Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION

Title:

Duane Arnold Energy Center Public Meeting: Afternoon Session Docket Number:

50-331 Location:

Hiawatha, Iowa Date:

Wednesday, April 22, 2009 Work Order No.:

NRC-2777 Pages 1-35 NEAL R. GROSS AND CO., INC.

Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.

Washington, D.C. 20005 (202) 234-4433

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 1

UNITED STATES OF AMERICA 1

NUCLEAR REGULATORY COMMISSION 2

+ + + + +

3 Before the Atomic Safety and Licensing Board 4

+ + + + +

5 DUANE ARNOLD ENERGY CENTER 6

Regarding the Renewal of Facility Operating 7

License for a 20-Year Period 8

WEDNESDAY 9

APRIL 22, 2009 10

+ + + + +

11 HIAWATHA CITY HALL 12 101 EMMONS STREET 13 HIAWATHA, IOWA 14

+ + + + +

15 The above-entitled matter commenced 16 pursuant to Notice before Maurice Heath, Project 17 Manager at 101 Emmons Street, Hiawatha, Iowa 52233, 18 on Wednesday, April 22, 2009, at 1:30 p.m.

19 PRESENT:

20 NRC STAFF:

21 Maurice Heath - Project Manager 22 Charles Eccleston 23 Scott Burnell 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 2

Caroline Tilton 1

P R O C E E D I N G S 2

(1:30 P.M.)

3 MR. HEATH: Good afternoon everybody.

4 Welcome to the meeting. We're going to talk about 5

the Duane Arnold Energy Center license renewal 6

application. My name is Maurice Heath and I'm a 7

Project Manager at the U.S. Nuclear Regulatory 8

Commission, or NRC as you're going to hear us call 9

it today. And I'll be your facilitator as well, so 10 bear with me with that. And I will also be the 11 first presenter of the afternoon.

12 The purpose of today's meeting is to 13 provide you an opportunity to give your comments on 14 what the environmental issues that the NRC should 15 consider during its review of the Duane Arnold 16 Energy Center license renewal application. The 17 meeting will essentially have two parts. The first 18 we'll have a presentation from NRC staff on the 19 license renewal process and environmental review 20 process.

21 I'm not sure if everybody knows that on 22 the back table we have sign in sheets and we also 23 have a copy of today's presentation if you'd like a 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 3

copy. Also in back we have a sign up for anybody 1

who wants to speak during the comment period at the 2

end. We ask that you put your name down, if you 3

didn't already, that's okay, you can still get on 4

and give comments, but please fill it out before you 5

leave just so we can get it on the transcript. We 6

want to make sure that we can accurately have your 7

correct spelling and make sure that everything is 8

all clean on the transcript.

9 So like I said, we have a court reporter 10 here. He will be transcribing the meeting, so when 11 you give a comment we'd ask that you please say your 12 name and spell it for the court reporter. And also, 13 if you have any affiliations, please name your 14 affiliation.

15 One of the items before we get started, 16 we do have NRC comment forms in the back, so if 17 you'd like to comment on how the meeting ran, we 18 would like you to fill that out and you can just 19 send it back to us. You don't have to have any 20 postage on it. You just fill it out and then send 21 it back and it will come actually directly to me, 22 and so we can receive that.

23 Just for your knowledge in case anybody 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 4

doesn't know, the restrooms are out the back door 1

and to the left.

2 Now with that, we're just going to go 3

right into our presentation. First, I'd like to 4

introduce Mr. Charles Eccleston. He's a Project 5

Manager as well just like myself, but he's going to 6

talk about the environmental process, environmental 7

scoping.

8 Now, today's meeting will provide an 9

overview of the license renewal process, which 10 includes both the safety and environmental as I said 11 earlier. But the most important thing in the 12 meeting today is that we get the comments that you 13 have on the environmental review. So we'll also 14 give a chance for you to submit any written comments 15 and give it to us as well.

16 At the conclusion of today's 17 presentation, we'll be happy to answer any questions 18 that you have. However, I'm going to have to ask 19 you to limit your participation with questions only 20 at that time where we have another designated time 21 to receive your comments for the record. So once we 22 get all the questions asked, then we'll stop that 23 portion and go directly to the comments if you'd 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 5

like to add your comments to the record.

1 Before I get into the process, I'd like 2

to take a minute to talk about NRC in terms of what 3

we do and what our mission is. The NRC is a federal 4

agency established in the Energy Reorganization Act 5

of 1974 and it regulates the civilian use of nuclear 6

material. The Atomic Energy Act of 1954 authorized 7

the NRC to grant a 40 year license. The 40 year 8

term is based on economic considerations and 9

antitrust factors, not on the safety or technical 10 limitations. The Atomic Energy Act also allows for 11 license renewal.

12 Now, the National Environmental Policy 13 Act of 1969, otherwise known as NEPA, established a 14 national policy that requires federal decision 15 makers to assess and consider impacts and 16 alternatives to a proposal before reaching a final 17 decision to pursue an action. As a matter of 18 policy, the NRC has determined that the reactor 19 license renewal constitutes a major federal action 20 in which we will prepare an Environmental Impact 21 Statement.

22 The NRC's regulations governing nuclear 23 safety, security and environmental protection are 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 6

contained in Title 10 of the Code of Federal 1

Regulations, which are referred to as 10 CFR. An 2

exercise in the regulatory authority, the NRC's 3

mission is threefold: to insure adequate protection 4

of public health and safety; promote the common 5

defense and security; and to protect the 6

environment.

7 The NRC accomplishes its mission through 8

a combination of regulatory programs and processes 9

such as establishing rules and regulations, 10 conducting inspections, issuing enforcement actions, 11 assessing licensee performance, and evaluating 12 operating experience for nuclear plants in this 13 country and internationally.

14 The NRC also has resident inspectors at 15 all operating nuclear plants. The inspectors are 16 considered the eyes and ears of the NRC. They carry 17 out the safety mission on a daily basis and are on 18 the front lines to insuring acceptable safety 19 performance and compliance with regulatory 20 requirements.

21 Now, with Duane Arnold, their current 22 operating license expires February 21st, 2014 and 23 their license renewal was submitted to us on October 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 7

1st, 2008. A license renewal application is 1

required to contain these elements:

general 2

information such as applicant's name, address, 3

business and administrative information; technical 4

information which pertains to the aging management 5

and this is the focus of the safety review; 6

technical specifications which define the operating 7

parameters of the plant. The application indicates 8

what, if any, changes or additions to the technical 9

specifications are necessary to manage the effect of 10 the aging during the period of extended operation.

11 And last but not least in the 12 application is the Environmental Report, which is 13 the applicant's assessment of the environmental 14 impacts of continued operation. This information 15 serves as a starting point for the environmental 16 review.

17 The license renewal process involves two 18 parallel reviews as I mentioned, the safety aspect 19 and the environmental aspect. Now, the safety 20 review focuses on aging effects of passive and long 21 lived components and structures that the NRC deems 22 important to plant safety. The staff's main 23 objective is to determine whether the effects of 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 8

aging will be adequately managed by the applicant.

1 The review also considers generic and site-specific 2

operating experience related to the effects of 3

aging. The results of the safety review are 4

documented in the Safety Evaluation Report, or as we 5

call it, SER.

6 For the environmental review, the NRC 7

evaluates environmental impacts of continued plant 8

operations for an additional 20 years. The NRC 9

prepares an Environmental Impact Statement, 10 otherwise known as the EIS, which is publicly 11 available and discloses these impacts.

12 The EIS also evaluates impacts of other 13 reasonable alternatives to license renewal. The 14 public is afforded an opportunity to provide 15 comments and input which help shape the scope of the 16 EIS analysis. The public is also afforded the 17 opportunity to comment on the accuracy of the draft 18 EIS. The goal is to provide the decision makers 19 with sufficient environmental information so they 20 can make a reasoned choice between the proposed 21 license renewal action and reasonable alternatives.

22 Now, I'd like to mention a few things 23 that come up in public meetings but they are usually 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 9

outside the scope of license renewal. However, 1

these items are dealt with in an ongoing regulatory 2

oversight and they are emergency planning, security 3

and current safety performance as defined by the NRC 4

inspection findings, violations, general assessment 5

and planning. For specifically at Duane Arnold, the 6

link below, which is also in your handouts, is the 7

location where you can find the performance of the 8

Duane Arnold Energy Center.

9 Now, this diagram illustrates the safety 10 and the environmental review processes. It also 11 features two other considerations in the 12 commission's decision of whether or not to renew an 13 operating license. One of these considerations is 14 the independent review performed by the Advisory 15 Committee on Reactor Safeguards, or ACRS.

16 Statutorily mandated by the Atomic Energy Act of 17 1954, the ACRS is a group of scientists and nuclear 18 safety experts who serve as a consulting body to the 19 commission. The ACRS reviews the license renewal 20 application and the NRC status SER. And the ACRS 21 reports their findings and recommendations directly 22 to the commission.

23 Hearings may also be conducted.

24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 10 Interested stakeholders may submit concerns or 1

contentions and request a hearing. An adjudicatory 2

panel from the Atomic Safety and Licensing Board 3

will be established to review contentions for 4

admissibility.

If a

hearing is granted the 5

commission considers the outcome of the hearing 6

process in its decision making for whether or not to 7

issue a renewed operating license.

8 Now, I want to describe the license 9

renewal process in a little more detail. The 10 regulations governing license renewal are based on 11 two guiding principles. To effectively communicate 12 these principles I need to describe a concept used 13 by the NRC. The concept is licensing basis.

14 Now, licensing basis consists of a wide 15 range of design and operational requirements and 16 conditions that must be met for the plant to comply 17 with its operating license. It serves as the basis 18 upon which the NRC originally licensed the plant and 19 to continue to operate, the plant it must conform 20 with its licensing basis.

21 The first principle is that the current 22 regulatory process is adequate to insure that the 23 licensing basis for all operating plants provide and 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 11 maintain an acceptable level of safety. The second 1

principle is that the current plant's extending 2

licensing basis must be maintained during the 3

renewal term in the same manner and to the same 4

extent as during the original license term. In 5

other words, the same rules apply that applied under 6

the current license will apply into the renewal 7

term.

8 In addition, a renewed license will 9

include conditions that must be met to insure the 10 aging of structures and components important to 11 safety are adequately managed so that the plant's 12 current licensing basis is maintained during the 13 period of extended operation.

14 The safety review is a very rigorous 15 review. The staff reviews the applicant's license 16 renewal application and supporting documentation.

17 Now, this review includes an evaluation of new and 18 existing programs and surveillance activities to 19 determine with reasonable assurance that the effects 20 of aging for certain plant structures and components 21 will be adequately managed or monitored.

22 The safety review also includes site 23 audits to verify the technical basis of the license 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 12 renewal application and to confirm that the 1

applicant's aging management programs and activities 2

conform with how they are described in the 3

application. The staff documents the basis and 4

conclusions of its review in the SER which is 5

publicly available.

In

addition, a

team of 6

specialized inspectors travels to the reactor site 7

to verify the aging management programs have been 8

implemented, modified or planned consistent with the 9

license renewal application.

10 Finally, I'll mention the ACRS performs 11 an independent review of the license renewal 12 application and SER and makes a recommendation to 13 the commission.

14 Next, I'll turn it over to Charles so he 15 can go over the environmental review and the scoping 16 process.

17 MR. ECCLESTON: Hello. I am the 18 Environmental Project Manager for this proposal and 19 we're now going to turn the lecture over to a review 20 of the environmental process that we're undertaking 21 for this particular project.

22 In 1969 the U.S. Congress passed what 23 has become a very historic and very important act.

24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 13 It was the National Environmental Policy Act of 1

1969. It's of such historical significance that now 2

over 100 nations around the world have basically 3

passed an act similar to our original NEPA.

4 NEPA is basically important for two 5

different aspects. First of all, it establishes the 6

basic national environmental policy or the national 7

environmental charter for the entire United States.

8 It was the first major environmental legislation to 9

ever pass -- legislation to ever pass in the United 10 States. Following NEPA, virtually every other law 11 and regulation that we have dealing with NEPA came 12 after the event in its footsteps and it is designed 13 to implement the policy that NEPA set up. So it's 14 important from that perspective, but probably even 15 more so under NEPA it requires that an Environmental 16 Impact Statement be prepared for all major federal 17 actions significantly affecting the quality of the 18 human environment.

19 Now, the NRC has come out and basically 20 said that license renewal projects are projects that 21 need an EIS, so that's why we're here today. I'd 22 like to also point out something, another interest 23 here. According to NEPA, you must follow an 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 14 objective interdiscip linary and systematic process 1

in preparing the EIS.

2 Now, let's see why that's important. It 3

has to be an objective process. They have to be 4

able to stand up to scientific scrutiny. There is 5

no room for bias in this analysis. It has to be 6

interdisciplinary. NEPA touches virtually every 7

discipline that somebody could think of from 8

biology, geology, hydrology, economics, sociology.

9 It brings all these disciplines together and these 10 experts in these disciplines prepare the analysis 11 that goes into the EIS. And it's systematic. And 12 by that it means that the agency must follow a very 13 systematic structured process. It's not a wishy 14 washy process. It has to be a very well thought 15 out, very systematic, very structured process in 16 preparing the EIS. So it's important from that 17 standpoint.

18 Under NEPA the EIS must rigorously 19 investigate environmental impacts of the license 20 renewal project and its alternatives. The purpose 21 of the EIS is to inform federal decision makers and 22 to publicly disclose the impacts of the proposal and 23 the reasonable alternatives, including the 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 15 alternative of taking no action at all, which in 1

this case would be not renewing the license for the 2

Duane Arnold Energy Center. Those have to be 3

evaluated.

4 Here is a simplified schematic of a 5

basic EIS process. It's actually in reality quite a 6

bit more complicated than this, but this shows the 7

basic most important aspects of preparing the EIS.

8 Note that the yellow blocks here is where the public 9

has the opportunity to become involved in the 10 process, provide comments, provide input, review the 11 documents and basically get engaged in the process.

12 NEPA is a very open process.

13

Now, the EIS process starts with 14 issuance of a Notice of Intent. That's an NOI.

15 That kicks the EIS process off. Once the NOI is 16 published in the Federal Register, we begin a public 17 scoping process, right here, and included in that 18 public scoping process is a public scoping meeting, 19 which is why we're here today. This is it.

20 The purpose of the scoping process is to 21 solicit public comments and public input in terms of 22 what the public views as important in terms of 23 shaping the scope of the EIS that will be prepared.

24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 16 So the public has, and that's what we're, like I 1

said, that's what we're here today to do. And then 2

until May 25th, that's what we're going to be doing 3

is interacting with the public, trying to find out 4

what the public thinks is important to put into this 5

EIS.

6 Once we determine the scope of the EIS, 7

then we move down and we prepare a

draft 8

Supplemental Environmental Impact Statement, and 9

I'll explain what I mean by supplemental. Don't get 10 hung up on that right now. I'll explain that in a 11 couple of slides as to why they're saying it's a 12 supplemental EIS.

13 But we prepare the supplemental EIS and 14 then after we prepare it, we issue it to the public.

15 It's publicly issued. The public has the ability 16 to take a look at the EIS and provide comments and 17 feedback. If they don't agree with the conclusions 18 in the EIS or if they don't agree, or if they think 19 it's not adequate or didn't cover something, that's 20 the public's opportunity to provide input. That 21 input is addressed by the NRC and the input is used 22 to prepare the final EIS.

23 The final EIS is again sent back out.

24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 17 It's publicly issued. Again, the public has an 1

opportunity to review that final EIS and basically 2

see what it says. And then from that point the 3

agency, in this case the NRC, publishes a Record of 4

Decision, or ROD. That is where the agency using 5

the EIS and other factors that they believe is 6

important in reaching the decision, that is where 7

they document that in a publicly available ROD, so 8

the public can see what the decision is. And only 9

then can the agency do any action or anything in 10 terms of or related to the proposal to re-license 11 the Duane Arnold Energy Center.

12 I think the most important thing here 13 that I want to put out there is this is a very 14 systematic process. A lot of steps go through this 15 and no decision, no decision at all regarding the 16 proposal can be made until we reach this step at the 17 end of the process. And no action with respect to 18 re-issuing the license or denying the license, for 19 that matter, or any other alternative that the NRC 20 might choose to do, can be taken until we've gone 21 through this entire process.

22 The purpose of this meeting, and I think 23 this is really important because sometimes people 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 18 get the wrong idea about the public scoping meeting, 1

the purpose of this meeting is not to make a 2

decision regarding the proposal for a prospective 3

license renewal. Instead, the purpose is to solicit 4

public input, public comment regarding the scope of 5

the EIS. And again, I want to emphasize that EIS 6

will then be used once it's done, gone through 7

public

review, and making the final decision 8

regarding the renewal of license application.

9 So what we are particularly interested 10 in in this meeting and during the entire public 11 scoping process, which will run through May 25th, is 12 determining what the public believes is the scope of 13 actions they want to see in the EIS. What is the 14 scope of the basic impacts and issues they want to 15 see evaluated in the EIS, and what are the 16 particular alternative and mitigation measures that 17 they want to see in the EIS. This is basically what 18 we're trying to pan in on at today's meeting here.

19 I think it's important just to take a 20 moment and talk about this GEIS and this SEIS. Back 21 in 1998, the NRC was doing re-licensing projects and 22 they decided that what they wanted to do was look at 23 all the licensing projects that are worked on and 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 19 try to get a common set of impacts that they could 1

make common conclusions about that would be 2

applicable to all re-licensing projects. They found 3

69 different impacts where they could make basically 4

general conclusions that would be applicable to any 5

kind of re-licensing project. The put it into this 6

GEIS, this Generic EIS.

7 What we are preparing for the Duane 8

Arnold is a Site-Specific Supplemental EIS, and we 9

say supplemental because it's supplementing the 10 conclusions that were printed to the Generic EIS.

11 And the NRC will basically be looking at evaluating 12 any new or significant information concerning the 13 general conclusions reached in the GEIS. So this is 14 how these two EIS's interface and interrelate with 15 one another.

16 Now, in addition to the scoping process 17 and the scoping meeting that we're having today, in 18 addition to that, to supplement that the NRC also 19 goes out and consults with federal, state and local 20 agencies. And examples of this would be like the 21 Fish and Wildlife

Service, the National 22 Oceanographic and Atmospheric Administration, the 23 U.S. Environmental Protection Agency, as well native 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 20 American tribes that could be potentially affected 1

by this project.

2 We go out and consult with them and then 3

along with, or the input we receive from these 4

consultations and scoping comments that we're 5

receiving, like from the meeting today, we take all 6

that stuff and that is used to determine the focus 7

of what's going to be going into that EIS.

8 In this case, it's been very common that 9

we're going to be looking at impacts to just a 10 diverse array of different kinds of impacts and 11 issues that affect people and the environment, 12 everything from fish and wildlife impacts to air and 13 water resource impacts, impacts to historical and 14 cultural resources, human health impacts, land use 15 impacts. And then there's also social economic 16 impacts, which are often very important to the local 17 citizens in a project like that.

18 And in terms of the social economic 19 impacts we're going to be looking at the impact on 20

taxes, community development, social
impacts, 21 environmental justice impacts, and then a host of 22 other impacts or issues that we feel is important in 23 weighing the final decision as to which action we 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 21 want to take.

1 So what we're basically asking here is 2

to get input. What are the common issues that you 3

believe the EIS should focus on? What are the local 4

environmental impacts or issues that should be 5

examined in the EIS? What reasonable alternatives 6

or mitigation measures are appropriate for this 7

area? That's the kind of input we're trying to 8

receive from this scoping meeting.

9 This basically is important because the 10 entire process is a decision making process. And 11 this shows how everything comes together to reach an 12 ultimate decision. Here we are, right up here at 13 the top, we're in this area right here. We're 14 trying to determine the scope of the EIS. Once we 15 determine the scope of the EIS, that will be the 16 entry to the preparation of the Supplemental 17 Environmental Impact Statement.

18 And once the Supplemental Environmental 19 Impact Statement is complete, the conclusions and 20 the information will be used by NRC in making a 21 decision about the license renewal. But that's not 22 the only things or factors that lead into the 23 decision. That's a key principle part of it, but in 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 22 addition to that as Maurice was talking about, 1

there's going to be a

very rigorous Safety 2

Evaluation Report. The information from that will 3

feed into the decision.

4 We have regional and planned 5

inspections. Information from that will feed into 6

the decision. The license renewal application that 7

was prepared by the applicant will provide 8

information that will lead into the final decision.

9 We also have an independent Advisory Committee on 10 Reactor Safeguards that will provide information, 11 possibly recommendations which again, feed into the 12 final decision. All this information is coming 13 together to help and assist the NRC in making the 14 wisest possible decision, the most informed decision 15 possible.

16 So in addition to receiving comments 17 here at the scoping meeting, there's three other 18 ways you can provide comments to us, and this is in 19 your handout. You can provide it by mail. The 20 address is in your handout. You can provide 21 comments by e-mail, this e-mail address there. If 22 you happen to be in the Washington, D.C. area 23 walking down the street, you can stop into the NRC 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 23 office and hand deliver comments right there.

1 Comments should be submitted by May 25th of this 2

year.

3 This is a table, a matrix of some of the 4

key dates on the EIS schedule that you may or may 5

not find important or they might affect how you want 6

to interface into the process. I'm not going to 7

belabor on this table. It's in your packet, but 8

there are the dates if you have any questions about 9

the dates.

10 Finally, additional information. If you 11 want additional information you can contact Maurice 12 Heath at this number here. Again, it's in your 13 handout, or myself at this number. We have also put 14 pertinent files, pertinent manuals and documents on 15 file with the Hiawatha Public Library. You can go 16 there. And pertinent documents will also be put 17 onto the NRC's website. So there's an area if you 18 want to get more information about this proposal, 19 there's where you go.

20 And with that, I guess I'll turn it back 21 over to you, Maurice.

22 MR. HEATH: Thank you. Now, with that 23 I'd like to open it up. Does anybody have any 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 24 questions they would like to ask?

1 (No response.)

2 One thing to note, if you do have 3

questions or maybe you come up with questions later, 4

we have this, what we call FAQ, Frequently Asked 5

Questions. It's on the side table. It will be to 6

your left over there.

7 There's a few copies. I'll describe 8

one. It's full of questions and answers that we 9

usually get, typically get at some of these scoping 10 meetings. So just grab one on your way out just for 11 reading material if you want. And if you run out, 12 please just let me know so I can get an address and 13 get you a copy of it.

14 Well, if we don't have any questions 15 then we'll move on to the comment period. We have 16 one speaker here registered to speak.

17 MR. BROWN: I'm the only one?

18 MR. HEATH: Yes, so far, and if anybody 19 else does, I still ask for you to sign the list and 20 after Mr. Brown is finished, actually can you speak 21 into the microphone? First just state your name and 22 spell it. And also for the scoping comment period, 23 we usually ask to just bear with no more than 10 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 25 minutes for your comments just in case we do have 1

somebody else that changes their mind and wants to 2

speak. Thank you, go ahead.

3 MR. BROWN: Thanks. My name is Bennett 4

Brown, B-e-n-n-e-t-t, last name is Brown, like the 5

color. I live in Iowa City. I teach high school 6

physics in Solon. I studied physics at MIT. I've 7

worked in a reactor briefly, and I'm not afraid of 8

nuclear reactors but I

don't feel that this 9

particular one should be renewed. I do acknowledge 10 it's got an excellent staff and I support your jobs, 11 and I think that the money spent at the reactor on 12 employment could be better spent with a better 13 source of energy and I'd like to mention what I'd 14 like to see the SEIS include in terms of impacts and 15 alternatives.

16 Specifically, the Department of Natural 17 Resources and the state of Iowa assessed the state's 18 wind resource and concluded that the state of Iowa 19 developing only class 4 jacobs sites. These are 20 currently developable at two and-a-half cents a 21 kilowatt hour, would produce six times as much 22 electricity as needed by the state of Iowa.

23 The Midwest Independent Systems 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 26 Operators as well as other utility grid operators 1

have studied how much wind penetration the grid 2

could sustain given the variability of the wind and 3

concluded that we could provide 15 to 25 percent of 4

our electricity from wind without any alterations in 5

the existing grid. So the percentage of electricity 6

produced in the state of Iowa from Duane Arnold 7

could easily be replaced by wind turbines with 8

existing technology and existing market support.

9 The second thing that I'd like to see 10 that the SEIS addresses is the effect on employment 11 decommissioning. As I see it, this is not a 12 question of whether to extend the life of the plant 13 by 20 years but rather a question as to whether to 14 decommission it in 2014 or 2034. And so the 15 question is is when would we rather have the jobs 16 provided necessary to decommission this plant and 17 construct a renewable source, or at least some other 18 source of electricity whether that's a new nuclear 19 plant or a new coal plant or wind plants. And the 20 Congress requires that the operators of this nuclear 21 plant provide $359,000,000 in a trust fund by 2014.

22 23 That money spent beginning in 2014 to 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 27 provide job decommissioning in this plant would be a 1

boon to the local economy and the 2.4 billion, and 2

there that's really a number off the top of my head 3

there just saying, well, 800 megawatts times three 4

per wind because of the name plate issue, I don't 5

know how familiar you are with wind, but an 800 6

megawatt nuclear plant takes 2400 megawatts of wind 7

to replace it. So that's roughly $2.4 billion in 8

construction of wind turbines and the associated 9

jobs that come with that construction on top of some 10 300 full time jobs maintaining that wind energy.

11 That would be a significant boon to the state of 12 Iowa and I would encourage the NRC to look at the 13 economic impact on the state of replacing this 14 nuclear plant with wind as distributed around the 15 state.

16 The third point that I'd like to make 17 has to do with the environmental impact of a severe 18 accident. And I understand that you also have a 19 safety review portion of the process and I also 20 understand that the 9th Circuit Court has ruled that 21 your SEIS must include an analysis of accidents in 22 the jurisdiction of the 9th Circuit Court. So in 23 lack of ruling from this Circuit Court, I believe 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 28 that that ruling has precedence and I would ask that 1

you include accidents and the impacts of accidents 2

in the SEIS --

3 Specifically on this point I would refer 4

to the Sandia Lab Study commissioned by the NRC in 5

1982 which calculated the impacts of a severe 6

accident with core damage estimating 3,000 peak 7

fatalities immediately after the accident within a 8

25 mile radius, and 12,000 radiation injuries in the 9

early aftermath of an accident within a 35 mile 10 radius.

And calculate the plant operators, 11 calculate at any given time if all equipment is 12 operating correctly, that the core damage frequency 13 is one in 3,000,000 per reactor year. But sometimes 14 parts are out of operation and the possibility that 15 there's a severe accident under their calculations 16 go up.

17 I would ask for this SEIS that the NRC 18 address the likelihood of an accident taking into 19 account more than the plant operators include in 20 their calculation of the CDF, particularly their 21 probablistic risk assessment assumes that all parts 22 operate as though they were new and have not been 23 subjected to problems of radiation exposure, heat 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 29

exposure, fluctuation of temperature, pressure 1

exposure and embrittlement.

2 In this regard, I'd specifically point 3

out that the CDF excludes vessel failure. This is a 4

Mark 1 reactor. It's one of 18 Mark 1 reactors in 5

the country. A study published by the Union of 6

Concerned Scientists in 1995 looked at the vessel 7

internals aging in the 18 Mark 1 reactors in the 8

country as a result of discoveries of major fissures 9

and cracks in Mark 1 core shrouds and found that at 10 about 20 years of operation the exposure to 11 radiation and heat fluctuation caused moderate or 12 extensive cracking in seven out of the 18 Mark 1 13 reactors.

14 Duane Arnold at that time had no 15 cracking evident and I would encourage the NRC to 16 consider the possibility that a 40 year license that 17 was initially granted to this reactor has allowed 18 the investors to recoup their losses and that we are 19 lucky today that the aging of the parts has not 20 resulted in an accident. But a 20 year extension of 21 the license represents too great a risk to this site 22 specific plan for an accident.

23 If the core shroud detailed in the UCS 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 30 report is one of just 21 vessel internal components 1

subject not only to the cracking that is described 2

in that report, but also to erosion, embrittlement, 3

fatigue, creep, as well as stress corrosion 4

cracking. So if these vessel internal parts were to 5

prevent an insertion of the control rods, then the 6

consequences of an accident could be quite severe.

7 In addition, the secondary containment 8

which is meant to control the impact and mitigate 9

the impact of such an accident in this particular 10 reactor, was discovered to be faulty in the early 11 days of operation of this reactor and the 17 other 12 reactors like it in the country.

13 In fact, in 1986 Harold Denton, at that 14 time a Chief Safety Officer with the NRC, in leading 15 a meeting of Mark 1 operators declared that the 16 taurus, as it is known, a million gallon tank of 17 water to suppress heat in the event that the reactor 18 was unable to be shut down and no where for the heat 19 to go because of a loss of connectivity to the grid 20 for

instance, that there was a

90 percent 21 probability that that taurus would fail at a meeting 22 of Mark 1 operators.

23 And so as a result of that assessment, 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 31 Mark 1 operators were instructed to install a bypass 1

system that instead of trying to contain the 2

pressure from the reactor using secondary 3

containment, would simply bypass secondary 4

containment and vent the taurus directly to the 5

atmosphere through a butterfly valve operated in the 6

control room. And Duane Arnold officials here today 7

verify that, in fact, that is the situation at Duane 8

Arnold, that it's not different than the other 17 9

Mark 1's.

10 And I think that I can understand why 11 you would let a plant live out its 40 year operating 12 license knowing that it had a design deficiency off 13 by a factor of 10 in the size of the secondary 14 containment in order to allow investors to recoup 15 their investment. But to extend the plant's life 16 for another 20 years when a viable alternative 17 exists that would be a boon to the state's economy, 18 I think is something that should be viewed with 19 skepticism.

20 Finally, I think that the NRC should 21 look at the history of scrams. Every scram at this 22 reactor significantly ages the components. It 23 subjects the components to significant changes in 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 32 temperature, just like when you take a hot glass and 1

submerge it suddenly in cold water. It can shatter 2

parts inside a reactor every time you scram the 3

reactor or suddenly subject it from one pressure 4

extreme to another, from one temperature extreme to 5

another and this significantly ages parts.

6 If the reactor, for instance, had in the 7

non-radiation side, had a metal part break off at a 8

filet weld simply because it had been cycled between 9

hot and cold, and that metal part found its way 10 through the system, scored open a number of tubes.

11 Finally, the problem was turned up because water 12 leaked first into one part and then overflowed into 13 another part of the plant, and it was only once the 14 plant was shut down and people investigated that 15 they found tubes slashed open and eventually found 16 the metal part that worked its way loose. That sort 17 of risk is simply unnecessary and there's a viable 18 alternative to the nuclear plant's continued 19 operation.

20 The final point that I'd like to make 21 concerning the reactor itself is this plant's 22 specific risk to a terrorist attack. The plant is 23 in proximity to the Rockwell Collins plant that used 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 33 to be in the Soviet Union's top three list of 1

targets because of its role in our nation's nuclear 2

arsenal, missile guidance and intelligence. That 3

means that both an attack on Rockwell Collins would 4

have an impact on the plant, on its safety, on its 5

ability to evacuate and so on.

6 It also means that there could be an 7

indirect threat to the plant because a terrorist 8

attack might find the plant a useful target in order 9

to move military protection away from Rockwell 10 Collins or the further strategic air command in 11 Omaha in order to free up the vulnerability of SEC.

12 So the specific location of this plant represents a 13 hazard that needs to be looked at from the 14 perspective of a terrorist attack.

15 And in addition, the Mark 1 design has a 16 spent fuel pool that's on top of a building that is 17 essentially unprotected, that various studies have 18 concluded that a piece of weaponry that can be moved 19 around in the trunk of a car and launched from 20 somebody's shoulder, a howitzer, could penetrate 21 that building and create a fire in the spent fuel 22 pool. In addition, that spent fuel pool would be 23 committed to use for five years beyond 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 34 decommissioning because if we were to decommission 1

the plant even today, then we would need to store 2

the spent fuel for a minimum of five years on that 3

local site.

4 So we're looking at a terrorist threat, 5

a target, an attractive target for five years beyond 6

decommission and I think it needs to be considered 7

whether in this day and age it's really necessary to 8

continue maintaining such an attractive target.

9 The final comment I'd like to make has 10 to do with transparency. I really do support all 11 your jobs. I think you all do a magnificent job at 12 Duane Arnold. I'm not afraid of nuclear power in 13 particular, I mean in general, nor do I think that 14 this plant in particular has a bad safety record.

15 But I do think that there are better alternatives 16 and I support your work to make this plant safe as 17 it continues to operate.

18 I hope that I don't cause any personal 19 tension with any of you in speaking, and similarly, 20 I think that the representatives here from the NRC 21 today have run a good meeting. I think that in 22 general they've made efforts to inform the public at 23 this

meeting, and so in griping about the 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 35 transparency I hope that it's not a personal 1

comment.

2 But I do notice that I'm the only 3

speaker registered and I do wonder why that might 4

be, and so for the record I'd like to state that 5

twice a week I've looked at the website that you 6

still have up here on your PowerPoint. In fact, I 7

just looked at it in this building's wireless and it 8

says that the date of this meeting is to be 9

determined. I can show you that after the meeting 10 if you like.

11 A friend of mine said hey, when is the 12 Duane Arnold thing coming up. Are you on top of 13 that? I said, yeah, I'm on top of it. I check 14 every two weeks. And he said well, I think it might 15 be coming up. I heard something about that and so I 16 looked on the NRC's website and found, sure enough, 17 it's yet to be determined. They haven't announced a 18 date for the SEIS scoping meeting. This was on 19 April 16th, by the way.

20 And I then, just to be darn sure, did a 21 search in the Adams document room to make sure that 22 there was not an announcement of an SEIS scoping 23 meeting and found much to my surprise an April 8th 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 36 memo came up in the search from David Pelton to each 1

of the two of you, to Charles Eccleston and to 2

Maurice Heath, and that in order to register to 3

speak at this meeting I had to do so by April 16th.

4 Well, I look at my watch and it's 7:00 p.m. on 5

April 16th, so ostensibly I missed the deadline to 6

register to speak for this meeting.

7 I immediately e-mailed both of you 8

following the e-mail address that was given in that 9

April 8th memorandum and those e-mails both bounced 10 back to me. I'd be happy to show you those e-mails 11 after the meeting, as being undeliverable by the 12 NRC. I then left a phone message on both of your 13 phones and got no phone call back, though you did 14 acknowledge that you got my phone call at the 15 beginning of the meeting and welcomed me to the 16 meeting.

17 Obviously from April 16th to now was 18 sufficient time for me to prepare, more or less, 19 though I must say that one of the people I had hoped 20 to talk to before this meeting from the Union of 21 Concerned Scientists was out of the country and 22 unavailable. So as a result of the lack of 23 transparency I'm not as prepared as I would have 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 37 liked to be and I can only guess who else might have 1

shown up had the meeting been better in 2

transparency.

3 And so I thank you for your attention 4

and look forward to working with you through the 5

process.

6 MR. ECCLESTON: Thank you.

7 MR. HEATH: All right, thank you for 8

your comment. Now, I have one other person 9

registered, Mr. Bruce Richardson, I believe. Is 10 that correct?

11 MR. RICHARDSON: No comments at this 12 time.

13 MR. HEATH: No comment, okay. Well, 14 like we said before, you can still submit your 15 comments other ways after the meeting up until May 16 25th.

17 Do we have anybody else that would like 18 to provide comments at this time?

19 (No response.)

20 Okay. Well, with that, thank you all 21 for coming to this meeting. We will adjourn this 22 meeting. We will be having another meeting between 23 7:00 and 10:00 upstairs in the community center 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 38 room, so if you'd like to stick around or come back, 1

we'll be here this evening. Thank you for coming.

2 (Whereupon the above matter concluded 3

at 2:27 p.m.)

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 39 1