December 2003 Monthly Operating Report for Surry Power Station Units 1 & 2
ML040210729
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/11/2004
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML040210729 (17)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICiIMOND, VIRGINIA 23261 January 11, 2004 U. S. Nuclear Regulatory Commission Serial No.04-015 Attention: Document Control Desk SPS Lic/JSA RO Washington, D.C. 20555-0001 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of December 2003 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station

Serial No. 04-015: SPS Monthly Operating Report bc page 1 of 1 bc (hard copy distribution):

Licensing File GOV 02-54B c/o Ms. M. McClure - N2 Records Management (bc original) c/o Ms. M. McClure - N2 MOR File - SPS bc (electronic distribution):

Mr. R. E. Fuller, IlIl - N2 Mr. B. A. Garber/J. S. Ashley - SPS Mr. T. A. Brookmire - N3 Mr. M. C. Murph - OJRP20 Mr. D. M. Olson, - IN2SE Ms. Barbara Lewis - McGraw-Hill, Inc./Utility Data Institute (barbara lewis@nlatts.com) - Provide only required electronic excerpts from MOR: 1) Operating Data Reports for Units 1 and 2 and 2) Unit Shutdown and Power Reduction (Equal To or Greater Than 20%) for Units 1 and 2.

CONCURRENCE:

Richard H. Blount /SPS See MOR cover sheet for approval Verification of Accuracy:

1. Operations Unit Shutdown and Power Reduction Report dated 01/05/04.
2. Operating Data Report - Surry Power Station dated 01/05/04.
3. December 2003 Summary of Operating Experience provided by Operations.
4. December 2003 Surry Power Station Chemistry Report provided by Chemistry.

Action Plan: - None.

Changes to the UFSAR or Topical Report: - None.

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 03-12 Approved:

Surry Monthly Operating Report No. 03-12 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1.............................................................  ;.3 Operating Data Report - Unit No. 2 .4 Unit Shutdowns and Power Reductions - Unit No. 1 .5 Unit Shutdowns and Power Reductions - Unit No. 2 .6 Average Daily Unit Power Level - Unit No. I .7 Average Daily Unit Power Level - Unit No. 2 .8 Summary of Operating Experience - Unit Nos. 1 and 2 .9 Facility Changes That Did Not Require NRC Approval .10 Procedure or Method of Operation Changes That Did Not Require NRC Approval.11 Tests and Experiments That Did Not Require NRC Approval .12 Chemistry Report.13 Fuel Handling - Unit Nos. 1 and 2 .14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications .15

Surry Monthly Operating Report No. 03-12 Page 3 of 15 OPERATING DATA REPORT Docket No.: 50-280 Date: 01/05/04 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ......................................................... Surry Unit 1
2. Reporting Period:................................................ December 2003
3. Licensed Thermal Power (MWt):......................... 2546
4. Nameplate Rating (Gross MWe):........................ 847.5
5. Design Electrical Rating (Net MWe):................... 788
6. Maximum Dependable Capacity (Gross MWe):... 842
7. Maximum Dependable Capacity (Net MWe):....... 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 744.00 8760.00 271968.00
12. Hours Reactor Was Critical 744.00 6881.88 201403.48
13. Reactor Reserve Shutdown Hours 0.00 0.00 3774.50
14. Hours Generator On-Line 744.00 6742.57 198604.77
15. Unit Reserve Shutdown Hours 0.00 0.00 3736.20
16. Gross Thermal Energy Generated (MWH) 1893619.10 16885606.90 474391923.60
17. Gross Electrical Energy Generated (MWH) 635998.00 5633941.00 156139265.00
18. Net Electrical Energy Generated (MWH) 613785.00 5419779.00 149162100.00
19. Unit Service Factor 100.00% 76.97% 73.03%
20. Unit Availability Factor 100.00% 76.97% 74.40%
21. Unit Capacity Factor (Using MDC Net) 101.85% 76.38% 70.01%
22. Unit Capacity Factor (Using DER Net) 104.69% 78.51% 69.60%
23. Unit Forced Outage Rate 0.00% 5.78% 12.05%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 20001

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 03-12 Page 4 of 15 OPERATING DATA REPORT Docket No.: 50-281 Date: 01/05/04 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name:......................................................... Surry Unit 2
2. Reporting Period:................................................ December 2003
3. Licensed Thermal Power (MWt):......................... 2546
4. Nameplate Rating (Gross MWe): ........................ 847.5
5. Design Electrical Rating (Net MWe):................... 788
6. Maximum Dependable Capacity (Gross MWe):... 847
7. Maximum Dependable Capacity (Net MWe):....... 815
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 744.00 8760.00 268849.00
12. Hours Reactor Was Critical 733.27 7078.90 198962.30
13. Reactor Reserve Shutdown Hours 0.00 0.00 328.10
14. Hours Generator On-Line 693.22 6862.02 196446.42
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 1714150.50 17419359.30 470646343.80
17. Gross Electrical Energy Generated (MWH) 569559.00 5837781.00 154978314.00
18. Net Electrical Energy Generated (MWH) 548798.00 5612119.00 148092836.00
19. Unit Service Factor 93.1 7% 78.33% 73.07%
20. Unit Availability Factor 93.17% 78.33% 73.07%
21. Unit Capacity Factor (Using MDC Net) 90.51% 78.61% 70.00%
22. Unit Capacity Factor (Using DER Net) 93.61% 81.30% 69.90%
23. Unit Forced Outage Rate 0.00% 2.04% 9.55%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 03-12 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EouAL To OR GREATER THAN 20%)

REPORT MONTH: December 2003 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 01/05/04 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 03-12 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQuAL To OR GREATER THAN 20%)

REPORT MONTH: December 2003 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 01/05/04 Completed by: R. Stief Telephone: (757) 365-2486 (1) (2) (3) (4) (5)

Method Duration of LER No. System Component Cause & Corrective Action to Date Type Hours Reason Shutting Code Code Prevent Recurrence Down Rx 12/01/03 S 50H 47M C 1 N/A N/A N/A Unit 2 offline for Refueling Outage/Reactor Vessel Head Replacement (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & LUcensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 03-12 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 01/05/04 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: December 2003 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 802 17 827 2 823 18 827 3 817 19 827 4 826 20 827 5 826 21 827 6 828 22 827 7 827 23 827 8 825 24 826 9 824 25 826 10 825 26 826 11 826 27 826 12 826 28 826 13 826 29 825 14 827 30 825 15 826 31 826 16 827 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-12 Page8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 01/05/04 Completed by: R. Stief Telephone: (757) 365-2486 MONrH: December 2003 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 0 17 820 2 0 18 820 3 168 19 820 4 548 20 820 5 808 21 821 6 821 22 820 7 821 23 821 8 821 24 821 9 821 25 821 10 821 26 821 11 821 27 821 12 821 28 821 13 821 29 821 14 821 30 821 15 820 31 821 16 820 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

I Surry Monthly Operating Report No. 03-12 Page 9 of 15

SUMMARY

OF OPERATING EXPERIENCE MoNTH[YEAR: December 2003 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNrr ONE:

12/01/03 0000 Unit started the month at 100% /856 MWe.

12103/03 1428 Commenced ramp to 90% to start HP Heater Drain Pump 1-SD-P-1 B and secure 1-SD-P1A.

12103/03 1505 Stopped ramp at 90% / 768 MWe.

12103103 1627 Commenced ramp to 100%. Unit at 89% / 765 MWe.

12103103 1900 Unit at 100% /851 MWe.

12131/03 2400 Unit finished the month at 100% /855 MWe.

UNrr Two:

12101/03 0000 Unit started the month at 0% /0 MWe. Unit offline for refueling/reactor vessel head replacement.

12101/03 1044 Reactor Critical.

12/03/03 0247 Unit online. Commenced ramp to 30%.

12103/03 0319 Stopped ramp at 30% for flux map/voltage regulator testing.

12103/03 1559 Commenced ramp to 40%. Unit at 29% / 185 MWe.

12103103 1644 Stopped ramp at 40% / 270 Mwe for voltage regulator testing.

12/03/03 2236 Commenced ramp to 70%.

12/04/03 0632 Stopped ramp at 68% for flux map.

12/04/03 1402 Commenced ramp from 69% / 551 MWe.

12/04/03 2224 Stopped ramp at 90% for NI adjustment.

12/04/03 2315 Commenced ramp to 96%.

12/05/03 0218 Stopped ramp at 96% / 815 MWe for power verifications.

12/05/03 0704 Commenced ramp to 100%.

12/05/03 0850 Unit at 100% / 848 Mwe.

12/31/03 2400 Unit finished the month at 100% / 851 MWe.

Surry Monthly Operating Report No. 03-12 Page 10 of 15 FAcILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNH/YEAR: December 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-12 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTH/YEAR: December 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-12 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MoNTHYEAR: December 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-12 Page 13 of 15 II CHEMISTRY REPORT MoNrHNYEAR: December 2003 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. Avg. Max. Min. Avg.

Gross Radioactivity, gCvml 3.73E-1 1.55E-1 2.71 E-1 3.27E-1 3.43E-4 1.98E-1 Suspended Solids, ppm 0.01 0.01 0.01 0.01 0.01 0.01 Gross Tritium, C/ml 7.64E-1 6.51 E-1 7.1OE-1 3.33E-1 3.48E-2 1.74E-1 1131, yCi/ml 2.57E-4 9.23E-5 1.44E-4 1.04E-4 2.12E-5 7.11 E-5 1131/1133 0.13 0.05 0.08 0.35 0.25 0.30 Hydrogen, cc/kg 34.8 33 34 38 31.7 35.8 Lithium, ppm 2.28 2.1 2.2 3.72 2.39 2.71 Boron - 10, ppm* 202 185 193 391 272 298 Oxygen, (DO). ppm

  • 0.005
  • 0.005
  • 0.005
  • 0.005
  • 0.005
  • 0.005 Chloride, ppm 0.007 0.004 0.005 0.009 0.006 0.008 pH @ 25 degree Celsius 6.65 6.5 6.58 6.45 6.15 6.3

Unit 1: 100% power Unit 2: In startup/power ascension, following Refueling Shutdown

Surry Monthly Operating Report No. 03-12 Page 14 of 15 FUEL HANDLING UNr 1 & 2 MoNTHIYEAR: December 2003 New Fuel Number of New or Spent Shipment or Date Stored Assemblies Assembly ANSI Initial Fuel Shipping Cask No. or Received per Shipment Number Number Enrichment Cask Activity None during the Reporting Period

Surry Monthly Operating Report No. 03-12 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED INTECHNICAL SPECIFICATIONS MoNTHYEAR: December 2003 None during the Reporting Period