I VIRGINIA ELECTRIC AND POWEl.R COMPANY RIcIIMONID, VIRGINIA 23261 March 5, 2004 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.
SPS Lic/JSA Docket Nos.04-132 RO 50-280 50-281 DPR-32 DPR-37 License Nos.
Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of February 2004 is provided in the attachment.
If you have any questions or require additional information, please contact us.
Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:
United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station
- o-2'j-
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 04-02 Approved:
,t 5
ie Vic-e-resdn
/Dar'e
Surry Monthly Operating Report No. 04-02 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1.............................................................
3 Operating Data Report - Unit No. 2...........................................................
4 Unit Shutdowns and Power Reductions - Unit No. 1............................................................5 Unit Shutdowns and Power Reductions - Unit No. 2........................................................... 6 Average Daily Unit Power Level - Unit No. 1.............................................................7 Average Daily Unit Power Level - Unit No. 2............................................................
8 Summary of Operating Experience - Unit Nos. 1 and 2............................................................
9 Facility Changes That Did Not Require NRC Approval........................................................... 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval.............................................. 11 Tests and Experiments That Did Not Require NRC Approval...........................................................
12 Chemistry Report............................................................
13 Fuel Handling - Unit Nos. 1 and 2...........................................................
14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications.................................................................................................................
.15
Surry Monthly Operating Report No. 04-02 Page 3 of 15 OPERATING DATA REPORT Docket No.:
Date:
Completed By:
Telephone:
50-280 03101/04 R. Stief (757) 365-2486 1.
2.
3.
4.
5.
6.
7.
Unit Name:.........................................................
Reporting Period:................................................
Licensed Thermal Power (MWt):.........................
Nameplate Rating (Gross MWe):........................
Design Electrical Rating (Net MWe):...................
Maximum Dependable Capacity (Gross MWe):...
Maximum Dependable Capacity (Net MWe):.......
Surry Unit 1 February 2004 2546 847.5 788 842 810
- 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9.
Power Level To Which Restricted, If Any (Net MWe):
- 10.
Reasons For Restrictions, If Any:
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 696.00 696.00 0.00 696.00 0.00 1771246.10 594984.00 574798.00 100.00%
100.00%
101.96%
104.80%
0.00%
Year-To-Date 1440.00 1440.00 0.00 1440.00 0.00 3664712.40 1230511.00 1188431.00 100.00%
100.00%
101.89%
104.73%
0.00%
Cumulative 273408.00 202843.48 3774.50 200044.77 3736.20 478056636.00 157369776.00 150350531.00 73.17%
74.53%
70.18%
69.79%
11.97%
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Type and duration of scheduled shutdowns are no longer provided.
[
Reference:
Letter S/N 00-069. dated February 7. 20001
- 25.
If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [
Reference:
Letter S/N 00-069, dated February 7, 20001
- 26.
Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Surry Monthly Operating Report No. 04-02 Page 4 of 15 OPERATING DATA REPORT Docket No.:
Date:
Completed By:
Telephone:
50-281 03/01/04 R. Stief (757) 365-2486 1.
2.
3.
4.
5.
6.
7.
Unit Name:.........................................................
Reporting Period:................................................
Licensed Thermal Power (MWt):.........................
Nameplate Rating (Gross MWe):........................
Design Electrical Rating (Net MWe):...................
Maximum Dependable Capacity (Gross MWe):...
Maximum Dependable Capacity (Net MWe):.......
Surry Unit 2 February 2004 2546 847.5 788 847 815
- 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9.
Power Level To Which Restricted, If Any (Net MWe):
- 10.
Reasons For Restrictions, If Any:
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 696.00 696.00 0.00 696.00 0.00 1770121.80 592484.00 572578.00 100.00%
100.00%
100.94%
104.40%
0.0%
Year-To-Date 1440.00 1440.00 0.00 1440.00 0.00 3664040.30 1225020.00 1183088.00 100.00%
100.00%
100.81%
104.26%
0.00%
Cumulative 270289.00 200402.30 328.10 197886.42 0.00 474310384.10 156203334.00 149275924.00 73.21%
73.21%
70.17%
70.09%
9.49%
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Type and duration of scheduled shutdowns are no longer provided.
Reference:
Letter S/N 00-069, dated February 7, 20001
- 25.
If Shut Down at End of Report Period, Estimated Date of Start-up:
Estimated start-up dates are no longer provided. [
Reference:
Letter S/N 00-069, dated February 7, 2000]
- 26.
Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Surry Monthly Operating Report No. 04-02 Page5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: February 2004 Docket No.:
50-280 Unit Name:
Surry Unit 1 Date:
03/01/04 Completed by: R. Stief Telephone:
(757) 365-2486 None during the Reporting Period (1)
F:
Forced S:
Scheduled (2)
REASON:
A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Licensing Examination F -
Administrative G -
Operational Error (Explain)
H Other (Explain)
(3)
METHOD:
1 -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Other (Explain)
(4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit 1 - Same Source
Surry Monthly Operating Report No. 04-02 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQuAL To OR GREATER THAN 20%)
REPORT MONTH: February 2004 Docket No.:
Unit Name:
Date:
Completed by:
Telephone:
50-281 Surry Unit 2 03/01/04 R. Stief (757) 365-2486 None during the Reporting Period (1)
F:
Forced S:
Scheduled (2)
REASON:
A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Licensing Examination F -
Administrative G -
Operational Error (Explain)
H Other (Explain)
(3)
METHOD:
1 -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Other (Explain)
(4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit 1 - Same Source
Surry Monthly Operating Report No. 04-02 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 03/01/04 Completed by:
R. Stief Telephone:
(757) 365-2486 MONTH:
February 2004 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe-Net) 825 824 825 825 825 826 826 826 826 825 825 826 827 827 827 826 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 Average Daily Power Level (MWe - Net) 826 826 826 826 826 826 826 826 826 826 826 826 826 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
Surry Monthly Operating Report No. 04-02 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name:
Surry Unit 2 Date:
03/01/04 Completed by:
R. Stief Telephone:
(757) 365-2486 MONTH:
February 2004 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 822 823 822 822 822 822 822 821 822 822 822 823 825 826 825 822 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 Average Daily Power Level (MWe - Net) 822 822 822 822 823 823 822 823 823 826 826 826 826 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
Surry Monthly Operating Report No. 04-02 Page 9 of 15
SUMMARY
OF OPERATING EXPERIENCE MoNTHINEAR: February 2004 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
UNrr ONE:
02/01/04 02/29/04 UNrr Two:
02/01/04 02/29/04 0000 2400 0000 2400 Unit started the month at 100% / 853 MWe.
Unit finished the month at 100% / 856 MWe.
Unit started the month at 100% / 850 MWe.
Unit finished the month at 100% / 852 MWe.
Surry Monthly Operating Report No. 04-02 Page 10 of 15 FAcILrTY CHANGES THAT DID NoT REQUIRE NRC APPROVAL MONTH/YEAR: February 2004 None during the Reporting Period.
Surry Monthly Operating Report No. 04-02 Page11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: February 2004 None during the Reporting Period
Surry Monthly Operating Report No. 04-02 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: February 2004 None during the Reporting Period
Surry Monthly Operating Report No. 04-02 Page 13 of 15 CHEMISTRY REPORT MoNTrHNYEAR: February 2004 Unit No. 1 l
Unit No. 2 Primary Coolant Analysis Max.
Min.
Avg.
Max.
Min.
Avg.
Gross Radioactivity, I.Cifml 4.24E-1 1.88E-1 2.92E-1 3.30E-1 1.69E-1 2.53E-1 Suspended Solids, ppm Gross Tritium, itCi/ml 1.04E+0 9.90E-1 1.01 E+0 8.88E-1 7.07E-1 7.98E-1 1131, 4Ci/ml 2.98E-4 8.62E-5 1.62E-4 1.23E-4 5.84E-5 9.03E-5 1131/1133 0.14 0.04 0.07 0.48 0.19 0.32 Hydrogen, cc/kg 35.6 31.5 33.9 40.1 34.8 37.7 Lithium, ppm 2.27 2.11 2.19 2.49 2.19 2.33 Boron - 10, ppm 170 155 163 268 254 260 Oxygen, (DO), ppm S 0.005 S 0.005 S 0.005 S 0.005 S 0.005 S 0.005 Chloride, ppm 0.007 0.004 0.004 0.009 0.007 0.008 pH @ 25 degree Celsius 6.76 6.64 6.69 6.45 6.32 6.39 Boron - 10 = Total Boron x 0.196 Comments:
Unit 1: 100% power Unit 2: 100% power Testing for Suspended Solids is required quarterly. No testing was performed in February.
Surry Monthly Operating Report No. 04-02 Page 14 of 15 FUEL HANDLING UNITS 1 & 2 MoNrTrYEAR: February 2004 New Fuel Shipment or Cask No.
Number of Date Stored Assemblies or Received per Shipment Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity None during the Reporting Period
Surry Monthly Operating Report No. 04-02 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHIYEAR: February 2004 None during the Reporting Period