February 2004 Monthly Operating Report for Surry, Units 1 and 2
ML040760720
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/05/2004
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
04-132
Download: ML040760720 (16)


Text

I VIRGINIA ELECTRIC AND POWEl.R COMPANY RIcIIMONID, VIRGINIA 23261 March 5, 2004 U. S. Nuclear Regulatory Commission Serial No.04-132 Attention: Document Control Desk SPS Lic/JSA RO Washington, D.C. 20555-0001 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of February 2004 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station - o-2'j-

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 04-02 Approved: - ,t 5 ie Vic-e- resdn /Dar'e

Surry Monthly Operating Report No. 04-02 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1 ............................................................. 3 Operating Data Report - Unit No. 2 ........................................................... 4 Unit Shutdowns and Power Reductions - Unit No. 1 ............................................................5 Unit Shutdowns and Power Reductions - Unit No. 2 ........................................................... 6 Average Daily Unit Power Level - Unit No. 1 .............................................................7 Average Daily Unit Power Level - Unit No. 2 ............................................................ 8 Summary of Operating Experience - Unit Nos. 1 and 2 ............................................................ 9 Facility Changes That Did Not Require NRC Approval ........................................................... 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval .............................................. 11 Tests and Experiments That Did Not Require NRC Approval ........................................................... 12 Chemistry Report ............................................................ 13 Fuel Handling - Unit Nos. 1 and 2 ........................................................... 14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications.................................................................................................................

.15

Surry Monthly Operating Report No. 04-02 Page 3 of 15 OPERATING DATA REPORT Docket No.: 50-280 Date: 03101/04 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name:......................................................... Surry Unit 1
2. Reporting Period:................................................ February 2004
3. Licensed Thermal Power (MWt):......................... 2546
4. Nameplate Rating (Gross MWe): ........................ 847.5
5. Design Electrical Rating (Net MWe):................... 788
6. Maximum Dependable Capacity (Gross MWe):... 842
7. Maximum Dependable Capacity (Net MWe):....... 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 696.00 1440.00 273408.00
12. Hours Reactor Was Critical 696.00 1440.00 202843.48
13. Reactor Reserve Shutdown Hours 0.00 0.00 3774.50
14. Hours Generator On-Line 696.00 1440.00 200044.77
15. Unit Reserve Shutdown Hours 0.00 0.00 3736.20
16. Gross Thermal Energy Generated (MWH) 1771246.10 3664712.40 478056636.00
17. Gross Electrical Energy Generated (MWH) 594984.00 1230511.00 157369776.00
18. Net Electrical Energy Generated (MWH) 574798.00 1188431.00 150350531.00
19. Unit Service Factor 100.00% 100.00% 73.17%
20. Unit Availability Factor 100.00% 100.00% 74.53%
21. Unit Capacity Factor (Using MDC Net) 101.96% 101.89% 70.18%
22. Unit Capacity Factor (Using DER Net) 104.80% 104.73% 69.79%
23. Unit Forced Outage Rate 0.00% 0.00% 11.97%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069. dated February 7. 20001

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 20001

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 04-02 Page 4 of 15 OPERATING DATA REPORT Docket No.: 50-281 Date: 03/01/04 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ......................................................... Surry Unit 2
2. Reporting Period:................................................ February 2004
3. Licensed Thermal Power (MWt):......................... 2546
4. Nameplate Rating (Gross MWe):........................ 847.5
5. Design Electrical Rating (Net MWe):................... 788
6. Maximum Dependable Capacity (Gross MWe):... 847
7. Maximum Dependable Capacity (Net MWe):....... 815
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 696.00 1440.00 270289.00
12. Hours Reactor Was Critical 696.00 1440.00 200402.30
13. Reactor Reserve Shutdown Hours 0.00 0.00 328.10
14. Hours Generator On-Line 696.00 1440.00 197886.42
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 1770121.80 3664040.30 474310384.10
17. Gross Electrical Energy Generated (MWH) 592484.00 1225020.00 156203334.00
18. Net Electrical Energy Generated (MWH) 572578.00 1183088.00 149275924.00
19. Unit Service Factor 100.00% 100.00% 73.21%
20. Unit Availability Factor 100.00% 100.00% 73.21%
21. Unit Capacity Factor (Using MDC Net) 100.94% 100.81% 70.17%
22. Unit Capacity Factor (Using DER Net) 104.40% 104.26% 70.09%
23. Unit Forced Outage Rate 0.0% 0.00% 9.49%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

Reference:

Letter S/N 00-069, dated February 7, 20001

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 04-02 Page5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: February 2004 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 03/01/04 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 04-02 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQuAL To OR GREATER THAN 20%)

REPORT MONTH: February 2004 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 03/01/04 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 04-02 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 03/01/04 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: February 2004 Average Daily Power Level Average Daily Power Level Day (MWe- Net) Day (MWe - Net) 1 825 17 826 2 824 18 826 3 825 19 826 4 825 20 826 5 825 21 826 6 826 22 826 7 826 23 826 8 826 24 826 9 826 25 826 10 825 26 826 11 825 27 826 12 826 28 826 13 827 29 826 -

14 827 15 827 16 826 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 04-02 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 03/01/04 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: February 2004 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 822 17 822 2 823 18 822 3 822 19 822 4 822 20 822 5 822 21 823 6 822 22 823 7 822 23 822 8 821 24 823 9 822 25 823 10 822 26 826 11 822 27 826 12 823 28 826 13 825 29 826 14 826 15 825 16 822 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 04-02 Page 9 of 15

SUMMARY

OF OPERATING EXPERIENCE MoNTHINEAR: February 2004 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNrr ONE:

02/01/04 0000 Unit started the month at 100% / 853 MWe.

02/29/04 2400 Unit finished the month at 100% / 856 MWe.

UNrr Two:

02/01/04 0000 Unit started the month at 100% / 850 MWe.

02/29/04 2400 Unit finished the month at 100% / 852 MWe.

Surry Monthly Operating Report No. 04-02 Page 10 of 15 FAcILrTY CHANGES THAT DID NoT REQUIRE NRC APPROVAL MONTH/YEAR: February 2004 None during the Reporting Period.

Surry Monthly Operating Report No. 04-02 Page11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: February 2004 None during the Reporting Period

Surry Monthly Operating Report No. 04-02 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: February 2004 None during the Reporting Period

Surry Monthly Operating Report No. 04-02 Page 13 of 15 CHEMISTRY REPORT MoNTrHNYEAR: February 2004 Unit No. 1 l Unit No. 2 Primary Coolant Analysis Max. Min. Avg. Max. Min. Avg.

Gross Radioactivity, I.Cifml 4.24E-1 1.88E-1 2.92E-1 3.30E-1 1.69E-1 2.53E-1 Suspended Solids, ppm -

Gross Tritium, itCi/ml 1.04E+0 9.90E-1 1.01 E+0 8.88E-1 7.07E-1 7.98E-1 1131, 4Ci/ml 2.98E-4 8.62E-5 1.62E-4 1.23E-4 5.84E-5 9.03E-5 1131/1133 0.14 0.04 0.07 0.48 0.19 0.32 Hydrogen, cc/kg 35.6 31.5 33.9 40.1 34.8 37.7 Lithium, ppm 2.27 2.11 2.19 2.49 2.19 2.33 Boron - 10, ppm 170 155 163 268 254 260 Oxygen, (DO), ppm S 0.005 S 0.005 S 0.005 S 0.005 S 0.005 S 0.005 Chloride, ppm 0.007 0.004 0.004 0.009 0.007 0.008 pH @ 25 degree Celsius 6.76 6.64 6.69 6.45 6.32 6.39

Unit 1: 100% power Unit 2: 100% power Testing for Suspended Solids is required quarterly. No testing was performed in February.

Surry Monthly Operating Report No. 04-02 Page 14 of 15 FUEL HANDLING UNITS 1 & 2 MoNrTrYEAR: February 2004 New Fuel Number of New or Spent Shipment or Date Stored Assemblies Assembly ANSI Initial Fuel Shipping Cask No. or Received per Shipment Number Number Enrichment Cask Activity None during the Reporting Period

Surry Monthly Operating Report No. 04-02 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED INTECHNICAL SPECIFICATIONS MONTHIYEAR: February 2004 None during the Reporting Period