VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 14, 2003 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.

SPS Lic/JSA Docket Nos.

License Nos.

Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of February 2003 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:

United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station 03-149 R0 50-280 50-281 DPR-32 DPR-37

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 03-02 Approved:

o Sitb Vice- ýsident

4ate,

Surry Monthly Operating Report No. 03-02 Page 2 of 18 TABLE OF CONTENTS Section Page Operating Data Report-Unit No. 1...........................................................................................................................

3 Operating Data Report - Unit No. 2...........................................................................................................................

4 Unit Shutdowns and Power Reductions - Unit No. 1..............................................................................................

5 Unit Shutdowns and Power Reductions - Unit No. 2.............................................................................................

6 Average Daily Unit Power Level - Unit No. 1.

7 Average Daily Unit Power Level - Unit No. 2......................................................................................................

8 Summary of Operating Experience - Unit Nos. 1 and 2.........................................................................................

9 Facility Changes That Did Not Require NRC Approval.......................................................................................

10 Procedure or Method of Operation Changes That Did Not Require NRC Approval...........................

11 Tests and Experiments That Did Not Require NRC Approval.............................................................................

12 Chemistry Report...................................................................................................................................................

13 Fuel Handling - Unit Nos. 1 and 2............................................................................................................................

14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications.....................................................................................................................

18

Surry Monthly Operating Report No. 03-02 Page 3 of 18 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

Unit Name:...........................................................

Reporting Period:.................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):.........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):...

Maximum Dependable Capacity (Net MWe):.......

50-280 03/03/03 R. Stief (757) 365-2486 Surry Unit 1 February 2003 2546 847.5 788 842 810

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 672.0 672.0 0.0 672.0 0.0 1709384.4 571701.0 551814.0 100.0%

100.0%

101.4%

104.2%

0.0%

Year-To-Date 1416.0 1125.7 0.0 1072.3 0.0 2643175.7 880103.0 847843.0 75.7%

75.7%

73.9%

76.0%

24.3%

Cumulative 264624.0 195647.3 3774.5 192934.5 3736.2 460149492.4 151385427.0 144590164.0 72.9%

74.3%

69.8%

69.3%

12.3%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

April 2003 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

1.
2.
3.
4.
5.
6.

7.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

Surry Monthly Operating Report No. 03-02 Page 4 of 18 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

Unit Name:...........................................................

Reporting Period:.................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MW e):.........................

Design Electrical Rating (Net MW e):....................

Maximum Dependable Capacity (Gross MWe):...

Maximum Dependable Capacity (Net MWe):.......

50-281 03/03/03 R. Stief (757) 365-2486 Surry Unit 2 February 2003 2546 847.5 788 847 815

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 672.0 672.0 0.0 672.0 0.0 1710728.7 593778.0 553854.0 100.0%

100.0%

101.1%

104.6%

0.0%

Year-To-Date 1416.0 1353.1 0.0 1328.3 0.0 3368113.6 1149421.0 1089996.0 93.8%

93.8%

94.5%

97.7%

6.2%

Cumulative 261505.0 193236.5 328.1 190912.7 0.0 456595098.1 150289954.0 143570713.0 73.0%

73.0%

69.8%

69.7%

9.8%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 20001

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 20001

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

1.
2.
3.
4.
5.
6.

7.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

Surry Monthly Operating Report No. 03-02 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: February 2003 Docket No.:

50-280 Unit Name:

Surry Unit 1 Date:

03/03/03 Completed by:

R. Stief Telephone:

(757) 365-2486 None during the Reporting Period (1)

F.

Forced S-Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Ucensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2

Manual Scram 3

Automatic Scram 4

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 03-02 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: February 2003 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 03/03/03 Completed by:

R. Stief Telephone:

(757) 365-2486 None during the Reporting Period (1)

F:

Forced S:

Scheduled (2)

REASON.

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD 1 -

Manual 2 -

Manual Scram 3

AutomaticScram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 03-02 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL MONTH:

February 2003 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 821 822 817 821 821 821 822 812 822 823 822 822 822 822 822 822 Day 17 18 19 20 21 22 23 24 25 26 27 28 Docket No.:

50-280 Unit Name.

Surry Unit 1 Date: 03/03/03 Completed by:

R. Stief Telephone:

(757) 365-2486 Average Daily Power Level (MWe - Net) 822 822 821 822 822 822 822 822 821 821 822 821 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-02 Page 8 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 03/03/03 Completed by:

R. Stief Telephone:

(757) 365-2486 MONTH:

February 2003 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 824 825 823 823 823 823 825 825 824 823 823 824 824 824 824 825 Day 17 18 19 20 21 22 23 24 25 26 27 28 Average Daily Power Level (MWe - Net) 824 825 825 825 824 825 825 825 825 825 826 825 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt

Surry Monthly Operating Report No. 03-02 Page 9 of 18

SUMMARY

OF OPERATING EXPERIENCE MoNTH/YEAR: February 2003 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNrr ONE:

02/01/03 0000 Unit started the month at 100% / 849 MWe.

02/03/03 1909 Ramped unit to 92% / 795 MWe in accordance with 1-OP-TM-005 to realign heater drain pumps.

02/03/03 2110 Commenced ramp to 100%.

02/03/03 2220 Unit at 100% / 852 MWe.

02/08/03 1000 Commenced ramp for 1-MS-GOV-3 main steam governor moog valve replacement.

02/08/03 1048 Ramp stopped at 90% / 771 MWe.

02/08/03 1240 Repair on 1-MS-GOV-3 complete.

02/08/03 1255 Commenced ramp to 100%.

02/08/03 1425 Unit at 100% / 850 MWe.

02/28/03 2400 Unit finished the month at 100% / 852 MWe.

UNrrTwo:

02/01/03 0000 Unit started the month at 100% / 850 MWe.

Unit finished the month at 100% / 854 MWe.

02/28/03 2400

Surry Monthly Operating Report No. 03-02 Page 10 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTH/YEAR: February 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-02 Page 11 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHYEAR: February 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-02 Page 12 of 18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MoNTHNYEAR: February 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-02 Page 13 of 18 CHEMISTRY REPORT MONTH/YEAR: February 2003 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.

Mm.

Avg Max.

Mm.

Avg.

Gross Radioactivity, pCl/ml 3.00E-1 2.10E-1 2.50E-1 3.03E-1 1.92E-1 2.32E-1 Suspended Solids, ppm-Gross Tritium, pCi/ml 8.61 E-2 5.28E-2 6.95E-2 7.77E-1 7.02E-1 7.44E-1 11 3 1, pCi/ml 2.24E-4 1.47E-4 1.91 E-4 1.23E-4 6.76E-5 9.54E-5 1131/1133 0.08 0.05 007 0.11 0.07 0.09 Hydrogen, cc/kg 42.6 33.3 37.3 42 36.9 38.6 Lithium, ppm 2.27 1.71 2.05 2.35 2 11 2.22 Boron - 10, ppm*

64 44 57 157 140 149 Oxygen, (DO), ppm

_< 0.005

  • < 0.005
  • 0 005

<0.005

< 0 005

  • 0.005 Chloride, ppm 0.003 0.001 0.002 0.003 0.001 0 002 pH @ 25 degree Celsius 7.4 6.21 7.04 6.98 5 93 6.44 Boron - 10 = Total Boron x 0.196 Comments.

None

Surry Monthly Operating Report No. 03-02 Page 14 of 18 FUEL HANDLING UNrrS 1 & 2 MONTH/YEAR: February 2003 New Fuel Number of Shipment or Date Stored or Assemblies Cask No.

Received per Shipment Spent Fuel Cask TN-32-31 02/03/03 32 Assembly Number 2H9 2H5 3V6 4J,1 0J3 0J7 4J6 0H4 0H9 4J5 iji 0H2 0J8 4J8 4V4 2H8 4V7 1,J3 New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity LMORNP LMORNK LMOTTS LMOUZD LMOUY9 LMOUYD LMOUZJ LMORMY LMORN3 LMOUZH LMOUYH LMORMW LMOUYE LMOUZL LMOTUO LMORNN LMOTU3 LMOUYK 4.0022 4.0077 3.9933 4.0167 3.8070 3.8073 4.0275 3.7974 3.8062 4.0145 3.8071 3.8026 3.8043 4.0197 4.0012 4.0037 3.9993 3.8065 N/A

Surry Monthly Operating Report No. 03-02 Page 15 of 18 FUEL HANDLING UNITS 1 & 2 MONTH/YEAR: February 2003 New Fuel Number of Shipment or Date Stored or Assemblies Cask No Received per Shipment Spent Fuel Cask TN-32-33 02/13/03 32 Assembly Number 4J3 4J4 3H3 3V3 4Vl 4V6 0H7 2H7 3V4 4H0 4J2 3J7 Oil 3V9 4H9 4H5 6V0 1,J7 ANSI Number LMOUZF LMOUZG LMORNT LMOTTP LMOTTX LMOTU2 LMORN1 LMORNM LMOTTO LMORPO LMOUZE LMOUZ9 LMOUY7 LMO0-V LMORP9 LMORP5 LMOTUG LMOUYP New or Spent Initial Fuel Shipping Enrichment Cask Activity 4.0096 4.0142 4.0034 4.0019 4.0013 3.9933 3.7996 4.0035 4.0012 4 0078 4.0169 4.0145 3.8066 3.9990 4.0080 4.0101 3.9911 3.8044 N/A

Surry Monthly Operating Report No. 03-02 Page 16 of 18 FUEL HANDLING UNITS 1 & 2 MONTH/YEAR: February 2003 New Fuel Number of Shipment or Date Stored or Assemblies Cask No Received per Shipment Assembly Number 2J0 1 J5 6J3 2H2 2H0 5J5 1 J9 5V6 2J3 2J9 5V0 4H6 5J9 5J3 5J2 5V3 5H2 11H0 ANSI Number LMOUYS LMOUYM LMOV0V LMORNG LMORNE LMOUZT LMOUYR LMOTUC LMOUYV LMOUZ1 LMOTU6 LMORP6 LMOVOR LMOUZR LMOUZQ LMOTU9 LMORPC LMORN4 New or Spent Initial Fuel Shipping Enrichment Cask Activitv 3.8070 3.8046 4 0234 3.7977 3.8002 4.0145 3.8070 3.9993 3.8070 3.8109 3.9988 4.0101 40142 4.0217 4.0145 3.9901 4.0064 3.7947 Number...

Surry Monthly Operating Report No. 03-02 Page 17 of 18 FUEL HANDLING UNITS 1 & 2 MONTHIYEAR: February 2003 New Fuel Number of Shipment or Date Stored or Assemblies Cask No.

Received per Shipment Assembly Number 6V1 5V7 4V8 5H0 1 H2 4H7 5V9 5J,1 6J2 5J4 New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity LMOTUH LMOTUD LMOTU4 LMORPA LMORN6 LMORP7 LMOTUF LMOUZP LM0VOU LMOUZS 3.9991 3.9876 4.0013 4.0104 3.8004 4.0068 4.0011 4.0276 4.0263 4.0144

Surry Monthly Operating Report No. 03-02 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR: February 2003 None during the Reporting Period