Units 1, 2, & 3 - Fire Protection Program - Post-Fire Operator Manual Actions
ML071150366
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/24/2007
From: Crouch W
Tennessee Valley Authority
To:
Document Control Desk, NRC/NRR/ADRO
References
Download: ML071150366 (6)


Text

April 24, 2007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Gentlemen:

In the Matter of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 1, 2 and 3 - FIRE PROTECTION PROGRAM - POST-FIRE OPERATOR MANUAL ACTIONS The purpose of this letter is to confirm that TVA has completed the commitments provided in Reference 1 and provide an additional commitment associated with References 2 and 3.

TVA and NRC discussed the BFN Fire Protection program at a meeting on April 5, 2006. As a result of that meeting, TVA provided a summary of commitments in Enclosure 1 of Reference 1. The commitments are complete. Closure packages for each commitment are available for review at the site.

In References 2 and 3, TVA stated that it would follow the Post-Fire Safe Shutdown Circuit Analysis Spurious Actuations issue and work with the industry and NRC towards a resolution. TVA acknowledges this as an explicit commitment.

U.S. Nuclear Regulatory Commission Page 2 April 24, 2007 A listing of the commitments made in this letter is provided in enclosure 1. If you have any questions regarding this information, please contact me at (256) 729-2636. I declare under penalty of perjury that the foregoing is true and accurate. Executed this 24th day of April 2007.

Sincerely, Original signed by:

William D. Crouch Manager of Licensing and Industry Affairs

References:

1. TVA letter to NRC dated April 24, 2006; Browns Ferry Nuclear Plant (BFN) - Fire Protection Program -

Post-Fire Operator Manual Actions

2. TVA letter to NRC dated January 11, 2007; Browns Ferry Nuclear Plant (BFN) - Units 1,2, and 3 - Response to Request for Additional Information (RAI) Concerning Fire Protection Three-Unit Operation Amendment and Exemption Request (TAC Nos.MD3412, MD 3413, MD 3414, MD3596, MD 3597 and MC 3598) (TS-459)
3. TVA letter to NRC dated November 15, 2006; Browns Ferry Nuclear Plant (BFN) - TVA BFN Technical Specification (TS) No. 459, Request for an Appendix R License Amendment

U.S. Nuclear Regulatory Commission Page 3 April 24, 2007 Enclosures cc (Enclosures):

State Health Officer Alabama Department of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, Alabama 36130-3017 Chairman Limestone County Commission 310 West Washington Street Athens, Alabama 35611 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 Malcolm Widmann, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 NRC Unit 1 Restart Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 cc: continued page 4

U.S. Nuclear Regulatory Commission Page 4 April 24, 2007 Enclosure cc (Enclosure):

Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739

U.S. Nuclear Regulatory Commission Page 5 April 24, 2007 JEM:BAB Enclosure cc (Enclosure):

A. S. Bhatnagar, LP 6A-C D. C. Matherly, Jr.

R. H. Bryan, Jr., LP 4J-C J. C. Fornicola, LP 6A-C R. G. Jones, POB 2C-BFN G. V. Little, NAB 1D-BFN R. F. Marks, Jr., PAB 1C-BFN B. A. Wetzel, BR 4X-C B. J. OGrady, PAB 1E-BFN P. D. Swafford, LP 6A-C E. J. Vigluicci, ET 11A-K NSRB Support, LP 5M-C EDMS WT CA-K, s:/Licensing/Lic/Submit/Subs/Appendix RFPR FRNoticeClosure.doc

E-1 ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2, AND 3 Commitment Listing

1. TVA will continue to follow the Post-Fire Safe Shutdown Circuit Analysis Spurious Actuations issue and work with industry and NRC towards a resolution of the issue.