Summary of Public Meeting with Exelon Generation Company, LLC (Exelon) Regarding Operating Reactor Licensing Issues
ML041190275
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/03/2004
From: Scott Wall
NRC/NRR/DLPM/LPD1
To:
Wall, S. NRR/DLPM 415-2855
References
Download: ML041190275 (6)


Text

May 3, 2004 LICENSEE: Exelon Generation Company, LLC (Exelon)

FACILITY: Limerick Generating Station, Units 1 and 2 (LGS-1 and 2)

SUBJECT:

SUMMARY

OF APRIL 08, 2004, PUBLIC MEETING WITH EXELON ON OPERATING REACTOR LICENSING ISSUES On April 8, 2004, the U.S. Nuclear Regulatory Commission (NRC) staff held a meeting at the NRC Headquarters, One White Flint North, Rockville, Maryland, with representatives from Exelon, to discuss issues related to the Risk Management Technical Specifications (RMTS)

Initiative 5b on Risk-Informed Surveillance Requirements. Pursuant to the Commissions Policy Statement on Enhancing Public Participation in NRC Meetings, (67 FR 36920), dated May 28, 2002, the meeting was open to the public for observation and an opportunity to communicate with the NRC staff following the business portion of the meeting. One member of the public was in attendance. A list of attendees is provided as Attachment 1. The presentation handout that includes the agenda for the meeting is provided as Attachment 2. A supporting handout from the meeting is provided as Attachment 3.

The discussions with Exelon addressed the RMTS Initiative 5b methodology and the forthcoming license amendment requests (LARs) for the pilot plant LGS-1 and 2. The presentation focused on how LGS-1 and 2 intends to apply the methodology when conducting surveillance test interval (STI) adjustments. Exelon provided, as an example, an STI evaluation concerning the main steam isolation valve position (Attachment 3). It was noted by the NRC staff that the methodology seemed to concentrate on the process by which an STI could be extended. The NRC staff expressed concerns regarding the feedback mechanism that would allow for the reduction of an STI if new data became available. Exelon indicated that the surveillance program would have surrogate monitoring and periodic reviews to verify the appropriateness of the STI.

As a result of the meeting, the attendees agreed to the following action items:

1. Exelon noted that the probabilistic risk assessment (PRA) model and related documentation would be available to the NRC staff via the Nuclear Energy Institute (NEI) archives. This paralleled the arrangements made with the NRC staff for the Regulatory Guide (RG) 1.200, "An Approach for Determining the Technical Adequacy Of Probabilistic Risk Assessment Results For Risk-Informed Activities," PRA reviews.

The NRC staff agreed to verify the appropriateness of this arrangement and provide guidance on the scope of PRA information that should be submitted with the forthcoming LARs for LGS-1 and 2.

CONTACT: S. Wall, NRR 301-415-2855 spw@nrc.gov

Exelon After internal consideration, the NRC staff has requested that summaries and supporting risk assessments of the six Limerick pilot surveillance requirement frequency evaluations be provided directly to the staff at NRC headquarters. Since the requested information deals with only six evaluations, and not the multitude of cases required for RG 1.200 reviews, it is felt that what will be provided is commensurate with normal LARs and not unduly burdensome.

2. The Application-Specific PRA Audit and review of the implementation of the STI evaluation process for the Initiative 5b Pilot will be conducted after receipt of the LGS-1 and 2 submittal. Site visits for the RG 1.200 PRA Quality and Application-Specific PRA audits, and observations of the application of the STI evaluation process will be necessary. The NRC staff agreed to provide Exelon additional details of the site visit currently scheduled for July 2004.
3. Exelon indicated that the STI evaluation process would involve a panel of experts.

Representatives from Excel Services Corporation (Excel) agreed to provide an implementation guidance document to address such issues as the level of training and certification necessary to become a member of this panel.

Members of the public were in attendance; but, no questions were asked. Public meeting feedback forms were available; however, no forms have been received.

Please direct any inquiries to Scott P. Wall at 301-415-2855, or spw@nrc.gov.

/RA/

Scott P. Wall, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353 Attachments: 1. List of Attendees

2. Exelons Presentation Material
3. Surveillance Test Interval Evaluation cc w/encls: See next page

Exelon After internal consideration, the NRC staff has requested that summaries and supporting risk assessments of the six Limerick pilot surveillance requirement frequency evaluations be provided directly to the staff at NRC headquarters. Since the requested information deals with only six evaluations, and not the multitude of cases required for RG 1.200 reviews, it is felt that what will be provided is commensurate with normal LARs and not unduly burdensome.

2. The Application-Specific PRA Audit and review of the implementation of the STI evaluation process for the Initiative 5b Pilot will be conducted after receipt of the LGS-1 and 2 submittal. Site visits for the RG 1.200 PRA Quality and Application-Specific PRA audits, and observations of the application of the STI evaluation process will be necessary. The NRC staff agreed to provide Exelon additional details of the site visit currently scheduled for July 2004.
3. Exelon indicated that the STI evaluation process would involve a panel of experts.

Representatives from Excel Services Corporation (Excel) agreed to provide an implementation guidance document to address such issues as the level of training and certification necessary to become a member of this panel.

Members of the public were in attendance; but, no questions were asked. Public meeting feedback forms were available; however, no forms have been received.

Please direct any inquiries to Scott P. Wall at 301-415-2855, or spw@nrc.gov.

/RA/

Scott P. Wall, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353 Attachments: 1. List of Attendees

2. Exelons Presentation Material
3. Surveillance Test Interval Evaluation cc w/encls: See next page DISTRIBUTION:

PUBLIC SWall CBixler, RI NSaltos DHarrison PD1-2 R/F MO'Brien JJolicoeur, EDO, RI GParry SMagruder TMarsh/ELeeds TBoyce TMensah CSchulten WScott AHowe MRubin OGC MWohl AEl-Bussioni JClifford MReinhart ACRS DShum RTjader Accession Number: ML041190275 Meeting Announcement: ML04086004 Attachment No. 2: ML Attachment No. 3: ML Package Number: ML041190285 OFFICE PD1-2/PM PD1-2/LA IROB/SC PD1-2/SC NAME SWall SLittle for MOBrien TBoyce JClifford DATE 4/21/04 4/22/04 4/23/04 5/3/04 OFFICIAL RECORD COPY

Limerick Generating Station, Unit Nos. 1 and 2 cc:

Chief Operating Officer Director Licensing Exelon Generation Company, LLC Exelon Generation Company, LLC 4300 Winfield Road Nuclear Group Headquarters Warrenville, IL 60555 Correspondence Control P. O. Box 160 Site Vice President Kennett Square, PA 19348 Limerick Generating Station Exelon Generation Company, LLC Manager Licensing P.O. Box 2300 Limerick and Peach Bottom Sanatoga, PA 19464 Exelon Generation Company, LLC Nuclear Group Headquarters Plant Manager Correspondence Control Limerick Generating Station P.O. Box 160 Exelon Generation Company, LLC Kennett Square, PA 19348 P.O. Box 2300 Sanatoga, PA 19464 Vice President General Counsel and Secretary Regulatory Assurance Manager - Limerick Exelon Generation Company, LLC Exelon Generation Company, LLC 2301 Market Street, S23-1 P.O. Box 2300 Philadelphia, PA 19101 Sanatoga, PA 19464 Correspondence Control Desk Senior Vice President - Nuclear Services Exelon Generation Company, LLC Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-1 4300 Winfield Road Kennett Square, PA 19348 Warrenville, IL 60555 Regional Administrator, Region I Vice President - Mid-Atlantic Operations U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC 475 Allendale Road 200 Exelon Way, KSA 3-N King of Prussia, PA 19406 Kennett Square, PA 19348 Senior Resident Inspector Vice President - Operations Support U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC Limerick Generating Station 4300 Winfield Road P.O. Box 596 Warrenville, IL 60555 Pottstown, PA 19464 Vice President Library Licensing and Regulatory Affairs U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC Region I 4300 Winfield Road 475 Allendale Road Warrenville, IL 60555 King of Prussia, PA 19406

Limerick Generating Station, Unit Nos. 1 and 2 cc:

Chief-Division of Nuclear Safety PA Dept. of Environmental Resources P.O. Box 8469 Harrisburg, PA 17105-8469 Chairman Board of Supervisors of Limerick Township 646 West Ridge Pike Linfield, PA 19468 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348

List of Attendees NRC Meeting with Exelon Generating Company, LLC Risk-Informed Technical Specifications - Initiative 5b on Licensing Activities Thursday, April 8, 2004 9:30 a.m. - 12:00 p.m.

Room: O-13B4 Name Organization Phone Number Scott Wall NRC 301-415-2855 Tom Boyce NRC 301-415-0184 Bob Tjader NRC 301-415-1187 Carl Schulten NRC 301-415-1192 Wayne Scott NRC 301-415-1020 Gareth Parry NRC 301-415-1464 David Shum NRC 301-415-2860 Nick Saltos NRC 301-415-1072 Millard Wohl NRC 301-415-1181 Donnie Harrison NRC 301-415-3587 Stu Magruder NRC 301-415-3139 A. El-Bussioni NRC 301-415-1094 David Helker EXELON 610-765-5525 Gene Kelly EXELON 610-718-3520 Glenn Stewart EXELON 610-765-5529 Phil Tarpinian EXELON 610-718-2834 Biff Bradley NEI 202-739-8083 Don Vanover ERIN ENGINEERING, USA 610-431-8360 Donald R. Hoffman EXCEL 301-984-4400 Brian Mann EXCEL 301-984-4400 Don McCamy TENNESSEE VALLEY AUTHORITY 256-729-2474 Deann Raleigh SCIENTECH 240-626-9556 Attachment 1