Letter Sequence Meeting |
---|
TAC:MD3002, Control Room Habitability (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0733004532003-11-27027 November 2003 Schedule and Response to PSEG Letter (LR-N07-0274) Dated October 23, 2007, Plans Related to Steam Dryer Evaluation Regarding Request for Extended Power Uprate Project stage: Other ML0626900642006-09-0101 September 2006 Attachment 26, C.D.I. Report No. 06-16NP, Rev 1, Estimating High Frequency Flow Induced Vibration in the Main Stream Lines at Hope Creek Unit 1: a Subscale Four Line Investigation of Standpipe Behavior. Project stage: Request LR-N06-0286, Request for License Amendment Extended Power Uprate2006-09-18018 September 2006 Request for License Amendment Extended Power Uprate Project stage: Request ML0626900442006-09-30030 September 2006 Attachment 21, C.D.I. Report No. 06-27, Rev 0, Stress Analysis of Hope Creek Unit 1 Steam Dryer at CLTP and EPU Conditions Using 1/8th Scale Model Pressure Measurement Data. Project stage: Request ML0631101672006-09-30030 September 2006 Attachment 2 - CDI Technical Memo 06-23P (Non-Proprietary) Comparison of Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions, Revision 0, Dated September 2006 Project stage: Request LR-N06-0413, Supplement to License Amendment Request for Extended Power Uprate2006-10-10010 October 2006 Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0628303692006-10-13013 October 2006 Supplement to Application for Extended Power Uprate Project stage: Other ML0629003222006-10-18018 October 2006 Extended Power Uprate Accpetance Review Results Project stage: Other LR-N06-0418, Supplement to License Amendment Request for Extended Power Uprate, to Increase the Maximum Authorized Power Level to 3840 Megawatts Thermal2006-10-20020 October 2006 Supplement to License Amendment Request for Extended Power Uprate, to Increase the Maximum Authorized Power Level to 3840 Megawatts Thermal Project stage: Supplement ML0628304722006-11-0808 November 2006 PSEG Nuclear LLC, Withholding from Public Disclosure, NEDC-33076P, Revision 2, Safety Analysis Report for Hope Creek Constant Pressure Power Uprate, Class III, MD3002 Project stage: Other ML0628304532006-11-21021 November 2006 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML0633301432006-12-15015 December 2006 11/13-14/2006 Summary of Category 1 Meeting with PSEG Nuclear LLC, Regarding Application for Extended Power Uprate for Hope Creek Project stage: Meeting ML0703002772007-01-26026 January 2007 E-Mail Shea-NRR,to Duke, PSEG, Group1 Draft EPU RAI Project stage: Draft Other ML0716303072007-01-31031 January 2007 C.D.I. Technical Note No. 07-01NP, EPU Conditions in the Main Steam Lines at Hope Creek Unit 1: Additional Subscale Four Line Tests. Project stage: Request LR-N07-0034, C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions.2007-01-31031 January 2007 C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions. Project stage: Request LR-N07-0026, Supplemental to License Amendment Request for Extended Power Uprate2007-02-14014 February 2007 Supplemental to License Amendment Request for Extended Power Uprate Project stage: Supplement LR-N07-0029, Supplement to License Amendment Request for Extended Power Uprate2007-02-16016 February 2007 Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0703304152007-02-16016 February 2007 Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI ML0706606192007-02-20020 February 2007 Draft Request for Additional Information Hope Creek EPU Grp 5 Project stage: Draft RAI ML0706601992007-02-20020 February 2007 Draft Request for Additional Information Hope Creek EPU Grp 4 Project stage: Draft RAI ML0704602432007-02-23023 February 2007 Ltr Request for Additional Information Related to the Request for Extended Power Uprate Project stage: RAI ML0706606382007-02-23023 February 2007 Draft Request for Additional Information Hope Creek EPU Grp 6 Project stage: Draft RAI ML0706803142007-02-28028 February 2007 Hope Creek, Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0708103652007-02-28028 February 2007 C.D.I. Report No. 07-01NP, Rev. 0, Revised Hydrodynamic Loads on Hope Creek Unit 1 Steam Dryer to 200 Hz. Project stage: Request ML0706006112007-03-0202 March 2007 Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI ML0709200252007-03-0202 March 2007 Slides for Summary of March 2, 2007 Meeting with PSEG Nuclear LLC on an Application for Extended Power Uprate for Hope Creek Generating Station Regarding Steam Dryer Margin Project stage: Meeting ML0706803062007-03-13013 March 2007 Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI LR-N07-0035, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-13013 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0055, Supplement to License Amendment Request for Extended Power Uprate2007-03-13013 March 2007 Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0708004302007-03-29029 March 2007 Summary of March 2, 2007, Meeting with PSEG Nuclear, LLC, on an Application for Extended Power Uprate for Hope Creek Generating Station Regarding Steam Dryer Margin Project stage: Meeting LR-N07-0060, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-30030 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0069, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-30030 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0070, Response to Request for Additional Information on Request for License Amendment - Extended Power Uprate2007-04-13013 April 2007 Response to Request for Additional Information on Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0084, Supplement to License Amendment Request for Extended Power Uprate, Revised No Significant Hazards Consideration2007-04-18018 April 2007 Supplement to License Amendment Request for Extended Power Uprate, Revised No Significant Hazards Consideration Project stage: Supplement ML0711400912007-04-20020 April 2007 Request for Additional Information Regarding Request for Extended Power Uprate (TAC MD3002) - NON-PROPRIETARY Project stage: RAI ML0713603772007-04-30030 April 2007 C.D.I. Report No. 06-16NP, Rev. 2, Estimating High Frequency Flow Induced Vibration in the Main Steam Lines at Hope Creek, Unit 1: a Subscale Four Line Investigation of Standpipe Behavior. Project stage: Request LR-N07-0099, Response to Request for Additional Information Request for License Amendment, Extended Power Uprate2007-04-30030 April 2007 Response to Request for Additional Information Request for License Amendment, Extended Power Uprate Project stage: Response to RAI ML0710104492007-05-0303 May 2007 Explanation of Hope Creek Nuclear Generating Station Extended Power Uprate and Conclusion of Informal Consultation Project stage: Other ML0712404872007-05-0909 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N07-0102, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-05-10010 May 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI ML0712404112007-05-14014 May 2007 RAI, Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI ML0712405052007-05-15015 May 2007 Summary of Meeting with PSEG Nuclear LLC, Regarding Technical Aspects of the Licensee'S Application for an Extended Power Uprate (EPU) at the Hope Creek Generating Station (Hope Creek) Project stage: Meeting ML0712404612007-05-17017 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML0628605302007-05-17017 May 2007 Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML0713707002007-05-17017 May 2007 Request for Additional Information (RAI) Regarding Request for Extended Power Uprate Project stage: RAI ML0712405102007-05-17017 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N07-0123, Response to Request for Additional Information, Request for License Amendment - Extended Power Uprate2007-05-18018 May 2007 Response to Request for Additional Information, Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0113, Supplement to Request for License Amendment Extended Power Uprate Steam Dryer Limit Curves2007-05-18018 May 2007 Supplement to Request for License Amendment Extended Power Uprate Steam Dryer Limit Curves Project stage: Supplement LR-N07-0122, Supplement to Request for License Amendment Re Extended Power Uprate & C.D.I. Technical Note No. 07-012007-05-24024 May 2007 Supplement to Request for License Amendment Re Extended Power Uprate & C.D.I. Technical Note No. 07-01 Project stage: Supplement ML0717203702007-05-31031 May 2007 Attachment 2, C.D.I. Technical Note No. 07-19NP, Revision 0, Hope Creek, Unit 1, Extended Power Uprate Limit Curve Analysis for Dryer Stress Prediction During Power Ascension Project stage: Request 2007-02-28
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML23300A0382023-11-0101 November 2023 Summary of Hope Creek Oct 24, 2023, Pre Submittal Public Meeting with PSEG Nuclear LLC to Discuss Future Amendments Regarding Improved TS Conversion 24 Month Fuel Cycle & Surveillance Interval Extension & Safety Relief Valve Lift Setpoint C ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23146A1012023-05-31031 May 2023 Summary of May 25, 2023, Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Reduction of the Site'S Exclusion Area Boundary ML22325A3052022-11-22022 November 2022 Summary of November 17, 2022, Pre Submittal Public Meeting with PSEG Nuclear LLC to Discuss Threshold Determination on Transferring Ownership of Portions of the Site ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML21092A1502021-04-15015 April 2021 Summary of Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss License Amendment Regarding Ultimate Heat Sink Technical Specification Changes ML21064A0962021-03-0909 March 2021 Summary of 3/4/2021 Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Adoption of ASME Section XI Code Cases N-878, N-879, and N-880 at Hope Creek Generating Station and Salem Nuclear Generating Station ML20308A3692020-11-19019 November 2020 Summary of Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Replacement of Source and Intermediate Range Neutron Monitors with Numac Wide Range Neutron Monitoring System ML19317E6762019-11-26026 November 2019 Summary of November 12, 2019, Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment to Adopt 10 CFR 50.69 ML19109A1282019-04-16016 April 2019 and Hope Creek Generating Station: Summary of Public Webinar Meeting on April 10, 2019 ML19045A4702019-02-15015 February 2019 Summary of Closed Teleconference Meeting with PSEG Nuclear LLC and General Electric-Hitachi Nuclear Energy to Discuss a General Electric Part 21 Issue ML18156A4242018-06-0505 June 2018 Annual Assessment Meeting, 5/30/18 Meeting Summary ML18044A9942018-02-26026 February 2018 Summary of Meeting with PSEG Nuclear LLC Regarding Planned Submittal of License Amendment Request to Revise Technical Specifications Regarding Extending the Allowed Outage Time for the Inverters ML18036A6142018-02-21021 February 2018 Generation Station-Summary of January 24, 2018, Meeting with PSEG Nuclear LLC on Planned Submittal of License Amendment Request to Revise Technical Specifications Regarding Diesel Generator Extended Allowed Outage Time ML17201A1012017-08-0404 August 2017 Summary of Meeting with PSEG Nuclear LLC to Discuss Potential License Amendment Request Technical Specification Task Force Traveler-542 for Hope Creek Generating Station ML17164A1742017-06-20020 June 2017 Summary of May 31, 2017, Meeting with PSEG Nuclear LLC to Discuss a Potential Measurement Uncertainty Recapture Power Uprate for Hope Creek Generating Station ML17102A7772017-04-10010 April 2017 Summary of Annual Assessment Meeting with PSEG ML16362A2022017-01-24024 January 2017 Summary of Meeting with PSEG Nuclear LLC Regarding Potential Measurement Uncertainty Recapture Power Uprate ML17023A1452017-01-23023 January 2017 Summary of Teleconference with PSEG Regarding Hope Creek HPCI ML16347A3932017-01-0505 January 2017 Summary of Teleconference with PSEG Nuclear LLC Regarding Planned License Amendment Request Regarding Change to the Salem Nuclear Generating Station-Hope Creek Generating Station Emergency Action Levels (MF8875, MF8876, and MF8877) ML16201A0292016-08-15015 August 2016 Summary of June 21, 2016, Teleconference with PSEG Nuclear LLC on the Upgrade of the Hope Creek Generating Station Power Range Neutron Monitoring System to a Digital Power Range Neutron Monitoring System ML16217A4552016-08-15015 August 2016 Summary of July 19, 2016, Teleconference with PSEG Nuclear LLC on the Upgrade of Hope Creek Generating Station'S Power Range Neutron Monitoring System ML16141A2402016-06-16016 June 2016 Summary of April 19, 2016, Teleconference with PSEG Nuclear LLC on the Upgrade of Hope Creek Generating Stations'S Power Range Neutron Monitoring System to a Digital Power Range Neutron Monitoring System ML16113A3962016-04-29029 April 2016 Summary of Teleconference with PSEG Nuclear LLC on the Upgrade of Hope Creek Generating Station'S Power Range Neutron Monitoring System to a Digital Power Range Neutron Monitoring System ML16096A2222016-04-0505 April 2016 March 30, 2016, Summary of Annual Assessment Meeting with PSEG - Salem Nuclear Generating Station & Hope Creek Generating Station ML16064A0052016-03-22022 March 2016 Summary of Teleconference with PSEG Nuclear LLC on the Upgrade of Hope Creek Generating Station'S Power Range Neutron Monitoring System to a Digital Power Range Neutron Monitoring System ML16116A2352016-03-15015 March 2016 Meeting Summary for Public Teleconference Between PSEG LLC and the Nuclear Regulatory Commission, Hope Creek Generating Station - Power Range Neutron Monitoring System Digital Upgrade LAR HCGS Numac Upgrade - Open Item DOC-0006-2118 Ri ML15104A1492015-04-14014 April 2015 Hope, Summary of Annual Assessment Meeting with PSEG ML15043A2392015-03-24024 March 2015 January 29, 2015, Summary of Pre-licensing Meeting with PSEG Regarding Digital Upgrade of Power Range Neutron Monitor (Prnm) ML14224A1332014-08-26026 August 2014 Summary of August 12, 2014, Pre-Licensing Meeting with PSEG Regarding Digital Upgrade of Power Range Neutron Monitor ML14100A0242014-04-10010 April 2014 Salem and Hope Creek - Summary of Annual Assessment Meeting with PSEG ML13364A2422014-02-0404 February 2014 9/11/2013 - Summary of Pre-Licensing Meeting with PSEG Regarding Digital Upgrade of Power Range Neutron Monitor ML13099A3242013-04-0909 April 2013 Salem & Hope Creek - Summary of Annual Assessment Meeting with PSEG ML12144A3312012-05-23023 May 2012 Summary of Meeting at the PSEG to Discuss the Nrc'S Assessment of Pseg'S Safety Performance at Salem & Hope Creek for 2011 ML1129700652011-10-21021 October 2011 Summary of PSEG Drop-in Visit, 9-28-2011 and Slides ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML11181A1772011-06-30030 June 2011 June 29, 2011 Summary of Public Meeting to Discuss Observations and Lessons Learned During the Hope Creek Nuclear Generating Station Application of the Nuclear Energy Institute'S Nuclear Safety Culture Assessment Process ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML11138A3212011-06-0808 June 2011 May 9, 2011, Summary of Telephone Conference Call Held Between NRC and PSEG Nuclear, LLC, Concerning Status of Hope Creek Drywell Air Gap Drains ML11137A0762011-06-0202 June 2011 Summary of Telephone Conference Call Held on May 11, 2011, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning the Hope Creek License Condition for the Drywell ML1114002132011-05-20020 May 2011 Summary of Annual Assessment Meeting for Salem and Hope Creek ML11105A0372011-05-0404 May 2011 Summary of Telephone Conference Call Held on March 25, 2011, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Findings on the Hope Creek Generating Station Gas Turbine ML1100700302011-03-25025 March 2011 Summary of Telephone Conference Call Held on August 30, 2010, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Questions Pertaining to the Hope Creek Generating Station License Renewal Application ML1034909292011-02-0909 February 2011 Summary of Telephone Conference Call Held on November 18, 2010, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Findings on the Hope Creek Generating Station Recent Outage ML1100501592011-02-0909 February 2011 September 15, 2010 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Questions Pertaining to the Hope Creek Generating Station License Renewal Application ML1031907452010-11-19019 November 2010 Summary of Telephone Conference Call Held on 10/21/10 Btw the USNRC and PSEG Nuclear, LLC, Concerning Hope Creek Generating Station, License Renewal Application, Environmentally Assisted Fatigue Analysis ML1025903832010-11-0202 November 2010 September 09, 2010, Summary of Telephone Conference Call Held Between NRC & PSEG Concerning a LRA Supplement Pertaining to the Hope Creek Generating Station, License Renewal Application ML1024407062010-09-20020 September 2010 Summary of Telephone Conference Call Held on August 18,2010 Between Us NRC and PSEG Nuclear, LLC Concerning Questions Pertaining to the Hope Creek Generating Station License Renewal Application ML1022200122010-08-13013 August 2010 Summary of Telephone Conf Call Held on 7/29/10, Between the USNRC and PSEG Nuclear LLC, Concerning Follow-Up Questions Pertaining to the Salem Nuclear Generating Station, Units 1 & 2, and Hope Creek Generating Station License Renewal Enviro ML1021102682010-08-0404 August 2010 Enclosure 5: PSEG Nuclear LLC - Hope Creek Presentation of July 28, 2010 Public Meeting 2023-06-28
[Table view] |
Text
March 29, 2007 LICENSEE: PSEG NUCLEAR, LLC FACILITY: HOPE CREEK GENERATING STATION
SUBJECT:
SUMMARY
OF MARCH 2, 2007, MEETING WITH PSEG NUCLEAR, LLC, ON AN APPLICATION FOR EXTENDED POWER UPRATE FOR HOPE CREEK GENERATING STATION REGARDING STEAM DRYER MARGIN (TAC NO. MD 3002)
On March, 2, 2007, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of PSEG Nuclear, LLC (PSEG, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss technical aspects of the licensees application for an extended power uprate (EPU) at the Hope Creek Generating Station dated September 18, 2006 (Agencywide Documents and Management System (ADAMS) Accession No. ML062680451). contains the meeting agenda, Enclosure 2 is a list of meeting attendees, and is the licensees presentation.
The licensee presented information detailing steam dryer margin statistics relating to the EPU license amendment request (LAR) (see attached licensee presentation). The information discussed at the meeting was intended to be an overview of information provided in an LAR supplement (Accession No. ML070680314), dated February 28, 2007. The supplement discusses additional benchmarking to establish scale model test (SMT) flow rates more representative of mean steam flow speeds at current licensed thermal power (CLTP) and EPU conditions, modeling of additional steam dryer weld reinforcements that were made before initial plant operation but were not previously included in the finite element model used to predict stress levels for EPU operation, and monitoring reactor pressure vessel steam dome to confirm the absence of a significant pressure pulsation frequency peak at 80 Hz. The licensee discussed the validation of in-plant data and the steam dryer power ascension test plan during the meeting. The NRC staff asked how often the NRC will be notified before each power set point is reached during power ascension. The licensee stated that a specific notification schedule has not yet been developed.
The NRC staff was interested in how the Mach number used in scale mode testing for both the 1/5th and 1/8th scales, including uncertainty, was measured, calculated, and validated. The licensee said these questions could be addressed in a formal NRC request for additional information (RAI). Other topics discussed during the meeting, which will be addressed through RAIs, included how low-frequency pressure loading is monitored, how loading on the steam dryer due to vibration at the re-circulation pump bypass frequency is monitored, bias and uncertainty involved in the Strain Gage measurement, Acoustic Circuit Model (ACM) analysis and Finite Element analysis, and how the conservative factor was derived based on the pressure loads on the dryer resulting from the ACM analyses.
During the meeting, the licensee committed to provide the following documents for staff review:
- Report on reactor pressure vessel dome dynamic pressure data recently collected by PSEG (Structural Integrity Report).
- Stress report based on new in-plant strain gage data at CLTP with all gages working.
PSEG representatives stated that the Hope Creek EPU schedule is on-track. The licensee is currently working on responses to RAIs from the NRC staff.
There were no members of the general public in attendance. However, a few representatives of other licensees participated in the meeting who had previous proprietaty agreements with the vendor. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1388, or jjs@nrc.gov].
/ra/
James J. Shea, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosures:
- 1. Meeting Agenda
- 2. List of Attendees
- 3. Meeting Presentation cc w/encls: See next page
During the meeting, the licensee committed to provide the following documents for staff review:
- Report on reactor pressure vessel dome dynamic pressure data recently collected by PSEG (Structural Integrity Report).
- Stress report based on new in-plant strain gage data at CLTP with all gages working.
PSEG representatives stated that the Hope Creek EPU schedule is on-track. The licensee is currently working on responses to RAIs from the NRC staff.
There were no members of the general public in attendance. However, a few representatives of other licensees participated in the meeting who had previous proprietaty agreements with the vendor. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1388, or jjs@nrc.gov].
/ra/
James J. Shea, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosures:
- 1. Meeting Agenda
- 2. List of Attendees
- 3. Meeting Presentation cc w/encls: See next page Distribution PUBLIC Branch Reading RidsNrrDorlLpl1-2 RidsNrrPMJShea RidsNrrLAEWhitt RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrOd JRaval, NRR RidsNrrLASLittle RidsNrrDORL RidsRgn1MailCenter JHoch, NRR HChernoff, NRR TAlexion, NRR PHearn, NRR TScarbrough, NRR AFerkile, OIG EBrown, NRR JWu, NRR SMiotla, OIG ADAMS ACCESSION NO.: Meeting Summary - ML070800430 Presentation - ML070920025 Package No.: ML070930464 OFFICE DORL/LPL1-2 DORL/LPL1-2:LA DORL/LPL1-2:PM DORL/LPL1-2:BC NAME JHoch SLittle JShea HChernoff DATE 03/29/07 03/29/07 03/29/07 03/29/07 OFFICIAL RECORD COPY
Hope Creek Generating Station cc:
Mr. Michael P. Gallagher Jeffrie J. Keenan, Esquire Vice President - Eng/Tech Support PSEG Nuclear - N21 PSEG Nuclear P.O. Box 236 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Mr. Michael Brothers Joint Owner Affairs Vice President - Nuclear Assessments Exelon Generation Company, LLC PSEG Nuclear Nuclear Group Headquarters KSA1-E P.O. Box 236 200 Exelon Way Hancocks Bridge, NJ 08038 Kennett Square, PA 19348 Mr. George P. Barnes Lower Alloways Creek Township Site Vice President - Hope Creek c/o Mary O. Henderson, Clerk PSEG Nuclear Municipal Building, P.O. Box 157 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Mr. George H. Gellrich Radiation Protection Programs Plant Support Manager NJ Department of Environmental PSEG Nuclear Protection and Energy P.O. Box 236 CN 415 Hancocks Bridge, NJ 08038 Trenton, NJ 08625-0415 Mr. Michael J. Massaro Brian Beam Plant Manager - Hope Creek Board of Public Utilities PSEG Nuclear 2 Gateway Center, Tenth Floor P.O. Box 236 Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Ms. Christina L. Perino U.S. Nuclear Regulatory Commission Director - Regulatory Assurance 475 Allendale Road PSEG Nuclear - N21 King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Hope Creek Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038
MEETING AGENDA MARCH 2, 2007 WORKING-LEVEL MEETING TO DISCUSS EXTENDED POWER UPRATE HOPE CREEK GENERATING STATION PSEG NUCLEAR LLC DOCKET NO. 50-354 Schedule Discussion Topics 10:00 a.m. - 10:15 a.m. Introductory Remarks/Introductions 10:15 a.m. - 11:30 a.m. Steam Dryer Integrity (proprietary information may be discussed) 11:30 a.m. - 12:00 Noon Steam dryer monitoring during proposed uprate power ascension Enclosure 1
ATTENDANCE FOR PUBLIC MEETING WITH EXELON, MARCH 2, 2007 NAME ORGANIZATION James Shea NRR Joseph Hoch NRR Harold Chernoff NRR Tom Alexion NRR John Wu NRR Thomas Scarbrough NRR Peter Hearn NRR Eva Brown NRR Andrea Ferkile OIG Sherri Miotla OIG Larry Curran PSEG Nuclear Harold Trenka PSEG Nuclear Paul Davison PSEG Nuclear Shelly Kugler PSEG Nuclear Paul Duke PSEG Nuclear Pam Cowan Exelon/PSEG Services Agreement David Langley TVA Rick Cutsinger TVA Alan Bilanin Continuum Dynamics Inc Keven Browning PPL, Susquehanna Enclosure 2
MEETING PRESENTATION MARCH 2, 2007 HOPE CREEK GENERATING STATON STEAM DRYER MARGIN Enclosure 3