Summary of March 2, 2007, Meeting with PSEG Nuclear, LLC, on an Application for Extended Power Uprate for Hope Creek Generating Station Regarding Steam Dryer Margin
ML070800430
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/29/2007
From: James Shea
NRC/NRR/ADRO/DORL/LPLI-2
To:
Hoch, Joseph NRR/DORL 415-3635
Shared Package
ML070930464 List:
References
TAC MD3002
Download: ML070800430 (7)


Text

March 29, 2007 LICENSEE: PSEG NUCLEAR, LLC FACILITY: HOPE CREEK GENERATING STATION

SUBJECT:

SUMMARY

OF MARCH 2, 2007, MEETING WITH PSEG NUCLEAR, LLC, ON AN APPLICATION FOR EXTENDED POWER UPRATE FOR HOPE CREEK GENERATING STATION REGARDING STEAM DRYER MARGIN (TAC NO. MD 3002)

On March, 2, 2007, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of PSEG Nuclear, LLC (PSEG, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss technical aspects of the licensees application for an extended power uprate (EPU) at the Hope Creek Generating Station dated September 18, 2006 (Agencywide Documents and Management System (ADAMS) Accession No. ML062680451). contains the meeting agenda, Enclosure 2 is a list of meeting attendees, and is the licensees presentation.

The licensee presented information detailing steam dryer margin statistics relating to the EPU license amendment request (LAR) (see attached licensee presentation). The information discussed at the meeting was intended to be an overview of information provided in an LAR supplement (Accession No. ML070680314), dated February 28, 2007. The supplement discusses additional benchmarking to establish scale model test (SMT) flow rates more representative of mean steam flow speeds at current licensed thermal power (CLTP) and EPU conditions, modeling of additional steam dryer weld reinforcements that were made before initial plant operation but were not previously included in the finite element model used to predict stress levels for EPU operation, and monitoring reactor pressure vessel steam dome to confirm the absence of a significant pressure pulsation frequency peak at 80 Hz. The licensee discussed the validation of in-plant data and the steam dryer power ascension test plan during the meeting. The NRC staff asked how often the NRC will be notified before each power set point is reached during power ascension. The licensee stated that a specific notification schedule has not yet been developed.

The NRC staff was interested in how the Mach number used in scale mode testing for both the 1/5th and 1/8th scales, including uncertainty, was measured, calculated, and validated. The licensee said these questions could be addressed in a formal NRC request for additional information (RAI). Other topics discussed during the meeting, which will be addressed through RAIs, included how low-frequency pressure loading is monitored, how loading on the steam dryer due to vibration at the re-circulation pump bypass frequency is monitored, bias and uncertainty involved in the Strain Gage measurement, Acoustic Circuit Model (ACM) analysis and Finite Element analysis, and how the conservative factor was derived based on the pressure loads on the dryer resulting from the ACM analyses.

During the meeting, the licensee committed to provide the following documents for staff review:

- Report on reactor pressure vessel dome dynamic pressure data recently collected by PSEG (Structural Integrity Report).

- Stress report based on new in-plant strain gage data at CLTP with all gages working.

PSEG representatives stated that the Hope Creek EPU schedule is on-track. The licensee is currently working on responses to RAIs from the NRC staff.

There were no members of the general public in attendance. However, a few representatives of other licensees participated in the meeting who had previous proprietaty agreements with the vendor. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1388, or jjs@nrc.gov].

/ra/

James J. Shea, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354

Enclosures:

1. Meeting Agenda
2. List of Attendees
3. Meeting Presentation cc w/encls: See next page

During the meeting, the licensee committed to provide the following documents for staff review:

- Report on reactor pressure vessel dome dynamic pressure data recently collected by PSEG (Structural Integrity Report).

- Stress report based on new in-plant strain gage data at CLTP with all gages working.

PSEG representatives stated that the Hope Creek EPU schedule is on-track. The licensee is currently working on responses to RAIs from the NRC staff.

There were no members of the general public in attendance. However, a few representatives of other licensees participated in the meeting who had previous proprietaty agreements with the vendor. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1388, or jjs@nrc.gov].

/ra/

James J. Shea, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354

Enclosures:

1. Meeting Agenda
2. List of Attendees
3. Meeting Presentation cc w/encls: See next page Distribution PUBLIC Branch Reading RidsNrrDorlLpl1-2 RidsNrrPMJShea RidsNrrLAEWhitt RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrOd JRaval, NRR RidsNrrLASLittle RidsNrrDORL RidsRgn1MailCenter JHoch, NRR HChernoff, NRR TAlexion, NRR PHearn, NRR TScarbrough, NRR AFerkile, OIG EBrown, NRR JWu, NRR SMiotla, OIG ADAMS ACCESSION NO.: Meeting Summary - ML070800430 Presentation - ML070920025 Package No.: ML070930464 OFFICE DORL/LPL1-2 DORL/LPL1-2:LA DORL/LPL1-2:PM DORL/LPL1-2:BC NAME JHoch SLittle JShea HChernoff DATE 03/29/07 03/29/07 03/29/07 03/29/07 OFFICIAL RECORD COPY

Hope Creek Generating Station cc:

Mr. Michael P. Gallagher Jeffrie J. Keenan, Esquire Vice President - Eng/Tech Support PSEG Nuclear - N21 PSEG Nuclear P.O. Box 236 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Mr. Michael Brothers Joint Owner Affairs Vice President - Nuclear Assessments Exelon Generation Company, LLC PSEG Nuclear Nuclear Group Headquarters KSA1-E P.O. Box 236 200 Exelon Way Hancocks Bridge, NJ 08038 Kennett Square, PA 19348 Mr. George P. Barnes Lower Alloways Creek Township Site Vice President - Hope Creek c/o Mary O. Henderson, Clerk PSEG Nuclear Municipal Building, P.O. Box 157 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Mr. George H. Gellrich Radiation Protection Programs Plant Support Manager NJ Department of Environmental PSEG Nuclear Protection and Energy P.O. Box 236 CN 415 Hancocks Bridge, NJ 08038 Trenton, NJ 08625-0415 Mr. Michael J. Massaro Brian Beam Plant Manager - Hope Creek Board of Public Utilities PSEG Nuclear 2 Gateway Center, Tenth Floor P.O. Box 236 Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Ms. Christina L. Perino U.S. Nuclear Regulatory Commission Director - Regulatory Assurance 475 Allendale Road PSEG Nuclear - N21 King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Hope Creek Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038

MEETING AGENDA MARCH 2, 2007 WORKING-LEVEL MEETING TO DISCUSS EXTENDED POWER UPRATE HOPE CREEK GENERATING STATION PSEG NUCLEAR LLC DOCKET NO. 50-354 Schedule Discussion Topics 10:00 a.m. - 10:15 a.m. Introductory Remarks/Introductions 10:15 a.m. - 11:30 a.m. Steam Dryer Integrity (proprietary information may be discussed) 11:30 a.m. - 12:00 Noon Steam dryer monitoring during proposed uprate power ascension Enclosure 1

ATTENDANCE FOR PUBLIC MEETING WITH EXELON, MARCH 2, 2007 NAME ORGANIZATION James Shea NRR Joseph Hoch NRR Harold Chernoff NRR Tom Alexion NRR John Wu NRR Thomas Scarbrough NRR Peter Hearn NRR Eva Brown NRR Andrea Ferkile OIG Sherri Miotla OIG Larry Curran PSEG Nuclear Harold Trenka PSEG Nuclear Paul Davison PSEG Nuclear Shelly Kugler PSEG Nuclear Paul Duke PSEG Nuclear Pam Cowan Exelon/PSEG Services Agreement David Langley TVA Rick Cutsinger TVA Alan Bilanin Continuum Dynamics Inc Keven Browning PPL, Susquehanna Enclosure 2

MEETING PRESENTATION MARCH 2, 2007 HOPE CREEK GENERATING STATON STEAM DRYER MARGIN Enclosure 3