Letter Sequence Request |
---|
|
|
MONTHYEARL-2019-009, Certification of Permanent Cessation of Power Operations2019-01-18018 January 2019 Certification of Permanent Cessation of Power Operations Project stage: Request L-2019-157, Supplement to License Amendment Request (TSCR-183): Application to Revise Technical Specifications for the Permanently Defueled Condition2019-09-12012 September 2019 Supplement to License Amendment Request (TSCR-183): Application to Revise Technical Specifications for the Permanently Defueled Condition Project stage: Supplement L-2019-161, License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3), Fire Protection Program2019-09-25025 September 2019 License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3), Fire Protection Program Project stage: Request ML20049A8222020-02-13013 February 2020 NextEra Energy Duane Arnold, LLC - License Amendment Request (TSCR-184): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition Project stage: Request NG-20-0006, Request for Approval of NextEra Energy Duane Arnold, Llc'S Quality Assurance Topical Report (FPL-3) Revision 02020-02-13013 February 2020 Request for Approval of NextEra Energy Duane Arnold, Llc'S Quality Assurance Topical Report (FPL-3) Revision 0 Project stage: Request ML20069E0752020-03-19019 March 2020 Review of Quality Assurance Opical Report (FPL-3), Revision 0 Project stage: Approval ML20153A3772020-05-28028 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center Quality Assurance Topical Report (FPL-3) - EPID L-2020-LLQ-0002) Project stage: RAI NG-20-0050, Response to Request for Additional Information - NextEra Energy Duane Arnold, LLC Quality Assurance Topical Report (FPL-3)2020-06-26026 June 2020 Response to Request for Additional Information - NextEra Energy Duane Arnold, LLC Quality Assurance Topical Report (FPL-3) Project stage: Response to RAI ML20225A0002020-08-27027 August 2020 Approval of Quality Assurance Topical Report (FPL-3), Revision 0 (EPID-L-2020-LLQ-0002) Project stage: Other 2020-02-13
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2021-161, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2021-08-24024 August 2021 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2020-154, CFR 140.21 Licensee Guarantees of Payment of Deferred Preminms2020-11-12012 November 2020 CFR 140.21 Licensee Guarantees of Payment of Deferred Preminms L-2020-041, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2020-04-14014 April 2020 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2020-040, Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2020-03-11011 March 2020 Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2020-004, Mock Adversary Force2020-01-13013 January 2020 Mock Adversary Force L-2019-216, Proposed Turkey Point Units 6 and 7; Seabrook Station; Duane Arnold Energy Center; and Point Beach Units 1 and 2 - Re-issuance of Official Service List2019-12-19019 December 2019 Proposed Turkey Point Units 6 and 7; Seabrook Station; Duane Arnold Energy Center; and Point Beach Units 1 and 2 - Re-issuance of Official Service List L-2019-155, NextEra Energy Duane Arnold, Llc'S Request for Rescission of Commission Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Beyond-Design Basis External Events2019-11-21021 November 2019 NextEra Energy Duane Arnold, Llc'S Request for Rescission of Commission Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Beyond-Design Basis External Events L-2019-202, CFR 50.46 - Emergency Core Cooling System LOCA 30-Day Report2019-11-19019 November 2019 CFR 50.46 - Emergency Core Cooling System LOCA 30-Day Report L-2019-182, Duane Arnold, and Point Beach Units 1 and 2, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2019-10-22022 October 2019 Duane Arnold, and Point Beach Units 1 and 2, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2019-161, License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3), Fire Protection Program2019-09-25025 September 2019 License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3), Fire Protection Program L-2019-157, Supplement to License Amendment Request (TSCR-183): Application to Revise Technical Specifications for the Permanently Defueled Condition2019-09-12012 September 2019 Supplement to License Amendment Request (TSCR-183): Application to Revise Technical Specifications for the Permanently Defueled Condition L-2019-133, Duane Arnold Energy Center and Point Beach, Units 1 & 2 -10 CFR Part 95 Facility Security Clearances2019-08-19019 August 2019 Duane Arnold Energy Center and Point Beach, Units 1 & 2 -10 CFR Part 95 Facility Security Clearances L-2019-141, NextEra Energy Duane Arnold, Llc'S Request for Rescission of Commission Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation.2019-08-0808 August 2019 NextEra Energy Duane Arnold, Llc'S Request for Rescission of Commission Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. L-2019-142, NextEra Energy Duane Arnold, Llc'S Request for Rescission of Commission Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.2019-08-0808 August 2019 NextEra Energy Duane Arnold, Llc'S Request for Rescission of Commission Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions. L-2019-146, Official Service List Update2019-07-22022 July 2019 Official Service List Update L-2019-134, Units 1 and 2 - Quality Assurance Topical Report, Revision 22, Annual Submittal2019-07-12012 July 2019 Units 1 and 2 - Quality Assurance Topical Report, Revision 22, Annual Submittal L-2019-105, License Amendment Request (TSCR-183): Application to Revise Operating License and Technical Specifications for Permanently Defueled Condition2019-06-20020 June 2019 License Amendment Request (TSCR-183): Application to Revise Operating License and Technical Specifications for Permanently Defueled Condition L-2019-093, Duane Arnold Energy Center and Point Beach, Units 1 & 2 - Official Service List Update2019-04-25025 April 2019 Duane Arnold Energy Center and Point Beach, Units 1 & 2 - Official Service List Update L-2019-050, License Amendment Request (TSCR-181): Application to Align Technical Specification Staffing and Administrative Requirements for Permanently Defueled Condition2019-04-19019 April 2019 License Amendment Request (TSCR-181): Application to Align Technical Specification Staffing and Administrative Requirements for Permanently Defueled Condition L-2019-070, License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition2019-04-0909 April 2019 License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition L-2019-045, NextEra Energy Duane Arnold, Ilc - Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Status Reports, Financial Assurance Update2019-03-25025 March 2019 NextEra Energy Duane Arnold, Ilc - Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Status Reports, Financial Assurance Update L-2019-057, Cf~ 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2019-03-19019 March 2019 Cf~ 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2019-052, Florida Power and Light Co. - Nuclear Property Insurance - 10 CFR 50.54(w)(3)2019-03-18018 March 2019 Florida Power and Light Co. - Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2019-047, Request for Exemption from 10 CFR 73.55(p)(1)(i) and (II) Related to the Suspension of Security Measures in an Emergency or During Severe Weather2019-02-28028 February 2019 Request for Exemption from 10 CFR 73.55(p)(1)(i) and (II) Related to the Suspension of Security Measures in an Emergency or During Severe Weather L-2019-009, Certification of Permanent Cessation of Power Operations2019-01-18018 January 2019 Certification of Permanent Cessation of Power Operations L-2018-214, Units 1 and 2, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2018-12-0303 December 2018 Units 1 and 2, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2018-068, Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations2018-04-0303 April 2018 Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations L-2018-060, Florida Power & Light: Nuclear Property Insurance - 10 CFR 50.54(w)(3)2018-03-26026 March 2018 Florida Power & Light: Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2018-063, CFR 50.46 Annual Reporting and 30-day Notification of Changes or Errors in Emergency Core Cooling System Models or Applications2018-03-26026 March 2018 CFR 50.46 Annual Reporting and 30-day Notification of Changes or Errors in Emergency Core Cooling System Models or Applications L-2018-067, Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table L-2018-030, Nuclear Energy Institute Commitments2018-03-0909 March 2018 Nuclear Energy Institute Commitments L-2018-064, NextEra Energy-Entergy Joint Composite Adversary Force2018-03-0808 March 2018 NextEra Energy-Entergy Joint Composite Adversary Force L-2017-212, Anchor Darling Double Disc Gate Valve Information and Status2017-12-21021 December 2017 Anchor Darling Double Disc Gate Valve Information and Status L-2017-200, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2017-12-13013 December 2017 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2017-145, CFR 50.46 30-Day Special Report of Changes in Peak Cladding Temperature2017-08-28028 August 2017 CFR 50.46 30-Day Special Report of Changes in Peak Cladding Temperature L-2017-121, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-07-24024 July 2017 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography L-2017-118, Submittal of 10 CFR 50.46 30-Day Special Report of Changes in Peak Cladding Temperature2017-06-28028 June 2017 Submittal of 10 CFR 50.46 30-Day Special Report of Changes in Peak Cladding Temperature L-2017-122, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 21 Annual Submittal2017-06-28028 June 2017 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 21 Annual Submittal L-2017-095, Official Service List Changes2017-06-26026 June 2017 Official Service List Changes L-2017-104, Submittal of Report Pursuant to 10 CFR 71.95(a)(3) and (B) - Failure to Follow Conditions of TN-RAM Packaging Certificate of Compliance No. 92332017-06-15015 June 2017 Submittal of Report Pursuant to 10 CFR 71.95(a)(3) and (B) - Failure to Follow Conditions of TN-RAM Packaging Certificate of Compliance No. 9233 L-2017-014, Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 20162017-04-17017 April 2017 Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016 L-2017-040, Decommissioning Funding Status Reports/Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2017-03-30030 March 2017 Decommissioning Funding Status Reports/Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2017-051, Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2017-03-27027 March 2017 Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2016-216, Duane Arnold Energy Ctr., Point Beach Units 1 & 2, License Guarantees Payment of Deferred Premiums2016-12-0202 December 2016 Duane Arnold Energy Ctr., Point Beach Units 1 & 2, License Guarantees Payment of Deferred Premiums L-2016-188, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)2016-11-0303 November 2016 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) L-2016-175, Units 1 and 2, Official Service List Changes and Distribution for Safeguards Information2016-08-30030 August 2016 Units 1 and 2, Official Service List Changes and Distribution for Safeguards Information 2024-01-25
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML22033A0802022-02-0202 February 2022 Supplement to License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition NG-21-0010, License Amendment Request (TSCR-192): Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2021-06-28028 June 2021 License Amendment Request (TSCR-192): Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme ML21167A1862021-06-0303 June 2021 License Amendment Request (TSCR-191): Proposed Change to the Physical Security Plan for the Isfsl Only Condition ML21105A7452021-04-0707 April 2021 Supplement to License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition NG-20-0094, License Amendment Request (TSCR-189): Revision to Facility License and Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool2021-02-19019 February 2021 License Amendment Request (TSCR-189): Revision to Facility License and Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool NG-20-0022, License Amendment Request (TSCR-185): Application to Revise Operating License to Remove Cyber Security Plan Requirements2020-05-15015 May 2020 License Amendment Request (TSCR-185): Application to Revise Operating License to Remove Cyber Security Plan Requirements NG-20-0021, Supplement to License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition2020-03-11011 March 2020 Supplement to License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition NG-20-0017, License Amendment Request (TSCR-184) Non-SGI Document Retransmittal2020-02-24024 February 2020 License Amendment Request (TSCR-184) Non-SGI Document Retransmittal NG-20-0011, Supplement to License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition2020-02-21021 February 2020 Supplement to License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition ML20049A8222020-02-13013 February 2020 NextEra Energy Duane Arnold, LLC - License Amendment Request (TSCR-184): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition ML20044C8642020-02-0707 February 2020 License Amendment Request (TSCR-184): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition L-2019-161, License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3), Fire Protection Program2019-09-25025 September 2019 License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3), Fire Protection Program L-2019-157, Supplement to License Amendment Request (TSCR-183): Application to Revise Technical Specifications for the Permanently Defueled Condition2019-09-12012 September 2019 Supplement to License Amendment Request (TSCR-183): Application to Revise Technical Specifications for the Permanently Defueled Condition L-2019-105, License Amendment Request (TSCR-183): Application to Revise Operating License and Technical Specifications for Permanently Defueled Condition2019-06-20020 June 2019 License Amendment Request (TSCR-183): Application to Revise Operating License and Technical Specifications for Permanently Defueled Condition L-2019-050, License Amendment Request (TSCR-181): Application to Align Technical Specification Staffing and Administrative Requirements for Permanently Defueled Condition2019-04-19019 April 2019 License Amendment Request (TSCR-181): Application to Align Technical Specification Staffing and Administrative Requirements for Permanently Defueled Condition ML19101A2622019-04-0909 April 2019 License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition NG-17-0236, License Amendment Request (TSCR-179) Application to Add Technical Specification 3.2.3. Linear Heat Generation Rate.2017-12-19019 December 2017 License Amendment Request (TSCR-179) Application to Add Technical Specification 3.2.3. Linear Heat Generation Rate. NG-17-0235, Duane Arnold Energy Center, License Amendment Request TSCR-166, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2017-12-15015 December 2017 Duane Arnold Energy Center, License Amendment Request TSCR-166, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. NG-17-0235, Attachment 2: Duane Arnold Energy Center, License Amendment Request TSCR-166, Clean Copy of the Proposed DAEC EAL Scheme2017-12-15015 December 2017 Attachment 2: Duane Arnold Energy Center, License Amendment Request TSCR-166, Clean Copy of the Proposed DAEC EAL Scheme NG-17-0235, Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 2 of 22017-12-15015 December 2017 Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 2 of 2 NG-17-0235, Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 1 of 22017-12-15015 December 2017 Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 1 of 2 NG-17-0233, Submittal of License Amendment Request (TSCR-178) Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers2017-12-15015 December 2017 Submittal of License Amendment Request (TSCR-178) Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers ML17363A0692017-12-15015 December 2017 Duane Arnold Energy Center, License Amendment Request TSCR-166, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. ML17363A0712017-12-15015 December 2017 Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 1 of 2 ML17363A0722017-12-15015 December 2017 Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 2 of 2 ML17363A0742017-12-15015 December 2017 Attachment 2: Duane Arnold Energy Center, License Amendment Request TSCR-166, Clean Copy of the Proposed DAEC EAL Scheme NG-17-0127, License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating2017-09-0505 September 2017 License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating NG-17-0169, License Amendment Request TSCR-175, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2017-08-31031 August 2017 License Amendment Request TSCR-175, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors NG-17-0093, License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-06-0909 June 2017 License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control NG-17-0084, License Amendment Request (TSCR-164), Revision to Technical Specification 3.1.2, Reactivity Anomalies2017-04-20020 April 2017 License Amendment Request (TSCR-164), Revision to Technical Specification 3.1.2, Reactivity Anomalies NG-17-0037, Duane Arnold Energy Center - Submittal of License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan2017-03-31031 March 2017 Duane Arnold Energy Center - Submittal of License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan NG-17-0037, Duane Arnold Energy Center - Evaluation of Proposed Amendment for License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan2017-03-31031 March 2017 Duane Arnold Energy Center - Evaluation of Proposed Amendment for License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan ML17102B1842017-03-31031 March 2017 Duane Arnold Energy Center - Evaluation of Proposed Amendment for License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan ML17102B1832017-03-31031 March 2017 Duane Arnold Energy Center - Submittal of License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan NG-17-0069, License Amendment Request (TSCR-169), Revision to Technical Specification Table 3.3.2.1-1, Control Rod Block Instrumentation2017-03-24024 March 2017 License Amendment Request (TSCR-169), Revision to Technical Specification Table 3.3.2.1-1, Control Rod Block Instrumentation NG-17-0037, Kld TR-910, Duane Arnold Energy Center Development of Evacuation Time Estimates for Revised EPZ Boundary (in Support of License Amendment Request (TSCR-165))2017-03-0909 March 2017 Kld TR-910, Duane Arnold Energy Center Development of Evacuation Time Estimates for Revised EPZ Boundary (in Support of License Amendment Request (TSCR-165)) NG-16-0102, License Amendment Request (TSCR-161) to Revise Technical Specifications 2.1.1.2 Safety Limit Minimum Critical Power Ratio, and to Remove an Outdated Historical Footnote from Table 3.3.5.1-12016-05-18018 May 2016 License Amendment Request (TSCR-161) to Revise Technical Specifications 2.1.1.2 Safety Limit Minimum Critical Power Ratio, and to Remove an Outdated Historical Footnote from Table 3.3.5.1-1 ML16145A1832016-04-30030 April 2016 Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR Cycle 26 NG-16-0052, License Amendment Request (TSCR-159) to Revise Technical Specifications Fuel Storage Requirements2016-03-15015 March 2016 License Amendment Request (TSCR-159) to Revise Technical Specifications Fuel Storage Requirements NG-15-0284, License Amendment Request (TSCR-1 30) for Amendment to Technical Specifications Section 5.5.6 for the Inservice Testing Program2015-10-14014 October 2015 License Amendment Request (TSCR-1 30) for Amendment to Technical Specifications Section 5.5.6 for the Inservice Testing Program NG-15-0234, License Amendment Request (TSCR-143) to Extend Containment Leakage Test Frequency2015-08-18018 August 2015 License Amendment Request (TSCR-143) to Extend Containment Leakage Test Frequency NG-15-0048, License Amendment Request (TSCR-153) to Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits2015-08-0606 August 2015 License Amendment Request (TSCR-153) to Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits NG-15-0230, License Amendment Request (TSCR-1 54) to Correct Examples in Technical Specifications Section 1.4, Frequency.2015-07-24024 July 2015 License Amendment Request (TSCR-1 54) to Correct Examples in Technical Specifications Section 1.4, Frequency. NG-14-0291, License Amendment Request (TSCR-1 51) for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2015-01-26026 January 2015 License Amendment Request (TSCR-1 51) for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control NG-14-0150, License Amendment Request (TSCR-147): Application to Revise Cyber Security Plan Milestone 8 Completion Date2014-08-28028 August 2014 License Amendment Request (TSCR-147): Application to Revise Cyber Security Plan Milestone 8 Completion Date NG-14-0143, License Amendment Request (TSCR-146): Application to Revise Tech Specs to Adopt Technical Specifications Task Force (TSTF) Traveler-523,Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Proces2014-06-23023 June 2014 License Amendment Request (TSCR-146): Application to Revise Tech Specs to Adopt Technical Specifications Task Force (TSTF) Traveler-523,Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process NG-13-0297, License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.42013-08-29029 August 2013 License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 NG-13-0110, License Amendment Request (TSCR-140): Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, Section Affected: 1.12013-03-14014 March 2013 License Amendment Request (TSCR-140): Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, Section Affected: 1.1 NG-12-0483, License Amendment Request (TSCR-142): Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hrs Per Month, Using Consolidated Line Item Improvement Process2012-12-21021 December 2012 License Amendment Request (TSCR-142): Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hrs Per Month, Using Consolidated Line Item Improvement Process NG-12-0434, Technical Specification Change Request (TSCR-141): License Amendment Request for Change to Renewed Operating License Condition C.122012-11-13013 November 2012 Technical Specification Change Request (TSCR-141): License Amendment Request for Change to Renewed Operating License Condition C.12 2022-02-02
[Table view] |
Text
NEXTeraM ENERGY~
September 25, 2019 NG-19-0100 L-2019-161 10 CFR 50.90 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555 Duane Arnold Energy Center Docket No. 50-331 Renewed Facility Operating License No. DPR-49 License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3), Fire Protection Program Pursuant to 10 CFR 50.90, NextEra Energy Duane Arnold, LLC (NEDA) is submitting a request for an amendment to the Operating License for the Duane Arnold Energy Center (DAEC). The proposed amendment would delete License Condition 2.C.(3),
"Fire Protection Program," which requires that NEDA implement and maintain a fire protection program that complies with the requirements of 10 CFR 50.48(a) and 10 CFR 50.48(c).
By letter dated January 18, 2019 (Accession No. ML19023A196), NEDA provided formal notification to the U.S. Nuclear Regulatory Commission (NRG) pursuant to 10 CFR 50.82(a)(1 )(i) and 10 CFR 50.4(b)(8) of the intention to permanently cease power operations at the DAEC in the fourth quarter of 2020. After the certifications of permanent cessation of power operation and of permanent removal of fuel from the DAEC reactor vessel are docketed in accordance with 10 CFR 50.82(a)(1)(i) and (ii) respectively, and pursuant to 10 CFR 50.82(a)(2), the 10 CFR 50 license will no longer authorize reactor operation or emplacement or retention of fuel in the reactor vessel.
As a result, the Fire Protection Program license condition may be removed, and NEDA will maintain a Fire Protection Program in accordance with 10 CFR 50.48(f), as required during the continued effectiveness period of the Part 50 license under 10 CFR 50.51 (b).
The Enclosure to this letter provides NEDA's evaluation of the proposed change.
Attachment 1 to the enclosure provides a markup of the Operating License showing the proposed change, and Attachment 2 provides the clean Operating License pages containing the proposed change.
NEDA requests approval of the proposed license amendment by October 1, 2020.
NEDA requests that the approved amendment become effective following submittal of the certifications required by 10 CFR 50.82(a)(1)(i) and (ii). /JiJD~
NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324 jV/:/c_
l Document Control Desk NG-19-0100 Page 2 of 2 In accordance with 10 CFR 50.91, a copy of this application with the enclosure is being provided to the designated State of Iowa official.
As discussed in the enclosure, the proposed change does not involve a significant hazards consideration pursuant to 10 CFR 50.92, and there are no significant environmental impacts associated with the change. The DAEC Onsite Review Group has reviewed and concurred with the proposed license amendment.
This letter contains no new or revised regulatory commitments.
If you have any questions or require additional information, please contact Mike Davis, Licensing Manager, at 319-851-7032.
I declare under penalty of perjury that the foregoing is true and correct. Executed on September 25, 2019.
9~~J Dean Curtland Site Director NextEra Energy Duane Arnold, LLC Enclosure cc: Regional Administrator, USNRC, Region Ill, Project Manager, USNRC, Duane Arnold Energy Center Resident Inspector, USNRC, Duane Arnold Energy Center A. Leek (State of Iowa)
Enclosure NEXTERA ENERGY DUANE ARNOLD, LLC DUANE ARNOLD ENERGY CENTER NG-19-0100 LICENSE AMENDMENT REQUEST (TSCR-186)
DESCRIPTION AND EVALUATION OF THE PROPOSED CHANGES Page 1 of 6
Duane Arnold Energy Center Docket No. 50-331 License Amendment Request Enclosure to NG-19-0100 Page 2 of 6 NEXTERA ENERGY DUANE ARNOLD, LLC DUANE ARNOLD ENERGY CENTER License Amendment Request CTSCR-186): Removal of License Condition 2.C.(3),
Fire Protection Program EVALUATION OF PROPOSED CHANGE 1.0 Summary Description 2.0
- Detailed Description 3.0 Technical Evaluation 4.0 Regulatory Evaluation 4.1 Applicable Regulatory Requirements/Criteria 4.2 Precedent 4.3 No Significant Hazards Consideration 4.4 Conclusions 5.0 Environmental Considerations 6.0 References - Proposed Operating License Changes (Mark-Up) - Revised Operating License Pages (Clean, with Proposed Changes)
Duane Arnold Energy Center Docket No. 50-331 License Amendment Request Enclosure to NG-19-0100 Page 3 of 6 1.0
SUMMARY
DESCRIPTION The proposed amendment would delete the DAEC Operating License Condition 2.C.(3),
"Fire Protection Program," which requires that NextEra Energy Duane Arnold, LLC (NEDA) implement and maintain a fire protection program that complies with the requirements of 10 CFR 5b.48(a) and 10 CFR 50.48(c). NEDA will maintain a Fire Protection Program in accordance with 10 CFR 50.48(f), as required for licensees that have submitted certification of permanent cessation of operations.
2.0 DETAILED DESCRIPTION 2.1 Current Operating License Requirements License Condition 2.C.(3) requires NEDA to implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c) as specified in the licensee amendment request dated August 5, 2011, as supplemented and approved in the safety evaluation report dated September 10, 2013. Additionally, the license condition includes criteria for making changes to the approved program without prior NRG approval.
2.2 Reason for the Proposed Change The proposed change is requested as a result of NEDA's formally-stated intention to permanently cease power operation at DAEC in the fourth quarter of 2020 (Reference 1). After the certifications of permanent cessation of power operation and of permanent removal of fuel from the DAEC reactor vessel are docketed, in accordance with 10 CFR 50.82(a)(1)(i) and (ii) respectively, and pursuant to 10 CFR 50.82(a)(2), the 10 CFR 50 license will no longer authorize reactor operation or emplacement or retention of fuel in the reactor vessel. As a result, License Condition 2.C.(3) will no longer apply because it establishes requirements that relate to the ability to shut down the plant safely in the event of a fire.
2.3 Description of the Proposed Change The revised License Condition will read as follows:
2.C.(3) Deleted provides a markup of the Operating License showing the proposed change, and Attachment 2 provides the clean Operating License pages containing the proposed change.
Duane Arnold Energy Center Docket No. 50-331 License Amendment Request Enclosure to NG-19-0100 Page 4 of 6
3.0 TECHNICAL EVALUATION
The current Fire Protectiqn License Condition is applicable to an operating reactor as the requirements of 10 CFR 50.48(a) and 50.48(c) apply to holders of operating licenses issued under Part 50. The conditions specified in the License Condition include consideration of risk metrics for core damage frequency and large early release frequency, which are associated with power operation.
After th.e certifications of permanent cessation of power operation and of permanent removal of fuel from the DAEC reactor vessel are docketed in accordance with 10 CFR 50.82(a)(1 )(i) and (ii) respectively, and pursuant to 10 CFR 50.82(a)(2), the DAEC license will no longer authorize operation of the reactor. As such, the conditions specified in License Condition 2.C.(3) are no longer required or applicable, and License Condition 2.C.(3) can be-deleted.
Following submittal of the certifications required under 10 CFR 50.82(a)(1 ), a fire protection program is required by 10 CFR 50.48(f) to address the potential for fires that could result in a radiological hazard. This regulation is applicable regardless of whether a requirement for a fire protection program is included in the facility license. Fire Protection program aspects that relate to a permanently defueled condition are specifically and adequately addressed by 10 CFR 50.48(f). As a re.suit, the fire protection program will be revised to take into account the decommissioning facility conditions and activities.
The revision to the DAEC Operating License (OL) is proposed in. accordance with 10 CFR 50.51(b) and the proposed changes would become effective following submittal of the certifications required by 10 CFR 50.82(a)(1)(i) and (ii).
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria 10 CFR 50.48(f) states in part that: "Licensees that have submitted the certifications required under 10 CFR 50.82(a)(1) shall maintain a fire protection program to address the potential for fires that could cause the release or spread of radioactive materials (i.e., that~ould result in a.radiological hazard) ... "
- 4.2 Precedent The proposed change is consistent with the changes submitted by Fort Calhoun Station
Duane Arnold Energy Center Docket No. 50-331 License Amendment Request Enclosure to NG-19-0100 Page 5 of 6 4.3 No Significant Hazards Consideration NEDA has evaluated whether a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of.amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed change does not alter, degrade or prevent action described or assumed in any accident in the UFSAR from being performed. The proposed change does not alter any assumptions previously made in evaluating radiological consequences. The proposed change does not affect the integrity of any fission product barrier.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of .
accident from any accident previously evaluated?
Response: No The proposed change does not alter any safety limits or safety analysis assumptions associated with the operation of the plant. The proposed change does not introduce any new accident initiators, nor does the change reduce or adversely affect the capabilities of any plant structure or system in the performance of its safety function.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No The proposed change does not alter the manner in which safety limits or limiting safety system settings are determined. The safety analysis acceptance criteria are not affected by the proposed change. The proposed change does not change the design function of any equipment assumed to operate in the event of an accident.
Duane Arnold Energy Center Docket No. 50-331 License Amendment Request Enclosure to NG-19-0100 Page 6 of 6 Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, NEDA concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92, and, accordingly, a finding of "no significant hazards consideration" is justified.
4.4 Conclusions Based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
S NEDA has evaluated the proposed amendment for environmental considerations. The review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement.
However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
6.0 REFERENCES
6.1 Letter from Mano K. Nazar, NextEra Energy Duane Arnold, LLC to U.S. Nuclear Regulatory Commission - "Duane Arnold Energy Center - Certification of Permanent Cessation of Power Operations," dated January 18, 2019, (ADAMS Accession No. ML19023A196).
LIST OF ATTACHMENTS - Proposed Operating License Changes (Mark-Up) - Revised Operating License Pages (Clean, with Proposed Changes)
Duane Arnold Energy Center Docket No. 50-331 License Amend menfReq Liest NG-19-0100 Enclosure, Attachment 1 Page 1 of 4 ATTACHMENT 1 PROPOSED OPERATING LICENSE CHANGES (MARK-UP)
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I; Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations , and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level NextEra Energy Duane Arnold , LLC is authorized to operate the Duane Arnold Energy Center at steady state reactor core power levels not in excess of 1912 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendix A , as revised through _J..
Amendment No. 307, are hereby incorporated in the license. NextEra Energy Duane -1 Arnold , LLC shall operate the facility in accordance with the Technical Specifications.
(a) For Surveillance Requirements (SRs) whose acceptance criteria are modified ,
either directly or indirectly, by the increase in authorized maximum power level in 2.C.(1) above, in accordance with Amendment No. 243 to Facility Operating License DPR-49, those SRs are not required to be performed until their next scheduled performance, which is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment No. 243.
(b) Deleted.
(3) Fire Proteotion PrograFR Deleted NextEra Energy Duane Arnold , LLG shall iFRpleRlent and Rlaintain in effeot all provisions of the approved fire proteotion prograFR that 00R1ply with 10 GFR 60. 48(a) and 10 GFR 60.48(0) , as speoified in the lioensee aR1endR1ent request dated August 6, 2011 (and supplements dated Ootober 14 , 2011 , April 23, 2012, May 23, 2012, duly 9, 2012, Ootober 16, 2012, January 11 , 2013, February 12, 2013, Marsh 6, 2013, May 1, 2013, May 29, 2013, two suppleR1ents dated duly 2, 2013, and supplements dated August 6, 2013 and August 28, 2013) and as approved in the safety evaluation report dated SepteFRber 10, 2013. Exoept where NRG approval for ohanges or deviations is required by 10 GFR 60.48(0) , and provided no other regulation , teohnioal speoifioation , lioense oondition or requirement would require prior ~JRG approval , the lioensee FRay FRake ohanges to the fire protection prograRl without prior approval of the GomFRission if those ohanges satisfy the provisions set forth in 10 GFR 60.48(a) and 10 GFR 60. 48(0) , the ohange does not require a ohange to a teohnioal speoifioation or a lioense oondition , and the oriteria listed belm,*,*
are satisfied .
Renewed License No. DPR-49 Amendment ~ 1
- Fire AlarR'l aRd DeteotioR SysteR'!s (SeotioR e.8) ;
- AutoFRatio aRd MaRual Water Based Fire SuppressioR SysteFRs (SeotioR e.O) ;
- Gaseous Fire SuppressioR SysteR'!s (Seotion 3.10); and ,
- Passive Fire ProteotioR Features (Seotion e.11 ).
This Lioenso Condition does not apply to any deFRonstration of equivaleRoy under Seotion 1.7 of NFPA 806 .
- 2. Fire ProteotioR PrograFR GhaRges that le4ave No More thaR MiRiFRal Risk IFRpaot Prior NRG review and approval are not required for ohaRges to the lioeRsee's fire proteotioR prograFR that have beeR deR'!oRstrated to have RO FRore thaR a R'liRiFRal risk iFRpaot. The lioeRsee R'lay use its soreening prooess as appro\*ed iR the ~~RC safety evaluatioR re port dated SepteR'!ber 10, 2013 to deterR'liRe that oertaiR fire proteotioR prograR'! ohaRges R'!eet the R'liniR'lal oriterion . T he lioensee shall eRsure that fire proteotioR defeRse in depth and safety FRargins are FRaiRtaiRed wheR ohaRges are FRade to the fire proteotion prograFR .
TransitioR Lioense GoRditioRs (1) Before aohieving full ooFRpliance with 10 GFR 50.48(0) , as specified by (2) and (3) below, risk inforFRed ohanges to the lioeRsee's fire proteotioR prograR'l FRay not be FRade 1Nithout prior NRG review and approval unless the ohange has been deR'!onstrated to have no FRore than a R'liRiR'lal risk iFRpaot, as desoribed in (2) abO\'e .
(2) The lioeRsee shall iFRpleFReRt the R'!odifioations to its faoi lity, as desoribed iR Enolosure 2, AttaohR'leRt S, Table S 1, "Plant FROdifioatiORS GOFRFRitted," of DAEG letter NG 1a 0287, dated July 2, 2013, to ooR'lplete the traRsitioR to full ooFRpliaRoe with 1O GFR 50 .48(0) by DeceFRber 31 , 201 4. The licensee shall FRaintaiR appropriate COFRpeRsatory R'!easures iR plaoe URtil COR'lpletioR of these FRodifioatioRs.
(e) The lioensee shall iR'lpleFReRt the iteR'ls listed iR ~Rolosure 2, AttaohFReRt S, Table S 2 , "IFRpleR'!eRtatioR lteR'ls," of DA~G letter NG 13 0287 , dated July 2 ,
201 e, by Marsh 0 , 2014 .
(4) The licensee is authorized to operate the Duane Arnold Energy Center following installation of modified safe-ends on the eight primary recirculation system inlet lines which are described in the licensee letter dated July 31, 1978, and supplemented by letter dated December 8, 1978.
(5) Physical Protection NextEra Energy Duane Arno ld , LLC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, Renewed License No. DPR-49 Amendment -286 ~
Duane Arnold Energy Center Docket No. 50-331 License Amendment Request NG-19-0100 Enclosure, Attachment 2 Page 1 of 2 ATTACHMENT 2 REVISED OPERATING LICENSE PAGES (CLEAN , WITH PROPOSED CHANGES)
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I; Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the ru les, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level NextEra Energy Duane Arnold, LLC is auth orized to operate the Duane Arnold Energy Center at steady state reactor core power levels not in excess of 1912 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 307, are hereby incorporated in the license. NextEra Energy Duane Arnold, LLC shall operate the facility in accordance with the Technical Specifications.
(a) For Surveillance Requirements (SRs) whose acceptance criteria are modified, either directly or indirectly, by the increase in authorized maximum power level in 2.C.(1) above, in accordance with Amendment No. 243 to Facility Operating License DPR-49, those SRs are not required to be performed until their next scheduled performance, which is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment No. 243.
(b) Deleted.
(3) Deleted (4) The licensee is authorized to operate the Duane Arnold Energy Center following installation of modified safe-ends on the eight primary recirculation system inlet lines which are described in the licensee letter dated July 31 , 1978, and supplemented by letter dated December 8, 1978.
(5) Physical Protection NextEra Energy Duane Arnold, LLC shall fu lly implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, Renewed License No. DPR-49 Amendment