MONTHYEARML24253A1942024-09-0909 September 2024 NRR E-mail Capture - Final Eeeb RAI - Hope Creek Amendment to Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24240A2092024-08-27027 August 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Relief Request VR-04, SSW Rupture Disc Replacement ML24197A1022024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Lift Settings for Reactor Coolant System Safety Relief Valves ML24163A1632024-06-11011 June 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23129A7892023-05-0909 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise Trip and Standby Auto-Start Logic Associated with Safety Related HVAC Trains ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML22194A0522022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review - Hope Creek, Salem 1 and 2 - Relocate Staff Qualification Requirements to Licensee Quality Assurance Topical Report ML22038A1552022-02-0404 February 2022 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML22021A7012022-01-21021 January 2022 NRR E-mail Capture - Acceptance Review - Hope Creek -Relief Request HC-I4R-220 Regarding Partial Penetration Nozzle Repairs (L-2022-LLR-0003) ML22006A3212022-01-0606 January 2022 NRR E-mail Capture - Final RAI - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML21334A1182021-11-30030 November 2021 NRR E-mail Capture - Acceptance Review - Hope Creek -Revise SRs for Electric Power Monitor Channels for RPS and Power Range Neutron Monitoring System ML21154A0102021-05-28028 May 2021 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML20295A4922020-10-21021 October 2020 NRR E-mail Capture - Hope Creek - Final RAI Revise ECCS TS with Respect to HPCI System Inoperability (L-2020-LLA-0131) ML20293A1832020-10-19019 October 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20289A7062020-10-15015 October 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise Low Pressure Safety Limit to Address GE Part-21 Safety Communication SC05-03 ML20246G5952020-09-0202 September 2020 Acceptance Review - Hope Creek - Adopt TSTF-427, Allowance for Non TS Barrier Degradation ML20191A0202020-07-0202 July 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise ECCS TS with Respect to HPCI System Inoperability ML20153A3782020-06-0101 June 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Actions for Suppression Pool Cooling ML20006E2802020-01-0606 January 2020 NRR E-mail Capture - Acceptance Review - Hope Creek: LAR Regarding Proposed Adoption of 10 CFR 50.69, Risk- Informed Categorization and Treatment of SSCs for Nuclear Power Plants ML19280A0002019-10-0303 October 2019 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Final RAI Emergency Plan Staffing Requirements (L-2019-LLA-0145) ML19267A1622019-09-24024 September 2019 NRR E-mail Capture - Hope Creek - Acceptance Review: Alternative for Exam of ASME Section XI, Exam Category B-G-1, Item Number B6.40, Threads in Flange (L-2019-LLR-0090) ML19226A3932019-08-14014 August 2019 NRR E-mail Capture - Salem 1 & 2, Hope Creek - Acceptance Review: Delete License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19198A0992019-07-17017 July 2019 NRR E-mail Capture - Salem 1 & 2, Hope Creek - Acceptance Review: Changes to Emergency Plan Staffing ML19186A3842019-07-0505 July 2019 NRR E-mail Capture - Acceptance Review - Hope Creek, Revise TS to Adopt TSTF-563, Revise Instrumentation Testing Definition ML19123A2172019-05-0303 May 2019 NRR E-mail Capture - Re Acceptance Review - Hope Creek, Revise TS to Adopt TSTF-564, Safety Limit MCPR ML19081A1532019-03-22022 March 2019 NRR E-mail Capture - Acceptance Review: Hope Creek - Revise TS to Adopt TSTF-546 (L-2019-LLA-0032) ML19046A2382019-02-15015 February 2019 NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request to Use ASME Code Case OMN-17 (L-2019-LLR-0010) ML18323A0252018-11-16016 November 2018 NRR E-mail Capture - Acceptance Review: Hope Creek - Remote Shutdown System I & C Amendment (L-2018-LLA-0295) ML18288A2512018-10-15015 October 2018 NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request Associated with Third 10-Year ISI Interval (L-2018-LLR-0124) ML18271A0342018-09-13013 September 2018 Receipt of Stephen Comley, We the People, September 6, 11 and 12 2018 Voicemail and Email ML18263A1442018-09-12012 September 2018 NRR E-mail Capture - Final RAI from Apla: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18250A3142018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18206A7302018-07-27027 July 2018 (50-272, 50-311, 50-354), Transmittal Email 26.717 Updates ML18201A1112018-07-20020 July 2018 NRR E-mail Capture - Acceptance Review Results: Hope Creek, Salem 1 & 2 Revise TS to Adopt TSTF-529 (L-2018-LLA-0185) ML18150A6912018-05-30030 May 2018 NRR E-mail Capture - Hope Creek - Final RAI Revise TS to Adopt TSTF-542 ML18128A3862018-05-0808 May 2018 NRR E-mail Capture - Acceptance Review Results: Hope Creek Revise Inverter AOT TS Actions (L-2018-LLA-0101) ML18122A2392018-05-0202 May 2018 NRR E-mail Capture - Acceptance Review Results: Revise Emergency Diesel Generator Technical Specifications Action to Remove Salem Unit 3 Gas Turbine Generator (L-2018-LLA-0079) ML17348A6242017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Human Factors Associated with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A9972017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17349A0812017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Reactor Systems Branch (Srxb) - Hope Creek Mur ML17340B2682017-12-0606 December 2017 NRR E-mail Capture - Notification to State of New Jersey of Impending License Amendment Issuance for Hope Creek (MF9501; EPID L-2017-LLA-0183) ML17338A2742017-12-0404 December 2017 NRR E-mail Capture - State of New Jersey: Notification of Impending Amendment Issuance for Hope Creek - Relocate Pressure-Temperature Limits Curves to the Pressure-Temperature Limits Report 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24253A1942024-09-0909 September 2024 NRR E-mail Capture - Final Eeeb RAI - Hope Creek Amendment to Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML22006A3212022-01-0606 January 2022 NRR E-mail Capture - Final RAI - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML21300A0222021-10-27027 October 2021 Notification of Conduct of a Fire Protection Team Inspection ML21041A3972021-02-18018 February 2021 Request for Additional Information Revise Low Pressure Safety Limit to Address General Electric Part-21 Safety Communications (Non-Proprietary) ML20295A4922020-10-21021 October 2020 NRR E-mail Capture - Hope Creek - Final RAI Revise ECCS TS with Respect to HPCI System Inoperability (L-2020-LLA-0131) ML18263A1442018-09-12012 September 2018 NRR E-mail Capture - Final RAI from Apla: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18250A3142018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18150A6912018-05-30030 May 2018 NRR E-mail Capture - Hope Creek - Final RAI Revise TS to Adopt TSTF-542 ML18120A2482018-04-27027 April 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000354/2018403 ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML17349A0812017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Reactor Systems Branch (Srxb) - Hope Creek Mur ML17348A9972017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A6242017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Human Factors Associated with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A6282017-11-21021 November 2017 NRR E-mail Capture - Draft Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17331A0072017-11-21021 November 2017 E-mail Regarding Final Eicb Request for Additional Information - Hope Creek Power Uprate ML17324A2602017-11-17017 November 2017 NRR E-mail Capture - Final Request for Additional Information - Hope Creek Mur Electrical Instrumentation and Controls ML17320A2152017-11-16016 November 2017 NRR E-mail Capture - Hope Creek Measurement Uncertainty Recapture Application Review - Electrical Engineering (Eeob) Request for Additional Information (L-2017-LLS-0002) ML17290B0132017-10-17017 October 2017 NRR E-mail Capture - Hope Creek Mur Request for Additional Information for Apla and Snpb ML17222A1652017-08-10010 August 2017 NRR E-mail Capture - Hope Creek: Final Request for Information, Pressure-Temperature Limit Report Request (MF9502) ML17181A1352017-06-29029 June 2017 NRR E-mail Capture - Request for Additional Information Related to Hope Creek and Salem Emergency Action Level Scheme Change License Amendment Request (MF9268/69/70) ML17164A4062017-06-13013 June 2017 NRR E-mail Capture - Hope Creek - Final Request for Additional Information Concerning ILRT (MF8462) ML17027A3282017-02-27027 February 2017 Request for Additional Information Regarding License Amendment Request to Permanently Extend Type a and Type C Leak Rate Test Frequencies ML16321A4642016-11-21021 November 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request for Additional Information Regarding License Amendment Request to Remove Certain Training Requirements ML16277A5142016-11-0303 November 2016 Request for Additional Information Regarding License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML16271A2052016-11-0202 November 2016 Request for Additional Information Regarding Request to Delete Technical Specifications Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML16231A4272016-08-24024 August 2016 Request for Additional Information Regarding Relief Request VR-02, Associated with the Fourth 10-Year Inservice Test Interval ML16217A4302016-08-17017 August 2016 Request for Additional Information Regarding Digital Power Range Neutron Monitoring System Upgrade ML16007A1742016-05-31031 May 2016 Request for Additional Information Regarding Review of Post-EPU Steam Dryer Stress Calculation Acoustic Circuit Model Software Error ML16089A0792016-05-0505 May 2016 Request for Additional Information Regarding Relief Requests GR-01, PR-01, PR-02, VR-01, and VR-02, Associated with the Fourth 10-Year Inservice Test Interval ML16124A5802016-05-0303 May 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Redacted - Request for Additional Information Review of Security Plan Revision 17 Changes ML15055A3772015-03-10010 March 2015 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information Request to Update Appendix B to Renewed Facility Operating License DPR-70, DPR-75 and NPF-57 ML14197A6192014-07-24024 July 2014 and Salem Nuclear Generating Station, Units 1 and 2 - Request for Additional Information Regarding Cyber Security Plan Milestone 8 Implementation Schedule (Tac Nos. MF3384, MF3385 and MF3386) ML14168A2352014-07-0202 July 2014 Request for Additional Information Regarding Flooding Hazard Reevaluation ML13309B5922013-11-22022 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13168A2762013-08-12012 August 2013 Peach Bottom, Units 2 and 3, Request for Additional Information Decommissioning Funding Status Report (TAC No. MF2202; MF2227; MF2228) ML13193A2912013-07-22022 July 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) TAC MF1031 ML13204A2532013-07-19019 July 2013 Draft RAIs - Decommissioning Funding Status Report for Hope Creek and Peach Bottom ML13190A2212013-07-0202 July 2013 RAIs for Hope Creek Regarding Response to Order EA-12-051 ML13154A4952013-06-0404 June 2013 Rai'S Following Ifib Analysis of Pseg'S 2013 Decommissioning Funding Status Report for Hope Creek Generating Station ML12334A3102012-12-0505 December 2012 Request for Additional Information Request to Correct Technical Specification and Facility Operating License Editorial Items ML12310A1672012-11-0101 November 2012 Draft RAI to License Amendment Request Regarding Average Power Range Monitoring Operability Requirements in Operational Condition 5 ML1227901012012-10-0505 October 2012 Clarifying Information for Question No. 4 (with Attachment) ML12212A1032012-08-0808 August 2012 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information ML12216A1792012-08-0303 August 2012 Draft RAI Related to Request for Exemption from Certain Requirements of the Fitness for Duty Rule ML12213A6162012-07-30030 July 2012 Draft Request for Additional Information Related to Request for Exemption from Certain Requirements of the Fitness for Duty Rule ML1209002372012-03-29029 March 2012 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Draft Request for Additional Information 2024-09-09
[Table view] |
Text
NRR-DMPSPEm Resource From: Kim, James Sent: Thursday, September 6, 2018 9:56 AM To: Duke, Paul R.; Thomas, Brian J.
Cc: Marabella, Lee A.
Subject:
Hope Creek - Final RAI RE: Inverter AOT Extension Attachments: Hope Creek Inverter AOT - Final RAI.docx By letter dated April 13, 2018 (Agencywide Documents Access management System (ADAMS) Accession No. ML18103A218), Public Service Enterprise Group Nuclear LLC (PSEG, the licensee), requested an amendment to the Renewed Facility Operating License NPF-57 for Hope Creek Generating Station (HCGS) Unit 1. The proposed license amendment request (LAR) would revise the Technical Specifications (TS) 3.8.3.1, Distribution - Operating, to increase the allowed outage time (AOT) for restoring inoperable alternate current (AC) inverter(s) to operable status from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days.
The NRC staff has determined that the additional information is required for the staff to complete its review. On August 21, 2018, the NRC staff sent PSEG the draft Request for Additional Information (RAI). This RAI relates to the licensees request to increase AOT for restoring inoperable AC inverter(s).
On September 5, 2018, the NRC staff and the licensee held a conference call to clarify the request. A publicly available version of this final RAI (attached) will be placed in the NRCs ADAMS. Subsequently, the licensee agreed to respond to this request by October 12, 2018.
Jim Kim Project Manager - Hope Creek Generating Station NRR/DORL/LPL1 301-415-4125 1
Hearing Identifier: NRR_DMPS Email Number: 552 Mail Envelope Properties (James.Kim@nrc.gov20180906095500)
Subject:
Hope Creek - Final RAI RE: Inverter AOT Extension Sent Date: 9/6/2018 9:55:39 AM Received Date: 9/6/2018 9:55:00 AM From: Kim, James Created By: James.Kim@nrc.gov Recipients:
"Marabella, Lee A." <Lee.Marabella@pseg.com>
Tracking Status: None "Duke, Paul R." <Paul.Duke@pseg.com>
Tracking Status: None "Thomas, Brian J." <Brian.Thomas@pseg.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1261 9/6/2018 9:55:00 AM Hope Creek Inverter AOT - Final RAI.docx 30042 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION HOPE CREEK GENERATING STATION UNIT 1 LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS 3.8.3.1 REGARDING ALTERNATING CURRENT INVERTERS DOCKET NO. 50-354 (CAC/EPID:000976/L-2018-LLA-0140)
By letter dated April 13, 2018 (Agencywide Documents Access management System (ADAMS)
Accession No. ML18103A218), Public Service Enterprise Group Nuclear LLC (PSEG, the licensee), requested an amendment to the Renewed Facility Operating License NPF-57 for Hope Creek Generating Station (HCGS) Unit 1. The proposed license amendment request (LAR) would revise the Technical Specifications (TS) 3.8.3.1, Distribution - Operating, to increase the allowed outage time (AOT) for restoring inoperable alternate current (AC) inverter(s) to operable status from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days.
The Electrical Engineering Operating Branch (EEOB) staff has determined that the following additional information is needed to complete the review of the HCGS LAR.
Regulatory Requirements:
Title 10 of the Code of Federal Regulations (10 CFR) Part 50.36, Technical Specifications, requires, in part, that the operating license of a nuclear production facility include TS. 10 CFR 50.36 (c)(2) requires that the TS include limiting conditions for operation (LCOs) which are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When an LCO of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met.
The EEOB staff also considered the following guidance document to evaluate the LAR:
Branch Technical Position (BTP) 8-8, "Onsite (Emergency Diesel Generators) and Offsite Power Sources Allowed Outage Time Extensions," was developed by the NRC staff to provide guidance for reviewing LARs for AOT extensions for the onsite and offsite electrical power sources to perform online maintenance of the power sources.
EEOB RAI - 1 In the LAR, the licensee proposed to extend the AOT for restoring inoperable inverter (s) in one channel to operable status from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days, which is a 6-day extension. The licensee stated that the current 24-hour AOT can be insufficient in certain instances to support on-line troubleshooting, corrective maintenance, and post-maintenance testing in response to emergent issues. The licensee further states:
[if] the emergent issue had required complex troubleshooting or more extensive post-maintenance testing, or if backup, burnt in replacement components were not available on site, the process of returning the inverter to operable status could have taken more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The recommended burn-in period for replacement circuit cards is 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />.
In addition, the licensee stated that HCGS performs preventive maintenance on the safety related UPS units during each refueling outage and has no current plans to perform routine
preventive maintenance on a scheduled basis at power. The licensee provided operating experience instances for inoperable inverters.
The NRC staffs guidance in BTP 8-8 for reviewing LARs for AOT extensions for electrical power sources states that the licensee must provide justification for the duration of the requested AOT (actual hours plus margin) based on plant-specific past operating experience.
The NRC staff notes that the inoperable inverters were returned to operable status within the existing 24-hour AOT in each of the HCGS operating experience instances, and the licensee did not provide a technical justification for the proposed extended AOT. Therefore, the NRC staff requests the following information:
Provide a discussion that details a technical justification for the proposed inverter AOT extension based on the HCGS plant-specific past operating experience and vendor recommendations for performing maintenance on the inverters.
EEOB RAI 2 LAR Section 2.1, System Design and Operation, states:
The Class 1E AC power system is designed to provide reliable source of power to all Class 1E loads in the plant. The system is divided into 4 channels (A, B, C, D). These loads are essential for safe and orderly shutdown of the plant, maintaining the plant in a safe condition, and mitigating the consequences of an accident. The loads are divided into 4 groups such that any combination of 3 out of the 4 groups has the ability to supply the minimum required safety loads to perform the above functions. The channels do not have load sharing ability. Each of these channels has two associated Class 1E 120 V
[volts] AC uninterruptable power supply (UPS) units. []
Each UPS is comprised of a static rectifier, a static inverter, a static switch assembly, and a regulated power supply.
The licensee provided a summary of the effects of an inverter failure on the plant safety systems, controls, and indications for each 120 V AC distribution panel fed by its associated inverter. The failure of each of the two inverters in a channel has different impacts on the plant.
The NRC staffs guidance in BTP 8-8 for reviewing LARs for AOT extensions for electrical power sources recommends the provision of a supplemental power source capable of performing the function of the inoperable equipment during the extended AOT. The NRC staff notes that the licensee did not discuss the provision of a supplemental power source during the extended AOT. To allow the NRC staff to evaluate the technical adequacy of the extended AOT for inoperable inverters, provide the following information:
In case another inverter would fail in a redundant channel during the proposed extended AOT for restoring inoperable inverters in one channel to operable status, provide a discussion that describes:
a- The plant response and the effects on the plant safety-related systems required to mitigate a design basis event (DBE) and their safety functions.
b- The use of a supplemental 120 V AC power source such as a spare inverter or a UPS, the compensatory measures, equipment alignment, and the procedures in place to address the potential consequences to the plant in the event of a DBE or an anticipated operational occurrence if there would be a potential loss of safety functions or reduction in defense in depth of affected safety systems. If there is not a need to use a supplemental 120 V AC power source, please provide a justification.