ML22033A080 | 2 February 2022 | Supplement to License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition | Cyber Security |
NG-21-0010, License Amendment Request (TSCR-192): Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme | 28 June 2021 | License Amendment Request (TSCR-192): Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme | Time of Discovery Safeguards Contingency Plan Earthquake Fuel cladding Minimum staff Fire Watch Grace period |
ML21167A186 | 3 June 2021 | License Amendment Request (TSCR-191): Proposed Change to the Physical Security Plan for the Isfsl Only Condition | Cyber Security |
ML21105A745 | 7 April 2021 | Supplement to License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition | |
NG-20-0094, License Amendment Request (TSCR-189): Revision to Facility License and Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool | 19 February 2021 | License Amendment Request (TSCR-189): Revision to Facility License and Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool | |
NG-20-0022, License Amendment Request (TSCR-185): Application to Revise Operating License to Remove Cyber Security Plan Requirements | 15 May 2020 | License Amendment Request (TSCR-185): Application to Revise Operating License to Remove Cyber Security Plan Requirements | Cyber Security Exemption Request Fuel cladding Fire Protection Program |
NG-20-0021, Supplement to License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition | 11 March 2020 | Supplement to License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition | |
NG-20-0017, License Amendment Request (TSCR-184) Non-SGI Document Retransmittal | 24 February 2020 | License Amendment Request (TSCR-184) Non-SGI Document Retransmittal | Cyber Security |
NG-20-0011, Supplement to License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition | 21 February 2020 | Supplement to License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition | |
ML20049A822 | 13 February 2020 | NextEra Energy Duane Arnold, LLC - License Amendment Request (TSCR-184): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition | |
ML20044C864 | 7 February 2020 | License Amendment Request (TSCR-184): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition | |
L-2019-161, License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3), Fire Protection Program | 25 September 2019 | License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3), Fire Protection Program | Large early release frequency Fire Protection Program |
L-2019-157, Supplement to License Amendment Request (TSCR-183): Application to Revise Technical Specifications for the Permanently Defueled Condition | 12 September 2019 | Supplement to License Amendment Request (TSCR-183): Application to Revise Technical Specifications for the Permanently Defueled Condition | |
L-2019-105, License Amendment Request (TSCR-183): Application to Revise Operating License and Technical Specifications for Permanently Defueled Condition | 20 June 2019 | License Amendment Request (TSCR-183): Application to Revise Operating License and Technical Specifications for Permanently Defueled Condition | Safe Shutdown Time of Discovery Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Fire Barrier Anticipated operational occurrence Tornado Missile Water Inventory Control Post Accident Monitoring Internal Flooding Hydrostatic Cyber Security Qualified Offsite Circuit Missed surveillance Abnormal operational transient Pressure and Temperature Limits Report Surveillance Frequency Control Program Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Feedwater Controller Failure Safeguards Contingency Plan License Renewal Fuel cladding Offsite Circuit Fire Protection Program |
L-2019-050, License Amendment Request (TSCR-181): Application to Align Technical Specification Staffing and Administrative Requirements for Permanently Defueled Condition | 19 April 2019 | License Amendment Request (TSCR-181): Application to Align Technical Specification Staffing and Administrative Requirements for Permanently Defueled Condition | Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
ML19101A262 | 9 April 2019 | License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition | Safe Shutdown Operating Basis Earthquake Design basis earthquake Severe Accident Management Guideline Deep Dose Equivalent Fuel cladding Minimum staff Siren Overexposure |
NG-17-0236, License Amendment Request (TSCR-179) Application to Add Technical Specification 3.2.3. Linear Heat Generation Rate. | 19 December 2017 | License Amendment Request (TSCR-179) Application to Add Technical Specification 3.2.3. Linear Heat Generation Rate. | Anticipated operational occurrence Post Accident Monitoring Abnormal operational transient Surveillance Frequency Control Program Scram Discharge Volume Process Control Program Feedwater Controller Failure Fuel cladding Coast down |
NG-17-0235, Duane Arnold Energy Center, License Amendment Request TSCR-166, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. | 15 December 2017 | Duane Arnold Energy Center, License Amendment Request TSCR-166, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. | |
NG-17-0235, Attachment 2: Duane Arnold Energy Center, License Amendment Request TSCR-166, Clean Copy of the Proposed DAEC EAL Scheme | 15 December 2017 | Attachment 2: Duane Arnold Energy Center, License Amendment Request TSCR-166, Clean Copy of the Proposed DAEC EAL Scheme | |
NG-17-0235, Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 2 of 2 | 15 December 2017 | Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 2 of 2 | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Fire Barrier Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action FLEX Design basis earthquake Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage |
NG-17-0235, Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 1 of 2 | 15 December 2017 | Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 1 of 2 | Safe Shutdown Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Probabilistic Risk Assessment FLEX Process Control Program Spent Fuel Pool Instrumentation Battery sizing Earthquake Fuel cladding Backfit |
NG-17-0233, Submittal of License Amendment Request (TSCR-178) Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers | 15 December 2017 | Submittal of License Amendment Request (TSCR-178) Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers | |
ML17363A069 | 15 December 2017 | Duane Arnold Energy Center, License Amendment Request TSCR-166, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. | |
ML17363A071 | 15 December 2017 | Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 1 of 2 | Safe Shutdown Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Probabilistic Risk Assessment FLEX Process Control Program Spent Fuel Pool Instrumentation Battery sizing Earthquake Fuel cladding Backfit |
ML17363A072 | 15 December 2017 | Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 2 of 2 | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Fire Barrier Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action FLEX Design basis earthquake Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage |
ML17363A074 | 15 December 2017 | Attachment 2: Duane Arnold Energy Center, License Amendment Request TSCR-166, Clean Copy of the Proposed DAEC EAL Scheme | |
NG-17-0127, License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating | 5 September 2017 | License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating | Reactor Vessel Water Level Surveillance Frequency Control Program Fuel cladding |
NG-17-0169, License Amendment Request TSCR-175, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors | 31 August 2017 | License Amendment Request TSCR-175, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors | |
NG-17-0093, License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | 9 June 2017 | License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Stroke time Water Inventory Control Hydrostatic Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Power Operated Valves Fuel cladding Offsite Circuit Scaffolding |
NG-17-0084, License Amendment Request (TSCR-164), Revision to Technical Specification 3.1.2, Reactivity Anomalies | 20 April 2017 | License Amendment Request (TSCR-164), Revision to Technical Specification 3.1.2, Reactivity Anomalies | Shutdown Margin Anticipated operational occurrence Abnormal operational transient |
NG-17-0037, Duane Arnold Energy Center - Submittal of License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan | 31 March 2017 | Duane Arnold Energy Center - Submittal of License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan | |
NG-17-0037, Duane Arnold Energy Center - Evaluation of Proposed Amendment for License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan | 31 March 2017 | Duane Arnold Energy Center - Evaluation of Proposed Amendment for License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan | Grab sample Met Tower Deep Dose Equivalent |
ML17102B184 | 31 March 2017 | Duane Arnold Energy Center - Evaluation of Proposed Amendment for License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan | Grab sample Met Tower Deep Dose Equivalent |
ML17102B183 | 31 March 2017 | Duane Arnold Energy Center - Submittal of License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan | |
NG-17-0069, License Amendment Request (TSCR-169), Revision to Technical Specification Table 3.3.2.1-1, Control Rod Block Instrumentation | 24 March 2017 | License Amendment Request (TSCR-169), Revision to Technical Specification Table 3.3.2.1-1, Control Rod Block Instrumentation | Process Control Program MELLLA |
NG-17-0037, Kld TR-910, Duane Arnold Energy Center Development of Evacuation Time Estimates for Revised EPZ Boundary (in Support of License Amendment Request (TSCR-165)) | 9 March 2017 | Kld TR-910, Duane Arnold Energy Center Development of Evacuation Time Estimates for Revised EPZ Boundary (in Support of License Amendment Request (TSCR-165)) | |
NG-16-0102, License Amendment Request (TSCR-161) to Revise Technical Specifications 2.1.1.2 Safety Limit Minimum Critical Power Ratio, and to Remove an Outdated Historical Footnote from Table 3.3.5.1-1 | 18 May 2016 | License Amendment Request (TSCR-161) to Revise Technical Specifications 2.1.1.2 Safety Limit Minimum Critical Power Ratio, and to Remove an Outdated Historical Footnote from Table 3.3.5.1-1 | Reactor Vessel Water Level Anticipated operational occurrence Abnormal operational transient Minimum Critical Power Ratio Fuel cladding |
ML16145A183 | 30 April 2016 | Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR Cycle 26 | Safety Limit Minimum Critical Power Ratio Fuel cladding |
NG-16-0052, License Amendment Request (TSCR-159) to Revise Technical Specifications Fuel Storage Requirements | 15 March 2016 | License Amendment Request (TSCR-159) to Revise Technical Specifications Fuel Storage Requirements | Coatings Surveillance Frequency Control Program Earthquake |
NG-15-0284, License Amendment Request (TSCR-1 30) for Amendment to Technical Specifications Section 5.5.6 for the Inservice Testing Program | 14 October 2015 | License Amendment Request (TSCR-1 30) for Amendment to Technical Specifications Section 5.5.6 for the Inservice Testing Program | Safe Shutdown Stroke time Slow transfer Incorporated by reference Surveillance Frequency Control Program Fuel cladding Offsite Circuit |
NG-15-0234, License Amendment Request (TSCR-143) to Extend Containment Leakage Test Frequency | 18 August 2015 | License Amendment Request (TSCR-143) to Extend Containment Leakage Test Frequency | Safe Shutdown High winds Packing leak Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Aging Management Large early release frequency Moisture barrier Earthquake Fuel cladding Fire Protection Program Grace period |
NG-15-0048, License Amendment Request (TSCR-153) to Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits | 6 August 2015 | License Amendment Request (TSCR-153) to Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits | Reactor Vessel Water Level Anticipated operational occurrence Abnormal operational transient Fuel cladding |
NG-15-0230, License Amendment Request (TSCR-1 54) to Correct Examples in Technical Specifications Section 1.4, Frequency. | 24 July 2015 | License Amendment Request (TSCR-1 54) to Correct Examples in Technical Specifications Section 1.4, Frequency. | Fuel cladding |
NG-14-0291, License Amendment Request (TSCR-1 51) for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | 26 January 2015 | License Amendment Request (TSCR-1 51) for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | Safe Shutdown Abnormal operational transient Surveillance Frequency Control Program |
NG-14-0150, License Amendment Request (TSCR-147): Application to Revise Cyber Security Plan Milestone 8 Completion Date | 28 August 2014 | License Amendment Request (TSCR-147): Application to Revise Cyber Security Plan Milestone 8 Completion Date | Cyber Security |
NG-14-0143, License Amendment Request (TSCR-146): Application to Revise Tech Specs to Adopt Technical Specifications Task Force (TSTF) Traveler-523,Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Proces | 23 June 2014 | License Amendment Request (TSCR-146): Application to Revise Tech Specs to Adopt Technical Specifications Task Force (TSTF) Traveler-523,Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process | Ultimate heat sink Stroke time Surveillance Frequency Control Program |
NG-13-0297, License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 | 29 August 2013 | License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 | Surveillance Frequency Control Program Battery sizing |
NG-13-0110, License Amendment Request (TSCR-140): Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, Section Affected: 1.1 | 14 March 2013 | License Amendment Request (TSCR-140): Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, Section Affected: 1.1 | Shutdown Margin Grace period |
NG-12-0483, License Amendment Request (TSCR-142): Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hrs Per Month, Using Consolidated Line Item Improvement Process | 21 December 2012 | License Amendment Request (TSCR-142): Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hrs Per Month, Using Consolidated Line Item Improvement Process | Surveillance Frequency Control Program Grace period |
NG-12-0434, Technical Specification Change Request (TSCR-141): License Amendment Request for Change to Renewed Operating License Condition C.12 | 13 November 2012 | Technical Specification Change Request (TSCR-141): License Amendment Request for Change to Renewed Operating License Condition C.12 | Aging Management License Renewal |