April 25, 2005 LICENSEE: Nuclear Management Company FACILITY: Point Beach Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF THE APRIL 19, 2005, PUBLIC MEETING TO DISCUSS THE POINT BEACH END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 19, 2005, the Nuclear Regulatory Commission (NRC) held a public meeting at the Two Creeks Town Hall in Two Creeks, Wisconsin. The meeting was between NRC Region III Management and Nuclear Management Company representatives to discuss the NRCs End-of-Cycle Assessment of licensee performance. The meeting notice and NRC presentation can be found in ADAMS as ML050760328, and ML051150228 respectively. A list of NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Process and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Point Beachs performance in calendar year 2004, which is documented in the March 2, 2005, End-of-Cycle assessment letter. The NRC also discussed upcoming inspections and activities at Point Beach, related to Confirmatory Action Letter follow-up.

The licensees presentation responded to the NRCs assessment documented in the March 2, 2005, End-of-Cycle letter, and specifically addressed their efforts to resolve the documented substantive cross-cutting issues in problem identification & resolution and human performance.

The licensee high-lighted recent examples that demonstrated the effectiveness of their corrective actions taken to address the substantive cross-cutting issues.

Patrick Louden, Chief Branch 5 Division of Reactor Projects Docket No. 50-266; 50-301 License No. DPR-24; DPR-27

Enclosure:

As Stated See Attached Distribution

April 25, 2005 LICENSEE: Nuclear Management Company FACILITY: Point Beach Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF THE APRIL 19, 2005, PUBLIC MEETING TO DISCUSS THE POINT BEACH END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 19, 2005, the Nuclear Regulatory Commission (NRC) held a public meeting at the Two Creeks Town Hall in Two Creeks, Wisconsin. The meeting was between NRC Region III Management and Nuclear Management Company representatives to discuss the NRCs End-of-Cycle Assessment of licensee performance. The meeting notice and NRC presentation can be found in ADAMS as ML050760328, and ML051150228 respectively. A list of NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Process and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Point Beachs performance in calendar year 2004, which is documented in the March 2, 2005, End-of-Cycle assessment letter. The NRC also discussed upcoming inspections and activities at Point Beach, related to Confirmatory Action Letter follow-up.

The licensees presentation responded to the NRCs assessment documented in the March 2, 2005, End-of-Cycle letter, and specifically addressed their efforts to resolve the documented substantive cross-cutting issues in problem identification & resolution and human performance.

The licensee high-lighted recent examples that demonstrated the effectiveness of their corrective actions taken to address the substantive cross-cutting issues.

/RA/

Patrick Louden, Chief Branch 5 Division of Reactor Projects Docket No. 50-266; 50-301 License No. DPR-24; DPR-27

Enclosure:

As Stated See Attached Distribution DOCUMENT NAME: C:\MyFiles\Copies\Poi.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII NAME PLouden:co DATE 04/25/05 OFFICIAL RECORD COPY

Nuclear Management Company cc w/encl: F. Kuester, President and Chief Executive Officer, We Generation J. Cowan, Executive Vice President Chief Nuclear Officer D. Cooper, Senior Vice President, Group Operations J. McCarthy, Site Director of Operations D. Weaver, Nuclear Asset Manager Plant Manager Regulatory Affairs Manager Training Manager Site Assessment Manager Site Engineering Director Emergency Planning Manager J. Rogoff, Vice President, Counsel & Secretary K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin State Liaison Officer

Nuclear Management Company ADAMS Distribution:

WDR HKC RidsNrrDipmIipb GEG KGO CAA1 DRPIII DRSIII PLB1 JRK1

Enclosure Meeting Participants NRC James Caldwell, Regional Administrator Steven Reynolds, Deputy Director, Division of Reactor Projects Patrick Louden, Chief, Branch 5, Division of Reactor Projects Ann Marie Stone, Chief, Engineering Branch 2, Division of Reactor Safety Robert Krsek, Senior Resident Inspector, Point Beach Jack Giessner, Reactor Engineer Nuclear Management Company Dennis Koehl, Site Vice President James McCarthy, Director of Site Operations Aldo Capristo, Regulatory Affairs Manager James Schweitzer, Site Engineering Manager