03--
1.005 'Operator Fails to Open CV491OB W-OPFFWS04--
1.005 Operator Fails to Open CV4910A G-OPLOCSTRTU 1.005 Operator Fails to Close Breaker to Start GSW Pump HS4914 1.005 Failure of the RWS Loop 'B' Makeup Hand Switch PD12046 1.005 Failure of the RHRSW Loop 'A' HX Diff Press Indicator APPENDIX F Page F-13 Duane Arnold Energy Center License Renewal Application Environmental Report 3.1.1.2 Level I PRA Model Changes since IPE Submittal The major Level 1 changes incorporated into the updated DAEC model since the 1992 IPE Submittal are described as follows: Revisions 3 (aka 3A) and 3B, April and October 1995, respectively" Incorporation of Design and Procedural changes since the IPE freeze date through January 1994," Inclusion of control building flood event trees," Revision to HPCI/RCIC battery life estimates," Reclassification of DAEC offsite power independence group from Li to L2,* Re-evaluation of the LOOP initiator,* Incorporation of the Manual Shutdown event tree," Incorporation of the LOCA Outside of Containment event tree," Revision of the RPV water level and pressure instrumentation to reflect the correct mission time for transmitters failure probabilities,* Incorporation of changes resulting from the PSA QA program," Addition of house events and flag settings to facilitate batch file capability and automation of fault tree quantification,* Modification of fault tree and event tree culling limits to reduce quantification of less significant cut sets," Incorporation of a revised control building HVAC assessment," Incorporation of sole dependence of DC power on 125 VDC batteries given a LOOP or LOCA initiator," Modification of success criteria for SORV cases,* Addition of maintenance basic events.Revision 4 (aka 4A), March 1998* Essential Switchgear rooms' ventilation requirement relaxed,* ADS Suppression added as a means for vapor suppression,* Allowance for failure of DHR upon success of HPCI / RCIC in small LOCA event tree sequences," Addition of credit for River Water Supply Recovery," Sequences for Loss of Offsite Power events with subsequent failure to re-close SRVs categorized as LOOP to IORV," Added Credit for Drywell Venting,* Revision of event trees for Human Error Probabilities or Containment heat removal," Added credit for procedures dealing with total loss of 125VDC," Incorporated.
initiating event frequencies for transients and manual shutdown,* Addition of Several Maintenance Unavailability Terms," Inclusion of modification to the Well Water System Design," Inclusion of Common Cause Failure for SRVs, APPENDIX F Page F-14 Duane Arnold Energy Center License Renewal Application Environmental Report" Updated maintenance unavailability rates from the Maintenance Rule database," Added an explicit model of the important transformers, control breakers, and power source lines.Revision 4B, March 1998* Conversion from REBECA to CAFTA.Revision 5 (aka 5A), October 2003" Updated several Human Error Probabilities (HEPs) as a result of the plant's power uprate," Numerous basic event nomenclature and failure probability changes were made in order to make the failure rates more traceable and make the nomenclature more self-consistent,* Loss of offsite power initiator frequency was updated to reflect plant operating experience since the last PRA update,* Added a fault tree for the instrument air system," Modification to the modeling of the CV4909 River Water radwaste dilution isolation valve," Incorporated changes with smaller impacts on CDF as a result of BWROGPSA Certification team comments.*Revision 5B, February 2005" ESW/RHRSW pumphouse ventilation dependency added to ESW fault tree,* Explicit fault tree modeling of Recirculation Pump Trip failure rather than a single point estimate value,* Basic event nomenclature and failure probability changes were made,* Loss of offsite power initiator frequency was updated to be consistent with the plant station blackout (SBO) analysis.Revision 5C, July 2007* Eliminated the use of quantification flag setting from the Base Rev 5B Level 1 internal events model to correct a quantification error.Since the 1992 IPE Submittal, the CDF has changed in the following manner: Changes in Internal CDF / Year Since 1992 IPE Submittal 1992 IPE Rev 3A Rev 3B Rev 4A Rev 4B Rev 5A Rev 5B Rev 5C Submittal (3/95) (8/95) (3/98) (12/01) (10/03) (2/05) (7/07)Total 7.84E-06 3.30E-05 1.50E-05 1.11E-05 1.19E-05 1.02E-05 1.07E-05 1.09E-05 LOOP 2.93E-06 2.53E-05 7.27E-06 5.90E-06 6.37E-06 3.71E-06 3.75E-06 3.82E-06 ATWS 1.91E-06 3.30E-06 3.30E-06 2.02E-06 1.97E-06 3.11E-06 3.15E-06 3.15E-06 3.1.2 External Events The current DAEC External Events PRA explicitly models internal fire and seismic initiated core damage accidents.
These models are based on the original DAEC IPEEE APPENDIX F ,: .Page F-15 Duane Arnold Energy Center License Renewal Application Environmental Report (Individual Plant Examination of External Events) Submittal which showed fire and seismic events to be the most significant external hazards with respect to calculated CDF.The fire and seismic accident sequence logic was incorporated into the internal events PRA system fault tree logic.The External Events PRA CDFs (based on PRAQuant sequence results) are as follows:-.Total External Events CDF: 3.74E-06/yr
- Internal Fires 3.04E-06/yr
-Seismic 6.99E-07/yr Prior to 1997, the risks associated with external events were assessed on a room by room basis. No comprehensive CDF was developed.
In 1997 DAEC created a living External Events Model which includes the calculation of an overall CDF for external events. The CDF for external events is re-calculated following a major revision (e.g., from version 4 to 5) or minor revision (e.g., 5A to 5B) to the Level 1 internal events PRA.Starting in December of 2001, the External Events CDF was calculated at the same time as the Internal Events CDF. The changes in the External Events CDF are as follows: Changes in External Events CDF / Year Since 1997 Model Development Corresponding Level 1 Rev 3B Rev 4A Rev 4B Rev 5A Rev 5B Rev 5C Revision External Events Revision Feb-97 Jun-99 Dec-01 Oct-03 Feb-05 Jul-07 Date Total 3.85E-06 3.68E-06 3.82E-06 3.83E-06 3.74E-06 3.74E-06 Fire 2.81E-06 2.98E-06 3.12E-06 3.13E-06 3.04E-06 3.04E-06 Seismic 1.04E-06 7.04E-07 7.OOE-07 7.04E-07 6.99E-07 6.99E-07 There are no outstanding recommendations related to external events with respect to potential improvements and strategies described in the DAEC IPEEE submittal.
3.1.2.1 Internal Fires 3.1.2.1.1 Current Model Modeling the external events fire sequences consists of three main steps: " Determining the fire ignition frequency for each fire compartment;" Performing fire growth and suppression analysis; and" Determining the fire-induced CDF.APPENDIX F Page F-16 Duane Arnold Energy Center License Renewal Application Environmental Report The individual fire compartment fire ignition frequencies used are taken from the DAEC IPEEE Fire-Induced Vulnerability Evaluation (FIVE) (PLC 1992) analysis.
Fire compartments that had fire core damage frequencies of 2.5E-8/yr or more in the FIVE IPEEE analysis are analyzed further in the external events analysis.The fire initiating event frequencies are used as input into the fire growth and suppression event trees. The analysis determines the probability that a fire will damage at least one piece of equipment in the room as well as the probability that all equipment in the room is destroyed.
These probabilities then serve as inputs into the fire-induced core damage event trees which determine the core damage frequencies due to fire for each fire compartment.
3.1.2.1.2 Original IPEEE Model The original IPEEE utilized the FIVE methodology to identify fire areas of potential risk significance, calculated area fire ignition frequencies, and provided hazards analysis for resulting critical areas. This methodology provided a conservative analysis process that utilized existing plant analyses, such as the DAEC Fire Hazard Analysis (FHA) (ERIN 1995a) and the DAEC Level 1 PRA.This evaluation consisted of three phases:: The Phase I screening involved the identification of plant fire areas and a qualitative assessment of the consequences of a fire in these areas. Phase II was a progressive probabilistic evaluation that considered the sequence of events which must occur to prevent safe shutdown.
It allowed fire areas to be screened from further analysis once the frequency of fire initiated core damage accident sequences dropped below 1E-06/yr.
Phase III consisted of a walkdown and verification process to determine whether or not the assumptions and calculations of the evaluation were supported by the physical conditions of the plant.These walkdowns were performed concurrently with activities in the first two phases.The analyses determined that credible fire events had an acceptably low frequency of causing core damage. The two essential 4kV switchgear rooms had the highest contribution to the fire induced core damage frequency and were reportable per the NRC criterion of a CDF greater than 1 E-06/yr. A postulated fire in either of the essential 4kV switchgear rooms had the potential to result in loss of all divisional AC powered plant equipment supported by the respective essential switchgear.
The consequences of such an occurrence were evaluated by propagating the postulated failure through the DAEC Level 1 PSA models. The results of this process showed that complete loss of the decay heat removal function is the dominant challenge to plant safety.Postulated fire events in all other areas of the plant did not represent significant contributors to core damage frequency.
The DAEC fire suppression system was reviewed against the recommendations of IN 94-12 (NRC 1994a) to assess the effects of fire protection system actuation on safety APPENDIX F Page. F-1 7 Duane Arnold Energy Center License Renewal Application Environmental Report related equipment.
The DAEC fire suppression system was determined to be configured and maintained to minimize the risk of safety system failure due to inadvertent suppression system operation.
DAEC has routinely designed and located fire protection system components and/or shielded safety equipment cognizant of the issue of inadvertent or advertent actuations.
As Part of this review, a 1985 Bechtel study to address fire suppression actuation effects with respect to Appendix R safe shutdown (IELP 1985) were verified as complete.A walkdown undertaken in support of the IPEEE identified a potentially dominant core damage sequence related to the fire suppression sprinkler piping for the Control Building HVAC room located above the Control Room. Rupture of pipe walls or fittings of the fire suppression piping could lead to flooding of the essential switchgear rooms via an HVAC shaft. A modification was implemented to turn these two wet pipes into dry pipes with isolation valves. Procedures were also modified to direct operations personnel to open the isolation valves upon receipt of smoke or heat detector alarms initiated from the HVAC room.3.1.2.2 Seismic Events 3.1.2.2.1 Current Model Modeling the external events seismic sequences consists of three main steps: " Seismic hazard analysis" Seismic capacity and fragility analysis" Seismically-induced core damage frequency analysis The seismic hazard analysis uses seismic hazard curves developed by Lawrence Livermore National Laboratory (NRC 1994b) to determine the annual exceedance probabilities of various magnitudes of earthquakes at 69 nuclear power plant sites in the United States, including DAEC. These probabilities are used as the input frequencies to seismic event trees.The seismic core damage sequences are modeled for nine seismic magnitude intervals, ranging from o.01g to 1.0g and greater. The nine event trees only credit equipment from the Safe Shutdown Equipment List,(SSEL) since this was the only equipment credited in the original IPEEE analysis.
The exception to this is the torus hard pipe vent system which is not on the SSEL but was installed according to class 1 seismic standards.
The seismic analysis uses High Confidence Low Probability of Failure (HCLPF) values taken from industry studies to determine the probability that SSEL equipment will fail under the nine different magnitudes of seismic ground acceleration.
The HCLPF values are used to derive fragility values, which give the probabilities that components will fail given a certain seismic ground acceleration.
These fragility values are inserted into modified versions of the various Level 1 system fault trees, such that the seismic fault trees consist of the typical random failures used in the Level 1 PRA, in addition to APPENDIX F Page F-1 8 Duane Arnold Energy Center License Renewal Application Environmental Report events that take into account the probability of equipment failure at the nine seismic magnitude intervals due to earthquakes.
3.1.2.2.2 Original IPEEE Model DAEC participated with a number of utilities to form the Seismic Qualification Utility Group (SQUG) in 1982. The goal of this group was to address Unresolved Safety Issues (USI A-46) and the anticipated generic letter. The SQUG devised a seismic verification plan, referred to as the Generic Implementation Procedure (GIP) that used earthquake experience data and test data to demonstrate the ruggedness of generic classes of equipment.
The major elements of GIP were the identification of safe-shutdown equipment and the performance of walkdowns and screening analyses to verify seismic adequacy.The approach used to address USI A-46 was similar to the approach specified in NUREG-1407 for addressing the seismic IPEEE for reduced-scope seismic margins plants. The two programs are compatible and are efficiently performed together for plants that were required to resolve the A-46 issue as.well as conduct seismic margins studies to address the IPEEE. As such, analyses and walkdowns were coordinated to address both the seismic IPEEE and USI A-46.The Seismic Margins Assessment (SMA) defined in EPRI NP-6041 (EPRI 1991) was used to examine the seismic risk for DAEC and was composed of the following analysis steps:* Review of plant information and plant walkdowns" Systems analysis* Structure response analysis" Equipment seismic capability analysis" Containment performance analysis Approximately eight hundred and fifty (850) items were identified for inclusion in the DAEC Seismic Safe Shutdown Equipment List (SSEL) based on criteria defined in NUREG-1407 and EPRI NP-6041. No equipment outliers were identified with respect to seismic capacity.
The majority of the DAEC SSEL equipment items met all applicable requirements of GIP Appendix B's (SQUG 1991) caveats and inclusion rules.Exceptions were shown to be acceptable by calculation, and those remaining were resolved by maintenance action or modification.
Field inspections and ultrasonic testing showed that most SSEL equipment items are Well anchored in accordance with Bechtel standard drawings for the plant. Exceptions were shown to be acceptable by calculation, or were resolved by maintenance action or modification.
Seismic interaction outliers comprised about 40% of all DAEC SSEL equipment outliers.
The majority of seismic interaction outliers were resolved by maintenance action, a few were shown to be adequate by calculation.
APPENDIX F Page F-19 APPENDIXF Page F-19 Duane Arnold Energy Center License Renewal Application Environmental Report With respect to civil structures, four items were addressed in accordance with EPRI NP-6041:-Masonry walls" Control Room ceilings* Category II structures over Category I structures" Dams, levees, and dikes One masonry wall was identified during walkdowns as a potential outlier that could fall and damage SSEL equipment.
This wall was subsequently qualified for SSE loading.Inspections of the Control Room ceiling members indicated potential outliers with respect to connections and restraint.
This issue was subsequently resolved by modifying selected elements of the Control Room ceiling. No outliers were identified with respect to Category II structure failures over Category I structures.
No outliers were identified with respect to dams, levees, and dikes.Seismic induced fire and flood issues were also addressed.
Two air handlers in the HPCI room were identified as potential flood/spray outliers due to potential interaction of nearby sprinkler heads with adjacent piping. This outlier was resolved by calculation to show that clearances are sufficient to preclude impact. MCC 1 D41 and Control Building HVAC chillers 1VCH001A and B, all located in the reactor building, were identified as potential outliers due to the presence of nearby unanchored gas storage bottles. These outliers were resolved by providing adequate restraint.
The diesel-driven fire pump day tank, located in the pump house, was identified as a potential seismic fire outlier due to anchorage concerns.
This outlier was shown not to be risk significant due to the large distance and the substantial reinforced-concrete walls between the tank and SSEL equipment.
The turbine lube oil storage tank, located in the turbine building, was identified as a potential seismic fire outlier due to inadequate supports.
This potential outlier was determined by analysis not to be risk significant.
3.1.2.3 Other External Events 3.1.2.3.1 High Winds and Tornadoes DAEC Category I structures are designed to withstand a tornado with a horizontal peripheral tangential velocity of 300 mph and a transverse velocity of 60 mph. This is the primary factor in the determination that high wind and tornado risk at DAEC is not significant to overall plant risk.The total estimated contribution to core damage frequency from high winds and tornadoes is approximately 1.41 E-07/yr (IES 1995), which is below the NRC reporting criteria of greater than 1 E-06/yr. This is a conservative estimate, as the approach to the quantification is a conservative bounding approach.
The analysis performed shows the design of the DAEC plant is appropriate for its siting (i.e., with respect to potential extreme winds) such that the contribution to overall plant risk from extreme winds is not significant.
No vulnerabilities were identified.
APPENDIX F Page F-20 Duane Arnold Energy Center License Renewal Application Environmental Report 3.1.2.3.2 Floods The DAEC design basis has been determined to meet the Standard Review Plan in effect in 1975. Based on this, the contribution to core damage frequency from external flood initiated accident sequences is judged to be less than 1 E-06/yr. No vulnerabilities were identified.
3.1.2.3.3 Transportation and Nearby Facility Accidents The hazards assessed in this facet of the IPEEE included: " Transportation accidents o Aviation (commercial/general/military) o Marine (ship/barge) o Railroad o Truck" Gas, oil or chemical pipeline accidents" Nearby facility accidents o nearby industrial facilities o nearby military facilities
- On-site and offsite material storage accidents Transportation hazards involving marine, railroad and truck accidents represent no significant risk to the plant based on separation distance.
With respect to aviation hazards, two federal airways were identified to exist over the vicinity of the plant site.However, a detailed conservative analysis showed that traffic along these airways contributes less than 1 E-06/yr to the plant core damage frequency.
Therefore, transportation hazards do not pose a significant threat to plant safety.With respect to pipeline hazards, this evaluation identified two natural gas pipelines within the five mile radius of the site. However, analysis showed that the pipelines are sufficiently small and distant (greater than 2 miles) so as to present no significant risk to the safe operation of the plant.With respect to nearby facility hazards, no facility accidentcould be postulated that would impact the safe operation of the plant. The area around the site is rural. The small communities in the vicinity of the site have little or no heavy industry; the communities consist of small retail establishments.
In addition, there are no nearby military facilities.
Therefore, nearby facilities do not pose a significant threat to plant safety.With respect to hazardous material storage, a 1980 survey performed to support a control room habitability study, concluded that onsite storage of gaseous chlorine represented the only significant hazardous material risk to the plant. Gaseous chlorine was eliminated in 1982 and replaced with sodium hypochlorite, which is non-hazardous.
A 1994 survey showed that the hazardous material status in and around the plant had not changed significantly since the 1980 survey. Finally, a 2004 Control Room APPENDIX F Page F-21 Duane Arnold Energy Center License Renewal Application Environmental Report Habitability study for toxic gases and smoke, completed in response to NRC Generic Letter 2003-001, did not identify any new hazards.The hydrogen storage and distribution system was reviewed against the recommendations of Generic Letter 93-06, "Piping and the Use of Highly Combustible Gases in Vital Areas" (NRC 1993). The DAEC configuration was determined to meet the guidance provided in GL 93-06. Since the initial IPEEE, a 9000 gallon liquid hydrogen storage tank was added to the system. This tank was situated such that the distance from the tank to the nearest safety related structures complies with EPRI guidelines.
The auxiliary boiler pilot light propane storage tank (1T445) was identified as a potential risk outlier. The tank is located outside, 25 feet from the emergency diesel generator rooms. Evaluation of the tank shows that the tank does not present an immediate risk to plant safety, but a propane explosion can be postulated that could affect both diesel generators and offsite power. The largest contributor to the propane tank failure and subsequent explosion is due to human error (specifically vehicle impact). Concrete barriers have been placed around the propane tank to effectively eliminate the risk of vehicle impact, thereby assuring that the overall core damage frequency contribution is less than 1 E-06/yr.3.2 LEVEL 2 PRA MODEL The Level 2 model used for the SAMA analysis was Revision 5C. As with the Level 1 PRA, plant modifications are screened for impact on the Level 2 PRA. If necessary, the model is upgraded to include the plant modification.
This screening process identified no modifications which would affect the results of the SAMA study. Thus, no changes were made to the current Level 2 PRA model to accommodate the SAMA analysis.3.2.1 Description of Level 2 PRA Model The Level 2 is mainly phenomenon-based, and is driven by the results obtained in the Level 1 PRA along with certain post-accident mitigation strategies.
The Level 2 accident sequences are designed with a detailed set of containment event trees (CETs). The DAEC Level 2 PRA uses an approach that was developed as part of the Nuclear Management and Resources Council (NUMARC) (now the Nuclear Energy Institute[NEI]) evaluation of containment performance (NUMARC 1991). This evaluation includes all systems, phenomena, and operator actions important to containment performance during severe accidents.
This approach allows considerable detail to be reflected in the overall containment performance without losing the ability to depict the response in a containment event tree format.The Level 1 accident sequences are grouped into core damage accident classes with similar characteristics and then are input into the CETs. Three different CET structures are used, depending upon the characteristics of the incoming Level 1 accident sequences.
The CETs model the following key issues: APPENDIX F Page F-22 Duane Arnold Energy Center License Renewal Application Environmental Report" Containment Isolation" Core Melt Arrested In-Vessel" Energetic Phenomena Post-Core Melt" Steel Containment Shell Failure" Containment Flooding" Containment Heat Removal" Containment Over-pressurization (or Over-temperature)
Failure" Suppression Pool Bypass* Release Mitigation in Reactor Building The containment event tree is analyzed through the linking of fault trees. Whenever possible, fault trees used in the Level 1 analysis are called into the CETs to avoid duplication of effort and to propagate dependencies.
The accident sequence truncation limit used in quantification is 1E-12 in the Level 2.The end state of the CETs is a radionuclide release to the environment.
The release end states are categorized based on the magnitude and timing of the release (12 release categories are used). The results of revision 5C are presented below.Table 3.2.1-1 Revision 5C Level 2 PRA Release Frequencies Release Category Release Frequency (per year)Low-Low and Early (LUE) 1.51 E-07 Low-Low and Intermediate (LL/I) 1.52E-08 Low-Low and Late (LUL) 1.45E-07 Low and Early (L/E) 7.67E-07 Low and Intermediate (LI) 6.71 E-07 Low and Late (LUL) 4.85E-07 Medium and Early (M/E) 4.27E-06 Medium and Intermediate (M/1) 1.09E-06 Medium and Late (M/L) 7.54E-08 High and Early (H/E) 1.39E-06 High and Intermediate (H/I) 2.37E-07 High and Late (H/L) 2.18E-07 Total Release: 9.52E-06 The total internal events release frequency for DAEC is calculated to be 9.52E-06 per year using the sequence model. The Level 2 release frequency does not match the Level 1 core damage frequency, because approximately 18% of the accident sequences modeled in the Level 1analysis result in no release (or a release within Technical Specification limits). These core damage accidents typically involve recovering coolant injection, arresting the core melt in-vessel, and maintaining the primary containment intact (i.e., no containment failure or bypass, and no EOP-directed RPV venting or containment venting).APPENDIX F Page F-23 Duane Arnold Energy Center License Renewal Application Environmental Report The high and early release frequency (also known as the Large Early Release Frequency or LERF) is the most commonly used figure of merit in level 2 PRA analysis.This frequency is 1.39E-06 per year, or approximately 15 percent of the total release frequency.
The top six initiating events based on the Fussell-Vesely importance measure are: 1. Loss of Offsite Power (31%)2. Turbine Trip with Bypass (17%)3. MSIV Closure (15%)4. Inadvertent Open Relief Valve (9%)5. Loss of Condenser Vacuum (6%)6. Loss of Div 2 125 Volt DC Power (4%)A review of basic event Fussell-Vesely values revealed that the top 10 systems are the same as those for Level 1. These are: 1. Normal AC Power 2. Emergency AC Power 3. CRD Hydraulic
/ RPS 4. 125 Volt DC Power 5. Standby Liquid Control 6. Reactor Core Isolation Cooling 7. River Water Supply 8. High Pressure Coolant Injection 9. Residual Heat Removal 10. RHR Service Water Likewise, a review of basic event Fussell-Vesely values revealed that the top 10 operator actions are similar to those for Level 1. The top 10 risk significant operator actions for Level 2 are: 1. Operator Fails to Recover Torus Cooling 2. Operator Fails to Inject Standby Liquid Control Early (within 4 minutes)3. Operator Fails to Bypass MSIV Isolation Interlocks During ATWS 4. Operator Fails to Recover the Main Condenser 5. Operator Fails to Vent Containment Per Emergency Operating Procedures
- 6. Operator Fails to Prevent Overfilling the Reactor Pressure Vessel 7. Operator Fails to Lower RPV Level to Top of Active Fuel for ATWS Level/Power Control 8. Operator Fails to Depressurize the RPV Given Depressurization Failed in Level 1 9. Operator Fails to Inhibit ADS During ATWS Events with High Pressure Injection Systems Available 10. Operator Fails to Recover Battery Charger 0 APPENDIX F Page F-24 Duane Arnold Energy Center License Renewal Application Environmental Report In the Level 3 modeling, it was assumed that the release was at ground level with zero heat release for all modeled sequences.
Consideration of other release heights and release heat levels was treated in the sensitivity analyses discussed in Section 8.3.2.2 Level 2 PRA Model Changes Since IPE Submittal The changes to the Level 2 release frequencies for the twelve categories are presented.below. Note that the total does not match the Level 1 CDF because events resulting in no release or releases below Technical Specifications were not included.Table 3.2.2-1 Changes to Level 2 CDF by Release Category 1992 Rev 3A Rev 3B Rev 4A Rev 4B Rev 5A Rev 5B Rev 5C Category Submittal (3/95) (8/95) (3/98) (12/01) (10/03) (2/05) (7/07)LL/E 1.78E-07 2.28E-07.
1.66E-07 1.07E-07 1.12E707 1.47E-07 1.50E-07 1.51E-07 LL/I 2.60E-09 1.52E-08 1.51E-08 1:40E-08 2.OOE-08 1.51E-08 1.53E-08 1.52E-08 LLIL 3.26E-07 2.08E-07 1.73E-07 7.30E-08 9.48E-08 7.74E-08 8.04E-08 1.45E-07 L/E 1.37E-06 8.11E-07 8.04E-07 4.93E-07 4.95E-07 7.47E-07 7.55E-07 7.67E-07 L/I 2.27E-08 9.03E-08 5.32E-08 5.94E-08 4.07E-07 5.70E-07 5.79E-07 6.71 E-07 L/L 8.62E-07 1.11E-06 9.84E-07 4.14E-07 5.36E-07 4.34E-07 4.51E-07 4.85E-07 M/E 1.61E-06 1.39E-05 4.24E-06 2.56E-06 3.81E-06 3.71E-06 3.88E-06 4.27E-06 M/I 4.51E-07 1.94E-06 1.92E-06 1.75E-06 1.92E-06 1.06E-06 1.08E-06 1.09E-06 M/L 2.20E-07 1.50E-07 1.25E-07 4.76E-08 7.50E-08 6.95E-08 7.25E-08 7.54E-08 H/E 5.02E-07 3.63E-06 1.32E-06 8.55E-07 1.14E-06 1.15E-06 1.23E-06 1.39E-06 H/I 1.07E-07 2.99E-07 2.98E-07 3.31E-07 3.74E-07 2.30E-07 2.34E-07 2.37E-07 H/L 5.OOE-07 3.70E-07 3.27E-07 1.41E-07 1.99E-07 1.77E-07 1.88E-07 2.18E-07 Total Release 6.15E-06 2.28E-05 1 1.04E-05 I6.85E-06 9.18E-06I 8.39E-061 8.72E-06 J 9.52E-06 No changes to major modeling assumptions, containment event tree structure, accident progression
/ source term calculations, or binning of end states in the Level 2 PRA model have been made since the IPE submittal 3.3 MODEL REVIEW
SUMMARY
DAEC was the first non-pilot plant to have a PSA Peer Certification (BWROG 1997).The PSA Certification process used a team of experienced PSA and system analysts to provide both an objective review of the PSA technical elements and a subjective assessment based on their PSA experience regarding the acceptability of the PSA elements.The review team consisted of participants with significant expertise in both PSA development and PSA applications.
The team was knowledgeable of PSA methodology and applications, nuclear plant design, and operational practices.
The team utilized checklists to evaluate the scope, comprehensiveness, completeness, and fidelity of the DAEC PSA products available.
APPENDIX F Page F-25 APPENDIX IF Page F-25 Duane Arnold Energy Center License Renewal Application Environmental Report One of the key aspects of the review was the assessment of the PSA update and maintenance process. This process is a necessary part of a quality product to accurately reflect the many aspects of a changing plant and includes the following: " Procedures
-Plant modifications" Technical Specifications" Operating Philosophy (e.g., on-line maintenance)" Training Facts and Observations considered by the certification team to be either extremely important or important are listed with their respective dispositions in Table 3.3-1.The overall owner's group peer review results can be summarized as follows: "...the DAEC PSA certification resulted in a very consistent evaluation across all the elements.For each element, the certification team assigned a summary grade level of 3 which supports risk significance determinations supplemented by appropriate deterministic analyses." (BWROG 1997)APPENDIX F Page F-26 APPENDIX F Page F-26 Duane Arnold Energy Center License Renewal Application Environmental Report Table 3.3-1 Disposition of Peer Review Facts & Observations Sub- Significance Observation/Recommendation Disposition Element IE-14 B ISLOCA may not be fully assessed with Inclusion of RWCU in the PRA's regard to RWCU. Evaluate the need for ISLOCA was evaluated and rejected.including RWCU in the PRA's ISLOCA RWCU was not included because its study, and if necessary, develop a fault design pressure is the same as the tree primary system (re: IDF-25).SY-8 B Some non-dominant but potentially Justification for not modeling certain important common-cause failure modes non-dominant common-cause events have been ignored. Provide justification has been included in the for not modeling certain nondominant documentation (re: IDF-31).common-cause events (documentation issue).SY-9 B Some support systems are "black-boxed" A fault tree for instrument air has (i.e., Instrument air in Vent; RBCCW in been incorporated.
CRD is not CRD). Evaluate the need to develop credited for alternate injection, fault trees for important "black-boxed" therefore it is not included in the support systems (i.e., instrument air, model (re: IDF-26).RBCCW).SY-1 3 B Air and nitrogen accumulators may not Justification that components have been assessed for a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> supported by air and nitrogen mission. Provide justification that accumulators will remain operable for components supported by air and their required mission time has been nitrogen accumulators will remain completed (re: IDF-27).operable for their required mission time.DA-4 B All component failure probability data are Some plant specific component generic values; plant specific values are failure rate data has been needed for certain elements.
incorporated into the PRA model (RE: Incorporate plant specific component IDF-22).failure rate data into the PRA model.DA-4 B A distinction should be made in MOV The need to differentiate between and AOV failure rates according to their AOV and MOV failure probabilities test frequency was evaluated and determined to be unnecessary (re. IDF-28).DA-1 0 B Common cause failures of some groups The adequacy of the use of common of components, (e.g., circuit breakers) cause factors in the PRA mode was have not been included in the PSA evaluated.
Common cause factors model. for SRVs and EDG breakers were added (re:. IDF-29).HR-5&6 B Pre-initiator human interactions have not The adequacy of the use of pre-been fully evaluated, initiator Human Error Probabilities (HEPs) in the PRA model was evaluated.
No model changes were made (re: IDF30).HR-12 B Justification is lacking for some low value The 1 E-06value was re-assessed and human error probabilities.
Particularly found to be appropriate (re: IDF-32).the 1 E-06 value for LOPTORCOOLY (Operator Fails to Align Torus Cooling)HR-16 B There is no clear evidence that HEP Guidance was added to PSAG-2 dependency effects have been stating that an HEP dependency evaluated, review should be performed following an update to the PRA. Guidance was added to PTG-008 to describe how to I perform an HEP dependency review APPENDIX F ,Page F-27 Duane Arnold Energy Center License Renewal Application Environmental Report Table 3.3-1 Disposition of Peer Review Facts & Observations (Cont.)Sub- Significance Observation/Recommendation Disposition Element HR-26 B There is no clear evidence that HEP Guidance was added to PSAG-2 dependency effects have been stating that an HEP dependency evaluated, review should be performed following an update to the PRA. Guidance was added to PTG-008 to describe how to perform an HEP dependency review DE-6 A Cutsets were not reviewed for multiple A review of Human Error Probability human actions. (HEP) dependencies was performed for the Rev. 5 PRA model update as described in Section 3.3.1 of the Rev.5 summary document.QU-1 0 A Guidance and examples of how human Guidance was added to PSAG-2-action dependencies are to be treated is stating that an HEP dependency lacking. review should be performed following an update to the PRA. Guidance was added to PTG-008 to describe how to perform an HEP dependency review.MU-6 B Configuration control and physical Department Instruction PSAG-1 has security of the software and models is been updated to include guidance for inadequate, maintenance, revision, and control of the PSA model and associated documents and software.MU-9 B Guidance for PSA updates does not Department Instruction PSAG-1 has include a requirement for an independent been updated to include guidance for review of the results. review and approval of new or revised PSA elements.
Section 4.2 pertains to review by a qualified internal reviewer while Section 4.3 pertains to review and validation by other organizations.
MU-1 1 B The impact of new revisions on prior Guidance for reassessment of prior PRA applications does not appear to applications is contained in Section have been assessed.
4.5 of PSAG-1. Review of affected PRA applications is described in Section 6.3 of the PRA Rev. 4 Summary Document.Significance A Extremely important and necessary to address in order to assure the technical adequacy of the PRA or technical quality of the PRA or the qualify of the PRA update process. These are contingency items for certification.
B Important and necessary to address, but may be deferred until the next PRA update. These are also contingency items for certification.
APPENDIX F Page F-28 Duane Arnold Energy Center License Renewal Application Environmental Report 3.4 LEVEL 3 PRA MODEL The MACCS2 code (NRC 1998) was used to perform the Level 3 PRA. The input parameters given with the MACCS2 "Sample Problem A," which included the COMIDA2 food model, formed the basis for the present analysis.
These generic values were supplemented with parameters specific to DAEC and the surrounding area. Site-specific data included population distribution, economic parameters, and agricultural production.
Parameters describing the costs of evacuation, relocation and decontamination were escalated from the time of their formulation (1986) to present (July 2007) costs. Plant-specific release data included the time-activity distribution of nuclide releases and release frequencies.
The behavior of the population during a release (evacuation parameters) was based on plant and site-specific set points (i.e., declaration of a General Emergency) and evacuation time estimates (TOMCOD 2003).These data were used in combination with site specific meteorology to simulate the probability distribution of impact risks (exposure and economic) to the surrounding (within 50 miles) population from the 12 evaluated source term category releases at DAEC.3.4.1 Population Distribution The population distribution was based on the 2000 census as accessed by SECPOP2000 (NRC 2003). The baseline population was determined for each of the sixteen directions and each of ten concentric distance rings with outer radii at 1, 2, 3, 4, 5, 10, 20, 30, 40 and 50 miles surrounding the site. The transient population within ten miles of the site was included.
County growth rates, based on projections from the State Data Center of Iowa (State Library 2006), were applied to estimate the population distribution at the year 2040.3.4.2 Economic Data MACCS2 requires the spatial distribution of certain agriculture and economic data (fraction of land devoted to farming, annual farm sales, fraction of farm sales resulting from dairy production, and property value of farm and non-farm land) in the same manner as the population.
This was again done by applying the SECPOP2000 program, changing the regional economic data format to comply with MACCS2 input requirements.
In this case, SECPOP2000 was used to access data from the 1997 National Census of Agriculture; the version 3.12.01 data file accessed by SECPOP2000 for that information, COUNTY97.DAT, was revised by filling its "notes" parameter so that data from the proper county is associated with the site. The program's specification of crop production parameters for the 50-mile region (e.g., fraction of farmland devoted to grains, vegetables, etc.) was also applied.Area-wide farm wealth was calculated from the 2002 National Census of Agriculture county statistics (USDA 2002) for farm land, building and machinery.
Only the fraction of each county within 50 miles of DAEC was considered.
The area-wide non-farm APPENDIX F Page F-29 Duane Arnold Energy Center License Renewal Application Environmental Report wealth was taken as the population-weighted average of the SECPOP2000 non-farm land property value.In addition, generic economic data that is applied to the region as a whole were revised from the MACCS2 sample problem input in order to account for cost escalation since 1986, the year that input was firstspecified.
A factor of 1.90, representing cost escalation from 1986 to July 2007 was applied to parameters describing cost of evacuating and relocating people, land decontamination, and property condemnation.
3.4.3 Nuclide
Release The core inventory corresponds to the end-of-cycle values for DAEC operating at 1912 MWt. Table 3.4.3-1 gives the estimated DAEC core inventory.
Release frequencies, nuclide release fractions (of the core inventory), shown in Table 3.4.3-2, and the time distribution of the release (described in Table 3.4.3-2 for noble gases and Cs) were analyzed to determine the sum of the exposure (50-mile dose) and economic (50-mile economic costs) risks from accident sequences representing 12 source term categories (also given in Table 3.4.3-2).
Each accident frequency was chosen to represent the set of similar accident releases.
DAEC nuclide release categories, as determined by the MAAP computer code, were related to the MACCS categories as shown in Table 3.4.3-3. Release duration periods were defined which represented the time distribution of each category's releases.
Release inventories of each of the two chemical forms of the Cs and Te releases, as given by the MAAP code output, were incorporated into the nuclide release fractions.
APPENDIX F Page F-30 Duane Arnold Energy Center License Renewal Application Environmental Report Table 3.4.3-1 Estimated DAEC Core Inventory Core Inventory Core Inventory Nuclide (Curies) Nuclide (Curies)Co-58 2.92E+05 Te-131m 7.62E+06 Co-60 3.50E+05 Te-132 7.37E+07 Kr-85 7.94E+05 1-131 5.20E+07 Kr-85m 1.28E+07 1-132 7.50E+07 Kr-87 2.44E+07 1-133 1.05E+08 Kr-88 3.43E+07 1-134 1.15E+08 Rb-86 1.49E+05 1-135 9.85E+07 Sr-89 4.60E+07 Xe-133 1.01E+08 Sr-90 6.37E+06 Xe-1 35 3.65E+07 Sr-91 5.83E+07 Cs-134 1.55E+07 Sr-92 6.37E+07 Cs-1 36 4.67E+06 Y-90 6.58E+06 Cs-1 37 8.88E+06 Y-91 5.99E+07 Ba-1 39 9.32E+07 Y-92 6.40E+07 Ba-140 8.99E+07 Y-93 7.49E+07 La-140 9.67E+07 Zr-95 8.48E+07 La-141 8.48E+07 Zr-97 8.59E+07 La-142 8.17E+07 Nb-95 8.52E+07 Ce-141 8.53E+07 Mo-99 9.83E+07 Ce-143 7.81 E+07 Tc-99m 8.61 E+07 Ce-144 7.08E+07 Ru-103 8.30E+07 Pr-143 7.55E+07 Ru-105 5.88E+07 Nd-147 3.44E+07 Ru-106 3.50E+07 Np-239 1.11E+09 Rh-1 05 5.53E+07 Pu-238 3.23E+05 Sb-127 5.83E+06 Pu-239 2.62E+04 Sb-129 1.72E+07 Pu-240 3.85E+04 Te-127 5.80E+06 Pu-241 1.10E+07 Te-127m 7.84E+05 Am-241 1.54E+04 Te-129 1.69E+07 Cm-242 3.89E+06 Te-129m 2.51 E+06 Cm-244 2.93E+05 Source: Supplied by DAEC as curies/MWt.
Multiplied by 1912 MWt to account for 2007 plant upgrade APPENDIX F Page F-31 Duane Arnold Energy Center License Renewal Application Environmental Report Table 3.4.3-2. Accident Sequence Frequencies Source Term Category HIL H/I HIE M/L M/I MWE Representative Sequence 2T02 3AO1A 4AO1LD 2L01 3A02 1D03 Frequency 2.18E-07 2.37E-07 1.39E-06 7.54E-08 1.09E-06 4.27E-06 Release Fraction by Release Category Xe/Kr 1.OOE+00 7.33E-01 1.OOE+00 8.66E-01 8.66E-01 1.OOE+00 I 1.72E-01 3.43E-01 1.57E-01 4.05E-01 1.72E-01 7.45E-02 Cs 1.64E-01 5.20E-01 2.37E-01 4.18E-01 1.69E-01 9.65E-02 Te 1.84E-01 1.56E-01 1.77E-01 2.06E-01 O.OOE+00 5.59E-06 Sr 6.43E-03 1.81 E-06 9.20E-03 6.44E-03 8.32E-05 3.98E-07 Ru 2.39E-03 2.27E-07 6.14E-04 5.07E-02 9.58E-03 2.60E-09 La 4.38E-04 1.01 E-07 6.53E-04 4.29E-04 9.72E-07 1.23E-09 Ce 2.48E-03 7.51 E-07 3.39E-03 2.23E-03 2.36E-06 1.1OE-08 Ba 3.20E-03 1.15E-06 4.34E-03 1.16E-02 3.49E-04 1.94E-07 Sb 1.75E-02 1.57E-02 2.07E-01 2.86E-01 5.03E-03 5.12E-04 Release time (hr from scram) of noble 40-60/ 18-30/ 3.3-10/ 28.9-30/ 10-30/ 1.9-10/gas/Cs release 40-100 ,18-40 3.3-48 28.9-60 10-40 1.9-60 Source Term Category L/L L/I L/E LL/L LL/I LL/E Representative Sequence 2TO1WW 1A03A 1D11 3AO1B 1A03LW 1D12 Frequency 4.85E-07 6.71 E-07 7.67E-07 1.45E-07 1.52E-08 1.51 E-07 Release Fraction by Release Category Xe/Kr 1.OOE+00 1.OOE+00 7.36E-01 6.26E-01 1.OOE+00 7.39E-01 I 8.46E-03 1.26E-02 1.84E-04 5.55E-04 5.31 E-03 1.72E-05 Cs 9.32E-03 1.07E-02 2.1OE-04 2.28E-04 4.91E-03 2.OOE-05 Te 4.OOE-03 9.77E-03 3.35E-08 0.OOE+00 9.47E-03 1.71 E-08 Sr 1.13E-04 7.85E-07 3.44E-09 2.88E-08 3.30E-04 1.67E-09 Ru 2.58E-04 9.45E-10 1.61E-10 1.93E-05 1.75E-07 5.32E-12 La 6.58E-06 6.08E-08 3.31E-11 2.80E-10 2.25E-05 1.65E-11 Ce 4.08E-05 3.70E-07 2.17E-10 1.44E-09 1.20E-04 1.04E-10 Ba 8.47E-05 1.12E-06 1.62E-09 2.65E-07 1.38E-04 7.56E-10 Sb 3.1OE-03 4.35E-03 2.14E-07 3.66E-07 3.94E-03 1.34E-08 Release time (hr from scram) of noble 40-80/ 16-20/ 1.9-20/ 35.7-40/ 19.5-20/ 1.9-20/gas/Cs release 40-80 16-60 1.9-10 35.7/40 19.5-50 1.9-10 APPENDIX F Page F-32 Duane Arnold Energy Center License Renewal Application Environmental Report Table 3.4.3-3. MACCS release categories vs. DAEC MAAP release categories.
MACCS Release Categories DAEC MAAP Release Categories Xe/Kr 1 -noble gases I 2-CsI Cs 2 & 6 -Csl and CsOH Te 3 & 11- TeO 2 & Te 2 Sr 4 -SrO Ru 5 -MoO 2 (Mo is in Ru MACCS category)La 8 -La 2 03 Ce 9 -CeO 2 & U0 2 Ba 7 -BaO Sb (supplemental category) 10 -Sb Alternative representative sequences were considered for some of the source term categories, e.g., 3C01 for the H/E category.
In each of these cases, the sequence yielding the greatest conditional population-dose was chosen. In all such cases, impacts were comparable between the chosen and alternative sequence.The reactor building width and height above grade are each 140 feet (FPL 2005). All releases were modeled as being from the off-gas stack or the top of the reactor building, depending on the accident sequence release location (ERIN 1995b). It is expected that reactor building releases would be from the blowout vents approximately 100 feet above grade (Erin 1995c). The reactor building release height was a parameter considered in sensitivity analyses, presented in Section 8.4. The thermal content of each of the releases was assumed to be the same as ambient, i.e., buoyant plume rise was not modeled. This assumption was also considered in the sensitivity analyses.3.4.4 Emergency Response Reactor trip for each sequence was taken as time zero relative to the core containment response times. A General Emergency is declared when plant conditions degrade to the point where it is judged that there is a credible risk to the public; it was assumed here that the declaration would coincide with the onset of core damage (ERIN 1995b).The times used in the analysis for the different source term categories are shown in Table 3.4.4-1. It is expected that a general emergency will be declared significantly prior to core damage for some sequences, e.g., Class 2 and 4 (ERIN 1995d). A time zero general emergency declaration was considered in sensitivity analyses, presented in Section 8.4.APPENDIX F Page F-33 Duane Arnold Energy Center License Renewal Application Environmental Report Table 3.4.4-1 General Emergency Declaration Times (hours from reactor trip)Source Term Category H/L H/I HIE M/L M/I MWE LUL L/I LIE LUL LLII LL/E G.E. Time 1 39.1 1 0.4 1 1.6 1 26.5 1 0.4 1 1.4 1 38.5 1 1.3 1 1.4 1 0.4 1 1.3 1 1.4 The MACCS2 User's Guide input parameters of 95 percent of the population within 10 miles of the plant (Emergency Planning Zone, EPZ) evacuating, and 5 percent not evacuating were employed.
These values are conservative relative to the NUREG-1150 study, which assumed evacuation of 99.5 percent of the population within the Emergency Planning Zone (NRC 1998).The evacuees are assumed to begin evacuation 17 minutes (NRC 1998) after a general emergency has been declared at an evacuation radial speed of 0.314 m/sec. This speed is derived from the projected time to evacuate the entire EPZ under winter weekday, mid-day adverse weather conditions during the year 2000, the census year of the evacuation study. The evacuation speed was projected to year 2040 conditions by conservatively assuming that all of the roads in 2000 transported traffic at their maximum throughput and that no new roads would be constructed (although the roads would be maintained at 2000 conditions).
The 2040 evacuation speed was then the 2000 speed multiplied by the ratio of 2000 to projected 2040 EPZ (10-mile) populations.
That estimated 2040 evacuation speed, 0.205 m/sec, was used in the risk analysis.The evacuation speed was considered further in the sensitivity analyses presented in Section 8.4.3.4.5 Meteorological Data Sequential hourly onsite meteorology data from 2002 through 2006 were used in MACCS2. Of the 2002-2006 hourly data points of interest (10-meter wind speed; 10-meter wind direction; stability class and precipitation), 0.13; 0.15; 0.17; 0.63; and 0.09%respectively were missing. Data gaps were filled in by (in order of preference):
using corresponding data from another level (taking the relationship between the levels as determined from immediately preceding hours), interpolation (if the data gap was less than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />), or using datafrom the same hour and a nearby day of a previous year.The 2005 data set was found to result (see subsequent discussion of sensitivity analysis) in the largest dose and economic cost risks and was used to create the one-year sequential hourly data set used in the baseline MACCS2 runs. Atmospheric mixing heights were specified for AM and PM hours for each season of the year. These values ranged from 300 meters for Summer AM to 1500 meters for Summer PM (EPA 1972).0 APPENDIX F Page F-34 Duane Arnold Energy Center License Renewal Application Environmental Report 3.5 SEVERE ACCIDENT RISK RESULTS The resulting annual risk from the analyzed DAEC releases is provided in Table 3.5-1.Table 3.5-1 Results of DAEC Level 3 PRA Analysis (Annual Risk, Internal Events onl Source Term Category HIL HII HIE I M/L MII ME Population dose risk (person-0-50 miles 0.619 0.822 4.59 0.421 2.70 9.48 Total economic cost risk ($)0-50 miles 2,530 3,980 16,400 1,030 12,200 38,200 Source Term Category LIL LII LIE LL/L LL/I LLIE Total Population dose risk 0-50 miles 0.426 0.643 0.0487 0.00893 0.0100 0.00156 19.8 Total economic cost risk ($)0-50 miles 902 1,400 47.6 10.9 19.0 0.26 76,700 Approximately 50% of the total baseline risk (both dose and cost) is from release category M/E, owing to its relatively large conditional dose and cost impacts coupled with its frequency, which is almost equal to that of the other categories combined.
The total DAEC risk was found to be due chiefly to its Cs release.The annual baseline population dose risk within 50 miles of DAEC is calculated to be 19.8 person-rem.
The total annual economic risk was calculated at $76,700.4 COST OF SEVERE ACCIDENT RISK I MAXIMUM BENEFIT Cost/benefit evaluation of SAMAs is based upon the cost of implementation of a SAMA compared to the averted onsite and offsite costs resulting from the implementation of that SAMA. The methodology used for this evaluation was based upon the NRC's guidance for the performance of cost-benefit analyses found in NUREG/BR-01 84 (NRC 1997). This guidance involves determining the net value for each SAMA according to the following formula: Net Value = (APE + AOC + AOE + AOSC) -COE where APE = present value (worth) of averted public exposure ($)AOC present value (worth) of averted offsite property damage costs ($)AOE = present value (worth) of averted occupational exposure ($)AOSC = present value (worth) of averted onsite costs ($)COE = cost of enhancement
($)If the net value of a SAMA is negative, the cost of implementing the SAMA is larger than the benefit associated with the SAMA and is not considered beneficial.
The derivation of each of these costs is described in below.APPENDIX F Page F-35 APPENDIX F Page F-35 Duane Arnold Energy Center License Renewal Application Environmental Report The following specific values were used for various terms in the analyses: Present Worth The present worth was determined by: PW-eI r Where: r is the discount rate = 7% (assumed throughout these analyses)t is the duration of the license renewal = 20 years PW is the present worth of a string of annual payments = 10.76 Dollars per REM The conversion factor used for assigning a monetary value to on-site and off-site exposures was $2,000/person-rem averted. This is consistent with the NRC's regulatory analysis guidelines presented in and used throughout NUREG/BR-0184, (NRC 1997).On-site Person REM per Accident The occupational exposure associated with severe accidents was assumed to be 23,300 person-rem/accident.
This value includes a short-term component of 3,300 person-rem/accident and a long-term component of 20,000 person-rem/accident.
These estimates are consistent with the "best estimate" values presented in Section 5.7.3 of NUREG/BR-0184 (NRC 1997). In the cost/benefit analyses, the accident-related on-site exposures were calculated using the best estimate exposure components applied over the on-site cleanup period.On-site Cleanup Period In the cost/benefit analyses, the accident-related on-site exposures were calculated over a 10-year cleanup period.Present Worth On-site Cleanup Cost ner Accident The estimated cleanup cost for severe accidents was assumed to be$1.5E+09/accident (undiscounted).
This value was derived by the NRC in NUREG/BR-0184, Section 5.7.6.1, Cleanup and Decontamination (NRC 1997). This cost is the sum of equal annual costs over a 10-year cleanup period. At a 7% discount rate, the present value of this stream of. costs is$1.1E+09.APPENDIX F Page F-36 APPENDIX F Page F-36 Duane Arnold Energy Center License Renewal Application Environmental Report 4.1 OFF-SITE EXPOSURE COST Accident-Related Off-Site Dose Costs Offsite doses were determined using the MACCS2 model developed for DAEC. Costs associated with these doses were calculated using the following equation: APE = (F, Des -FADpA )R 1 -(1)r where: APE = monetary value of accident risk avoided due to population doses, after discounting R = monetary equivalent of unit dose, ($/person-rem)
F = accident frequency (events/yr)
Dp = population.dose factor (person-rem/event)
S = status quo (current conditions)
A = after implementation of proposed action r = real discount rate tf = years remaining until end of facility life The values used are: R = $2000/person-rem r = 0.07 Dp = 23,300 person-rem/accident (best estimate)APE ($2.15E + 4XFsDe, -FADP )4.2 OFF-SITE ECONOMIC COST Accident-Related Off-Site Property Damage Costs AOC = (FsPF 1 -FAPD )1P -e-f r AOC = monetary value of accident risk avoided due to offsite property damage, after discounting PD = offsite property loss factor (dollars/event)
APPENDIX F Page F-37 Duane Arnold Energy Center License Renewal Application Environmental Report 4.3 ON-SITE EXPOSURE COST Methods for Calculatinq Averted Costs Associated with Onsite Accident Dose Costs a) Immediate Doses (at time of accident and for immediate management of emergency)
For the case where the plant is in operation, the equations in NUREG/BR-0184 (NRC 1997).can be expressed as: W/o -FAD oA)R I (r where: W1o= monetary value of accident risk avoided due to immediate doses, after discounting, R = monetary equivalent of unit dose, ($/person-rem), F = accident frequency (events/yr), D 1 0 = immediate occupational dose (person-rem/event), S = status quo (current conditions), A = after implementation of proposed action, r = real discount rate, tf = years remaining until end of facility life.The values used are: R = $2000/person rem r = .07 D 1 0 = 3,300 person-rem
/accident (best estimate)The license extension time of 20 years is used for tf.For the basis discount rate, assuming FA is zero, the best estimate of the limiting savings is W,0 (FSD 10S)W e-r]--.07.20= 3300
- F * $2000 *.07-Fs * $6, 600, 000
- 10. 763 Fs *$0.71E+ 8, b) Long-Term Doses (process of cleanup and refurbishment or decontamination)
For the case where the plant is in operation, the equations can be expressed as: APPENDIX F Page F-38 Duane Arnold Energy Center License Renewal Application Environmental Report WLTO =(FsDLTO, _FADLR l-e-' ,-e* (2)O r rm where: WLTO = monetary value of accident risk avoided long term doses, after discounting, $m = years over which long-term doses accrue. (NRC 1997)The values used are: R = $2000/person rem r = .07 DLTO = 20,000 person-rem
/accident (best estimate)m = "as long as 10 years" The license extension period of 20 years is used for tf.For the discount rate of 7%, assuming FA is zero, the best estimate of the limiting savings is WLTO =(FDLTos)R*
e-r
- le-rm r rm=(F,20000)$2000 eO 7*2 0 e 0 7*10.07 .07"*10= Fs $40, 000, 000*10. 763*0.719 Fs *$3.10E+8,.
c) Total Accident-Related Occupational (On-site)
Exposures Combining equations (1) and (2) above, using delta (A) to signify the difference in accident frequency resulting from the proposed actions, and using the above numerical values, the long term accident related on-site (occupational) exposure avoided (AOE) is: Best Estimate: AOE=zAW, o+ AWLo = ZIF *$(0.71+3.1)E+8AF*$3.81E+8 APPENDIX F Page F-39 APPENDIX F Page F-39 Duane Arnold Energy Center License Renewal Application Environmental Report 4.4 ON-SITE ECONOMIC COST Methods for Calculation of Averted Costs Associated with Accident-Related On-Site Property Damaqe a) CleanuplDecontamination A total cleanup/decontamination cost of $1.5E+09 was used as a reasonable estimate (NUMARC 1991). Considering a 10-year cleanup period, the present value of this cost is: P VCD = (CcDj(1-ee-J Where PVCD = Present value of the cost of annual cleanup/decontamination, CCD = Total cost of the cleanup/decontamination effort, m = Cleanup period, r = Discount rate.Based upon the values previously assumed: PD($1.5E +9)r J-e--0 7-1 0-VD 10 .07)PVcD = $1.079E + 09 This cost is integrated over the term of the proposed license extension as follows: UCD = PVCD 1-e-r Where UCD = Net present value of cleanup and decontamination over the life of the facility (in dollars per year).Based upon the values previously assumed: UcD =$1.079E + 9 [10.763]UcD =$1.161E+
10 APPENDIX F Page FAQ APPENDIX F Page F-40 Duane Arnold Energy Center License Renewal Application Environmental Report b) Replacement Power Costs Replacement power costs, URP, are an additional contributor to onsite costs.These are calculated in accordance with NUREG/BR-0184, Section 5.6.7.2.1 Since replacement power will be needed for that time period following a severe accident, for the remainder of the expected generating plant life, long-term power replacement calculations have been used. The calculations are based on the 910 MWe reference plant, and are conservatively scaled down for the 610 MWe net Duane Arnold plant. The present value of replacement power is calculated as follows: K$1.2E + 8) (cRteIP) -erf)Where PVRP = Present value of the cost of replacement power for a single event, tf = years remaining until end of facility life, r = Discount rate, Ratepwr = Rated power of the unit (including the planned power uprate).The $1.2E+08 value has no intrinsic meaning but is a substitute for a string of non-constant replacement power costs that occur over the lifetime of a "generic" reactor after an event (NRC 1997). This equation was developed per NUREG/BR-0184.for discount rates between 5% and 10% only.For discount rates between 1% and 5%, NUREG/BR-0184 indicates that a linear interpolation is appropriate between present values of $1.2E+09 at 5% and$1.6E+09 at 1%. So for discount rates in this range the following equation was used to perform this linear interpolation.
P VRP = {($i.6E + 9) -j($1. 6E+/-+9) -($J.2E +9)]*r RaOMepw[5%-1] *r-% *ý910MWej Where rs = Discount rate (small), between 1% and 5%.Ratepwr = Rated power of the unit (including the planned power uprate)The section number for Section 5.6.7.2 apparently contains a typographical error. This section is a subsection of 5.7.6 and follows 5.7.6.1. However, the section number as it appears in the NUREG will be used in this document.APPENDIX F Page F-41 Duane Arnold Energy Center License Renewal Application Environmental Report To account for the entire lifetime of the facility, URP was then calculated from PVRP, as follows: U -PVRP (I e-r)2 r Where URP -Present value of the cost of replacement power over the life of the facility.Again, this equation is only applicable in the range of discount rates from 5% to 10%. NUREG/BR-0184 states that for lower discount rates, linear interpolations for URp are recommended between $1.9E+10 at 1% and $1.2E+10 at 5%. The following equation was used to perform this linear interpolation:
URP =($1.9E + 1 0) ([($1.9E + 10)-($1.2E
+ 10)] *[ Ratepwr"~ [5% -]%]
- 91 -] We Where r. = Discount rate (small), between 1% and 5%.Ratepwr = Rated power of the unit (including the planned power uprate)c) Repair and Refurbishment It is assumed that the plant would not be repaired/refurbished; therefore, there is no contribution to averted onsite costs from this source.d) Total Onsite Property Damage Costs The net present value of averted onsite damage costs is, therefore:
A OSC = F * (UcD + Up,)Where F = Annual frequency of the event.4.5 TOTAL COST OF SEVERE ACCIDENT RISK / MAXIMUM BENEFIT Cost/benefit evaluation of the maximum benefit (or maximum attainable benefit, MAB) is baseline risk of the plant converted dollars by summing the contributors to cost.Maximum Benefit Value = (APE + AOC + AOE + AOSC)where APE = present value of averted public exposure ($), AOC = present value of averted offsite property damage costs ($), AOE = present value of averted occupational exposure ($), APPENDIX F Page F-42 Duane Arnold Energy Center License Renewal Application Environmental Report AOSC = present value of averted ohsite costs ($).For Duane Arnold, this value is $2,261,022 as shown below.Parameter Present Dollar Value ($)Averted Public Exposure $666,236 Averted offsite costs $1,292,225 Averted occupational exposure $6,534 Averted onsite costs $296,027 Total $2,261,022 5 SAMA IDENTIFICATION A list of SAMA candidates was developed by reviewing the major contributors to CDF and population dose based on the plant-specific risk assessment and the standard BWR list of enhancements (NEI 2005). This section discusses the SAMA selection process and its results.5.1 PRA IMPORTANCE Risk reduction worth (RRW) for the basic events in the baseline model was used to identify those basic events that could have a significant potential for reducing risk. All the basic events having a risk reduction worth of 1.005 or greater were considered as potential SAMAs. This group of basic events is shown on Table 3.1.1.1-1 ranked by their importances (RRW). These basic events were further divided into human action basic events and hardware basic events, Tables 5.1-1 and 5.1-2 respectively.
The current plant procedures and training meet current industry standards.
There are no additional specific procedure improvements that could be identified that would affect the result of the HEP calculations.
Therefore, no SAMA items were added to the plant specific list of SAMAs as a result of the human actions on the list of basic events with RRW greater than 1.005. Those human actions shown on Table 5.1-1 are, therefore, not identified as potential SAMA candidates.
The hardware basic events found to dominate the risk reduction potential are shown in Table 5.1-2. Each of these events was considered for treatment in the SAMA analysis.Table 5.1-2 identifies the SAMA candidate number(s) associated with each of the basic events.APPENDIX F Page F-43 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.1-1 List of Dominant Human Action Contributors Basic Event RRW Description B-OPSLCE--U 1.0993 Operator Fails to Inject SBLC Early (Within 4 Minutes)FTPE-Q4-Q4-1.0591 Operator Fails to Bypass MSIV Isolation Interlocks (ATWS)V-OPTORVENTU 1.0529 Operator Fails to Vent Containment Per EOPs FTPE-L---L--
1.0527 Operator Fails to Prevent Overfilling RPV L2OPNOREC-U 1.0489 Operator Fails to Recover Torus Cooling FTPE-L1--Li-1.0416 Operator Fails to Lower RPV Level to TAF for ATWS Pwr Cntrl FTPE-X---X--
1.0310 Operator Fails to Inhibit ADS (ATWS with High Press Inj)FTPE-L2--L2-1.0298 Operator Fails to Restore RPV Level Post ED (ATWS)C-OPNOREP--U 1.0290 Operator Fails to Recover Main Condenser O-OPMANDEP-U 1.0233 Operator Fails to Manually Initiate ADS (Non-Med LOCA)FTPE-LA--LA-1.0228 Operator Fails to Prevent Overfilling RPV FTPE-TR--TR-1.0180 Operator Fails to Bypass HPCI/RCIC Low RPV Press Trip L-OPCHRTRNSY 1.0174 Operator Fails to Follow EOPs for Cont. Ht. Removal V-OPVENTTRNY 1.0173 Operator Fails to Vent Torus (Transients/LOCA)
C-OPCDO3---U 1.0168 Operator Fails to Open an MSIV and/or Bypass Valve B-OPSLCLAT3U 1.0164 Operator Fails to Inject SBLC Early (Within 14 Minutes)FTPE-Q3--Q3-1.0144 Operator Fails to Bypass MSIV Isolation Interlocks (ATWS)W-OPWS04---U 1.0130 Operator Fails to Open CV4914 C-OPALTINJ-U 1.0130 Operator Fails to Initiate Condensate for Alt Inj W-OPWS02---U 1.0124 Operator Fails to Open CV4915 FTPE-XA-XA-1.0116 Operator Fails to Inhibit ADS (ATWS with No High Press Inj)I-OPLRESPERX 1.0111 Miscalibration of Low Press Permiss Instrumentation H-OP14 ----- U 1.0107 Operator Fails to Shutoff HPCI or RCIC Q-OPLEVEL-TT 1.0094 Operator Fails to Cntrl Rx Level Following Scram Z-OPWELLWTRU 1.0091 Operator Fails to Maximize Well Water to Circ Pit FTPE-X1--Xl-1.0084 Operator Fails to Manually Depressurize RPV (ATWS)L-OPCHRATWSY 1.0083 Operator Fails to Follow EOPs for Cont. Ht. Removal Q-OPFW99--LU 1.0080 Operator Fails to Initiate Feedwater (Large LOCA/ATWS)
P-OPBCREC--Y 1.0070 Operator Fails to Recover Battery Charger O-OPMNDPML-U 1.0064 Operator Fails to Manually Initiate ADS (Medium LOCA)U-OP2NOREPRS 1.0061 Operator Fails to Repressurize RPV for HPCI W-OPFFWS04--
1.0054 Operator Fails to Open CV491 OA W-OPFFWS03--
1.0054 Operator Fails to Open CV491 OB G-OPLOCSTRTU 1.0053 Operator Fails to Close Breaker to Start GSW Pump APPENDIX F Page F-44 APPENDIX F Page F-44 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.1-2 List of Dominant Hardware Contributors Basic RRW Description SAMA Analysis Treatment Event PD11947 1.0529 This represents failure of the See SAMA 165 RHRSW Loop 'B' HX Diff Press Indicator E/P4914 1.0330 Control Air Supply E/P converter for See SAMA 163 CV4914 CB8490 1.0328 This term represents failure of SAMAs 11, 14, 15, 17, 20, 24, and 26 Switchyard Control Breaker "M". evaluate improvements in the AC power system that would reduce the risk of loss of power to/from the switchyard.
1G031 1.0286 This represents failure of the Div 1 SAMAs 11, 14, 15, 17, 20, 24, and 26 Standby Diesel Generator.
evaluate improvements in the AC power system that would reduce the risk of loss of power to/from the switchyard.
E/P4915 1.0284 Control Air Supply E/P converter for See SAMA 163 CV4915 1 G021 1.0283 This represents failure of the Div 2 SAMAs 11, 14, 15, 17, 20, 24, and 26 Standby Diesel Generator.
evaluate improvements in the AC power system that would reduce the risk of loss of power to/from the switchyard.
1 P216 1.0250 This represents failure of the HPCI SAMAs 27, 28, 29, 31, 33,34 evaluate Pump/Turbine.
improvements that would reduce the risk of high pressure injection failures.PS4529 1.0156 RPV Low Pressure Permissive for See SAMA 166 LPCI/CS PS4545 1.0156 RPV Low Pressure Permissive for See SAMA 166 LPCI/CS 1A311 1.0134 This represents failure of the SBDG SAMAs 11, 14, 15, 17, 20, 24, and 26 1G031 to Bus 1A3 Circuit Breaker. evaluate improvements in the AC power system that would reduce the risk of loss of power to/from the switchyard.
SAMA 23 evaluates the risk due to breaker failures.1A411 1.0132 This represents failure of the SBDG SAMAs 11, 14, 15, 17, 20, 24, and 26 1G021 to Bus 1A4 Circuit Breaker. evaluate improvements in the AC power system that would reduce the risk of loss of power to/from the switchyard.
SAMA 23 evaluates the risk due to breaker failures.1T218 1.0106 This represents failure of the SBLC SAMAs 118, 119 evaluate alternate means of Storage Tank. boron injection in ATWS.1 P226 1.0104 This represents failure of the RCIC SAMAs 27, 28, 29, 31, 33, 34 evaluate Turbine/Pump.
improvements that would reduce the risk of high pressure injection failures.PS4530 1.0101 RPV Low Pressure Permissive for See SAMA 166 LPCI/CS PS4548 1.0101 RPV Low Pressure Permissive for See SAMA 166 LPCI/CS HS4914 1.0051 This represents failure of the RWS See SAMA 164 Loop 'B'.Makeup Hand Switch PD12046 1.0050 Thisrepresents failure of the See SAMA 165 RHRSW Loop 'A' HX Diff Press Indicator APPENDIX F Page F-45 Duane Arnold Energy Center License Renewal Application Environmental Report 5.2 PLANT IPE The Duane Arnold IPE was examined to determine whether any additional plant specific improvements were identified.
Several potential enhancements were identified and these are included in the SAMA list discussed in Section 5.5.5.3 PLANT IPEEE The Duane Arnold IPEEE was examined to determine whether any additional plant specific improvements were identified.
Several potential enhancements were identified and these are included in the SAMA list discussed in Section 5.5.5.4 INDUSTRY SAMA CANDIDATES The generic BWR enhancement list from Table 13 of NEI 2005 was included in the list of Phase I SAMA candidates to assure adequate consideration of potential enhancements identified by other industry studies.5.5 LIST OF PHASE I SAMA CANDIDATES Table 5.5-1 provides the combined list of potential SAMA candidates considered in the DAEC SAMA analysis.
From this table it can be seen that 166 SAMA candidates were identified for consideration.
APPENDiX F Page F-46 APPENDIX F Page F-46 0 0 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 1 Provide additional DC battery capacity.
Extended DC power availability during AC/DC BWR SAMA an SBO. Candidates (NEI 1995)2 Replace lead-acid batteries with fuel cells. Extended DC power availability during AC/DC BWR SAMA an SBO. Candidates (NEI 1995)3 Add additional battery charger or portable, diesel-driven battery charger to Improved availability of DC power AC/DC BWR SAMA existing DC system. system. Candidates (NEI 1995)4 Improve DC bus load shedding.
Extended DC power availability during AC/DC BWR SAMA an SBO. Candidates (NEI 1995)5 Provide DC bus cross-ties.
Improved availability of DC power AC/DC BWR SAMA system. Candidates (NEI 1995)6 Provide additional DC power to the 120/240V vital AC system. Increased availability of the 120 V.vital AC/DC BWR SAMA AC bus. Candidates (NEI 1995)7, Add.an automatic feature to transfer the 120V vital AC bus from normal to Increased.
availability of the 120 V vital AC/DC BWR SAMA standby power. AC bus. Candidates (NEI 1995)8 Increase training on response to loss of two 120V AC buses which Improved chancesof successful AC/DC BWR SAMA causes inadvertent actuation signals. response to loss of two 120V AC Candidates buses. (NEI 1995)9 Reduce DC dependence between high-pressure injection system and Improved containment AC/DC BWR SAMA ADS. depressurization and high-pressure Candidates injection following DC failure. (NEI 1995)10 Provide an additional diesel generator.
Increased availability of on-site AC/DC BWR SAMA emergency AC power. Candidates (NEI 1995)11 Revise procedure to allow bypass of diesel generator trips. Extended diesel generator operation.
AC/DC BWR SAMA Candidates (NEI 1995)12 Improve 4.16-kV bus cross-tie ability. Increased availability of on-site AC AC/DC BWR SAMA power. Candidates (NEI 1995)APPENDIX F Page F-47 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 13 Create AC power cross-tie capability with other unit (multi-unit site). Increased availability of on-site AC AC/DC BWR SAMA -power. Candidates (NEI 1995)14 Install an additional, buried off-site power source. Reduced probability of loss of off-site AC/DC BWR SAMA power. Candidates (NEI 1995)15 Install a gas turbine generator.
Increased availability of on-site AC AC/DC BWR SAMA power. Candidates
___(NEI 1995)16 Install tornado protection on gas turbine generator.
.Increased availability of on-site AC AC/DC BWR SAMA power. Candidates (NEI 1995)17 Install a steam-driven turbine.generator that uses reactor steam and Increased availability of on-site AC AC/DC BWR SAMA exhausts to the suppression pool. power. Candidates (NEI 1995)18 Improve uninterruptible power supplies.
Increased availability of power AC/DC BWR SAMA supplies supporting front-line Candidates equipment. (NEI 1995)19 Create a cross-tie for diesel fuel oil (multi-unit site). Increased diesel. generator availability.
AC/DC BWR SAMA Candidates (NEI 1995)20 Develop procedures for replenishing diesel fuel oil. Increased diesel generator availability.
AC/DC BWR SAMA Candidates (NEI 1995)21 Use fire water system as a backup source for diesel cooling. Increased diesel generator availability.
AC/DC BWR SAMA Candidates (NEI 1995)22 Add a new backup source of diesel cooling. Increased diesel generator availability.
AC/DC BWR SAMA Candidates (NEI 1995)23 Develop procedures to repair or replace failed 4 KV breakers.
Increased probability of recovery from AC/DC BWR SAMA failure of breakers that transfer 4.16 Candidates kV non- emergency buses from unit (NEI 1995)station service transformers.
24 In training, emphasize steps in recovery of off-site power after an SBO. Reduced human error probability AC/DC BWR SAMA during off-site power recovery.
Candidates (NEI 1995)APPENDIX F 0 Page F-48 0 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 25 Develop a severe weather conditions procedure.
Improved off-site power recovery AC/DC BWR SAMA following external weather-related Candidates events. (NEI 1995)26 Bury off-site power lines. Improved off-site power reliability AC/DC BWR SAMA during severe weather. Candidates (NEI 1995)27 Install an independent active or passive high pressure injection system. improved prevention of core melt Core Cooling BWR SAMA sequences.
Candidates (NEI 1995)28 Provide an additional high pressure injection pump with independent Reduced frequency of core melt from Core Cooling BWR SAMA diesel. small LOCA and SBO sequences.
Candidates (NEI 1995)29 Raise HPCI/RCIC backpressure trip set points. Increased HPCI and RCiC availability Core Cooling BWR SAMA when high suppression pool Candidates temperature exists. (NEI 1995)30 Revise procedure to allow bypass of RCIC turbine exhaust pressure trip. Extended RCIC operation.
Core Cooling BWR SAMA Candidates (NEI 1995)31 Revise procedure to allow intermittent operation of HPCI and RCIC. Extended HPCI and RCIC operation.
Core Cooling BWR SAMA Candidates (NEI 1995)32 Revise procedure to control torus temperature, torus level, and primary Increased probability that injection Core Cooling BWR SAMA containment pressure to increase available net positive suction head pumps will be available to inject Candidates (NPSH) for injection pumps. coolant into the vessel. (NEI 1995)33 Revise procedure to manually initiate HPCI and RCIC given auto initiation Increased availability of HPCI and Core Cooling BWR SAMA failure. RCIC given auto initiation.signal Candidates failure. (NEI 1995)34 Modify automatic depressurization system components to improve Reduced frequency of high pressure Core Cooling BWR SAMA reliability.
core damage sequences.
Candidates
___(NEI 1995)35 Add signals to open safety relief valves automatically in an MSIV closure Reduced likelihood of SRV failure to Core Cooling BWR SAMA transient.
open in an MSIV closure transient Candidates, reduces the probability of a medium (NEI 1995)LOCA.36 Revise procedure to allow manual initiation of emergency Improved prevention of core damage Core Cooling BWR SAMA depressurization.
during transients, small and medium Candidates
_LOCAs, and ATWS. (NEI 1995)APPENDIX F Page F-49 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 37 Revise procedure to allow operators to inhibit automatic vessel Extended HPCI and RCIC operation.
Core Cooling BWR SAMA depressurization in non-ATWS scenarios.
Candidates (NEI 1995)38 Add a diverse low pressure injection system. Improved injection capability.
Core Cooling BWR SAMA Candidates (NEI 1995)39 Increase flow rate of suppression pool cooling. Improved suppression pool cooling. Core Cooling BWR SAMA Candidates (NEI 1995)40 Provide capability for alternate injection via diesel-driven fire pump. Improved injection capability.
Core Cooling BWR SAMA Candidates (NEI 1995)41 Provide capability for alternate injection via reactor water cleanup Improved injection capability.
Core Cooling BWR SAMA (RWCU). Candidates (NEI 1995)42 Revise procedure to align EDG and allow use of essential CRD for vessel Improved injection capability.
Core Cooling BWR SAMA injection.
Candidates (NEI 1995)43 Revise procedure to allow use of condensate pumps for injection.
Improved injection capability.
Core Cooling BWR SAMA Candidates (NEI 1995)44 Revise procedure to allow use of suppression pool jockey pump for Improved injection capability Core Cooling BWR SAMA injection.
Candidates (NEI 1995)45 Revise procedure to re-open MSIVs. Regains the main condenser as a heat Core Cooling BWR SAMA sink. Candidates (NEI 1995)46 Improve ECCS suction strainers to enhance reliability of ECCS suction. Enhanced reliability of ECCS suction. Core Cooling BWR SAMA Candidates (NEI 1995)47 Revise procedure to align LPCI or core spray to CST on loss of Improved injection in loss of Core Cooling BWR SAMA suppression pool cooling. suppression pool cooling scenarios.
Candidates (NEI 1995)48 Remove LPCI loop select logic. Enables use of LPCI A loop for Core Cooling BWR SAMA injection in the event of a B injection Candidates path failure. (NEI 1995)APPENDIX F 0 Page F-50 40 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement..
Discussion Focus of SAMA Source SAMA Number 49 Replace two of the four electric safety injection pumps with diesel- Reduced common cause failure of the Cooling Water BWR SAMA powered pumps. safety injection system. This SAMA Candidates was originally intended for the (NEI 1995)Westinghouse-CE System 80+, which has four trains of safety injection.
However, the intent of this SAMA is to provide diversity within the high-and low-pressure safety injection systems.50 Change procedures to allow cross connection of motor cooling for Continued operation of both RHRSW Cooling Water. BWR SAMA RHRSW pumps. pumps on failure of one train of SW. Candidates
- __ -_(NEI 1995)51 Add redundant DC control power for SW pumps. Increased availability of SW. Cooling Water BWR SAMA Candidates
_(NEI 1995)-52 Replace ECCS pump motors with air-cooled motors. Elimination of ECCS dependency on Cooling Water BWR SAMA component cooling system. Candidates (NEI 1995)53 Provide self-cooled ECCS seals. Elimination of ECCS dependency on Cooling Water BWR SAMA component cooling system.: Candidates (NEI 1995)54 Enhance procedural guidance for use of cross-tied component cooling or Reduced frequency.of loss of Cooling Water BWR.SAMA service water pumps. -"component cooling water and service Candidates water. .(NEI 1995)55 Implement modifications to allow manual alignment of the fire water Improved ability to cool RHR heat Cooling Water BWR SAMA system to RHR heat exchangers.
exchangers.
Candidates (NEI 1995)56 Add a service water pump. Increased availability of cooling water. Cooling Water BWR SAMA Candidates (NEI 1995)57 Enhance the screen wash system. Reduced potential for loss of SW due Cooling Water BWR SAMA to clogging of screens. Candidates (NEI 1995)58 Install a digital feedwater upgrade. Reduced chance of loss of main Feedwater and BWR SAMA feedwater following a plant trip. Condensate.
Candidates
_ (NEI 1995)APPENDIX F Page F-Si APPENDIX F Page F-51 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 59 Create ability for emergency connection of existing or new water sources Increased availability of feedwater.
Feedwater and BWR SAMA to feedwater and condensate systems. Condensate Candidates (NEI 1995)60 Install an independent diesel for the condensate storage tank makeup Extended inventory in CST during an Feedwater and BWR SAMA pumps. SBO. Condensate Candidates (NEI 1995)61 Add a motor-driven feedwater pump. Increased availability of feedwater.
Feedwater and BWR SAMA Condensate Candidates (NEI 1995)62 Provide reliable power to control building fans. Increased availability of control room HVAC BWR SAMA ventilation.
Candidates (NEI 1995)63 Provide a redundant train or means of ventilation.
Increased availability of components HVAC BWR SAMA dependent upon room cooling. Candidates (NEI 1995)64 Enhance procedures for actions on loss of HVAC. Increased availability of components HVAC BWR SAMA dependent on room cooling. Candidates (NEI 1995)65 Add a diesel building high temperature alarm or redundant louver and Improved diagnosis of a loss of diesel HVAC BWR SAMA thermostat.
building HVAC. Candidates (NEI 1995)66- Create ability to switch HPCI and RCIC room fan power supply to DC in Increased availability of HPCI and HVAC BWR SAMA an SBO event. RCIC in an SBO event: Candidates (NEI 1995)67 Enhance procedure to trip unneeded RHR or CS pumps on loss of room Extended availability of required RHR HVAC BWR SAMA ventilation., or CS pumps due to reduction in room Candidates heat load. (NEI 1995)68 Stage backup fans in switchgear rooms. Increased availability of ventilation in HVAC BWR SAMA the event of a loss of switchgear Candidates ventilation. (NEI 1995)69 Add a switchgear room high temperature alarm. Improved diagnosis of a loss of HVAC BWR SAMA switchgear HVAC. Candidates (NE 11995)70 Provide cross-unit connectionof uninterruptible compressed air supply. Increased ability to vent containment IA/Nitrogen BWR SAMA using the hardened vent. Candidates (NEI 1995)APPENDIX F 0 Page F-52 0 0 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 71 Modify procedure to provide ability to align diesel power to more air Increased availability of instrument air IA/Nitrogen BWR SAMA compressors.
after a LOOP. Candidates (NEI 1995)72 Replace service and instrument air compressors with more reliable Elimination of instrument air system IA/Nitrogen BWR SAMA compressors which have self-contained air cooling by shaft driven fans. dependence on TBCCW and service Candidates water cooling. (NEI 1995)73 Install nitrogen bottles as backup gas supply for safety relief valves. Extended SRV operation time. IA/Nitrogen BWR SAMA Candidates (NEI 1995)74 Improve SRV and MSIV pneumatic components.
Improved availability of SRVs and IA/Nitrogen BWR SAMA MSIVs. Candidates (NEI 1995)75 Install an independent method of suppression pool cooling. Increased availability of containment Containment BWR SAMA heat removal. Performance Candidates (NEI 1995)76 Revise procedure to initiate suppression pool cooling during transients, Improved containment pressure Containment BWR SAMA LOCAs and ATWS. control and containment heat removal Performance Candidates capability. (NEI 1995)77 Cross-tie open cycle cooling system to enhance drywell spray system. Increased availability of containment Containment BWR SAMA heat removal. Performance Candidates (NEI 1995)78 Enable flooding of the drywell head seal. Reduced probability of leakage Containment BWR SAMA through the drywell head seal. Performance Candidates (NEI 1995)79 Create a reactor cavity flooding system. Enhanced debris cool ability, reduced Containment BWR SAMA core concrete interaction, and Performance Candidates increased fission product. (NEI 1995)80 Install a passive drywell spray system. Improved drywell spray capability.
Containment BWR SAMA Performance Candidates (NEI 1995)81 Use the fire water system as a backup source for the drywell spray Improved drywell spray capability.
Containment BWR SAMA system. Performance Candidates (NEI 1995)82 Enhance procedures to refill CST from de-mineralized water or service Reduced risk of core damage during Containment BWR SAMA water system. station blackouts or LOCAs that Performance Candidates render the suppression pool (NEI 1995)unavailable as an injection source.APPENDIX F Page F-53 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 83 Enhance procedure to maintain ECCS suction on CST as long as Reduced chance of pump failure due Containment BWR SAMA possible.
to high suppression pool temperature.
Performance Candidates (NEI 1995)84 Modify containment flooding procedure to restrict flooding to below the top Reduced forced containment venting. Containment BWR SAMA of active fuel. Performance Candidates (NEI 1995)85 Install an unfiltered, hardened containment vent. Increased decay heat removal Containment BWR SAMA capability for non-ATWS events, Performance Candidates without scrubbing released fission (NEI 1995)products.86 Install a filtered containment vent to remove decay heat. Increased decay heat removal Containment BWR SAMA Option 1: Gravel Bed Filter. capability for non-ATWS events, with Performance Candidates Option 2: Multiple Venturi Scrubber.
scrubbing of released fission products. (NE11995)87 Enhance fire protection system and standby gas treatment system Improved fission product scrubbing in Containment BWR SAMA hardware and procedures.
severe accidents.
Performance Candidates (NEI 1995)88 Modify plant to permit suppression pool scrubbing.
Increased scrubbing of fission Containment BWR SAMA products by directing vent path Performance Candidates through water in the suppression pool. (NEI 1995)89 Enhance containment venting procedures with respect to timing, path Improved likelihood of successful Containment BWR SAMA selection, and technique.
venting. Performance Candidates (NEI 1995)90 Control containment venting within a narrow band of pressure.
Reduced probability of rapid Containment BWR SAMA containment depressurization thus Performance Candidates avoiding adverse impact on low (NEI 1995)pressure injection systems that take suction from the torus.91 Improve vacuum breaker reliability by installing redundant valves in each Decreased consequences of a Containment BWR SAMA line. vacuum breaker failure to reseat. Performance Candidates (NEI 1995)92 Enhance air return fans (ice condenser plants). Reduced probability of containment Containment BWR SAMA failure in SBO sequences.
Performance Candidates (NEI 1995)93 Provide post-accident containment inerting capability.
Reduced likelihood of hydrogen and Containment BWR SAMA carbon monoxide gas combustion.
Performance Candidates (NEI 1995)APPENDIX F 0 Page F-54 0 Duane Arnold Energy Center License Renewal Application
.Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 94 Create a large concrete crucible with heat removal potential to contain Increased cooling and containment of Containment BWR SAMA molten core debris, molten core debris. Molten core debris Performance Candidates escaping from the vessel is contained (NEI 1995)within the crucible and a water cooling mechanism cools the molten core in the crucible, preventing melt-through of the base mat.95 Create a core melt source reduction system. Increased cooling and containment of Containment BWR SAMA molten core debris. Refractory Performance Candidates material would be placed underneath (NEI 1995)the reactor vessel such that a molten core falling on the material would melt and combine with the material.Subsequent spreading and heat removal from the vitrified compound would be facilitated, and concrete_attack would not occur.96 Strengthen primary/secondary containment (e.g., add ribbing to Reduced probability of containment Containment BWR SAMA containment shell). over-pressurization.
Performance Candidates (NEI 1995)97 Increase depth of the concrete base mat or use an alternate concrete Reduced probability of base mat melt7 Containment BWR SAMA material to ensure melt-through does not occur. through. Performance Candidates (NEI 1995)98 Provide a reactor vessel exterior cooling system. Increased potential to cool a molten Containment BWR SAMA*core before it causes vessel failure, by Performance Candidates submerging the lower head in water. (NEI 1995)99 Construct a building to be connected to primary/secondary containment Reduced probability of containment Containment BWR SAMA and maintained at a vacuum. over-pressurization.
Performance Candidates (NEI 1995)100 Institute simulator training for severe accident scenarios.
Improved arrest of core melt progress Containment BWR SAMA and prevention of containment failure. Performance Candidates (NEI 1995)101 Improve leak detection procedures.
Increased piping surveillance to Containment BWR SAMA identify leaks prior to complete failure. Performance Candidates Improved leak detection would reduce (NEI 1995)LOCA frequency.
APPENDIX F Page F-55 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 102 Install an independent power supply to the hydrogen control system using Reduced hydrogen detonation Containment BWR SAMA either new batteries, a non-safety grade portable generator, existing potential.
Performance Candidates station batteries, or existing AC/DC independent power supplies, such as (NEI 1995).the security system diesel.103 Install a passive hydrogen control system. Reduced hydrogen detonation Containment BWR SAMA potential.
Performance Candidates (NEI 1995)104 Erect a barrier that would provide enhanced protection of the containment Reduced probability of containment Containment BWR SAMA walls (shell) from ejected core debris following a core melt scenario at failure. Performance Candidates high pressure. (NEI 1995)105 Install additional pressure or leak monitoring instruments for detection of Reduced ISLOCA frequency.
Containment BWR SAMA ISLOCAs. Bypass Candidates (NEI 1995)106 Add redundant and diverse limit switches to each containment isolation Reduced frequency of containment Containment BWR SAMA valve. isolation failure and ISLOCAs. Bypass Candidates (NEl 1995)107 Increase leak testing of valves in ISLOCA paths. Reduced ISLOCA frequency.
Containment BWR SAMA Bypass Candidates (NEI 1995)108 Improve MSIV design. Decreased likelihood of containment Containment BWR SAMA bypass scenarios.
Bypass Candidates (NEI 1995)109 Install self-actuating containment isolation valves. Reduced frequency of isolation failure. Containment BWR SAMA Bypass Candidates (NEI 1995)110 Locate residual heat removal (RHR) inside containment.
Reduced frequency of ISLOCA Containment BWR SAMA outside containment.
Bypass Candidates (NEI 1995)111 Ensure ISLOCA releases are scrubbed.
One method is to plug drains in Scrubbed ISLOCA releases.
Containment BWR SAMA potential break areas so that break point will be covered with water. Bypass Candidates I_ I (NEI 1995)APPENDIX F Page F-56 S Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 112 Revise EOPs to improve ISLOCA identification.
Increased likelihood that LOCAs Containment BWR SAMA outside containment are identified as Bypass Candidates such. A plant had a scenario in which (NEI 1995)an RHR ISLOCA could direct initial leakage back to the pressurizer relief tank, giving indication that the LOCA was inside containment.
113 Improve operator training on ISLOCA coping. Decreased ISLOCA consequences.
Containment BWR SAMA Bypass Candidates (NEl 1995)114 Create cross-connect ability for standby liquid control (SLC) trains. Improved availability of boron injection ATWS BWR SAMA during ATWS. Candidates (NEI 1995)115 Revise procedures to control vessel injection to prevent boron loss or Improved availability of boron injection ATWS BWR SAMA dilution following SLC injection, during ATWS. Candidates (NEI 1995)116 Provide an alternate means of opening a pathway to the RPV for SLC Improved probability of reactor ATWS BWR SAMA injection, shutdown.
Candidates (NEI 1995)117 Increase boron concentration or enrichment in the SLC system. Reduced time required to achieve ATWS BWR SAMA shutdown concentration provides Candidates increased margin in the accident (NEI 1995)timeline for successful initiation of SLC.118 Add an independent boron injection system. Improved availability of boron injection ATWS BWR SAMA during ATWS. Candidates (NEI 1995)119 Provide ability to use control rod drive (CRD) or RWCU for alternate Improved availability of boron injection ATWS BWR SAMA boron injection.
during ATWS. Candidates (NEI 1995)120 Add a system of relief valves to prevent equipment damage from pressure Improved equipment availability after ATWS BWR SAMA spikes during an ATWS. an ATWS. Candidates (NEI 1995)121 Increase safety relief valve (SRV) reseat reliability.
Reduced risk of dilution of boron due ATWS BWR SAMA to SRV failure to reseat after standby Candidates liquid control (SLC) injection. (NEI 1995)APPENDIX F Page F-57 APPENDIX F Page F-57 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 122 Provide an additional control system for rod insertion (e.g., AMSAC). Improved redundancy and reduced ATWS BWR SAMA ATWS frequency.
Candidates (NEI 1995)123 Install an ATWS sized filtered containment vent to remove decay heat. Increased ability to remove reactor ATWS BWR SAMA heat from ATWS events. Candidates (NEI 1995)124 Revise procedure to bypass MSIV isolation in turbine trip ATWS Affords operators more time to ATWS BWR SAMA scenarios.
perform actions. Discharge of a Candidates substantial fraction of steam to the (NEI 1995)main condenser (i.e., as opposed to into the primary containment) affords the operator more time to perform actions (e.g., SLC injection, lower water level, depressurize RPV) than if the main condenser was unavailable, resulting in lower human error probabilities.
125 Revise procedure to allow override of low pressure core injection during Allows immediate control of low ATWS BWR SAMA an ATWS event. pressure core injection.
On failure of Candidates high pressure core injection and (NEI 1995)condensate, some plants direct reactor depressurization followed by five minutes of automatic low pressure core injection.
126 Seal penetrations between turbine building basement and switchgear Increased flood propagation Flooding BWR SAMA rooms. prevention.
Candidates (NEI 1995)127 Improve inspection of rubber expansion joints. Reduced frequency of internal flooding Flooding BWR SAMA due to failure of circulating water Candidates system expansion on main condenser (NEI 1995)joints.128 Modify swing direction of doors separating turbine building basement from Prevents flood propagation.
Flooding BWR SAMA areas containing safeguards equipment.
Candidates (NEI 1995)129 Increase seismic ruggedness of plant components.
Increased availability of necessary Seismic BWR SAMA plant equipment during and after Candidates seismic events. (NEl 1995)APPENDIX F Page F-58 0 0 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 130 Provide additional restraints for CO 2 tanks. Increased availability of fire protection Seismic BWR SAMA given a seismic event. Candidates (NEl 1995)131 Modify safety related condensate storage tank. Improved availability of CST following Seismic BWR SAMA a seismic event. Candidates (NEI 1995)132 Replace anchor bolts on diesel generator oil cooler. Improved availability of diesel Seismic BWR SAMA generators following a seismic event. Candidates (NEI 1995)133 Replace mercury switches in fire protection system. Decreased probability of spurious fire Fire BWR SAMA suppression system actuation.
Candidates (NEI 1995)134 Upgrade fire compartment barriers.
Decreased consequences of a fire. Fire BWR SAMA Candidates (NEI 1995)135 Install additional transfer and isolation switches.
Reduced number of spurious Fire BWR SAMA actuations during a fire. Candidates (NEI 1995)136 Enhance procedures to use alternate shutdown methods if the control Increased probability of shutdown if Fire BWR SAMA room becomes uninhabitable, the control room becomes Candidates uninhabitable. (NEI 1995)137 Enhance fire brigade awareness.
Decreased consequences of a fire. Fire BWR SAMA Candidates (NEI 1995)138 Enhance control of combustibles and ignition sources. Decreased fire frequency and Fire BWR SAMA consequences.
Candidates (NEI 1995)139 Install digital large break LOCA protection system. Reduced probability of a large break Other BWR SAMA LOCA (a leak before break). Candidates (NEI 1995)140 Enhance procedures to mitigate large break LOCA. Reduced consequences of a large Other BWR SAMA break LOCA. Candidates (NEI 1995)141 Install computer aided instrumentation system to assist the operator in Improved prevention of core melt Other BWR SAMA assessing post-accident plant status. sequences by making operator actions Candidates more reliable. (NEI 1995)APPENDIX F Page F-59 APPENDIX F Page F-59 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 142 Improve maintenance procedures.
Improved prevention of core melt Other BWR SAMA sequences by increasing reliability of Candidates important equipment. (NEI 1995)143 Increase training and operating experience feedback to improve operator Improved likelihood of success of Other BWR SAMA response.
operator actions taken in response to Candidates abnormal conditions. (NEI 1995)144 Develop procedures for transportation and nearby facility accidents.
Reduced consequences of Other BWR SAMA transportation and nearby facility Candidates accidents. (NEI 1995)145 Develop AOP or EOP for response to total loss of DC power. Many of the Improved mitigation of total loss of DC IPE DAEC IPE control breakers in the plant that require DC power are stored energy power events. (IELP 1992)breakers that can be locally operated.
Other strategies would include using EHC panel power to manually jack open the TBVs in order to depressurize, taking local manual control of the RCIC system, and using portable generators to power essential DC loads.146 Consider revision to the EOP direction to terminate injection to the RPV Enhance ability to mitigate long term IPE DAEC IPE from sources external to the drywell, irrespective of core cooling, in loss of containment heatup scenarios. (IELP 1992)containment heat removal scenarios where the Maximum Primary Containment Water Level Limit (MPCWLL) is reached.147 Maintain heightened awareness of the operations staff of the importance Eliminate scenarios in which SLC IPE DAEC IPE of timely injection of Standby Liquid Control in ATWS scenarios, initiation is delayed in ATWS (IELP 1992)conditions to prevent containment damage and subsequent core failure.148 Provide a procedure with a tested lineup that will allow the use of the Better mitigation of extended loss of IPE DAEC IPE diesel fire pump to inject to the RPV in extended loss of AC power AC power events. (IELP 1992)scenarios.
Also provide direction to maintain sufficient DC power reserve to keep the containment and RPV a low enough pressure for the firewater to RPV lineup to be successful.
149 Change EOPs to allow the use of Drywell Spray as well as removing Initiation of drywell spray prior to RPV IPE DAEC IPE ambiguity regarding the diversion of injection sources away from the RPV breach would preclude the debris (IELP 1992)when adequate core cooling is not assured. attack and failure of the drywellshell.
150 Relaxation of the restrictions on the use of the drywell sprays in the DWSI Drywell sprays offer an additional IPE DAEC IPE curve of the EOPs may be a possible future accident management item. alternative to the control of the drywell (IELP 1992)temperature to avoid premature containment failure.APPENDIX F Page F-60 0 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 151 Provide accident management strategies that provide guidance to the Reduction in the amount of release IPE DAEC IPE operators on protecting containment and cooling debris using methods through the containment vents early in (IELP 1992)that do not require the venting of the RPV and avoid using the drywell the accident.vent unless no other alternative exists.152 One masonry block wall was identified that was not included in the NRC Prevent damage to safety related IPEEE DAEC IPEEE IE Bulletin 80-11 program as a masonry wall that could potentially equipment during a seismic event. (IES 1995)damage Safe Shutdown Equipment List equipment.
153 Portions of the control room ceiling may not have adequate restraint of Prevent damage to safety related IPEEE DAEC IPEEE the membranes nor adequate strength in the connections to preclude equipment during a seismic event. (IES 1995)potential falling of ceiling elements onto critical equipment during a seismic loading.154 Problems identified with the adequacy of seismic equipment anchorages Prevent damage to safety related IPEEE DAEC IPEEE during field walkdowns and UT examinations.
equipment during a seismic event. (IES 1995)155 Two air handlers in the HPCI room were identified as seismically induced Prevent damage to equipment from IPEEE DAEC IPEEE flood/spray outliers because nearby piping could potentially impact fire post-seismic event flooding/spray. (IES 1995)protection sprinkler piping and break off the sprinkler heads, which could damage the air handler motors.156 Provide an alternate source of water for the RHRSW/ESW pit. Decrease the contribution to risk due Cooling Water Expert Panel to failure of the RWS system.157 Three areas were identified that have gas storage bottles that were not Prevent damage to equipment from IPEEE DAEC IPEEE adequately restrained against seismic events, nearby gas bottles post seismic event. _ (IES 1995)158 Prohibit any work in the switchgear room supporting the operating river Reduce the fire ignition frequency in IPEEE DAEC IPEEE water train during any maintenance on the river water system. the switchgear room supporting the (IES 1995)operable river water train.159 Post a fire watch in the switchgear room supporting the operating river Maximize the ability to respond to and IPEEE DAEC IPEEE water train, or stage temporary hoses for implementation of AOP-41 0, mitigate a fire in the switchgear room (IES 1995)Total Loss of River Water. supporting the operable river water train.160 Modify piping design to eliminate the flooding sequences from the fire Eliminate or reduce the damage IPEEE DAEC IPEEE protection piping in the control building HVAC room above the control caused by flooding from rupture of this (IES 1995)room. fire protection piping.161 Increase the distance of installation of a new hydrogen storage tank from Minimize damages to safety related IPEEE DAEC IPEEE safety related structures.
equipment from fires/explosions-in the (IES 1995)new hydrogen storage facility.APPENDIX F Page F-61 Duane Arnold Energy Center License Renewal Application Environmental Report Table 5.5-1 List of SAMA Candidates (Cont.)DAEC Potential Improvement Discussion Focus of SAMA Source SAMA Number 162 Install concrete barriers around the auxiliary boiler propane tank. Eliminate the risk of propane tank IPEEE DAEC IPEEE damage and subsequent (IES 1995)fire/explosion caused by vehicle impacts on the propane tank.163 Improve the reliability of the RWS system control valves CV4914 and Decreased risk due to failures of the PRA DAEC PRA CV4915. RWS system. (High PRA importance Rev 5C list.) (FPL 2007b)164 Improve the reliability of the RWS control system. Decreased risk due to failures of the PRA DAEC PRA RWS system. (High PRA importance Rev 5C list -HS- 4914.) (FPL 2007b)165 Improve the reliability of the RHRSW loop differential pressure indicators.
Decreased risk due to failures of the PRA DAEC PRA RHRSW system. (High PRA Rev 5C importance list.) (FPL 2007b)166 Increase the reliability of the low pressure ECCS RPV low pressure Decreased risk due to failures of the PRA DAEC PRA permissive circuitry.
Install manual bypass of low pressure permissive, low pressure ECCS systems. (High Rev 5C PRA importance list.) (FPL 2007b)APPENDIX F Page F-62 APPENDIX F 0 Page F-62 0 Duane Arnold Energy Center License Renewal Application Environmental Report 6 PHASE I ANALYSIS A preliminary screening of thecomplete list of SAMA candidates was performed to limit the number of SAMAs for which detailed analysis in Phase II was necessary.
The screening criteria used in the Phase I analysis are described below.* Screening Criterion A -Not Applicable:
If a SAMA candidate did not apply to the DAEC plant design, it was not retained.* Screening Criterion B -Already Implemented:
If a SAMA candidate had already been implemented at DAEC, it was not retained.* Screening Criterion C -Combined:
If a SAMA candidate was similar in nature and could be combined with another SAMA candidate to develop a more comprehensive or plant-specific SAMA candidate, only the combined SAMA candidate was retained." Screening Criterion D -Excessive Implementation Cost If a SAMA required extensive changes that will obviously exceed the maximum benefit (Section 4.5), even without an implementation cost estimate, it was not retained.* Screening Criterion E -Very Low Benefit If a SAMA from an industry document was related to a non-risk significant system for which change in reliability is known to have negligible impact on the risk profile, it was not retained. (No SAMAs were screened using this criterion.)
Table 6-1 presents the list of Phase I SAMA candidates and provides the disposition of each candidate along with the applicable screening criterion associated with each candidate.
Those candidates that have not been screened by application of these criteria are evaluated further in the Phase II analysis (Section 7). It can-be seen from this table that 142 SAMAs were screened from the analysis during Phase 1 and that 24 SAMAs passed into the-next phase of the analysis.-
APPENDIX F Page F-63 APPENDIX F Page F-63 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph I? Criterion Number 13 Create AC power cross-tie Increased availability of on-site AC power. Yes A -Not N/A. Single Unit.capability with other unit (multi-unit Applicable site).16 Install tornado protection on gas Increased availability of on-site AC power. Yes A -Not N/A. Do not have a gas turbine generator.
Applicable turbine.19 Create a cross-tie for diesel fuel oil Increased diesel generator availability.
Yes A -Not N/A. Single Unit.(multi-unit site). Applicable 29 Raise HPCI/RCIC backpressure trip Increased HPCI and RCIC availability when Yes A -Not The HPCI high backpressure set points. high suppression pool temperature exists. Applicable trip is already set at a pressure above the containment ultimate pressure; thus, raising the trip limit would have very limited impact. The RCIC trip limit could be increased or bypassed, but the benefit would also be small because RPV depressurization is required before containment conditions are above these back pressure set points.Therefore, no benefit is gained from increasing these numerical values.30 Revise procedure to allow bypass Extended RCIC operation.
Yes A -Not The RCIC trip limit could be of RCIC turbine exhaust pressure Applicable increased 6r bypassed, but trip. the benefit would also be small because RPV depressurization is required before containment conditions are above these back pressure set points.Therefore, no benefit is gained from increasing these numerical values.APPENDIX F Page F-64 APPENDIX F 0 Page F-64 0 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 44 Revise procedure to allow use of Improved injection capability Yes A -Not Flow rate too low, only 50 suppression pool jockey pump for Applicable gpm.-injection.
53 Provide self-cooled ECCS seals. Elimination of ECCS dependency on Yes A -Not Seal cooling is not required component cooling system. Applicab!e for injection or containment heat removal. Seal cooling is only needed during the initial stages of shutdown cooling operation.
57 Enhance the screen wash system. Reduced potential for loss of SW due to Yes A -Not Currently a reliable system.clogging of screens. Applicable Fire water and well water are available as backup for maintaining level in the safety-related pump pit.67 Enhance procedure to trip Extended availability of required RHR or CS Yes A -Not Not needed. Pumps can run unneeded RHR or CS pumps on pumps due to reduction in room heat load. Applicable for several days without room loss of room ventilation.
cooling.70 Provide cross-unit connection of Increased ability to vent containment using Yes A -Not N/A. Single unit.uninterruptible compressed air the hardened vent. Applicable supply.92 Enhance air return fans (ice Reduced probability of containment failure in Yes A -Not N/A. No ice condenser.
condenser plants). SBO sequences.
Applicable 102 Install an independent power supply Reduced hydrogen detonation potential.
Yes A -Not N/A. Inerted drywell.to the hydrogen control system Applicable using either new batteries, a non-safety grade portable generator, existing station batteries, or existing AC/DC independent power supplies, such as the security system diesel.103 Install a passive hydrogen control Reduced hydrogen detonation potential.
Yes A -Not N/A. Inerted drywell.system. Applicable 111 Ensure ISLOCA releases are Scrubbed ISLOCA releases.
Yes A -Not The majority of piping the for scrubbed.
One method is to plug Applicable these leakage paths is too drains in potential break areas so high the room for this to be that break point will be covered with effective.
water.APPENDIX F Page F-65 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 114 Create cross-connect ability for Improved availability of boron injection Yes A -Not N/A. Do not have two inject standby liquid control (SLC) trains, during ATWS. Applicable oaths. See 118.126 Seal penetrations between turbine Increased flood propagation prevention.
Yes A -Not N/A. Essential switchgear building basement and switchgear Applicable room not below ground level.rooms. Half of non-essential switchgear is below ground level. See SAMA 155 and 160 for plant specific flooding issues.128 Modify swing direction of doors Prevents flood propagation.
Yes A -Not N/A. Essential switchgear separating turbine building Applicable room not below ground level.basement from areas containing Half of non-essential safeguards equipment.
switchgear is below ground.level. See SAMA 155 and 160 for plant specific flooding issues.130 Provide additional restraints for CO Increased availability of fire protection given Yes A -Not C02 tanks not identified as 2 tanks. a seismic event. Applicable an issue in seismic studies and walkdowns.
132 Replace anchor bolts on diesel Improved availability of diesel generators Yes A -Not Diesel bolting not identified as generator oil cooler. following a seismic event. Applicable an issue in seismic walkdowns and studies.134 Upgrade fire compartment barriers.
Decreased consequences of a fire. Yes A -Not See SAMAs 155,158,159, Applicable 161, and 162 for plant___specific fire issues.135 Install additional transfer and Reduced number of spurious actuations Yes A -Not See SAMAs 155,158,159, isolation switches.
during a fire. Applicable 161, and 162 for plant specific fire issues.144 Develop procedures for Reduced consequences of transportation Yes A -Not DAEC is isolated, with no transportation and nearby facility and nearby facility accidents.
Applicable industrial facilities nearby.accidents.
Local transportation routes analyzed and determined to be acceptable by the Control Room Habitability Study.APPENDIX F 0 Page F-66 0 0 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion' Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 165 Improve the reliability of the Decreased risk due to failures of the Yes A -Not The PRA model does not RHRSW loop differential pressure RHRSW system. (High PRA importance Applicable reflect a modification for indicators, list.) removal of the automatic control function for delta pressure across the heat exchanger.
This causes these components to have an artificially high risk reduction worth.1 Provide additional DC battery Extended DC power availability during an Yes B -Implemented Implemented through SAMG.capacity.
SBO. OR Intent Met 3 Add additional battery charger or Improved availability of DC power system. Yes B -Implemented Implemented through SAMG.portable, diesel-driven battery OR Intent Met charger to existing DC system.4 Improve DC bus load shedding.
Extended DC power availability during an Yes B -Implemented Load shedding is in SBO. OR Intent Met procedure.
6 Provide additional DC power to the Increased availability of the 120 V vital AC Yes B -Implemented Implemented.
120/240V vital AC system. bus. OR Intent Met 7 Add an automatic feature to transfer Increased availability of the 120 V vital AC Yes B -Implemented Implemented.
the 120V vital AC bus from normal bus. OR Intent Met to standby power.8 Increase training on response to Improved chances of successful response to Yes B -Implemented Operators trained biennially.
loss of two 120V AC buses which loss of two 120V AC buses. OR Intent Met causes inadvertent actuation signals.9 Reduce DC dependence between Improved containment depressurization and Yes B -Implemented Implemented through an high-pressure injection system and high-pressure injection following DC failure. OR Intent Met alternate mitigation strategy.ADS.11 Revise procedure to allow bypass Extended diesel generator operation.
Yes B -Implemented If Emergency Start signal is of diesel generator trips. OR Intent Met present, the only diesel trip would come from a generator lock out or overspeed.
18 Improve uninterruptible power Increased availability of power supplies Yes B -Implemented Upgraded UPS installed.
supplies, supporting front-line equipment.
OR Intent Met Isolator fuses installed.
20 Develop procedures for Increased diesel generator availability.
Yes B -Implemented Procedures in place.replenishing diesel fuel oil. OR Intent Met APPENDIX F Page F-67 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 21 Use fire water system as a backup Increased diesel generator availability.
Yes B -Implemented Procedures in place.source for diesel cooling. OR Intent Met 22 Add a new backup source of diesel Increased diesel generator availability.
Yes B -Implemented EOPs contain guidance for cooling. OR Intent Met cross-tie to other water sources.23 Develop procedures to repair or Increased probability of recovery from failure Yes B -Implemented In place.replace failed 4 KV breakers.
of breakers that transfer 4.16 kV non- OR Intent Met emergency buses from unit station service transformers.
24 In training, emphasize steps in Reduced human error probability during off- Yes B -Implemented In place.recovery of off-site power after an site power recovery.
OR Intent Met SBO.25 Develop a severe weather Improved off-site power recovery following Yes B -Implemented In place.conditions procedure.
external weather-related events. OR Intent Met 31 Revise procedure to allow Extended HPCI and RCIC operation.
Yes B -Implemented In place.intermittent operation of HPCI and OR Intent Met_RCIC.32 Revise procedure to control torus Increased probability that injection pumps Yes B -Implemented Procedures in place.temperature, torus level, and will be available to inject coolant into the OR Intent Met primary containment pressure to vessel.increase available net positive suction head (NPSH) for injection pumps.33 Revise procedure to manually Increased availability of HPCI and RCIC Yes B -Implemented System operating instructions initiate HPCI and RCIC given auto given auto initiation signal failure. OR Intent Met have guidance for HPCI and initiation failure. RCIC. RCIC includes instructions for operating system with no power available.
34 Modify automatic depressurization Reduced frequency of high pressure core Yes B -Implemented Procedures in place.system components to improve damage sequences.
OR Intent Met reliability.
36 Revise procedure to allow manual Improved prevention of core damage during Yes B -Implemented EOPs provide guidance for initiation of emergency transients, small and medium LOCAs, and OR Intent Met manual initiation of depressurization.
ATWS. depressurization and for alternate means of depressurization.
APPENDIX F Page F-68 0 O Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 37 Revise procedure to allow Extended HPCI and RCIC operation.
Yes B -Implemented EOP in place.operators to inhibit automatic vessel OR Intent Met depressurization in non-ATWS scenarios.
38 Add a diverse low pressure Improved injectioncapability.
Yes B -Implemented Procedures in place.injection system. OR Intent Met 40 Provide capability for alternate Improved injection capability.
Yes B -Implemented Injection using existing fire injection via diesel-driven fire pump. OR Intent Met pump is current EOP implementing procedures.
Also can use a new portable diesel powered pump.42 Revise procedure to align EDG and Improved injection capability.
Yes B -Implemented Procedures in place.allow use of essential CRD for OR Intent Met vessel injection.
43 Revise procedure to allow use of Improved injection capability.
Yes B -Implemented Procedures in place.condensate pumps for injection.
OR Intent Met 45 Revise procedure to re-open Regains the main condenser as a heat sink. Yes B -Implemented Procedures in place.MSIVs. OR Intent Met 46. Improve ECCS suction strainers to Enhanced reliability of ECCS suction. Yes B -Implemented Done.enhance reliability of ECCS suction. OR Intent Met 47 Revise procedure to align LPCI or Improved injection in loss of suppression Yes B -Implemented Core Spray can be aligned.core spray to CST on loss of pool cooling scenarios.
OR Intent Met LPCI cannot.suppression pool cooling.48 Remove LPCI loop select logic. Enables use of LPCI A loop for injection in Yes B -Implemented Current licensing action.the event Of a B injection path failure. OR Intent Met 50 Change procedures to allow cross Continued operation of both RHRSW pumps Yes B -Implemented ESW loops can be cross-tied, connection of motor cooling for on failure of one train of SW. OR Intent Met spool piece staged in RHRSW pumps. pumphouse.
54 Enhance procedural guidance for Reduced frequency of loss of component Yes B -Implemented Hardware exists, procedure in use of cross-tied component cooling water and service water. OR Intent Met place for diesel.cooling or service water pumps.58 Install a digital feedwater upgrade. Reduced chance of loss of main feedwater Yes B -Implemented Have in place.following a plant tripý OR Intent Met 59 Create ability for emergency Increased availability of feedwater.
Yes B -Implemented Implemented through an connection of existing or new water OR Intent Met alternate mitigation strategy.sources to feedwater and condensate systems.APPENDIX F Page F-69 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 60 Install an independent diesel for the Extended inventory in CST during an SBO. Yes B -Implemented Implemented through an condensate storage tank makeup OR Intent Met alternate mitigation strategy.pumps.61 Add a motor-driven feedwater Increased availability of feedwater.
Yes B -Implemented Feedwater pumps are motor pump. OR Intent Met driven.62 Provide reliable power to control Increased availability of control room Yes B -Implemented Control Building HVAC runs building fans. ventilation.
OR Intent Met off essential power.63 Provide a redundant train or means Increased availability of components Yes B -Implemented In place.of ventilation.
dependent upon room cooling. OR Intent Met 64 Enhance procedures for actions on Increased availability of components Yes B -Implemented In place.loss of HVAC. dependent on room cooling. OR Intent Met 65 Add a diesel building high Improved diagnosis of a loss of diesel Yes B -Implemented Alarm exists.temperature alarm or redundant building HVAC. OR Intent Met louver and thermostat.
66 Create ability to switch HPCI and Increased availability of HPCI and RCIC in Yes B -Implemented Procedure bypasses RCIC room fan power supply to DC an SBO event. OR Intent Met temperature trips. RCIC will in an SBO event. run with no ventilation.
Need to open HPCI door.68 Stage backup fans in switchgear Increased availability of ventilation in the Yes B -Implemented Have alternate fans and rooms, event of a loss of switchgear ventilation.
OR Intent Met procedure.
69 Add a switchgear room high Improved diagnosis of a loss of switchgear Yes B -Implemented Same cooling as control temperature alarm. HVAC. OR Intent Met room. High temperatures would be noticed by operators well before alarm comes in.71 Modify procedure to provide ability Increased availability of instrument air after a Yes B -Implemented If essential bus is powered, to align diesel power to more air LOOP. OR Intent Met already in place.compressors.
72 Replace service and instrument air Elimination of instrument air system Yes B -Implemented Compressors are self cooled.compressors with more reliable dependence on TBCCW and service water OR Intent Met compressors which have self- cooling.contained air cooling by shaft driven fans.APPENDIX F 0 Page F-70 0
-Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cant.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 73 Install nitrogen bottles as backup Extended SRV operation time. Yes B -Implemented Accumulators exist on every gas supply for safety relief valves. OR Intent Met valve. Additionally, there are header connections outside the drywell for connection of portable bottles.74 Improve SRV and MSIV pneumatic Improved availability of SRVs and MSIVs. Yes B -Implemented Implemented.
MSIVs components.
OR Intent Met upgraded in 1990s. MSIVs and SRVs are subject to a PM Program and EQ part replacement program.76 Revise procedure to initiate Improved containment pressure control and Yes B -Implemented Procedures in place.suppression pool cooling during containment heat removal capability.
OR Intent Met transients, LOCAs and ATWS.77 Cross-tie open cycle cooling system Increased availability of containment heat Yes B -Implemented Procedures in place.to enhance drywell spray system. removal. OR Intent Met 79 Create a reactor cavity flooding Enhanced debris cool ability, reduced core Yes B -Implemented Procedures provide guidance system. concrete interaction, and increased fission. OR Intent Met on debris cooling.product.81 Use the fire water system as a Improved drywell spray capability.
Yes B -Implemented Covered in EOP support backup source for the drywell spray OR Intent Met procedures.
system.82 Enhance procedures to refill CST Reduced risk of core damage during station Yes' B -Implemented EMGs in place.from de-mineralized water or blackouts or LOCAs that render the OR Intent Met service water system. suppression pool unavailable as an injection source.83 Enhance procedure to maintain Reduced chance of pump failure due to high Yes B -Implemented Procedure exists to bypass ECCSsuction on CST as long as suppression pool temperature.
OR Intent Met HPCI high torus water level possible.
suction swap. RCIC does not swap suctions based on torus level. Core spray suction can be aligned to CST.84 Modify containment flooding Reduced forced containment venting. Yes B -Implemented Procedures in place.procedure to restrict flooding to , OR Intent Met below the top of active fuel.85 Install an unfiltered, hardened Increased decay heat removal capability for Yes B.- Implemented Done.containment vent. non-ATWS events, without scrubbing OR Intent Met released fission products.APPENDIX F Page F-71 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 87 Enhance fire protection system and Improved fission product scrubbing in severe Yes B -Implemented Guidance provided in current standby gas treatment system accidents.
OR Intent Met procedures.
hardware and procedures..
88 Modify plant to permit suppression Increased scrubbing of fission products by Yes B -Implemented Included in EOPs. Vent pool scrubbing.
directing vent path through water in the OR Intent Met paths from suppression pool suppression pool. airspace are preferred.
89 Enhance containment venting Improved likelihood of successful venting. Yes B -Implemented EOP-2 Appendix C to procedures with respect to timing, OR Intent Met Technical Support Guide.path selection, and technique.
90 Control containment venting within Reduced probability of rapid containment Yes B -Implemented Procedures in place.a narrow band of pressure.
depressurization thus avoiding adverse OR Intent Met impact on low pressure injection systems that take suction from the torus.91 Improve vacuum breaker reliability Decreased consequences of a vacuum Yes B -Implemented Two active and two swing by installing redundant valves in breaker failure to reseat. OR Intent Met valves on each line.each line.93 Provide post-accident containment Reduced likelihood of hydrogen and carbon Yes B -Implemented Containment is inerted prior inerting capability.
monoxide gas combustion.
OR Intent Met to event with the capability of replenishing the Nitrogen at low containment pressures.
98 Provide a reactor vessel exterior Increased potential to cool a molten core Yes, B -Implemented Procedures in place.cooling system. before it causes vessel failure, by OR Intent Met submerging the lower head in water.100 Institute simulator training for Improved arrest of core melt progress and Yes B -Implemented Covered in SAM training severe accident scenarios, prevention of containment failure. OR Intent Met program.101 Improve leak detection procedures.
Increased piping surveillance to identify Yes B -Implemented Currently have leak detection leaks prior to complete failure. Improved leak OR Intent Met systems monitor the drywell detection would reduce LOCA frequency.
with requirements for monitoring.
Outside the primary containment, there are room flooding indicators and other means of detecting leaks.105 Install additional pressure or leak Reduced ISLOCA frequency.
Yes B -Implemented ISLOCA paths already have monitoring instruments for detection OR Intent Met pressure monitoring of ISLOCAs. instrumentation installed.
APPENDIX F Page F-72 0 0 0 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 108 Improve MSIV design. Decreased likelihood of containment bypass Yes B'- Implemented Improved in 1990.scenarios.
OR Intent Met 110 Locate residual heat removal (RHR) Reduced~frequency of ISLOCA outside Yes B -Implemented Pumps are within secondary inside containment, containment.
OR Intent Met containment.
112 Revise EOPs to improve ISLOCA Increased likelihood that LOCAs outside Yes B -Implemented EOPs and SAGs address" identification.
containment are identified as such. A plant OR Intent Met this.had a scenario in which an RHR ISLOCA could direct initial leakage back to the pressurizer relief tank, giving indication that the LOCA was inside containment.
113 Improve operator training on Decreased ISLOCA consequences.
Yes B -Implemented Done, EOP training covers ISLOCA coping. OR Intent Met this topic..115 Revise procedures to control vessel Improved availability of boron injection Yes B -Implemented.
ATWS EOPs in place.injection to prevent boron loss or during ATWS. OR Intent Met dilution following SLC injection.
116 Provide an alternate means of Improved probability of reactor shutdown.
Yes B -Implemented Procedures in place.opening a pathway to the RPV for OR Intent Met SLC injection.
118 Add an independent boron injection Improved availability of boron injection" Yes B -Implemented Procedures in place.system. during ATWS., OR Intent Met 119 Provide ability to use control rod Improved availability of boron injection Yes B -Implemented Procedures in place.drive (CRD) or RWCU for alternate during ATWS. OR Intent Met boron injection.
121 Increase safety relief valve (SRV) Reduced risk of dilution of boron due to SRV Yes B -Implemented Process monitoring program reseat reliability, failure to reseat after standby liquid control OR Intent Met in place to monitor SRV (SLC) injection, health. PM program in place for the SRVs.122 Provide an additional control Improved redundancy and reduced ATWS Yes B -Implemented ARI system installed.
system for rod insertion (e.g., frequency.
OR Intent Met AMSAC). "_" APPENDIX F Page F-73 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph I? Criterion Number 124. Revise procedure to bypass MSIV Affords operators more time to perform Yes B -Implemented Procedures in place.isolation in turbine trip ATWS actions. Discharge of a substantial fraction of OR Intent Met scenarios.
steam to the main condenser (i.e., as opposed to into the primary containment) affords the operator more time to perform actions (e.g., SLC injection, lower water level, depressurize RPV) than if the main condenser was unavailable, resulting in lower human error probabilities.
_____________
125 Revise procedure to allow override Allows immediate control of low pressure Yes B -Implemented Procedures in place.of low pressure core injection core injection.
On failure of high pressure -OR Intent Met during an ATWS event, core injection and condensate, some plants-direct reactor depressurization followed by five minutes of automatic low pressure core injection.
_____________
127 Improve inspection of rubber Reduced frequency of internal flooding due Yes B -Implemented Inspected every refueling expansion joints, to failure of circulating water system OR Intent Met outage. Program in place to expansion on main condenser.
joints. replace before prior to end of___________life expectancy.
129 Increase seismic ruggedness of Increased availability of necessary plant Yes B -Implemented Done after Seismic plant components.
equipment during and after seismic events. OR Intent Met Qualification Utilities Group Inspection.
Also see SAMAs 152, 153, 154, 155, and 157 for plant specific seismic________________________________
__________issues.
131 Modify safety related condensate Improved availability of CST following a Yes B -Implemented Although not safety related, storage tank, seismic event. OR Intent Met the CST is bolted in order to_________
__________________________
____________________________________________
_sustain____ssutainseisiceeent APPENDIX IF 0 Page F-74 Duane Arnold Energy Center License-Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph I? Criterion Number 133 Replace mercury switches in fire Decreased probability of spurious fire Yes B -Implemented Per IPEEE, the only mercury protection system.- suppression system actuation.
OR Intent Met switches in the control circuitry of the DAEC fire protection systems are associated with the diesel-driven fire pump and jockey pump low pressure initiation logic. This control circuitry in no way influences potential suppression system_ _ _actuations.
136 Enhance procedures.to use Increased probability of shutdown if the Yes B -Implemented Implemented using an alternate shutdown methods if the control room becomes uninhabitable.
OR Intent Met alternate mitigation strategy.control room becomes uninhabitable.
137 Enhance fire brigade awareness.
Decreased consequences of a fire. Yes B -Implemented The fire brigade training and OR Intent Met procedures meet current....__industry standards.
138 Enhance control of combustibles Decreased fire frequency and Yes B -Implemented Procedures in place.and ignition sources. consequences.
OR Intent Met 140 Enhance procedures to mitigate Reduced consequences of a large break Yes B -Implemented EOPs and SAGs in place.large break LOCA. LOCA. OR Intent Met 141 Install computer aided -Improved prevention of core melt sequences Yes B -Implemented Done SPDS.instrumentation system to assist the by making operator actions more reliable.
OR Intent Met operator in assessing post-accident-plant status.142 Improve maintenance procedures.
Improved prevention of core melt sequences Yes B -Implemented Continuous improvement by increasing reliability of important OR Intent Met program in progress.equipment.
143 Increase training and operating Improved likelihood of success of operator Yes B -Implemented Current program meets experience feedback to improve actions taken in response to abnormal OR Intent Met current industry guidance.operator response.
conditions.
_APPENDIX F Page F-75 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 145 Develop AOP or EOP for response Improved mitigation of total loss of DC power Yes B -Implemented Procedures exist for total loss to total loss of DC power. Many of events. OR Intent Met of DC power, the control breakers in the plant that depressurization using-require DC power are stored energy alternate power to the TBVs, breakers that can be locally and operation of RCIC operated.
Other strategies would without DC power.include using EHC panel power to manually jack open the TBVs in order to depressurize, taking local manual control of the RCIC system, and using portable generators to power essentialDC loads.146 Consider revision to the EOP Enhance ability to mitigate long term Yes B -Implemented Guidance in EOPs.direction to terminate injection to containment heatup scenarios.
OR Intent Met the RPV from sources external to the drywell, irrespective of core cooling, in loss of containment heat removal scenarios where the Maximum Primary Containment Water Level Limit (MPCWLL) is reached.147 Maintain heightened awareness of Eliminate scenarios in which SLC initiation is Yes B -Implemented Included in operator training the operations staff of the delayed in ATWS conditions to prevent OR Intent Met program.importance of timely injection of containment damage and subsequent core Standby Liquid Control in ATWS failure.scenarios.
148 Provide a procedure with a tested Better mitigation of extended loss of AC Yes B -Implemented.
Procedures in place.lineup that will allow the use of the power'events.
OR Intent Met diesel fire pump to inject to the RPV in extended loss of AC power scenarios.
Also provide direction to maintain sufficient DC power reserve to keep the containment and RPV a low enough pressure for the firewater to RPV lineup to be successful.
APPENDIX F 0 Page F-76 0 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 149 Change EOPs to allow the use of Initiation of drywell spray prior to RPV Yes B -Implemented Procedures in place.Drywell Spray as well as removing breach would preclude the debris attack and OR Intent Met ambiguity regarding the diversion of failure of the drywell shell.injection sources away from the RPV when adequate core cooling is not assured.150 Relaxation of the restrictions on the Drywell sprays offer an additional alternative Yes B -Implemented Procedures in place.use of the drywell sprays in the to the control of the drywell temperature to OR Intent Met DWSI curve of the EOPs may be a avoid premature containment failure.possible future accident management item.151 Provide accident management Reduction in the amount of release through Yes B -Implemented Procedure in place.strategies that provide guidance to the containment vents early in the accident.
OR Intent Met the operators on protecting containment and cooling debris using methods that do not require the venting of the RPV and avoid using the drywell vent unless no other alternative exists.152 One masonry block wall was Prevent damage to safety related equipment Yes B -Implemented Already Implemented.
The identified that was not included in during a seismic event. OR Intent Met wall was added to the list and the NRC IE Bulletin 80-11 program qualified.
as a masonry wall that could potentially damage Safe Shutdown Equipment List equipment.
153 Portions of the control room ceiling Prevent damage to safety related equipment Yes B -Implemented Already Implemented.
may not have adequate restraint of during a seismic event; OR Intent Met Selected elements of the the membranes nor adequate control room ceiling were strength in the connections to modified.precludepotential falling of ceiling elements onto critical equipment during a seismic loading.APPENDIX F Page F-77 APPENDIX F Page F-77 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 154 Problems identified with the Prevent damage to safety related equipment Yes B -Implemented Already Implemented.
Some adequacy of seismic equipment during a seismic event. OR Intent Met identified anchorages were anchorages during field walkdowns qualified by analysis to use and UT examinations.
as-is, the remaining issues were resolved by maintenance actions or modifications.
155 Two air handlers in the HPCI room Prevent damage to equipment from post- Yes B -Implemented Already Implemented.
were identified as seismically seismic event flooding/spray.
OR Intent Met Further analysis shows that induced flood/spray outliers clearances between because nearby piping could equipment are sufficient to potentially impact fire protection preclude impact.sprinkler piping and break off the sprinkler heads, which could damage the air handler motors.157 Three areas were identified that Prevent damage to equipment from nearby Yes B -Implemented Already Implemented.
Gas have gas storage bottles that were gas bottles post seismic event. OR Intent Met bottles were either removed not adequately restrained against or additional restraint seismic, events. provided.158 Prohibit any work in the switchgear Reduce the fire ignition frequency in the Yes B -Implemented Maintenance risk room supporting the operating river switchgear room supporting the operable OR Intent Met management program water train during any maintenance river water train. provides for protection of on the river water system. certain systems when maintenance is being performed.
159 Post a fire watch in the switchgear Maximize the ability to respond to and Yes B -Implemented Maintenance risk room supporting the operating river mitigate a fire in the switchgear room OR Intent Met management program water train, or stage temporary supporting the operable river water train. provides for protection of hoses for implementation of AOP- certain systems when 410, Total Loss of River Water. maintenance is being performed.
160 Modify piping design to eliminate Eliminate or reduce the damage caused by Yes B -Implemented Already Implemented.
These the flooding sequences from the fire flooding from rupture of this fire protection OR Intent Met fire protection systems were protection piping in the control piping. changed to "dry pipe" building HVAC room above the systems.control room.APPENDIX F 0 Page F-78 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion NNumber 161 Increase the distance of installation Minimize damages to safety related Yes B -Implemented Already Implemented.
The of a new hydrogen storage tank equipment from fires/explosions in the new OR Intent Met new tank was sited properly from safety related structures.
hydrogen storage facility.
in relation to safety related structures.
The new location was determined to be in accordance with EPRI guidelines and to be consistent with recommendations in GL 93-06.162 Install concrete barriers around the Eliminate the risk of propane tank damage Yes B -Implemented Already Implemented.
auxiliary boiler propane tank. and subsequent fire/explosion caused by OR Intent Met Concrete barriers installed.
vehicle impacts on the propane tank.2 Replace lead-acid batteries with Extended DC power availability during an Yes C -Combined Combine with SAMA 3.fuel cells. SBO.5 Provide DC bus cross-ties.
Improved availability of DC power system. Yes C -Combined Combine with SAMA 3.14 Install an additional, buried off-site Reduced probability of loss of off-site power. Yes D -Excess Cost Standby Transformer already power source. underground.
A line to the nearest offsite black start unit would exceed 50 miles.26 Bury off-site power lines. Improved off-site power reliability during Yes D -Excess Cost Standby Transformer already severe weather. underground.
A line to the nearest offsite black start unit would exceed 50 miles.51 Add redundant DC control power Increased availability of SW. Yes D -Excess Cost Cost would exceed maximum for SW pumps. benefit. Mods would be required for RHRSW, ESW, and RWS.80 Install a passive drywell spray Improved drywell spray capability.
Yes D -Excess Cost Excess Cost.system.86 Install a filtered containment vent to Increased decay heat removal capability for Yes D -Excess Cost Cost will exceed maximum remove decay heat. non-ATWS events, with scrubbing of benefit.Option 1: Gravel Bed Filter. released fission products.Option 2: Multiple Venturi Scrubber.APPENDIX F Page F-79 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 94 Create a large concrete crucible Increased cooling and containment of molten Yes D -Excess Cost Excess Cost.with heat removal potential to core debris. Molten core debris escaping contain molten core debris, from the vessel is contained within the crucible and a water cooling mechanism cools the molten core in the crucible, preventing melt-through of the base mat.95 Create a core melt source reduction Increased cooling and containment of molten Yes D -Excess Cost Excess Cost.system. core debris. Refractory material would be placed underneath the reactor vessel such that a molten core falling on the material would melt and combine with the material.Subsequent spreading and heat removal from the vitrified compound would be facilitated, and concrete attack would not occur.96 Strengthen primary/secondary Reduced probability of containment over- Yes D -Excess Cost Excess Cost.containment (e.g., add ribbing to pressurization.
containment shell).97 Increase depth of the concrete base Reduced probability of base mat melt- Yes D -Excess Cost Excess Cost.mat or use an alternate concrete through.material to ensure melt-through does not occur.99 Construct a building to be Reduced probability of containment over- Yes D -Excess Cost Excess Cost.connected to primary/secondary pressurization.
containment and maintained at a vacuum.104 Erect a barrier that would provide Reduced probability of containment failure. Yes D -Excess Cost Excess Cost.enhanced protection of the containment walls (shell) from ejected core debris following a core melt scenario at high pressure.106 Add redundant and diverse limit Reduced frequency of containment isolation Yes D -Excess Cost Cost would exceed MAB.switches to each containment failure and ISLOCAs.isolation valve. _-109 Install self-actuating containment Reduced frequency of isolation failure. Yes D -Excess Cost Modification cost would_ isolation valves. I exceed maximum benefit.APPENDIX F Page F-80 APPENDIX F Page F-80 0 ý Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 10 Provide an additional diesel Increased availability of on-site emergency No Retain for Phase II analysis.generator.
AC power. Could conceivably use TSC Diesel. However, there are no plans to do so.12 Improve 4.16-kV bus cross-tie Increased availability of on-site AC power. No Retain for Phase II analysis.ability.15 Install a gas turbine generator.
Increased availability of on-site AC power. No Retain for Phase II analysis.17 Install a steam-driven turbine Increased availability of on-site AC power. No Retain for Phase II analysis.generator that uses reactor steam and exhausts to the suppression pool.27 Install an independent active or Improved prevention of core melt No Retain for Phase II analysis.passive high pressure injection sequences.
system.28 Provide an additional high pressure Reduced frequency of core melt from small No Retain for Phase II analysis.injection pump with independent LOCA and SBO sequences.
diesel.35 Add signals to open safety relief Reduced likelihood of SRV failure to open in No Retain for Phase II analysis.valves automatically in an MSIV an MSIV closure transient reduces the Open reliably now.closure transient.
probability of a medium LOCA.39 Increase flow rate of suppression Improved suppression pool cooling. No Retain for Phase II analysis.pool cooling. Do not need more flow, backup is better solution.
See item 75.41 Provide capability for alternate Improved injection capability.
No Retain for Phase II analysis.injection via reactor water cleanup No connections.(RWCU).49 Replace two of the four electric Reduced common cause failure of the safety No Retain for Phase II analysis.safety injection pumps with diesel- injection system. This SAMA was originally powered pumps. intended for the Westinghouse-CE System 80+, which has four trains of safety injection.
However, the intent of this SAMA is to provide diversity within the high-and low-pressure safety injection systems.52 Replace ECCS pump motors with Elimination of ECCS dependency on No Retain for Phase II analysis.air-cooled motors. component cooling system. Core spray now cooled by ESW.APPENDIX F Page F-81 Duane Arnold Energy Center License Renewal Application Environmental Report Table 6-1 DAEC Phase I SAMA Analysis (Cont.)DAEC Potential Improvement Discussion Screened Screening Phase I Disposition SAMA Out Ph 1? Criterion Number 55 Implement modifications to allow Improved ability to cool RHR heat No Retain for Phase II analysis.manual alignment of the fire water exchangers.
system to RHR heat exchangers.
56 Add a service water pump. Increased availability of cooling water. No Retain for Phase II analysis.75 Install an independent method of Increased availability of containment heat No Retain for Phase II analysis.suppression pool cooling. removal.78 Enable flooding of the drywell head Reduced probability of leakage through the No Retain for Phase II analysis.seal. drywell head seal.107 Increase leak testing of valves in Reduced ISLOCA frequency.
No Retain for Phase II analysis.ISLOCA paths.117 Increase boron concentration or Reduced time required to achieve shutdown No Retain for Phase II analysis.enrichment in the SLC system. concentration provides increased margin in the accident timeline for successful initiation of SLC.120 Add a system of relief valves to Improved equipment availability after an No Retain for Phase II analysis.prevent equipment damage from ATWS.pressure spikes during an ATWS.123 Install an ATWS sized filtered Increased ability to remove reactor heat from No Retain for Phase II analysis.containment vent to remove decay ATWS events.heat.139 Install digital large break LOCA Reduced probability of a large break LOCA No Retain for Phase II analysis.protection system. (a leak before break).156 Provide an alternate source of Decrease the contribution to risk due to No Retain for Phase II analysis.water for the RHRSW/ESW pit. failure of the RWS system.163 Improve the reliability of the RWS Decreased risk due to failures of the RWS No Retain for Phase II analysis.system control valves CV4914 and system. (High PRA importance list.)CV4915.164 Improve the reliability of the RWS Decreased risk due to failures of the RWS No Retain for Phase II analysis.control system. system. (High PRA importance list -HS-4914.)166 Increase the reliability of the low Decreased risk due to failures of the low No Retain for Phase II analysis.pressure ECCS RPV low pressure pressure ECCS systems. (High PRA permissive circuitry.
Install manual importance list.)bypass of low pressure permissive.
APPENDIX F Page F-82 0 0 0 Duane Arnold Energy Center License Renewal Application Environmental Report 7 PHASE II SAMA ANALYSIS A cost-benefit analysis was performed on each of the SAMA candidates remaining after the Phase I screening.
The benefit of a SAMA candidate is the difference between the baseline cost of severe accident risk (maximum benefit from Section 4.5) and the cost of the severe accident risk with the SAMA implemented (Section 7.1). The cost figure used is the estimated cost to implement the specific SAMA. If the benefit exceeds the estimated cost of implementation the SAMA iscost-beneficial.
7.1 SAMA BENEFIT 7.1.1 Severe Accident Risk With SAMA Implemented Bounding analyses were used to determine the change in risk following implementation of SAMA candidates or groups of similar SAMA candidates.
For each analysis case, the Level 1 internal events or Level 2 PRA models were altered to conservatively consider implementation of the SAMA candidate(s).
Then, severe accident risk measures were calculated using the same procedure used for the baseline case described in Section 3.The severe accident risk measures were obtained for each analysis case by modifying the baseline model in a simple manner to capture the effect of implementation of the SAMA in a bounding manner. Bounding analyses are very conservative and result in overestimation of the benefit of the candidate analyzed.
However, if this bounding assessment yields a benefit that is smaller than the cost of implementation, then the effort involved in refining the PRA modeling approach for the SAMA would be unnecessary because it would only yield a lower benefit result. If the benefit is greater than the cost when modeled in this bounding approach, it is necessary to refine the PRA model of the SAMA to remove conservatism.
As a result of this modeling approach, models representing the Phase II SAMAs will not all be at the same level of detail and if any are implemented, the PRA result after implementation of the final installed design will differ from the screening-type analyses done during this evaluation.
Examples of hypothetical "bounding analyses" are: LBLOCA This analysis case was used to evaluate the change in plant risk profile that would be achieved if a digital large break LOCA protection system was installed.
Although the proposed change would not completely eliminate the potential for a large break LOCA, a bounding benefit was estimated by removing the large break LOCA initiating event. This analysis case was used to model the benefit of SAMA xx.DCPWR APPENDIX F Page F-83 Duane Arnold Energy Center License Renewal Application Environmental Report This analysis case was used to evaluate plant modifications that would increase the availability of Class 1E DC power (e.g., increased battery capacity or the installation of a diesel-powered generator that would effectively increase battery capacity).
Although the proposed SAMAs would not completely eliminate the.potential failure, a bounding benefit was estimated by removing the battery discharge events and battery failure events. This analysis case was used to model the benefit of SAMAs a, b, etc.7.1.2 Cost of Severe Accident Risk with SAMA Implemented Using the PRA analyses described in Section 7.1.1, severe accident impacts in four areas (off-site exposure cost, off-site economic cost, on-site exposure cost, and on-site economic cost) were calculated using-the same procedure used for the baseline case described in Section 4. As in Section 4.5, the severe accident impacts were summed to estimate the total cost of severe accident risk with the SAMA implemented.
7.1.3 SAMA Benefit The respective SAMA benefit was calculated by subtracting the total cost of severe accident risk with the SAMA implemented from the baseline cost of severe accident risk (maximum benefit from Section 4.5). The estimated benefit for each SAMA candidate is listed in Table 7.1.3-1. The calculation of the benefit is performed using an Excel spreadsheet.
7.2 COST OF SAMA IMPLEMENTATION The final step in the evaluation of the SAMAs is estimating the cost of implementation for comparison with the benefit. For the purpose of this analysis, the DAEC staff has estimated that the cost of making a change to a procedure and for conducting the necessary training on a procedure change is expected to exceed $30,000. Similarly, the minimum cost associated with development and implementation of an integrated hardware modification package (including post-implementation costs, e.g. training) was assumed to be $100,000.
These values were used for comparison with the benefit of SAMAs.The benefits resulting from the bounding estimates presented in the benefit analysis are in some cases rather low. In those cases for which the benefits are so low that it is obvious that the implementation costs would exceed the benefit, a detailed cost estimate was not warranted.
In those cases where the benefit exceeded the minimum implementation costs, the SAMA was further assessed by an expert panel.APPENDiX F Page F-84 APPENDIX F Page F-84 Duane Arnold Energy Center License Renewal Application Environmental Report Table 7.1.3-1 DAEC Phase II SAMA Analysis DAEC Potential Improvement Discussion
% Red. % Red. SAMA SAMA Case Benefit Cost Cost Basis Evaluation Basis for SAMA In CDF In OS Case Description Evaluation Number Dose 10 Provide an additional diesel Increased availability of on- 37.79% 41.43% NOSBO This case determines
$954K >MAB Expert Panel. Not Cost- Cost generator.
site.emergency AC power. the benefit of eliminating Beneficial exceeds all Station Blackout MAB.events. This allows evaluation of possible improvements related to SBO sequences.
For the purposes of the analysis, a single bounding analysis is performed Which assumes the standby diesel generators do not fail.12 Improve 4.16-kV bus cross- Increased availability of on- 12.38% 18.18% NOSBO2A This case was used to $399K >$1,OOOK Expert Panel Not Cost- Cost tie ability. site AC power. determine the benefit of Beneficial Exceeds installing a cross-tie Benefit.between the two 4160V busses. For the purposes of the analysis, a single bounding analysis was performed which assumed the Div.I diesel generator does not fail. The Div. I diesel generator was chosen since it has higher risk reduction worth than the Div. II diesel generator 15 Install a gas turbine Increased availability of on- 37.79% 41.43% NOSBO This case determines
$954K >MAB Per Expert Not Cost- Cost generator.
site AC power. the benefit of eliminating Panel Beneficial Exceeds all Station Blackout MAB events. This allows evaluation of possible improvements related to SBO sequences.
For the purposes of the analysis, a single bounding analysis is performed which assumes the standby diesel generators do not fail.APPENDIX F PageF-85 Duane Arnold Energy Center License Renewal Application Environmental Report Table 7.1.3-1 DAEC Phase II SAMA Analysis (Cont.)DAEC Potential Improvement Discussion
% Red. % Red. SAMA SAMA Case Benefit Cost Cost Basis Evaluation Basis for SAMA In CDF In OS Case Description Evaluation Number Dose 17 Install a steam-driven turbine Increased availability of on- 37.79% 41.43% NOSBO This case determines
$954K >MAB Per Expert Not Cost- Cost generator that uses reactor site AC power. the benefit of eliminating Panel Beneficial Exceeds steam and exhausts to the all Station Blackout MAB.suppression pool. events. This allows evaluation of possible improvements re!ated to SBO sequences.
For the purposes of the analysis, a single bounding analysis is performed which assumes the standby diesel generators do not fail.27 Install an independent active Improved prevention of 26.16% 26.08% LOCA03 This case determines
$570K >MAB Per Expert Not Cost- Cost or passive high pressure core melt sequences.
the impact of eliminating Panel Beneficial Exceeds injection system. the small, medium, and MAB large LOCA initiators, the break outside of containment initiator, the inadvertent open relief valve initiator, and stuck open relief valve sequences in the quantification of the PRA model.28 Provide an additional high Reduced frequency of core 37.21% 35.99% LOCA01 This case determines
$814K >MAB Per Expert Not Cost- Cost pressure injection pump with melt from small LOCA and the benefit of the HPCI Panel Beneficial Exceeds independent diesel. SBO sequences.
system operating without MAB failure. For the purposes of the analysis, a single bounding analysis is performed which assumes the HPCI system does not fail.35 Add signals to open safety Reduced likelihood of SRV 15.12% 7.64% SRVOI This case determines
$185K >1,000K Per Expert Not Cost- Cost relief valves automatically in failure to open in an MSIV the benefit of Panel Beneficial Exceeds an MSIV closure transient.
closure transient reduces safety/relief valves Benefit.the probability of a medium successfully opening LOCA. without failure. For the purposes of the analysis, a single bounding analysis is performed which assumes the safety/relief valves do not fail to open when demanded.APPENDIX F 0 Page F-86 0 0 Duane Arnold Energy Center License Renewal Application Environmental Report Table 7.1.3-1 DAEC Phase II SAMA Analysis (Cont.)DAEC Potential Improvement Discussion
% Red. % Red. SAMA SAMA Case Benefit Cost Cost Basis Evaluation Basis for SAMA In CDF In OS Case Description Evaluation Number Dose 39 Increase flow rate of Improved suppression pool 8.14% 8.36% CONT01 This case determines
$167K >MAB Per Expert Not Cost- Cost suppression pool cooling, cooling, the benefit of eliminating Panel Beneficial Exceeds all containment heat MAB removal failures.
For the purpose of the analysis, a single bounding analysis is performed which assumes the event tree node representing torus cooling is always successful.
41 Provide capability for Improved injection 16.28% 15.96% LOCA04 Eliminate all steam line $345K $1.300K Per Expert Not Cost- Cost alternate injection via reactor capability.
breaks and stuck open Panel Beneficial Exceeds water cleanup (RWCU). SRVs. This wil be used MAB to evaluate using RWCU for vessel injection.
RWCU injection will only be effective for LOCAs that represent a steam break.49 Replace two of the four Reduced common cause 26.16% 26.08% LOCA03 This case determines
$570K >MAB Per Expert Not Cost- Cost electric safety injection failure of the safety the impact of eliminating Panel Beneficial Exceeds pumps with diesel-powered injection system. This the small, medium, and MAB pumps. SAMA was originally large LOCA initiators, intended for the the break outside of Westinghouse-CE System containment initiator, the 80+, which has four trains inadvertent open relief of safety injection, valve initiator, and stuck However, the intent of this open relief valve SAMA is to provide sequences in the diversity within the high- quantification of the PRA and low-pressure safety model.injection systems.52 Replace ECCS pump motors Elimination of ECCS 26.16% 26.08% LOCA03 This case determines
$570K >$1,500K Per Expert Not Cost- Cost with air-cooled motors. dependency on component the impact of eliminating Panel. $700K Beneficial Exceeds cooling system. the small, medium, and per motor x 2, Benefit.large LOCA initiators, engineering the break outside of costs, plus containment initiator, the installation inadvertent open relief valve initiator, and stuck open relief valve sequences in the quantification of the PRA model.APPENDIX F Page F-87 APPENDIX F Page F-87 Duane Arnold Energy Center License Renewal Application Environmental Report Table 7.1.3-1 DAEC Phase II SAMA Analysis (Cont.)DAEC Potential Improvement Discussion
% Red. % Red. SAMA SAMA Case Benefit Cost Cost Basis Evaluation Basis for SAMA In CDF In OS Case Description Evaluation Number Dose 55 Implement modifications to Improved ability to cool 4.65% 8.65% SWO1 This case determines
$156K >$500K Per Expert Not Cost- Cost allow manual alignment of RHR heat exchangers, the benefit of the RHR Panel Beneficial Exceeds the fire water system to RHR Service Water system Benefit heat exchangers.
operating without failure.For the purposes of the.analysis, a single bounding analysis is performed which assumes the RHR Service Water system does not fail.56 Add a service water pump. Increased availability of 4.65% 8.65% SWO1. This case determines
$156K >$1,000K Per Expert Not Cost- Cost cooling water, the benefit of the RHR Panel Beneficial Exceeds Service Water system Benefit operating without failure.For the purposes of the analysis, a single bounding analysis is performed which assumes the RHR Service Water system does not fail.75 Install an independent Increased availability of 8.14% 8.36% CONT01 This case determines
$167K >$1,000K Per Expert Not Cost- Cost method of suppression pool containment heat removal. the benefit of eliminating Panel Beneficial Exceeds cooling, all containment heat Benefit removal failures.
For the purpose of the analysis, a single bounding analysis is performed which assumes the event tree node representing torus cooling is always successful.
78 Enable flooding of the Reduced probability of 0.00% 1.77% CONT02B Eliminate all failures of $26K >$100K Expert Panel Not Cost- Cost drywell head seal. leakage through the the drywell head flange Procedure, Beneficial Exceeds drywell head seal. seal. does not Benefit consider ability to access area.107 Increase leak testing of Reduced ISLOCA 0.58% 0.52% ISLOCA This case determines
$10.5K >MAB Per Expert Not Cost- Cost valves in ISLOCA paths. frequency.
the impact of eliminating Panel. Plant Beneficial Exceeds all Interfacing System must be MAB. All LOCA initiated shutdown in ISLOCA sequences in the order to test. paths have quantification of the PRA pressure model. monitoring instrumentati Ion.APPENDIX F Page F-88 0 Duane Arnold Energy Center License Renewal Application Environmental Report Table 7.1.3-1 DAEC Phase II SAMA Analysis (Cont.)DAEC Potential Improvement Discussion
% Red. % Red. SAMA SAMA Case Benefit Cost Cost Basis Evaluation Basis for SAMA In CDF In OS Case Description Evaluation Number Dose 117 Increase boron concentration Reduced time required to 6.60% 6.00% ATWS02 Eliminate all failures of 137K $400K Expert Panel Not Cost- Cost or enrichment in the SLC achieve shutdown SLC to inject. In other Beneficial Exceeds system. concentration provides words, successful boron Benefit increased margin in the injection in ATWS accident timeline for scenarios.
successful initiation of SLC.120 Add a system of relief valves Improved equipment 29.65% 25.63% NOATWS This case determines
$590K >MAB Per Expert Not Cost- Cost to prevent equipment availability after an ATWS. the benefit of eliminating Panel Beneficial Exceeds damage from pressure all ATWS events. For MAB spikes during an ATWS. the purposes of the analysis, a single bounding analysis is performed which assumes that ATWS events do not occur.123 Install an ATWS sized Increased ability to remove 29.65% 25.63% NOATWS This case determines
$590K >MAB Per Expert Not Cost- Cost filtered containment vent to reactor heat from ATIWS the benefit of eliminating Panel Beneficial Exceeds remove decay heat. events, all ATWS events. For MAB the purposes of the analysis, a single bounding analysis is performed which assumes that ATWS events do not occur.139 Install digital large break Reduced probability of a 26.16% 26.08% LOCA03 This case determines
$570K >MAB Per Expert Not Cost- Cost LOCA protection system. large break LOCA (a leak the impact of eliminating Panel Beneficial Exceeds before break). the small, medium, and MAB large LOCA initiators, the break outside of containment initiator, the inadvertent open relief valve initiator, and stuck open relief valve sequences in the quantification of the PRA model.APPENDIX F Page F-89 Duane Arnold Energy Center License Renewal Application Environmental Report Table 7.1.3-1 DAEC Phase II SAMA Analysis (Cont.)DAEC Potential Improvement Discussion
% Red. % Red. SAMA SAMA Case Benefit Cost Cost Basis Evaluation Basis for SAMA In CDF In OS Case Description Evaluation Number Dose 156 Provide an alternate source Decrease the contribution 12.79% 14.62% RWS01 Eliminate all failures of $320K $250K Per Expert Potentially Cost- Potentially of water for the to risk due to failure of the the RWS system. Panel. Add a Beneficial Cost-RHRSW/ESW pit. RWS system. T-connection Beneficial and valve to the pipe connecting the RHRSW/ESW pit to the Circ Water pit to allow for backfiow from the Circ Water pit to the RHRSW/ESW pit.163 Improve the reliability of the Decreased risk due to 12.79% 14.62% RWS01 Eliminate all failures of $320K >$1,000K Per Expert Not Cost- Cost RWS system control valves failures of the RWS the RWS system. Panel. Add a Beneficial Exceeds CV4914 and CV4915. system. (High PRA parallel path Benefit importance list.) with piping and valve to each loop.164 Improve the reliability of the Decreased risk due to 0.37% 0.49% RWS02 Eliminate all failures of $10.OK $100K Per Expert Not Cost- Cost RWS control system, failures of the RWS Vs RWS handswitch HS- Panel Beneficial Exceeds system. (High PRA BASE02 4914 and the Benefit.importance list -HS- 4914.) corresponding switch in the opposite loop.166 Increase the reliability of the Decreased risk due to 6.40% 13.20% LOCA05 Eliminate all failures of $276K $250K Per Expert Potentially Cost- Potentially low pressure ECCS RPV low failures of the low pressure the low pressure ECCS Panel, for Beneficial Cost pressure permissive circuitry.
ECCS systems. (High low reactor pressure jumpers in Beneficial.
Install manual bypass of low PRA importance list.) permissive pressure control panel pressure permissive.
switches.
covered by procedure.
APPENDIX F Page F-90' Duane Arnold Energy Center License Renewal Application Environmental Report 8 SENSITIVITY ANALYSES The purpose of performing sensitivity analyses is to examine the impact of analysis assumptions on the results of the SAMA evaluation.
This section identifies several sensitivities that can be performed during SAMA (NEI 2005) and discusses the sensitivity as it applies to DAEC including the impact of the sensitivity on the results of the Phase II SAMA analysis at DAEC.Unless it was otherwise noted, it is assumed in these sensitivity analyses that sufficient margin existed in the maximum benefit estimation that the Phase I screening would not have to be repeated in the sensitivity analyses.8.1 PLANT MODIFICATIONS There are no plant modifications that are currently pending that would be expected to impact the results of this SAMA evaluation.
8.2 UNCERTAINTY
Since the inputs to PRA cannot be known with complete certainty, there is possibility that the actual plant risk is greater than the mean values used in the evaluation of the SAMA described in the previous sections.
To consider this uncertainty, a sensitivity analysis was performed in which an uncertainty factor was applied to the frequencies calculated by the PRA. Upper bound benefits were calculated based upon the mean risk values multiplied by this uncertainty factor. A value of 2.5 was used for the uncertainty factor and was based on a review of similar PRAs (FPL 2007a). Table 8.2-1 provides the benefit results from each of the sensitivities for each of the SAMA cases evaluated.
Two SAMAs (12 and 78) have upper bound. benefits that exceed the costs of implementation.
These two SAMAs have been retained as potentially cost-beneficial.
8.3 PEER REVIEW FACTS/OBSERVA TIONS The model used in this SAMA analysis includes the resolution (Section 3.3) of the Facts-and-Observations identified during the PRA Peer Review. Therefore, no specific sensitivities were performed related to this issue.8.4 LEVEL 3 SENSITIVITIES Perturbations to some MACCS2 inputs were investigated to determine their effects on annual risk. Among the parameters analyzed, release height, release heat, evacuation time and speed, general emergency declaration time and meteorological data year have been discussed previously.
The effect of building wake on the risk was determined because the proximity of other site buildings to the DAEC containment introduces uncertainty as to local air flow around these buildings.
APPENDIX F Page F-91 Duane Arnold Energy Center License Renewal Application Environmental Report Severe meteorological conditions in the last spatial segment of the model domain (40-50 miles) were chosen to assure conservatively high impacts and risks. Most especially, perpetual rainfall was imposed on this segment so that a conservatively large quantity of the nuclides released in each scenario were deposited (via wet deposition) within the model domain.Table 8.4-1 gives the sensitivity of the risk to the choice of these parameters.
The table also discusses the reason for considering that parameter and the-result.
Other than imposing the above described meteorological condition on the 40-50 mile distance interval and the choice of meteorological data year, the site risks to severe accidents vary no more than 3% as a result of any of the considered parameter changes. The baseline modeling conservatisms of specifying rainfall in the spatial ring from 40-50 miles and the choice of severe meteorological year is seen to more than balance any increases that might be due to alternative specification of release parameters.
8.5 DISCOUNT
RATE Calculation of severe accident impacts in the DAEC SAMA analysis was performed using a "real discount rate" of 7% (0.07/year) as recommended in NUREG/BR-0184 (NRC 1997).. Use of both a 7% and 3% real discount rate in regulatory analysis is specified in Office of Management Budget guidance (OMB 2003) and'in NUREG/BR-0058 (NRC 2004). Therefore, a sensitivity analysis was performed using a 3% real discount rate.In this sensitivity analysis, the real discount rate in the Level 3 PRA model was changed to 3% from 7% and the Phase II analysis was re-performed with the lower interest rate.Similarly, an additional sensitivity analysis was performed where the discount rate was changed to 8.5% from 7% and the Phase II analysis was re-preformed.
The 8.5%discount rate is currently used by FPL-Energy for project cost estimating.
The results of this sensitivity analysis are presented in Table 8.2-1. Neither sensitivity analysis challenges any decisions made regarding the SAMAs.8.6 ANALYSIS PERIOD As described in Section 4, calculation of severe accident impacts involves an analysis period term, tf, which could have been defined as either the period of extended operation (20 years), or the years remaining until the end of facility life (from the time of the SAMA analysis to the end of the period of extended operation).
Based on the current license expiration date of February 21, 2014, that time period is 27 years.The value used for this term was the period of extended operation (20 years).In this sensitivity analysis, the analysis period was modified to 27 years and the Phase II analysis was re-performed.
I APPENDIX F Page F-92 Duane Arnold Energy Center License Renewal Application Environmental Report The results of this sensitivity analysis are presented in Table 8.2-1. This sensitivity analysis does not challenge any decisions made regarding the SAMAs.APPENDIX F Page F-93 Duane Arnold Energy Center License Renewal Application Environmental Report Table 8.2-1 DAEC Sensitivity Evaluation DAEC Potential Improvement Discussion SAMA Benefit Benefit at Benefit at Benefit Benefit Cost Cost Basis Evaluation Basis for Evaluation SAMA Case 3% Disc BE Disc at 27yrs at UB Number Rate Rate 10 Provide an additional diesel generator.
Increased availability of on-site NOSBO $954K $1,376K $850K $1,093K $2,386K >$5,000 Expert Panel. Not Cost- Cost Exceeds emergency AC power. K Beneficial Benefit 12 Improve 4.16-kV bus cross-tie ability. Increased availability of on-site AC NOSBO2A $399K $572K $354K $456K $998K >$1,000 Expert Panel Not Cost- Cost Exceeds power. K Beneficial Benefit 15 Install a gas turbine generator.
Increased availability of on-site AC NOSBO $954K $1,376K $805K $1,093K $2,386K >MAB Per Expert Not Cost- Cost Exceeds MAB power. Panel Beneficial 17 Install a steam-driven turbine generator that Increased availability of on-site AC NOSBO $954K $1,376K $850K $1,093K $2,386K >MAB Per Expert Not Cost- Cost Exceeds MAB.uses reactor steam and exhausts to the power. Panel Beneficial suppression pool.27 Install an independent active or passive Improved prevention of core melt LOCA03 $570K $826K $508K $655K $1,426K >MAB Per Expert Not Cost- Cost Exceeds MAB._ high pressure injection system. sequences.
Panel Beneficial 28 Provide an additional high pressure Reduced frequency of core melt from LOCAO1 $814K $1,179K $725K $935K $2,035K >MAB Per Expert Not Cost- Cost Exceeds MAB.injection pump with independent diesel. small LOCA and SBO sequences.
Panel Beneficial 35 Add signals to open safety relief valves Reduced likelihood of SRV failure to SRV01 $185K $275K $164K $215K $462K 1,000K Per Expert Not Cost- Cost Exceeds automatically in an MSIV closure transient, open in an MSIV closure transient Panel Beneficial Benefit reduces the probability of a medium LOCA.39 Increase flow rate of suppression pool Improved suppression pool cooling. CONT01 $167K $242K $149K $192K $418K >MAB Per Expert Not Cost- Cost Exceeds MAB.cooling. Panel Beneficial 41 Provide capability for alternate injection via Improved injection capability.
LOCA04 $345K $499K $307K $396K $861K $1,300K Per Expert Not Cost- Cost Exceeds MAB.reactor water cleanup IRWCU). _ Panel Beneficial 49 Replace two of the four electric safety Reduced common cause failure of the LOCA03 $570K $826K $508K $655K $1,426K >MAB Per Expert Not Cost- Cost Exceeds MAB.injection pumps with diesel-powered safety injection system. This SAMA Panel Beneficial pumps. was originally intended for the Westinghouse-CE System 80+, which has four trains of safety injection.
However, the intent of this SAMA is to provide diversity within the high-and low-pressure safety injection systems.52 Replace ECCS pump motors with air- Elimination of ECCS dependency on LOCA03 $570K $826K $508K $655K $1,426K >$1,500 Per Expert Not Cost- Cost Exceeds cooled motors, component cooling system. K Panel. $700K Beneficial Benefit per motor x 2, engineering costs, plus installation 55 Implement modifications to allow manual Improved ability to cool RHR heat SWO1 $156K $224K $139K $178K $391K >$500K Per Expert Not Cost- Cost Exceeds alignment of the fire water system to RHR exchangers.
Panel Beneficial Benefit heat exchangers.
56 Add a service water pump. Increased availability of cooling water. SWO1 $156K $224K $139K $178K $391K >$1,000 Per Expert Not Cost- Cost Exceeds K Panel Beneficial Benefit 75 Install an independent method of Increased availability of containment CONT01 $167K $242K $149K $192K $418K '$1,000 Per Expert Not Cost- Cost Exceeds suppression pool cooling, heat removal. K Panel Beneficial Benefit 78 Enable flooding of the drywell head seal. Reduced probability of leakage through CONT02B $26K $36K $23K $29K $65K >$100K Expert Panel, Not Cost- Cost exceeds the drywell head seal. for procedure, Beneficial benefit.does not consider abiliity to access area.APPENDIX F 0 Page F-94 Duane Arnold Energy Center License Renewal Application Environmental Report Table 8.2-1 DAEC Sensitivity Evaluation (Cont.)DAEC Potential Improvement Discussion SAMA Benefit Benefit at Benefit at Benefit Benefit Cost Cost Basis Evaluation Basis for Evaluation SAMA Case 3% Disc BE Disc at 27yrs at UB Number Rate Rate 107 Increase leak testing of valves in ISLOCA Reduced ISLOCA frequency.
ISLOCA $10.5K $14.9K $9.3K $11.9K $26.1K vMAB Per Expert Not Cost- Cost Exceeds MAB, paths. Panel. Plant Beneficial All ISLOCA paths have must be pressure monitoring shutdown in instrumentation.
order to test.117 Increase boron concentration or enrichment Reduced time required to achieve ATWS02 $137K $198K $122K $157K $342K $400K Expert Panel Not Cost- Cost Exceeds in the SLC system. shutdown concentration provides Beneficial Benefit increased margin in the accident timeline for successful initiation of SLC.120 Add a system of relief valves to prevent Improved equipment availability after NOATWS $590K $857K $525K $678K $1,474K >MAB Per Expert Not Cost- Cost Exceeds MAB.equipment damage from pressure spikes an ATWS. Panel Beneficial during an ATWS.123 Install an ATWS sized filtered containment Increased ability to remove reactor heat NOATWS $590K $857K $525K $678K $1,474K >MAB Per Expert Not Cost- Cost Exceeds MAB.vent to remove decay heat. from ATWS events. Panel Beneficial 139 Install digital large break LOCA protection Reduced probability of a large break LOCA03 $570K $826K $508K $655K $1,426K >MAB Per Expert Not Cost- Cost Exceeds MAB.system. LOCA (a leak before break). Panel Beneficial 156 Provide an a ternate source of water for the Decrease the contribution to risk due to RWS01 $320K $461K $285K $366K $800K $250k Per Expert Potentially Cost- Potentially Cost-RHRSW/ESW pit. failure of the RWS system. Panel. Add a Beneficial Beneficial T-connection and valve to the pipe connecting the RHRSW/ESW pit to the Circ Water pit to allow for backflow from the Circ Water pit to the RHRSW/ESW pit.163 Improve the reliability of the RWS system Decreased risk due to failures of the RWS01 $320K $461 K $285K $366K $800K >$1,000 Per Expert Not Cost- Cost Exceeds control valves CV4914 and CV4915. RWS system. (High PRA importance Vs K Panel. Add a Beneficial Benefit list.) BASE02 parallel path with piping and valve to each loop.164 Improve the reliability of the RWS control Decreased risk due to failures of the RWSO2b2 $10.0K $14.4K $8.9K $11.5K $25.1K $100k Per Expert Not Cost- Cost Exceeds system. RWS system. (High PRA importance Panel Beneficial Benefit list -HS- 4914.)166 Increase the reliability of the low pressure Decreased risk due to failures of the LOCAO5 $276K $393K $246K $314K $690K $250 Per Expert Potentially Cost- Potentially Cost ECCS RPV low pressure permissive low pressure ECCS systems. (High Panel, for Beneficial Beneficial.
circuitry.
Install manual bypass of low PRA importance list.) jumpers in pressure permissive, control panel covered by_procedure.
Note: The benefits in this table are provided for 5 cases: (1) "Benefit" -Baseline benefit calculated using nominal values for all parameters; (2) "Benefit at 3% Disc Rate" -Benefit calculated using 3% discount rate rather than the nominal 7%; (3) "Benefit at BE Disc Rate" -Benefit calculated using the best estimate discount rate of 8.5% provided by DAEC rather than the nominal 7%; (4) "Benefit at 27yrs" -Benefit using a 27-year calculation period rather than the nominal 20 years; and (4) "Benefit at UB" -Benefit calculated using the upperbound of CDF as defined by DAEC rather than the point estimate for CDF.APPENDIX F Page F-95 Duane Arnold Energy Center License Renewal Application Environmental Report Table 8.4-1. Sensitivity of DAEC Baseline Risk (Dose/Economic) to Parameter Changes Parameter 1 Input Discussion Ratio to 50-Mile Baseline Output Discussion Population DoselCost Risk Number of Samples per The baseline mean risk is 4 samples/weather bin: 8 samples per weather bin Weather Bin determined by sampling each Dose = 92% more closely approximate the hour of each day of the baseline Cost = 91% true mean risk (i.e., sampling year (see Annual Met Data Set 8 samples/weather bin: each hour of each day) than next). The many sensitivity Dose = 101% does 4 samples per weather studies use the more rapidly Cost = 103% bin. All sensitivity runs use 8 executed weather bin sampling samples per weather bin. All method to approximate the subsequent sensitivity ratios mean risk. are to the baseline risk calculated with 8 samples per_weather bin.Annual Met Data Set Each year 2002-2006 Dose = 85% (2004) to 97% 2005, maximum risk year, (2006) chosen as baseline.
Mean Cost = 84% (2004) to 97% baseline risk (see MACCS2 (2006) Results Section) samples each hour of each day.2000 Evacuation Speed Baseline updated 2000 study Dose = 99% Faster 2000 evacuation speed with 2040 population, assumed Cost = No change 2 does not significantly change EPZ roads at saturation in risk. 0-10 mile risk is minor former. contributor to 50-mile risk.95% of population Baseline considered 50% of No change 0-10 mile risk is minor evacuating as indicator of population evacuating as contributor to 50-mile risk.period from emergency indicator.
declaration until evacuation begins General emergency Baseline assumed declaration Dose = 98% Sooner start of evacuation declaration at time zero at later time of core damage. Cost = No change results in minor decrease in dose risk. Choice of core damage time is conservative.
0-10 mile risk is minor contributor to 50-mile risk.Release Height Baseline assumed release from Release at 100 feet above Decrease in release height top of reactor building for all but grade: increases close-in deposition.
M/I and M/E release categories.
Dose = No change Change negligible but top of Variation in the top of building Cost = 99% reactor building release is release heights are considered Ground-level release: conservative.
here. Dose = No change Cost = 99%Release Heat (1 MW per Baseline assumed no heat. Up Dose= No change Effect of buoyant plume rise is segment) to 4 segments released per Cost = 101% similar to increase in release scenario.
height.Release Heat (10 MW per Baseline assumed no heat. Dose= No change See release height notes segment) Large value to bound effects. Cost = No change above.Wake Effects, SIGYINIT, Baseline determined based on One-half baseline:
Minor changes very near SIGZINIT reactor building size. Dose = No change release.Uncertainty due to proximity of Cost = No change other buildings.
Two times baseline: Dose = No change Cost = 99%Meteorology specification in Rainfall imposed at all times Dose = 91% Entire decrease is due to last spatial segment, from 40 to 50 miles from release Cost = 85% removing perpetual rainfall (wet LIMSPA to force conservative population deposition) and specifying exposure in baseline case. measured meteorology in ring from 40 to 50 miles from site.2 No Change indicates
<0.5% change in risk APPENDIX IF Page F-96 Duane Arnold Energy Center License Renewal Application Environmental Report 9 CONCLUSIONS As a result of this analysis, the SAMAs identified in Table 9-1 have been identified as potentially cost beneficial, either directly or as a result of the sensitivity analyses.
These SAMAs are not aging-related and are therefore not required to be resolved as part of the relicensing effort. However, since these potential improvements could result in a reduction in public riskthese SAMAs have been entered into the DAEC long-range plan development process for further consideration.
Implementation of SAMA 156 would involve the addition of a T-connection and valve to the pipe connecting the RHRSW/ESW pit to the Circ Water pit to allow for backflow from the Circ Water pit to the RHRSW/ESW pit. This would improve the reliability of the RHRSW/ESW system through addition of a redundant water source.Implementation of SAMA 166 would involve panel modifications to allow bypass of failed ECCS reactor low pressure permissive signals and develop emergency procedures for installation of the low reactor pressure permissive bypass. This would improve the reliability of the low pressure ECCS systems given a failure of the low reactor pressure permissive signals which was identified as a top risk contributor from the PRA model.Table 9-1 DAEC Potentially Cost Beneficial SAMAs DAEC Potential Improvement Discussion SAMA Number 156 Provide an alternate source of water for the RHRSW/ESW Decrease the contribution to risk due to failure of the RWS pit. system.166 Increase the reliability of the low pressure ECCS RPV low Decreased risk due to failures of the low pressure ECCS systems.pressure permissive circuitry.
Install manual bypass of low (High PRA importance list.)pressure permissive.
APPENDIX F Page F-97 Duane Arnold Energy Center License Renewal Application Environmental Report 10 REFERENCES BWROG (BWR Owners Group) 1997, "Duane Arnold Energy Center PSA Peer Review Certification Report," March.EPA (US Environmental Protection Agency) 1972, "Mixing Heights, Wind Speeds, and Potential for Urban Pollution Throughout the Contiguous United States," George C.Holzworth, Office of Air Programs, Research Triangle Park, North Carolina, January.EPRI (Electric Power Research Institute) 1991, "A Methodology for Assessment of Nuclear Power Plant Seismic Margin," Implementation Guide NP-6041 Rev 1, August.EPRI (Electric Power Research Institute) 2005 & Data Systemsand Solutions, LLC 2005 "CAFTA Fault Tree Analysis System," Version 5.2 April.ERIN (Energy & Research Inc) 1995a, "Internal Fire Hazards Evaluation of the DAEC Site," Report No C1249310-1800 Rev 0, November.ERIN (Energy & Research Inc) 1995b, DAEC Level'2 PSA Analysis, Appendix J April.ERIN (Energy & Research Inc) 1995c, DAEC Level 2 PSA Analysis, Appendix C.19 April.ERIN (Energy & Research Inc) 1995d, DAEC Level 2 PSA Analysis, Appendix N April.FPL (FPL Energy) 2005, DAEC Updated Safety Analysis Report, Rev. 18, Figures 1.2-5, 8 and 11, October.FPL (FPL Energy) 2007a "Uncertainty in CDF and LERF for Duane Arnold Energy Center," LRSA-020, DAEC-1FJR-01-010 Rev 0; October.FPL (FPL-Energy) 2007b, "DAEC PRA Summary Document," Revision 5C, June 28.IELP (Iowa Electric Light and Power Co.) 1985 "DAEC Job 11186-410-403-Inadvertent Actuation of Fire Suppression Systems Evaluation Report," Letter to RE Lessly (IELP) from LL Lucas (Bechtel), BLIEG-85-132, April 16.IELP (Iowa Electric Light and Power Co.) 1992, "Duane Arnold Energy Center Individual Plant Examination (IPE)," November 1992.IES (IES Utilities Inc) 1995, "Duane Arnold Energy Center Individual Plant Examination of External Events," November.NEI (Nuclear Energy Institute) 2005, "Severe Accident Mitigation Alternatives (SAMA)Analysis Guidance Document," NEI 05-01, November.APPENDIX F Page F-98 Duane Arnold Energy Center License Renewal Application Environmental Report NRC (US Nuclear Regulatory Commission) 1988, "Individual Plant Examination For Severe Accident Vulnerabilities
-10 CFR 50.54(f)," Generic Letter 88-20, November 23.NRC (US Nuclear Regulatory CommissiQn) 1993, "Piping and the Use of Highly Combustible Gases in Vital Areas," Generic Letter 93-06, October 25.NRC (US Nuclear Regulatory Commission) 1994a, "Insights Gained From Resolving Generic Issue 57: Effects of Fire Protection System Actuation on Safety-Related Equipment" Information Notice 94-12, February.NRC (US Nuclear Regulatory Commission) 1994b, "Revised Livermore Seismic Hazard Estimates for Sixty-Nine Nuclear Plant Sites East of the Rocky Mountains," NUREG-1488, April.NRC (US Nuclear Regulatory Commission) 1997, "Regulatory Analysis Technical Evaluation Handbook," NUREG/BR-0184.
NRC (US Nuclear Regulatory Commission) 1998, "Code Manual for MACCS2, User's Guide," NUREG/CR-6613, May.NRC (US Nuclear Regulatory Commission) 2003, NUREG/CR-6525, Revision 1, SECPOP2000:
Sector Population, Land Fraction, and Economic Estimation Program, Sandia National Laboratories, August 2003.NRC (US Nuclear Regulatory Commission) 2004, "Regulatory Analysis Guidelines of the U. S. Nuclear Regulatory Commission," NUREG/BR-0058, Revision 4, September.
NUMARC (Nuclear Management and Resource Council, Inc.) 1991, "Guidelines and Technical Basis for NUMARC Initiatives Addressing Station Blackout at Light Water Reactors," NUMARC 87-00, Rev 1, August.OMB (Office of Management and Budget) 2003, "Regulatory Analysis," Circular No. A-4, September 17.PLC (Professional Loss Control Inc) 1992, "Fire-Induced Vulnerability Evaluation," Research Project 3000-41 TR-100370, April.SQUG (Seismic Qualification Utility Group) 1991, "Generic Implementation Procedure," Rev 2, February.State Library 2006, "Projections of Total Population for U.S., Iowa, and its Counties: 2000-2030," adapted from Woods & Poole Economics, Inc., Washington, DC, June.TOMCOD (TOM COD Data Systems) 2003, Evacuation Time Estimate Study for the Duane Arnold Energy Center Emergency Planning Zone, Decorah, IA, June 19.APPENDIX F Page F-99 Duane Arnold Energy Center License Renewal Application Environmental Report USDA (United States Department of Agriculture) 2002, Census of Agriculture, Volume 1 Geographic Area Series Census, State-County Data, accessed on the internet at http://www.nass.usda.gov/Census/Create-CensusUSCNTY.jsp.
APPENDIX F Page F-1O00 The 108 Drawings referenced in the Table of Contents have been processed into ADAMS.These drawings can be accessed by NRC Staff members within the ADAMS package or by performing a search on the Document/Report Number.