May 2003 Monthly Operating Report for Surry Units 1 and 2
ML031681398
Person / Time
Site: Surry  
(DPR-032, DPR-037)
Issue date: 06/05/2003
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
03-363, SPS Lic/JSA R0
Download: ML031681398 (16)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 5, 2003 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.03-363 SPS Lic/JSA RO Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of May 2003 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:

United States Nudear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 303034931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station LA

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 03-05 Approved:

z

'2sit isden V

te 3

Surry Monthly Operating Report No. 03-05 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1...........................................................

3 Operating Data Report - Unit No. 2...........................................................

4 Unit Shutdowns and Power Reductions - Unit No. 1............................................................

5 Unit Shutdowns and Power Reductions - Unit No. 2............................................................

6 Average Daily Unit Power Level - Unit No. 1............................................................

7 Average Daily Unit Power Level - Unit No. 2............................................................

8 Summary of Operating Experience - Unit Nos. 1 and 2............................................................9 Facility Changes That Did Not Require NRC Approval........................................................... 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval................................................. 11 Tests and Experiments That Did Not Require NRC Approval...........................................................

12 Chemistry Report...........................................................

13 Fuel Handling - Unit Nos. 1 and 2...........................................................

14 Description of Periodic Test(s) Which Were Not Completed Within the lime Umits Specified in Technical Specifications............................................................

15

Surry Monthly Operating Report No. 03-05 Page 3 of 15 OPERATING DATA REPORr Docket No.:

Date:

Completed By:

Telephone:

50-280 06/01/03 R. Stief (757) 365-2486

1.

Unit Name:...........................................................

2.

Reporting Period:.................................................

3.

Ucensed Thermal Power (MWt):..........................

4.

Nameplate Rating (Gross MWe):.........................

5.

Design Electrical Rating (Net MWe):....................

6.

Maximum Dependable Capacity (Gross MWe):...

7.

Maximum Dependable Capacity (Net MWe):.......

Surry Unit 1 May 2003 2546 847.5 788 842 810

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe): _

10.

Reasons For Restrictions, If Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0%

0.0%

0.0%

0.0%

0.0/o Year-To-Date 3623.0 2325.5 0.0 2271.5 0.0 5688741.6 1899476.0 1831193.0 62.7%

62.7%

62.4%

64.1%

13.1%

Cumulative 266831.0 196847.1 3774.5 194133.7 3736.2 463195058.3 152404800.0 145573514.0 72.8%

74.2%

69.7%

69.2%

12.3%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

r

Reference:

Letter S/N 00-069. dated Februarv 7. 20001

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Uni In Test Status (Prior to Commercial Operation):

FORECAST INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

ACHIEVED

Surry Monthly Operating Report No. 03-05 Page 4 of 15 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-281 06101/03 R. Stief (757) 365-2486

1.

Unit Name:...........................................................

2.

Reporting Period:.................................................

3.

Ucensed Thermal Power (MWt):..........................

4.

Nameplate Rating (Gross MWe):.........................

5.

Design Electrical Rating (Net MWe):....................

6.

Maximum Dependable Capacity (Gross MWe):...

7.

Maximum Dependable Capacity (Net MWe):.......

Surry Unit 2 May 2003 2546 847.5 788 847 815

8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 1894162.9 635030.0 613882.0 100.0%

100.0%

101.2%

104.7%

0.0%

Year-To-Date 3623.0 3560.1 0.0 3535.3 0.0 8985852.4 3034860.0 2911044.0 97.6%

97.6%

98.6%h 102.0%

2.4%

Cumulative 263712.0 195443.5 328.1 193119.7 0.0 462212836.9 152175393.0 145391761.0 73.2%

73.2%

70.1%

70.0%

9.7/o

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

September 2003 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 20001

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided.

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Surry Monthly Operating Report No. 03-05 Page 5 of 15 UNrr SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: May 2003 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 06/01/03 Completed by. R. Stief Telephone:

(757) 365-2486 (1)

F:

Forced S: Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manuai Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source (1)

(2)

(3)

(4)

(5)

Method Duration of LER No.

System Component Cause & Corrective Action to Date Type Hours Reason Shutting Code Code Prevent Recurrence Down Rx 05/01103 S

744.00 C

I N/A NWA N/A Unit offline for Refueling Outage/Reactor Vessel Head Replacement

Surry Monthly Operating Report No. 03-05 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MoNTH: May 2003 Docket No.:

50-281 Unit Name:

Surry Unit 2 Date:

06101/03 Completed by: R. Stief Telephone:

(757) 365-2486 None during the Reporting Period (1)

F:

Forced S: Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Ucensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibt 1 - Same Source

Surry Monthly Operating Report No. 03-05 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL MoNTH:

May 2003 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Docket No.: 50-280 Unit Name:

Surry Unit 1 Date:

06/01/03 Completed by:

R. Stief Telephone:

(757) 365-2486 Average Daily Power Level (MWe - Net) 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day In the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-05 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 06/01/03 Completed by:

R. Stief Telephone:

(757) 365-2486 MoNTH:

May 2003 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 826 822 822 824 824 823 822 820 826 827 826 825 826 825 825 825 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 826 827 825 824 824 825 826 826 827 827 827 828 828 826 826 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-05 Page 9 of 15

SUMMARY

OF OPERANG EXPERIENCE MONH/YEAR: May 2003 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related Incidents.

0000 2400 0000 2400 Unit started the month at 0% /0 MWe.

Unit finished the month at 0% 0 MWe.

Unit started the month at 100% / 855 MWe.

Unit finished the month at 100% 854 MWe.

UNIT ONE:

05/01/03 05131/03 UNi Two:

05/01/03 05131/03

Surry Monthly Operating Report No. 03-05 Page 10 of 15 FACILITY CHANGES THAT DID NOT REOUIRE NRC APPROVAL MONTHYEAR: May 2003 None durng the Reporting Period

I Surry Monthly OperatUng Report No. 03-05 Page 11 of 15 PROCEDURE OR METHoD OF OPERATION CHANGES THAT DID NoT REQUIRE NRC APPROVAL MONTHYEAR: May 2003 FS02-034 UFSAR Change Request 05/01/03 (Regulatory Evaluation 03-003)

UFSAR Change Request FS02-034 changes the reference to the design limit criterion Westinghouse has adopted for limiting the corrosion of zirconium-based fuel assembly structural components. The revised limit Is more consistent with ASME Code Section III requirements after accounting for thinning due to corrosion than the previous requirement of limiting hydrides. This updated criterion ensures that corrosion of the fuel assembly structural components Is sufficiently restricted to preclude fuel damage, conforms to NUREG-0800 and Industry guidelines, and has been reviewed and approved by the NRC.

The new criterion Is being applied to the analysis of fuel for Surry Units 1 and 2 starting with the Surry 1 Cycle 19 reload evaluation.

Surry Monthly Operating Report No. 03-05 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHrYEAR: May 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-05 Page 13 of 15 CHEMISTRY REPORT MoNmIYEAR: May 2003 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.

Min.

Avg.

Max.

Min.

Avg.

Gross Radioactvity, CVmi 2.99E-1 125E-1 2.12E-1 Suspended Solids, ppm Gross Tritium, LCVml 7.11 E-1 6.40E-1 6.73E-1 l131, CVmI 2.65E-4 5.53E-5 1.18E4 11311133 0.23 0.05 0.1 Hydrogen, cclkg 37.5 34.8 36 Lithium, ppm 2.35 2.06 2.19 Boron - 10, ppm 487 478 483 100 80 91 Oxygen, (DO), ppm s

-0.005 s 0.005 s 0.005 Chloride, ppm 0.009 0.001 0.003 0.003 0.001 0.001 pH 25 degree Celsius 5.08 4.96 5.01 7.09 6.9 7.01 Boron - 10 = Total Boron x 0.196 Comments:

None

Surry Monthly Operating Report No. 03-05 Page 14 of 15 FUEL HANDLING UNrrs 1 & 2 MONTH/YEAR: May 2003 Date Stored or Received Number of Assemblies per Shipment Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity None during the Reporting Period New Fuel Shipment or Cask No.

Surry Monthly Operating Report No. 03-05 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHYEAR: May 2003 None during the Reporting Period i

I i