February 2003 Monthly Operating Report for Surry Power Station Units 1 & 2
ML030830162
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/14/2003
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
03-149
Download: ML030830162 (19)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 14, 2003 U. S. Nuclear Regulatory Commission Serial No.03-149 Attention: Document Control Desk SPS Lic/JSA R0 Washington, D.C. 20555-0001 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of February 2003 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 03-02 Approved: o Sitb Vice- ýsident 4ate,

Surry Monthly Operating Report No. 03-02 Page 2 of 18 TABLE OF CONTENTS Section Page Operating Data Report- Unit No. 1 ........................................................................................................................... 3 Operating Data Report - Unit No. 2 ........................................................................................................................... 4 Unit Shutdowns and Power Reductions - Unit No. 1 .............................................................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2 ............................................................................................. 6 Average Daily Unit Power Level - Unit No. 1 . ..................................................................................................... 7 Average Daily Unit Power Level - Unit No. 2 ...................................................................................................... 8 Summary of Operating Experience - Unit Nos. 1 and 2 ......................................................................................... 9 Facility Changes That Did Not Require NRC Approval ....................................................................................... 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval ........................... 11 Tests and Experiments That Did Not Require NRC Approval ............................................................................. 12 Chemistry Report ................................................................................................................................................... 13 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................ 14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ..................................................................................................................... 18

Surry Monthly Operating Report No. 03-02 Page 3 of 18 OPERATING DATA REPORT Docket No.: 50-280 Date: 03/03/03 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ........................................................... Surry Unit 1
2. Reporting Period: ................................................. February 2003
3. Licensed Thermal Power (MWt): .......................... 2546
4. Nameplate Rating (Gross MWe): ......................... 847.5
5. Design Electrical Rating (Net MWe): .................... 788
6. Maximum Dependable Capacity (Gross MWe): ... 842
7. Maximum Dependable Capacity (Net MWe): ....... 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 672.0 1416.0 264624.0
12. Hours Reactor Was Critical 672.0 1125.7 195647.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5
14. Hours Generator On-Line 672.0 1072.3 192934.5
15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2
16. Gross Thermal Energy Generated (MWH) 1709384.4 2643175.7 460149492.4
17. Gross Electrical Energy Generated (MWH) 571701.0 880103.0 151385427.0
18. Net Electrical Energy Generated (MWH) 551814.0 847843.0 144590164.0
19. Unit Service Factor 100.0% 75.7% 72.9%
20. Unit Availability Factor 100.0% 75.7% 74.3%
21. Unit Capacity Factor (Using MDC Net) 101.4% 73.9% 69.8%
22. Unit Capacity Factor (Using DER Net) 104.2% 76.0% 69.3%
23. Unit Forced Outage Rate 0.0% 24.3% 12.3%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

April 2003 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 03-02 Page 4 of 18 OPERATING DATA REPORT Docket No.: 50-281 Date: 03/03/03 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ........................................................... Surry Unit 2
2. Reporting Period: ................................................. February 2003
3. Licensed Thermal Power (MWt): .......................... 2546
4. Nameplate Rating (Gross MW e): ......................... 847.5
5. Design Electrical Rating (Net MW e): .................... 788
6. Maximum Dependable Capacity (Gross MWe): ... 847
7. Maximum Dependable Capacity (Net MWe): ....... 815
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 672.0 1416.0 261505.0
12. Hours Reactor Was Critical 672.0 1353.1 193236.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 328.1
14. Hours Generator On-Line 672.0 1328.3 190912.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1710728.7 3368113.6 456595098.1
17. Gross Electrical Energy Generated (MWH) 593778.0 1149421.0 150289954.0
18. Net Electrical Energy Generated (MWH) 553854.0 1089996.0 143570713.0
19. Unit Service Factor 100.0% 93.8% 73.0%
20. Unit Availability Factor 100.0% 93.8% 73.0%
21. Unit Capacity Factor (Using MDC Net) 101.1% 94.5% 69.8%
22. Unit Capacity Factor (Using DER Net) 104.6% 97.7% 69.7%
23. Unit Forced Outage Rate 0.0% 6.2% 9.8%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 20001

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 20001

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 03-02 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: February 2003 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 03/03/03 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F. Forced REASON: METHOD:

S- Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Ucensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Ucensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 03-02 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: February 2003 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 03/03/03 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F: Forced REASON. METHOD S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - AutomaticScram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 03-02 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name. Surry Unit 1 Date: 03/03/03 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: February 2003 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 821 17 822 2 822 18 822 3 817 19 821 4 821 20 822 5 821 21 822 6 821 22 822 7 822 23 822 8 812 24 822 9 822 25 821 10 823 26 821 11 822 27 822 12 822 28 821 13 822 14 822 15 822 16 822 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-02 Page 8 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 03/03/03 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: February 2003 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 824 17 824 2 825 18 825 3 823 19 825 4 823 20 825 5 823 21 824 6 823 22 825 7 825 23 825 8 825 24 825 9 824 25 825 10 823 26 825 11 823 27 826 12 824 28 825 13 824 14 824 15 824 16 825 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt

Surry Monthly Operating Report No. 03-02 Page 9 of 18

SUMMARY

OF OPERATING EXPERIENCE MoNTH/YEAR: February 2003 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNrr ONE:

02/01/03 0000 Unit started the month at 100% / 849 MWe.

02/03/03 1909 Ramped unit to 92% / 795 MWe in accordance with 1-OP-TM-005 to realign heater drain pumps.

02/03/03 2110 Commenced ramp to 100%.

02/03/03 2220 Unit at 100% / 852 MWe.

02/08/03 1000 Commenced ramp for 1-MS-GOV-3 main steam governor moog valve replacement.

02/08/03 1048 Ramp stopped at 90% / 771 MWe.

02/08/03 1240 Repair on 1-MS-GOV-3 complete.

02/08/03 1255 Commenced ramp to 100%.

02/08/03 1425 Unit at 100% / 850 MWe.

02/28/03 2400 Unit finished the month at 100% / 852 MWe.

UNrrTwo:

02/01/03 0000 Unit started the month at 100% / 850 MWe.

02/28/03 2400 Unit finished the month at 100% / 854 MWe.

Surry Monthly Operating Report No. 03-02 Page 10 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTH/YEAR: February 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-02 Page 11 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHYEAR: February 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-02 Page 12 of 18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MoNTHNYEAR: February 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-02 Page 13 of 18 CHEMISTRY REPORT MONTH/YEAR: February 2003 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Mm. Avg Max. Mm. Avg.

Gross Radioactivity, pCl/ml 3.00E-1 2.10E-1 2.50E-1 3.03E-1 1.92E-1 2.32E-1 Suspended Solids, ppm- -

Gross Tritium, pCi/ml 8.61 E-2 5.28E-2 6.95E-2 7.77E-1 7.02E-1 7.44E-1 11 3 1 , pCi/ml 2.24E-4 1.47E-4 1.91 E-4 1.23E-4 6.76E-5 9.54E-5 1131/1133 0.08 0.05 007 0.11 0.07 0.09 Hydrogen, cc/kg 42.6 33.3 37.3 42 36.9 38.6 Lithium, ppm 2.27 1.71 2.05 2.35 2 11 2.22 Boron - 10, ppm* 64 44 57 157 140 149 Oxygen, (DO), ppm _<0.005 *<0.005

  • 0 005 <0.005 < 0 005 *0.005 Chloride, ppm 0.003 0.001 0.002 0.003 0.001 0 002 pH @ 25 degree Celsius 7.4 6.21 7.04 6.98 5 93 6.44

None

Surry Monthly Operating Report No. 03-02 Page 14 of 18 FUEL HANDLING UNrrS 1 & 2 MONTH/YEAR: February 2003 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity Spent Fuel Cask TN-32-31 02/03/03 32 2H9 LMORNP 4.0022 N/A 2H5 LMORNK 4.0077 3V6 LMOTTS 3.9933 4J,1 LMOUZD 4.0167 0J3 LMOUY9 3.8070 0J7 LMOUYD 3.8073 4J6 LMOUZJ 4.0275 0H4 LMORMY 3.7974 0H9 LMORN3 3.8062 4J5 LMOUZH 4.0145 iji LMOUYH 3.8071 0H2 LMORMW 3.8026 0J8 LMOUYE 3.8043 4J8 LMOUZL 4.0197 4V4 LMOTUO 4.0012 2H8 LMORNN 4.0037 4V7 LMOTU3 3.9993 1,J3 LMOUYK 3.8065

Surry Monthly Operating Report No. 03-02 Page 15 of 18 FUEL HANDLING UNITS 1 & 2 MONTH/YEAR: February 2003 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No Received per Shipment Number Number Enrichment Cask Activity 4J3 LMOUZF 4.0096 4J4 LMOUZG 4.0142 3H3 LMORNT 4.0034 3V3 LMOTTP 4.0019 4Vl LMOTTX 4.0013 4V6 LMOTU2 3.9933 0H7 LMORN1 3.7996 2H7 LMORNM 4.0035 3V4 LMOTTO 4.0012 4H0 LMORPO 4 0078 4J2 LMOUZE 4.0169 3J7 LMOUZ9 4.0145 Oil LMOUY7 3.8066 3V9 LMO0-V 3.9990 Spent Fuel Cask TN-32-33 02/13/03 32 4H9 LMORP9 4.0080 N/A 4H5 LMORP5 4.0101 6V0 LMOTUG 3.9911 1,J7 LMOUYP 3.8044

Surry Monthly Operating Report No. 03-02 Page 16 of 18 FUEL HANDLING UNITS 1 & 2 MONTH/YEAR: February 2003 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Number Number Enrichment Cask Activitv Cask No Received per Shipment Number...

2J0 LMOUYS 3.8070 1 J5 LMOUYM 3.8046 6J3 LMOV0V 4 0234 2H2 LMORNG 3.7977 2H0 LMORNE 3.8002 5J5 LMOUZT 4.0145 1 J9 LMOUYR 3.8070 5V6 LMOTUC 3.9993 2J3 LMOUYV 3.8070 2J9 LMOUZ1 3.8109 5V0 LMOTU6 3.9988 4H6 LMORP6 4.0101 5J9 LMOVOR 40142 5J3 LMOUZR 4.0217 5J2 LMOUZQ 4.0145 5V3 LMOTU9 3.9901 5H2 LMORPC 4.0064 11H0 LMORN4 3.7947

Surry Monthly Operating Report No. 03-02 Page 17 of 18 FUEL HANDLING UNITS 1 & 2 MONTHIYEAR: February 2003 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity 6V1 LMOTUH 3.9991 5V7 LMOTUD 3.9876 4V8 LMOTU4 4.0013 5H0 LMORPA 4.0104 1 H2 LMORN6 3.8004 4H7 LMORP7 4.0068 5V9 LMOTUF 4.0011 5J,1 LMOUZP 4.0276 6J2 LM0VOU 4.0263 5J4 LMOUZS 4.0144

Surry Monthly Operating Report No. 03-02 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR: February 2003 None during the Reporting Period