Letter Sequence RAI |
---|
TAC:MD3002, Control Room Habitability (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0733004532003-11-27027 November 2003 Schedule and Response to PSEG Letter (LR-N07-0274) Dated October 23, 2007, Plans Related to Steam Dryer Evaluation Regarding Request for Extended Power Uprate Project stage: Other ML0626900642006-09-0101 September 2006 Attachment 26, C.D.I. Report No. 06-16NP, Rev 1, Estimating High Frequency Flow Induced Vibration in the Main Stream Lines at Hope Creek Unit 1: a Subscale Four Line Investigation of Standpipe Behavior. Project stage: Request LR-N06-0286, Request for License Amendment Extended Power Uprate2006-09-18018 September 2006 Request for License Amendment Extended Power Uprate Project stage: Request ML0626900442006-09-30030 September 2006 Attachment 21, C.D.I. Report No. 06-27, Rev 0, Stress Analysis of Hope Creek Unit 1 Steam Dryer at CLTP and EPU Conditions Using 1/8th Scale Model Pressure Measurement Data. Project stage: Request ML0631101672006-09-30030 September 2006 Attachment 2 - CDI Technical Memo 06-23P (Non-Proprietary) Comparison of Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions, Revision 0, Dated September 2006 Project stage: Request LR-N06-0413, Supplement to License Amendment Request for Extended Power Uprate2006-10-10010 October 2006 Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0628303692006-10-13013 October 2006 Supplement to Application for Extended Power Uprate Project stage: Other ML0629003222006-10-18018 October 2006 Extended Power Uprate Accpetance Review Results Project stage: Other LR-N06-0418, Supplement to License Amendment Request for Extended Power Uprate, to Increase the Maximum Authorized Power Level to 3840 Megawatts Thermal2006-10-20020 October 2006 Supplement to License Amendment Request for Extended Power Uprate, to Increase the Maximum Authorized Power Level to 3840 Megawatts Thermal Project stage: Supplement ML0628304722006-11-0808 November 2006 PSEG Nuclear LLC, Withholding from Public Disclosure, NEDC-33076P, Revision 2, Safety Analysis Report for Hope Creek Constant Pressure Power Uprate, Class III, MD3002 Project stage: Other ML0628304532006-11-21021 November 2006 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML0633301432006-12-15015 December 2006 11/13-14/2006 Summary of Category 1 Meeting with PSEG Nuclear LLC, Regarding Application for Extended Power Uprate for Hope Creek Project stage: Meeting ML0703002772007-01-26026 January 2007 E-Mail Shea-NRR,to Duke, PSEG, Group1 Draft EPU RAI Project stage: Draft Other ML0716303072007-01-31031 January 2007 C.D.I. Technical Note No. 07-01NP, EPU Conditions in the Main Steam Lines at Hope Creek Unit 1: Additional Subscale Four Line Tests. Project stage: Request LR-N07-0034, C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions.2007-01-31031 January 2007 C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions. Project stage: Request LR-N07-0026, Supplemental to License Amendment Request for Extended Power Uprate2007-02-14014 February 2007 Supplemental to License Amendment Request for Extended Power Uprate Project stage: Supplement LR-N07-0029, Supplement to License Amendment Request for Extended Power Uprate2007-02-16016 February 2007 Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0703304152007-02-16016 February 2007 Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI ML0706606192007-02-20020 February 2007 Draft Request for Additional Information Hope Creek EPU Grp 5 Project stage: Draft RAI ML0706601992007-02-20020 February 2007 Draft Request for Additional Information Hope Creek EPU Grp 4 Project stage: Draft RAI ML0704602432007-02-23023 February 2007 Ltr Request for Additional Information Related to the Request for Extended Power Uprate Project stage: RAI ML0706606382007-02-23023 February 2007 Draft Request for Additional Information Hope Creek EPU Grp 6 Project stage: Draft RAI ML0706803142007-02-28028 February 2007 Hope Creek, Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0708103652007-02-28028 February 2007 C.D.I. Report No. 07-01NP, Rev. 0, Revised Hydrodynamic Loads on Hope Creek Unit 1 Steam Dryer to 200 Hz. Project stage: Request ML0706006112007-03-0202 March 2007 Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI ML0709200252007-03-0202 March 2007 Slides for Summary of March 2, 2007 Meeting with PSEG Nuclear LLC on an Application for Extended Power Uprate for Hope Creek Generating Station Regarding Steam Dryer Margin Project stage: Meeting ML0706803062007-03-13013 March 2007 Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI LR-N07-0035, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-13013 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0055, Supplement to License Amendment Request for Extended Power Uprate2007-03-13013 March 2007 Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0708004302007-03-29029 March 2007 Summary of March 2, 2007, Meeting with PSEG Nuclear, LLC, on an Application for Extended Power Uprate for Hope Creek Generating Station Regarding Steam Dryer Margin Project stage: Meeting LR-N07-0060, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-30030 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0069, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-30030 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0070, Response to Request for Additional Information on Request for License Amendment - Extended Power Uprate2007-04-13013 April 2007 Response to Request for Additional Information on Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0084, Supplement to License Amendment Request for Extended Power Uprate, Revised No Significant Hazards Consideration2007-04-18018 April 2007 Supplement to License Amendment Request for Extended Power Uprate, Revised No Significant Hazards Consideration Project stage: Supplement ML0711400912007-04-20020 April 2007 Request for Additional Information Regarding Request for Extended Power Uprate (TAC MD3002) - NON-PROPRIETARY Project stage: RAI ML0713603772007-04-30030 April 2007 C.D.I. Report No. 06-16NP, Rev. 2, Estimating High Frequency Flow Induced Vibration in the Main Steam Lines at Hope Creek, Unit 1: a Subscale Four Line Investigation of Standpipe Behavior. Project stage: Request LR-N07-0099, Response to Request for Additional Information Request for License Amendment, Extended Power Uprate2007-04-30030 April 2007 Response to Request for Additional Information Request for License Amendment, Extended Power Uprate Project stage: Response to RAI ML0710104492007-05-0303 May 2007 Explanation of Hope Creek Nuclear Generating Station Extended Power Uprate and Conclusion of Informal Consultation Project stage: Other ML0712404872007-05-0909 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N07-0102, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-05-10010 May 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI ML0712404112007-05-14014 May 2007 RAI, Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI ML0712405052007-05-15015 May 2007 Summary of Meeting with PSEG Nuclear LLC, Regarding Technical Aspects of the Licensee'S Application for an Extended Power Uprate (EPU) at the Hope Creek Generating Station (Hope Creek) Project stage: Meeting ML0712404612007-05-17017 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML0628605302007-05-17017 May 2007 Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML0713707002007-05-17017 May 2007 Request for Additional Information (RAI) Regarding Request for Extended Power Uprate Project stage: RAI ML0712405102007-05-17017 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N07-0123, Response to Request for Additional Information, Request for License Amendment - Extended Power Uprate2007-05-18018 May 2007 Response to Request for Additional Information, Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0113, Supplement to Request for License Amendment Extended Power Uprate Steam Dryer Limit Curves2007-05-18018 May 2007 Supplement to Request for License Amendment Extended Power Uprate Steam Dryer Limit Curves Project stage: Supplement LR-N07-0122, Supplement to Request for License Amendment Re Extended Power Uprate & C.D.I. Technical Note No. 07-012007-05-24024 May 2007 Supplement to Request for License Amendment Re Extended Power Uprate & C.D.I. Technical Note No. 07-01 Project stage: Supplement ML0717203702007-05-31031 May 2007 Attachment 2, C.D.I. Technical Note No. 07-19NP, Revision 0, Hope Creek, Unit 1, Extended Power Uprate Limit Curve Analysis for Dryer Stress Prediction During Power Ascension Project stage: Request 2007-02-28
[Table View] |
|
---|
Category:Letter
MONTHYEARML24295A3742024-10-23023 October 2024 Project Manager Assignment IR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-02-12012 February 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers 2024-09-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24253A1942024-09-0909 September 2024 NRR E-mail Capture - Final Eeeb RAI - Hope Creek Amendment to Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML22006A3212022-01-0606 January 2022 NRR E-mail Capture - Final RAI - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML21300A0222021-10-27027 October 2021 Notification of Conduct of a Fire Protection Team Inspection ML21041A3972021-02-18018 February 2021 Request for Additional Information Revise Low Pressure Safety Limit to Address General Electric Part-21 Safety Communications (Non-Proprietary) ML20295A4922020-10-21021 October 2020 NRR E-mail Capture - Hope Creek - Final RAI Revise ECCS TS with Respect to HPCI System Inoperability (L-2020-LLA-0131) ML18263A1442018-09-12012 September 2018 NRR E-mail Capture - Final RAI from Apla: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18250A3142018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18150A6912018-05-30030 May 2018 NRR E-mail Capture - Hope Creek - Final RAI Revise TS to Adopt TSTF-542 ML18120A2482018-04-27027 April 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000354/2018403 ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML17349A0812017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Reactor Systems Branch (Srxb) - Hope Creek Mur ML17348A9972017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A6242017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Human Factors Associated with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A6282017-11-21021 November 2017 NRR E-mail Capture - Draft Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17331A0072017-11-21021 November 2017 E-mail Regarding Final Eicb Request for Additional Information - Hope Creek Power Uprate ML17324A2602017-11-17017 November 2017 NRR E-mail Capture - Final Request for Additional Information - Hope Creek Mur Electrical Instrumentation and Controls ML17320A2152017-11-16016 November 2017 NRR E-mail Capture - Hope Creek Measurement Uncertainty Recapture Application Review - Electrical Engineering (Eeob) Request for Additional Information (L-2017-LLS-0002) ML17290B0132017-10-17017 October 2017 NRR E-mail Capture - Hope Creek Mur Request for Additional Information for Apla and Snpb ML17222A1652017-08-10010 August 2017 NRR E-mail Capture - Hope Creek: Final Request for Information, Pressure-Temperature Limit Report Request (MF9502) ML17181A1352017-06-29029 June 2017 NRR E-mail Capture - Request for Additional Information Related to Hope Creek and Salem Emergency Action Level Scheme Change License Amendment Request (MF9268/69/70) ML17164A4062017-06-13013 June 2017 NRR E-mail Capture - Hope Creek - Final Request for Additional Information Concerning ILRT (MF8462) ML17027A3282017-02-27027 February 2017 Request for Additional Information Regarding License Amendment Request to Permanently Extend Type a and Type C Leak Rate Test Frequencies ML16321A4642016-11-21021 November 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request for Additional Information Regarding License Amendment Request to Remove Certain Training Requirements ML16277A5142016-11-0303 November 2016 Request for Additional Information Regarding License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML16271A2052016-11-0202 November 2016 Request for Additional Information Regarding Request to Delete Technical Specifications Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML16231A4272016-08-24024 August 2016 Request for Additional Information Regarding Relief Request VR-02, Associated with the Fourth 10-Year Inservice Test Interval ML16217A4302016-08-17017 August 2016 Request for Additional Information Regarding Digital Power Range Neutron Monitoring System Upgrade ML16007A1742016-05-31031 May 2016 Request for Additional Information Regarding Review of Post-EPU Steam Dryer Stress Calculation Acoustic Circuit Model Software Error ML16089A0792016-05-0505 May 2016 Request for Additional Information Regarding Relief Requests GR-01, PR-01, PR-02, VR-01, and VR-02, Associated with the Fourth 10-Year Inservice Test Interval ML16124A5802016-05-0303 May 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Redacted - Request for Additional Information Review of Security Plan Revision 17 Changes ML15055A3772015-03-10010 March 2015 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information Request to Update Appendix B to Renewed Facility Operating License DPR-70, DPR-75 and NPF-57 ML14197A6192014-07-24024 July 2014 and Salem Nuclear Generating Station, Units 1 and 2 - Request for Additional Information Regarding Cyber Security Plan Milestone 8 Implementation Schedule (Tac Nos. MF3384, MF3385 and MF3386) ML14168A2352014-07-0202 July 2014 Request for Additional Information Regarding Flooding Hazard Reevaluation ML13309B5922013-11-22022 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13168A2762013-08-12012 August 2013 Peach Bottom, Units 2 and 3, Request for Additional Information Decommissioning Funding Status Report (TAC No. MF2202; MF2227; MF2228) ML13193A2912013-07-22022 July 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) TAC MF1031 ML13204A2532013-07-19019 July 2013 Draft RAIs - Decommissioning Funding Status Report for Hope Creek and Peach Bottom ML13190A2212013-07-0202 July 2013 RAIs for Hope Creek Regarding Response to Order EA-12-051 ML13154A4952013-06-0404 June 2013 Rai'S Following Ifib Analysis of Pseg'S 2013 Decommissioning Funding Status Report for Hope Creek Generating Station ML12334A3102012-12-0505 December 2012 Request for Additional Information Request to Correct Technical Specification and Facility Operating License Editorial Items ML12310A1672012-11-0101 November 2012 Draft RAI to License Amendment Request Regarding Average Power Range Monitoring Operability Requirements in Operational Condition 5 ML1227901012012-10-0505 October 2012 Clarifying Information for Question No. 4 (with Attachment) ML12212A1032012-08-0808 August 2012 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information ML12216A1792012-08-0303 August 2012 Draft RAI Related to Request for Exemption from Certain Requirements of the Fitness for Duty Rule ML12213A6162012-07-30030 July 2012 Draft Request for Additional Information Related to Request for Exemption from Certain Requirements of the Fitness for Duty Rule ML1209002372012-03-29029 March 2012 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Draft Request for Additional Information 2024-09-09
[Table view] |
Text
January 23, 2008 Mr. William Levis President & Chief Nuclear Officer PSEG Nuclear LLC-N09 Post Office Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
HOPE CREEK GENERATING STATION - REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST FOR EXTENDED POWER UPRATE (TAC NO. MD3002)
Dear Mr. Levis:
By letter dated September 18, 2006,1 as supplemented by additional letters,2 PSEG Nuclear, LLC (PSEG or the licensee) submitted an amendment request for an extended power uprate (EPU) for the Hope Creek Generating Station (Hope Creek). The proposed amendment would increase the authorized maximum power level by approximately 15 percent, from 3,339 megawatts thermal (MWt) to 3,840 MWt.
The Nuclear Regulatory Commission (NRC) staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent by e-mail to your staff and were discussed on a phone call on January 14, 2008, to ensure that the questions were understandable, the regulatory basis was clear and to determine if the information was previously docketed.
Mr. Jeff Keenan of your staff agreed to respond by January 25, 2008, to the enclosed RAI questions.
1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML062680451 2
Letters dated: October 10, 2006 (ML062920092); October 20, 2006 (ML063110164); February 14, 2007 (ML070530099);
February 16, 2007 (ML070590182); February 28, 2007 (ML070680314); March 13, 2007 (ML070790508 & ML070810360);
March 22, 2007 (ML070930442); March 30, 2007 (ML071010243 & ML070960103); April 13, 2007 (ML071140157); April 18, 2007 (ML071160121); April 30, 2007 (ML071290559); May 10 (ML071360375); May 18, 2007 (ML071500294, ML071720368, &
ML071500317); May 24, 2007 (ML071630305); June 22, 2007 (ML071840167); July 12, 2007 (ML072110215); August 3, 2007 (ML072250369); August 17, 2007 (ML072480515, ML072480515); August 27, 2007 (ML072480570); August 31, 2007 (ML072540651); September 11, 2007 (ML072640410); October 10, 2007 (ML073100791); October 23, 2007 (ML073040393);
November 15, 2007 (ML073320601); November 30, 2007 (ML073460793); December 31, 2007 (ML080080577); January 14, 2008; January 15, 2008; and January 18, 2008.
W. Levis Please note that if you do not respond to this letter within the prescribed response times or provide an acceptable alternate date in writing, we may reject your application for amendment under the provisions of 10 CFR, Part 2, Section 2.108. If you have any questions, I can be reached at (301) 415-3100.
Sincerely,
/ra/
John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosure:
As stated cc: See next page
W. Levis Please note that if you do not respond to this letter within the prescribed response times or provide an acceptable alternate date in writing, we may reject your application for amendment under the provisions of 10 CFR, Part 2, Section 2.108. If you have any questions, I can be reached at (301) 415-3100.
Sincerely,
/ra/
John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosure:
As stated cc: See next page DISTRIBUTION:
PUBLIC Lpl1-2 R/F RidsNrrDORLLpl1-2 RidsOgcRP RidsNrrLAABaxter RidsAcrsAcnwMailCenter TScarbrough JQuichocho RidsNrrPMJLamb RidsNrrDORLDpr RidsRgn1MailCenter GPurciarello ADAMS Accession Number: ML080160570 OFFICE LPL1-2/PM LPL1-2/LA EMCB/BC LPL1-2/BC NAME JLamb ABaxter KManoly HChernoff DATE 1/22/08 1/22/08 1/22/08 1/23/08 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT EXTENDED POWER UPRATE HOPE CREEK GENERATING STATION DOCKET NO. 50-354 By letter dated September 18, 2006,1 as supplemented by additional letters,2 PSEG Nuclear, LLC (PSEG or the licensee) submitted an amendment request for an extended power uprate (EPU) for the Hope Creek Generating Station (Hope Creek). The proposed amendment would increase the authorized maximum power level by approximately 15 percent, from the current licensed thermal power (CLTP) of 3,339 megawatts thermal (MWt) to 3,840 MWt.
The Nuclear Regulatory Commission staff has reviewed the information the licensee provided that supports the proposed amendment and would like to discuss the following issues to clarify the submittal.
RAI 14.66 2nd Follow-Up - I Page 22 of Continuum Dynamics, Inc. (CDI) Report 07-27P, Finite Element Modeling Bias and Uncertainty Estimates Derived from the Hope Creek Unit 2 Dryer Shaker Test, Rev. 0, presents damping values computed for the finite element (FE) model to best match FE and measured acceleration response function peaks. CDI states that the inferred FE damping values are consistent with measured damping values in STI Technologies Report PA2168, Hope Creek Steam Dryer Vibration Test. However, no damping values (other than those for low frequency rigid body modes) are presented in the STI report.
(a) Provide and plot the damping values from the measurements as a function of shaker location and frequency. Also include minimum, maximum, mean, and root mean square values (computed over frequency) for each shaker location consistent with those in Table 3 in CDI Report 07-27P.
(b) Plot and compare the measured damping values and FE damping values inferred in CDI Report No.07-27P as a function of frequency and shaker location.
1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML062680451 2
Letters dated: October 10, 2006 (ML062920092); October 20, 2006 (ML063110164); February 14, 2007 (ML070530099);
February 16, 2007 (ML070590182); February 28, 2007 (ML070680314); March 13, 2007 (ML070790508 & ML070810360);
March 22, 2007 (ML070930442); March 30, 2007 (ML071010243 & ML070960103); April 13, 2007 (ML071140157); April 18, 2007 (ML071160121); April 30, 2007 (ML071290559); May 10 (ML071360375); May 18, 2007 (ML071500294, ML071720368, &
ML071500317); May 24, 2007 (ML071630305); June 22, 2007 (ML071840167); July 12, 2007 (ML072110215); August 3, 2007 (ML072250369); August 17, 2007 (ML072480515, ML072480515); August 27, 2007 (ML072480570); August 31, 2007 (ML072540651); September 11, 2007 (ML072640410); October 10, 2007 (ML073100791); October 23, 2007 (ML073040393);
November 15, 2007 (ML073320601); November 30, 2007 (ML073460793); December 31, 2007 (ML080080577); January 14, 2008; January 15, 2008; and January 18, 2008.
Enclosure
(c) Reconcile the differences between the measured and inferred FE damping values, and provide the resulting FE bias and uncertainty.
RAI 14.66 2nd Follow-Up - II STI Technologies Report PA2168, Hope Creek Steam Dryer Vibration Test states on page 7 that a Hanning window was applied to the measured vibration response. Hanning windows reduce peak amplitudes in Fourier Transforms. Was the Hanning window used during the peak response measurements conducted by driving the shaker at a single frequency? If so, how has the peak amplitude reduction been accounted for?
Hope Creek Generating Station cc:
Mr. Thomas Joyce Township Clerk Senior Vice President - Operations Lower Alloways Creek Township PSEG Nuclear Municipal Building, P.O. Box 157 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Mr. Paul Bauldauf, P.E., Asst. Director Mr. Dennis Winchester Radiation Protection Programs Vice President - Nuclear Assessment NJ Department of Environmental PSEG Nuclear Protection and Energy P.O. Box 236 CN 415 Hancocks Bridge, NJ 08038 Trenton, NJ 08625-0415 Mr. Carl Fricker Mr. Brian Beam Vice President - Operations Support Board of Public Utilities PSEG Nuclear 2 Gateway Center, Tenth Floor P.O. Box 236 Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Mr. John Perry U.S. Nuclear Regulatory Commission Plant Manager - Hope Creek 475 Allendale Road PSEG Nuclear King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Hope Creek Generating Station Mr. James Mallon U.S. Nuclear Regulatory Commission Manager - Licensing Drawer 0509 PSEG Nuclear Hancocks Bridge, NJ 08038 P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. Jeffrie J. Keenan, Esquire PSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. Michael Gaffney Manager - Hope Creek Regulatory Assurance PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038