Letter Sequence RAI |
---|
TAC:MD3002, Control Room Habitability (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0733004532003-11-27027 November 2003 Schedule and Response to PSEG Letter (LR-N07-0274) Dated October 23, 2007, Plans Related to Steam Dryer Evaluation Regarding Request for Extended Power Uprate Project stage: Other ML0626900642006-09-0101 September 2006 Attachment 26, C.D.I. Report No. 06-16NP, Rev 1, Estimating High Frequency Flow Induced Vibration in the Main Stream Lines at Hope Creek Unit 1: a Subscale Four Line Investigation of Standpipe Behavior. Project stage: Request LR-N06-0286, Request for License Amendment Extended Power Uprate2006-09-18018 September 2006 Request for License Amendment Extended Power Uprate Project stage: Request ML0626900442006-09-30030 September 2006 Attachment 21, C.D.I. Report No. 06-27, Rev 0, Stress Analysis of Hope Creek Unit 1 Steam Dryer at CLTP and EPU Conditions Using 1/8th Scale Model Pressure Measurement Data. Project stage: Request ML0631101672006-09-30030 September 2006 Attachment 2 - CDI Technical Memo 06-23P (Non-Proprietary) Comparison of Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions, Revision 0, Dated September 2006 Project stage: Request LR-N06-0413, Supplement to License Amendment Request for Extended Power Uprate2006-10-10010 October 2006 Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0628303692006-10-13013 October 2006 Supplement to Application for Extended Power Uprate Project stage: Other ML0629003222006-10-18018 October 2006 Extended Power Uprate Accpetance Review Results Project stage: Other LR-N06-0418, Supplement to License Amendment Request for Extended Power Uprate, to Increase the Maximum Authorized Power Level to 3840 Megawatts Thermal2006-10-20020 October 2006 Supplement to License Amendment Request for Extended Power Uprate, to Increase the Maximum Authorized Power Level to 3840 Megawatts Thermal Project stage: Supplement ML0628304722006-11-0808 November 2006 PSEG Nuclear LLC, Withholding from Public Disclosure, NEDC-33076P, Revision 2, Safety Analysis Report for Hope Creek Constant Pressure Power Uprate, Class III, MD3002 Project stage: Other ML0628304532006-11-21021 November 2006 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML0633301432006-12-15015 December 2006 11/13-14/2006 Summary of Category 1 Meeting with PSEG Nuclear LLC, Regarding Application for Extended Power Uprate for Hope Creek Project stage: Meeting ML0703002772007-01-26026 January 2007 E-Mail Shea-NRR,to Duke, PSEG, Group1 Draft EPU RAI Project stage: Draft Other ML0716303072007-01-31031 January 2007 C.D.I. Technical Note No. 07-01NP, EPU Conditions in the Main Steam Lines at Hope Creek Unit 1: Additional Subscale Four Line Tests. Project stage: Request LR-N07-0034, C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions.2007-01-31031 January 2007 C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions. Project stage: Request LR-N07-0026, Supplemental to License Amendment Request for Extended Power Uprate2007-02-14014 February 2007 Supplemental to License Amendment Request for Extended Power Uprate Project stage: Supplement LR-N07-0029, Supplement to License Amendment Request for Extended Power Uprate2007-02-16016 February 2007 Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0703304152007-02-16016 February 2007 Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI ML0706606192007-02-20020 February 2007 Draft Request for Additional Information Hope Creek EPU Grp 5 Project stage: Draft RAI ML0706601992007-02-20020 February 2007 Draft Request for Additional Information Hope Creek EPU Grp 4 Project stage: Draft RAI ML0704602432007-02-23023 February 2007 Ltr Request for Additional Information Related to the Request for Extended Power Uprate Project stage: RAI ML0706606382007-02-23023 February 2007 Draft Request for Additional Information Hope Creek EPU Grp 6 Project stage: Draft RAI ML0706803142007-02-28028 February 2007 Hope Creek, Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0708103652007-02-28028 February 2007 C.D.I. Report No. 07-01NP, Rev. 0, Revised Hydrodynamic Loads on Hope Creek Unit 1 Steam Dryer to 200 Hz. Project stage: Request ML0706006112007-03-0202 March 2007 Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI ML0709200252007-03-0202 March 2007 Slides for Summary of March 2, 2007 Meeting with PSEG Nuclear LLC on an Application for Extended Power Uprate for Hope Creek Generating Station Regarding Steam Dryer Margin Project stage: Meeting ML0706803062007-03-13013 March 2007 Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI LR-N07-0035, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-13013 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0055, Supplement to License Amendment Request for Extended Power Uprate2007-03-13013 March 2007 Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0708004302007-03-29029 March 2007 Summary of March 2, 2007, Meeting with PSEG Nuclear, LLC, on an Application for Extended Power Uprate for Hope Creek Generating Station Regarding Steam Dryer Margin Project stage: Meeting LR-N07-0060, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-30030 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0069, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-30030 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0070, Response to Request for Additional Information on Request for License Amendment - Extended Power Uprate2007-04-13013 April 2007 Response to Request for Additional Information on Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0084, Supplement to License Amendment Request for Extended Power Uprate, Revised No Significant Hazards Consideration2007-04-18018 April 2007 Supplement to License Amendment Request for Extended Power Uprate, Revised No Significant Hazards Consideration Project stage: Supplement ML0711400912007-04-20020 April 2007 Request for Additional Information Regarding Request for Extended Power Uprate (TAC MD3002) - NON-PROPRIETARY Project stage: RAI ML0713603772007-04-30030 April 2007 C.D.I. Report No. 06-16NP, Rev. 2, Estimating High Frequency Flow Induced Vibration in the Main Steam Lines at Hope Creek, Unit 1: a Subscale Four Line Investigation of Standpipe Behavior. Project stage: Request LR-N07-0099, Response to Request for Additional Information Request for License Amendment, Extended Power Uprate2007-04-30030 April 2007 Response to Request for Additional Information Request for License Amendment, Extended Power Uprate Project stage: Response to RAI ML0710104492007-05-0303 May 2007 Explanation of Hope Creek Nuclear Generating Station Extended Power Uprate and Conclusion of Informal Consultation Project stage: Other ML0712404872007-05-0909 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N07-0102, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-05-10010 May 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI ML0712404112007-05-14014 May 2007 RAI, Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI ML0712405052007-05-15015 May 2007 Summary of Meeting with PSEG Nuclear LLC, Regarding Technical Aspects of the Licensee'S Application for an Extended Power Uprate (EPU) at the Hope Creek Generating Station (Hope Creek) Project stage: Meeting ML0712404612007-05-17017 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML0628605302007-05-17017 May 2007 Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML0713707002007-05-17017 May 2007 Request for Additional Information (RAI) Regarding Request for Extended Power Uprate Project stage: RAI ML0712405102007-05-17017 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N07-0123, Response to Request for Additional Information, Request for License Amendment - Extended Power Uprate2007-05-18018 May 2007 Response to Request for Additional Information, Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0113, Supplement to Request for License Amendment Extended Power Uprate Steam Dryer Limit Curves2007-05-18018 May 2007 Supplement to Request for License Amendment Extended Power Uprate Steam Dryer Limit Curves Project stage: Supplement LR-N07-0122, Supplement to Request for License Amendment Re Extended Power Uprate & C.D.I. Technical Note No. 07-012007-05-24024 May 2007 Supplement to Request for License Amendment Re Extended Power Uprate & C.D.I. Technical Note No. 07-01 Project stage: Supplement ML0717203702007-05-31031 May 2007 Attachment 2, C.D.I. Technical Note No. 07-19NP, Revision 0, Hope Creek, Unit 1, Extended Power Uprate Limit Curve Analysis for Dryer Stress Prediction During Power Ascension Project stage: Request 2007-02-28
[Table View] |
|
---|
Category:Letter
MONTHYEARML24295A3742024-10-23023 October 2024 Project Manager Assignment IR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement 2024-09-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24253A1942024-09-0909 September 2024 NRR E-mail Capture - Final Eeeb RAI - Hope Creek Amendment to Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML22006A3212022-01-0606 January 2022 NRR E-mail Capture - Final RAI - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML21300A0222021-10-27027 October 2021 Notification of Conduct of a Fire Protection Team Inspection ML21041A3972021-02-18018 February 2021 Request for Additional Information Revise Low Pressure Safety Limit to Address General Electric Part-21 Safety Communications (Non-Proprietary) ML20295A4922020-10-21021 October 2020 NRR E-mail Capture - Hope Creek - Final RAI Revise ECCS TS with Respect to HPCI System Inoperability (L-2020-LLA-0131) ML18263A1442018-09-12012 September 2018 NRR E-mail Capture - Final RAI from Apla: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18250A3142018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18150A6912018-05-30030 May 2018 NRR E-mail Capture - Hope Creek - Final RAI Revise TS to Adopt TSTF-542 ML18120A2482018-04-27027 April 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000354/2018403 ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML17349A0812017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Reactor Systems Branch (Srxb) - Hope Creek Mur ML17348A9972017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A6242017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Human Factors Associated with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A6282017-11-21021 November 2017 NRR E-mail Capture - Draft Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17331A0072017-11-21021 November 2017 E-mail Regarding Final Eicb Request for Additional Information - Hope Creek Power Uprate ML17324A2602017-11-17017 November 2017 NRR E-mail Capture - Final Request for Additional Information - Hope Creek Mur Electrical Instrumentation and Controls ML17320A2152017-11-16016 November 2017 NRR E-mail Capture - Hope Creek Measurement Uncertainty Recapture Application Review - Electrical Engineering (Eeob) Request for Additional Information (L-2017-LLS-0002) ML17290B0132017-10-17017 October 2017 NRR E-mail Capture - Hope Creek Mur Request for Additional Information for Apla and Snpb ML17222A1652017-08-10010 August 2017 NRR E-mail Capture - Hope Creek: Final Request for Information, Pressure-Temperature Limit Report Request (MF9502) ML17181A1352017-06-29029 June 2017 NRR E-mail Capture - Request for Additional Information Related to Hope Creek and Salem Emergency Action Level Scheme Change License Amendment Request (MF9268/69/70) ML17164A4062017-06-13013 June 2017 NRR E-mail Capture - Hope Creek - Final Request for Additional Information Concerning ILRT (MF8462) ML17027A3282017-02-27027 February 2017 Request for Additional Information Regarding License Amendment Request to Permanently Extend Type a and Type C Leak Rate Test Frequencies ML16321A4642016-11-21021 November 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request for Additional Information Regarding License Amendment Request to Remove Certain Training Requirements ML16277A5142016-11-0303 November 2016 Request for Additional Information Regarding License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML16271A2052016-11-0202 November 2016 Request for Additional Information Regarding Request to Delete Technical Specifications Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML16231A4272016-08-24024 August 2016 Request for Additional Information Regarding Relief Request VR-02, Associated with the Fourth 10-Year Inservice Test Interval ML16217A4302016-08-17017 August 2016 Request for Additional Information Regarding Digital Power Range Neutron Monitoring System Upgrade ML16007A1742016-05-31031 May 2016 Request for Additional Information Regarding Review of Post-EPU Steam Dryer Stress Calculation Acoustic Circuit Model Software Error ML16089A0792016-05-0505 May 2016 Request for Additional Information Regarding Relief Requests GR-01, PR-01, PR-02, VR-01, and VR-02, Associated with the Fourth 10-Year Inservice Test Interval ML16124A5802016-05-0303 May 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Redacted - Request for Additional Information Review of Security Plan Revision 17 Changes ML15055A3772015-03-10010 March 2015 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information Request to Update Appendix B to Renewed Facility Operating License DPR-70, DPR-75 and NPF-57 ML14197A6192014-07-24024 July 2014 and Salem Nuclear Generating Station, Units 1 and 2 - Request for Additional Information Regarding Cyber Security Plan Milestone 8 Implementation Schedule (Tac Nos. MF3384, MF3385 and MF3386) ML14168A2352014-07-0202 July 2014 Request for Additional Information Regarding Flooding Hazard Reevaluation ML13309B5922013-11-22022 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13168A2762013-08-12012 August 2013 Peach Bottom, Units 2 and 3, Request for Additional Information Decommissioning Funding Status Report (TAC No. MF2202; MF2227; MF2228) ML13193A2912013-07-22022 July 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) TAC MF1031 ML13204A2532013-07-19019 July 2013 Draft RAIs - Decommissioning Funding Status Report for Hope Creek and Peach Bottom ML13190A2212013-07-0202 July 2013 RAIs for Hope Creek Regarding Response to Order EA-12-051 ML13154A4952013-06-0404 June 2013 Rai'S Following Ifib Analysis of Pseg'S 2013 Decommissioning Funding Status Report for Hope Creek Generating Station ML12334A3102012-12-0505 December 2012 Request for Additional Information Request to Correct Technical Specification and Facility Operating License Editorial Items ML12310A1672012-11-0101 November 2012 Draft RAI to License Amendment Request Regarding Average Power Range Monitoring Operability Requirements in Operational Condition 5 ML1227901012012-10-0505 October 2012 Clarifying Information for Question No. 4 (with Attachment) ML12212A1032012-08-0808 August 2012 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information ML12216A1792012-08-0303 August 2012 Draft RAI Related to Request for Exemption from Certain Requirements of the Fitness for Duty Rule ML12213A6162012-07-30030 July 2012 Draft Request for Additional Information Related to Request for Exemption from Certain Requirements of the Fitness for Duty Rule ML1209002372012-03-29029 March 2012 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Draft Request for Additional Information ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding 2024-09-09
[Table view] |
Text
March 13, 2007 Mr. William Levis Senior Vice President & Chief Nuclear Officer PSEG Nuclear LLC-X04 Post Office Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
HOPE CREEK GENERATING STATION - REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST FOR EXTENDED POWER UPRATE (TAC NO. MD3002)
Dear Mr. Levis:
By letter dated September 18, 2006 (Agencywide Documents and Management System (ADAMS) Accession No. ML062680451), as supplemented on October 10, 2006 (Accession No. ML062920092), October 20, 2006 (Accession No. ML063110164), February 14, 2007 (Accession No. ML070530099), and February 16, 2007 (Accession No. ML070590178), PSEG Nuclear, LLC submitted an amendment request for an extended power uprate for Hope Creek Nuclear Generating Station. The proposed amendment would increase the authorized maximum power level by approximately 15 percent, from 3339 megawatts thermal (MWt) to 3840 MWt.
The Nuclear Regulatory Commission (NRC) staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information. The questions were sent by e-mail to you on February 20, (Accession No. ML070660199 and ML070660619) and February 23, 2007 (Accession No. ML070660638), to ensure that the questions were understandable, the regulatory basis was clear and to determine if the information was previously docketed. In subsequent discussions with your staff, questions were revised for further clarification.
Mr. Paul Duke of your staff agreed to respond by March 30, 2007, for the enclosed questions.
Please note that if you do not respond to this letter within the prescribed response times or provide an acceptable alternate date in writing, we may reject your application for amendment under the provisions of Title 10 of the Code of Federal Regulations, Section 2.108. If you have any questions, I can be reached at (301) 415-1388.
Sincerely,
/ra/
James J. Shea, Project Manager Project Directorate I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosure:
As Stated cc w/encl: See next page
ML070680306 OFFICE PDI-2/PM PDI-1/LA SBWB/BC IHPB/BC CPTB/BC SCVB/BC PD1-2/BC NAME JShea SLittle GCranston TFrye JMcHale RDennig HChernoff (w/comments)
DATE 3/12/07 3/12/07 1/11/07 2/16/07 3/1/07 2/13/07 3/13/07 Hope Creek Generating Station cc:
Mr. Michael P. Gallagher Jeffrie J. Keenan, Esquire Vice President - Eng/Tech Support PSEG Nuclear - N21 PSEG Nuclear P.O. Box 236 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Mr. Michael Brothers Joint Owner Affairs Vice President - Nuclear Assessments Exelon Generation Company, LLC PSEG Nuclear Nuclear Group Headquarters KSA1-E P.O. Box 236 200 Exelon Way Hancocks Bridge, NJ 08038 Kennett Square, PA 19348 Mr. George P. Barnes Lower Alloways Creek Township Site Vice President - Hope Creek c/o Mary O. Henderson, Clerk PSEG Nuclear Municipal Building, P.O. Box 157 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Mr. George H. Gellrich Radiation Protection Programs Plant Support Manager NJ Department of Environmental PSEG Nuclear Protection and Energy P.O. Box 236 CN 415 Hancocks Bridge, NJ 08038 Trenton, NJ 08625-0415 Mr. Michael J. Massaro Brian Beam Plant Manager - Hope Creek Board of Public Utilities PSEG Nuclear 2 Gateway Center, Tenth Floor P.O. Box 236 Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Ms. Christina L. Perino U.S. Nuclear Regulatory Commission Director - Regulatory Assurance 475 Allendale Road PSEG Nuclear - N21 King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Hope Creek Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038
REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION CHANGES FOR EXTENDED POWER UPRATE HOPE CREEK GENERATING STATION DOCKET NO. 50-354 By letter dated September 18, 2006 (Agencywide Documents and Management System (ADAMS) Accession No. ML062680451), as supplemented on October 10, 2006 (Accession No. ML062920092), October 20, 2006 (Accession No. ML063110164), February 14, 2007 (Accession No. ML070530099), and February 16, 2007 (Accession No. ML070590178), PSEG Nuclear, LLC (PSEG or licensee) submitted an amendment request for an extended power uprate (EPU) for Hope Creek Nuclear Generating Station. The proposed amendment would increase the authorized maximum power level by approximately 15%, from 3339 megawatts thermal (MWt) to 3840 MWt.
The Nuclear Regulatory Commission (NRC) staff has been reviewing the submittal and has determined that additional information is needed to complete its review.
- 11) Health Physics Branch (IHPB) 11.1 In the Hope Creek Power Uprate Safety Analysis Report (PUSAR), Section 8.4.1 (page 8-5) you state that Nitrogen Isotope (N16) in the turbine components is expected to increase approximately 16% for a 20% increase in steam flow. On the basis of previous EPU calculations, the activity of N16 in steam leaving the reactor pressure vessel is expected to increase in proportion to the power level increase (15% for Hope Creek).
Since the steam flow also increases in proportion to the power level increase (i.e., by 15%), the transit time for the N16 to reach the major source components that contribute significantly to the skyshine dose in the turbine building is reduced. Therefore, the N16 activity in the steam in those areas of the turbine building which contribute to skyshine should increase both in proportion to the power level increase and due to the reduced decay time between the reactor pressure vessel and the turbine building components.
a) Justify your reasoning for stating that the N16 activity in turbine components will increase by 16% instead of a higher percentage.
b) Justify your reasoning for stating that the steam flow will increase by 20% for a 15% power uprate.
11.2 In the Hope Creek PUSAR, Section 8.4.1 (page 8-5) you state that the N16 levels are expected to increase in the turbine components due to EPU. Verify that the expected increase in dose rates from N16 does not create new radiation, or high radiation areas around condensate systems and components in the turbine building.
Enclosure
11.3. In the Hope Creek PUSAR, Section 8.4.2 (page 8-6) you state that, although activated corrosion products and fission products are expected to increase as a result of EPU, their post-EPU concentrations will not exceed the design basis concentrations. Provide the expected percentage increases in the concentrations of activated corrosion products and fission products in both the steam and in the water and compare this with the design basis concentration levels.
11.4. In the Hope Creek PUSAR, Section 8.5 (page 8-7) you state that the post-EPU occupational radiation levels in most of the affected plant areas are expected to increase by less than 20%.
a) Justify your statement that radiation levels would increase by approximately 20%
when the proposed power uprate is for 15%.
b) List any plant areas where you would expect the dose rates to increase by greater than the percentage of the proposed power uprate.
c) Describe what measures you plan to take (e.g., changes to permanent and or temporary shielding, changes to access controls, change to work packages) in areas where dose rates are expected to increase following EPU to maintain worker doses ALARA and within the occupational dose limits of 10 CFR Part 20.
11.5. Describe what impact you expect the proposed power uprate will have on the annual collective doses at Hope Creek and provide an estimate of the occupational dose that will result from the plant modifications that will be needed to support the implementation of the proposed power uprate.
11.6. In the Hope Creek PUSAR, Section 8.5 (page 8-6) you state that a post-EPU radiation assessment in the turbine building complex to evaluate the effects of the proposed EPU on area dose rates was completed.
a) Discuss how you plan to verify post-EPU dose rates throughout the plant. Will you be conducting radiation surveys of selected plant areas as part of the EPU startup and test plan?
b) Have you identified plant areas that may require changes in radiation shielding or zone designations?
c) Please provide a listing of plant areas where you will conduct radiation surveys following the proposed EPU implementation and describe your criteria for selecting these areas.
11.7. Provide the following clarifying information regarding the information contained in Table 8-1 (page 8-9) of the Hope Creek PUSAR:
a) Table 8-1 has a column which shows allowable occupancy times for each of the vital areas listed. The title allowable occupancy can imply that this is the maximum time that a person can be in the area before exceeding the 5 REM, in Title 10 of the Code of Federal Regulation (10 CFR) Part 50, Appendix A, General
Design Criterial for Nuclear Power Plants (GDC) 19, dose limit. Verify that the times listed in this column are the estimated times needed to complete the mission in each of the vital areas listed.
b) Verify that the whole body and total effective-dose equivalent (TEDE) dose rates shown in table 8-1 are the maximum post-accident dose rates reached in each of the vital areas listed and may not necessary be the dose rates in the vital area when the area needs to be accessed to perform post-accident vital area functions.
c) For each of the vital areas listed in Table 8-1, provide a brief description of why the area is classified as a vital area (i.e., what is the vital area function which needs to be performed in the area) and provide plant layout maps indicating the location of each of the vital areas listed in Table 8-1 d) Verify that the vital area missions for each of the vital areas listed in Table 8-1 can be accomplished following an accident post-CPPU without exceeding the 5 person-REM criteria specified in 10 CFR Part 50, Appendix A, GDC 19. In calculating the mission doses for each of the vital areas, the doses received to access and exit from the area should be included in the total vital area mission dose estimate.
11.8. Section 6.3.3 (pages 6-4,5) of your submittal states that the post-EPU radiation exposures in accessible areas adjacent to the sides or bottom of the spent fuel pool (SFP) are expected to be within the allowable dose rate limit of the existing radiation zone designation. Discuss any plans that you may have (such as shuffling of spent fuel assemblies in the SFP so that the older assemblies are located at the perimeter of the SFP) to minimize the effects of the storage of the higher irradiated spent fuel assemblies in the SFP on dose rates in areas surrounding the SFP.
11.9. Discuss what affects the proposed EPU will have on the whole body dose to the public with respect to the 25 mrem per year dose limits of 40 CFR 190.
- 12) Component and Performance and Testing Branch (CPTB) 12.1. PSEG is requested to discuss the plans to implement the Inservice Testing (IST)
Program for Hope Creek that incorporates appropriate changes in light of applicable EPU operating conditions. In particular, the licensee is requested to discuss with three examples of each type, if applicable, the evaluation of the impact of EPU conditions on the performance of safety-related pumps, power-operated valves, check valves, safety or relief valves, including consideration of changes in ambient conditions and power supplies (as applicable), and dynamic restraints; and to indicate any resulting component or support modifications, or adjustments to the IST Program, resulting from that evaluation.
12.2. In the Hope Creek PUSAR, Section 8.5 (page 8-6) you state that process parameters of temperature, pressure, and flow for motor-operated valves (MOVs) within the scope of Generic Letter (GL) 89-10, Safety-Related Motor-Operated Valve Testing and Surveillance, were reviewed; and minor changes were identified as a result of EPU
conditions. You also state that MOV calculations will be revised as necessary. PSEG is requested to discuss with examples its evaluation of safety-related MOVs within the programs established in response to GL 89-10 and GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, at Hope Creek for the potential impact from EPU operation, including the impact of increased process flows on operating requirements and increased ambient temperature on motor output.
12.3. In the Hope Creek PUSAR, Section 4.1.4 you state that the effect of the EPU on the potential for pressure locking and thermal binding under GL 95-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves, was reviewed.
The licensee is requested to discuss with examples its evaluation of safety-related power-operated gate valves in light of any changes in ambient temperature on the potential for pressure locking or thermal binding resulting from EPU operation.
12.4. In the Hope Creek PUSAR, Section 4.1.4 you state the process parameters of temperature, pressure, and flow for air-operated valves (AOVs) were reviewed, and no changes to the functional requirements of any AOVs were identified. PSEG is requested to summarize the approach used and provide three examples of the methodology for evaluation of safety-related AOVs (and solenoid-operated valves, as applicable) for potential impact from EPU operation.
12.5. In the Hope Creek PUSAR, Section 10.3, Environmental Qualification, you indicate that safety-related components are to be qualified for the environment in which they are required to operate. In Section 10.3.2, Mechanical Equipment with Non-Metallic Components, you state that the reevaluation of safety-related mechanical equipment with non-metallic components identified some equipment potentially affected by EPU conditions that were resolved by reanalysis. PSEG is requested to provide examples of the range of the non-metallic components in safety-related mechanical equipment effected by the EPU. These examples should include a discussion on the following topics:
a) applicable environmental conditions; b) required operating life; c) capabilities of the non-metallic components; d) basis for the environmental qualification of mechanical equipment; and the e) surveillance and maintenance program to be developed to ensure functionality during their design life.
12.6. In the Hope Creek PUSAR, Section 10.3.3, Mechanical Component Design Qualification, you state that mechanical design of equipment and components in certain systems is affected by operation at EPU conditions due to slightly increased temperatures and, in some cases, flow. Also, you state that the revised operating conditions do not significantly affect the cumulative usage fatigue factors of mechanical components that the increased fluid induced loads on safety-related components and supports are insignificant. PSEG is requested to:
a) Discuss the environmental qualification methods and approaches applied to mechanical equipment (including pumps, power-operated valves, safety-related valves, and check valves) and their supports.
b) Provide at least three examples of equipment and components that will experience increased temperatures, flows, and loads resulting from EPU conditions to demonstrate that the impact is insignificant.
c) Describe the surveillance and maintenance program for mechanical equipment to ensure functionality during their design life.
- 13) Containment and Ventilation Branch (SCVB) 13.1 In the Hope Creek EPU application request, Section 4 of Attachment 1, Request for Change to Technical Specifications Extended power Uprate addressed Ultimate Heat Sink (UHS) and the design calculation for UHS temperature limits. It was stated that the Emergency Core Cooling System (ECCS) cooler loads in the UHS temperature limit calculation are based on an updated reactor building GOTHIC model analysis. Describe the GOTHIC model, and sources of heat input (e.g. pump motors, piping, electrical). Did the ECCS cooler loads increase, stay the same or decrease? Response to this question, at least in part, can be included in response to question 13.6.
13.2 In the Hope Creek PUSAR, Section 4.4, you addressed the Main Control Room (MCR)
Atmosphere Control System. It was stated that "there are no changes to the MCR envelope and there are no significant changes to the temperatures in the adjacent walls and ceilings." Describe the areas surrounding the Control Room and what was considered in those areas to conclude that there are no significant changes to the temperatures in the adjacent walls and ceilings of the Control Room.
13.3 Discuss and confirm that the Filtration, Recirculation, and Ventilation Systems (FRVS) ability on achieving a negative draw down pressure in the secondary containment is not impacted by the EPU. Also, identify the maximum FRVS inlet temperature under EPU operating conditions and its relationship to any design inlet temperature limitations.
13.4 In the Hope Creek EPU application request, Section 6.6 of Attachment 6, you addressed Diesel Generator Room (SDG) temperature. It was stated that the SDG remains below rated capacity. Confirm that the design basis heat loads are based on rated capacity (not actual loading) and assure that the ability of the safety-related SDG Room Recirculation System coolers to maintain the room within the required temperature is not impacted by the EPU.
13.5 In the Hope Creek EPU application request Section 6.6 of Attachment 6 states that there is no increase in the design basis heat loads in the SFP area. Discuss and confirm that the effects on the SFP area Heating Ventillation and Air Conditioning (HVAC) system due to higher burnup fuel in the spent fuel pool are fully considered. Also, address whether there are any effects due to EPU on the ventilation system that could result from loss of SFP cooling.
13.6 Are there any modifications planned to the HVAC systems (including atmospheric cleanup systems) as a result of the EPU? Clearly define the areas that will see higher heat loads due to EPU, magnitude of the increase, and the basis for determining that the existing systems are adequate under post EPU conditions (with or without modifications).
13.7 In the Hope Creek PUSAR, Section 4.1, explain why the choice of the Residual Heat Removal (RHR) heat exchanger "K" value is conservative. Describe the program to ensure that the actual value is not less than this value.
13.8 In the Hope Creek PUSAR, Section 4.1, verify that all input parameters to the containment peak pressure and temperature, environmental qualification and subcompartment analyses remain the same as those in the updated final safety analysis report except for those affected by the power uprate. For example, containment volume, heat sink descriptions, heat exchanger performance, equipment flow rates and flow temperatures, initial relative humidity, ultimate heat sink temperature, etc. justify any changes made for the power uprate analyses.
13.9 In the Hope Creek PUSAR, Section 4.1, what is the temperature limit for piping attached to the torus? What is the calculated peak temperature of this piping?
13.10 In the Hope Creek PUSAR, Section 4.1.1.2, containment structural design basis temperature is stated to be 340 ºF. This is higher than that of some other BWRs and is usually the temperature limit for Environmental Qualification (EQ). Verify that 340 ºF is the correct value.
13.11 In the Hope Creek PUSAR, Section 4.1.2.3, provide the value of pressure differential calculated for the EPU and the Hope Creek pressure difference limit.
13.12 In the Hope Creek PUSAR, Table 1-1 shows that both the "STEMP" and the "SHEX" codes are used for the Anticipated Transient Without Scram (ATWS) event. Describe the function of each code in this calculation.
13.13 In reference to the Hope Creek PUSAR, Section 4.1, is the metal-water reaction increased by the EPU? What is the effect on containment response?
13.14 In reference to the Hope Creek PUSAR, Section 4.1.1.1(a), please provide the peak suppression pool temperatures resulting from the postulated ATWS, Station Blackout and 10 CFR Part 50, Appendix R Fire events.
13.15 In reference to the Hope Creek PUSAR, Section 4.7, what, if any, changes are necessary to Containment Atmosphere Deluge System, CADS operation or nitrogen storage due to the power uprate?
Revised Questions from (SBWB):
3.2 The NRC staff review of previous EPU applications included evaluation of the dynamic effects and missiles that might result from plant equipment failures at EPU operating conditions, as well as the effects of a loss-of-coolant accident (LOCA). In the Hope Creek EPU application request, Section 2.8.6.2 of Attachment 11, does not address this specific concern, please justify why similar criteria does not apply to the Hope Creek spent fuel storage.
3.5 In NEDC-33172P, SAFER/GESTR-LOCA for HCGS at Power Uprate, it was reported that the Licensing Basis PCTs are 1380 F for GE14 and 1540 F for SVEA-96+. Please provide the following additional information:
a) What is the corresponding break size for above Licensing Basis PCTs, and is it classified as small-break or large-break LOCA? Is the current Licensing Basis PCT is based on small-break or large-break LOCA? If they are different, explain why.
b) Was top-peaked and mid-peaked axial power shape included in establishing the MAPLHGR and determining the limiting PCT?
c) In previous EPU LOCA analyses, the NRC staff has noted that the fuel types did not significantly impact the value of PCT, provided that the limiting LOCA event was a small break. The explanation for this was based on the fact that the affect of fuel stored energy was insignificant for small-break LOCA. Explain why a relatively large difference in PCT values (160 ºF) between GE14 and SVEA-96+
exists.
d) The PUSAR indicates that the limiting PCT for GE14 increases 10 ºF from 1370 ºF to 1380 ºF before and after EPU. Please provide the limiting PCT for SVEA before and after EPU. The PCT changes due to EPU were typically within 20 ºF. Please confirm if it is also true for SVEA fuel. If not, then please explain why.
New Question from (SBWB):
3.57 Section 1.2.2 Computer Codes, Table 1-2 of the PUSAR lists all the nuclear steam system codes used for the EPU request. This section indicates that the HCGS application of these codes complies with the limitations, restrictions, and conditions specified in the applicable NRC safety evaluation report that approved each code, with exceptions as noted in Table 1-2. The NRC staff has noted that in Section 2.0 of Attachment 15 to the submittal, a limited number of those codes (TGBLA, PANACEA, ISCOR, ODYN, TASC, SAFER and GESTR), and their methods and range of applications were discussed. However, the report did not include all the codes listed in Table 1-2 of the PUSAR.
Please review the fuel vendor's analytical methods and code systems (neutronic, LOCA, transient, and accidents, etc.) used to perform the safety analyses supporting the HCGS EPU application and provide the following information:
a) Confirm that the steady state and transient neutronic and thermal-hydraulic analytical methods and code systems used to perform the safety analyses supporting the EPU conditions are being applied within the NRC-approved applicability ranges.
b) Confirm that for the EPU conditions, the calculational and measurement uncertainties applied to the thermal limits analyses are valid for the predicted neutronic and thermal-hydraulic core and fuel conditions.
c) Confirm that the assessment database and the assessed uncertainty of models used in all licensing codes that interface with or are used to simulate the response of HCGS during steady state, transient or accident conditions remain valid and applicable for the EPU conditions.