February 2002 Monthly Operating Report for Surry Power Station, Units 1 & 2
ML020840346
Person / Time
Site: Surry  
Issue date: 03/11/2002
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
02-141
Download: ML020840346 (17)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 11, 2002 U. S. Nuclear Regulatory Commission Serial No.02-141 Attention: Document Control Desk SPS Lic/JSA RO Washington, D.C. 20555-0001 Docket Nos.

50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of February 2002 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:

United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 02-02 Approved:

L I Site-Vice President "at

Surry Monthly Operating Report No. 02-02 Page 2 of 16 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. I...........................................................................................................................

3 Operating Data Report - Unit No. 2...........................................................................................................................

4 Unit Shutdowns and Power Reductions - Unit No. 1............................................................................................

5 Unit Shutdowns and Power Reductions - Unit No. 2.............................................................................................

6 Average Daily Unit Power Level - Unit No. 1......................................................................................................

7 Average Daily Unit Power Level - Unit No. 2........................................................................................................

8 Summary of Operating Experience - Unit Nos. 1 and 2.........................................................................................

9 Facility Changes That Did Not Require NRC Approval.......................................................................................

10 Procedure or Method of Operation Changes That Did Not Require NRC Approval...........................................

11 Tests and Experiments That Did Not Require NRC Approval..............................................................................

12 Chemistry Report.....................................................................................................................................................

13 Fuel Handling - Unit Nos. 1 and 2............................................................................................................................

14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications......................................................................................................................

16

Surry Monthly Operating Report No. 02-02 Page 3 of 16 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

U nit N am e:............................................................

Reporting Period:..................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):..........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):....

Maximum Dependable Capacity (Net MWe):........

50-280 03/04/02 R. Stief (757) 365-2486 Surry Unit 1 February 2002 2546 847.5 788 842 810

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 672.0 672.0 0.0 672.0 0.0 1710850.9 573616.0 553573.0 100.0%

100.0%

101.7%

104.5%

0.0%

Year-To-Date 1416.0 1416.0 0.0 1416.0 0.0 3604402.8 1208707.0 1166972.0 100.0%

100.0%

101.7%

104.6%

0.0%

Cumulative 255864.0 187177.6 3774.5 184518.2 3736.2 438911880.7 144288810.0 137759833.0 72.1%

73.6%

68.9%

68.3%

12.7%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 20001

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

1.
2.
3.
4.
5.
6.

7.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

Surry Monthly Operating Report No. 02-02 Page 4 of 16 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

U nit N am e :............................................................

Reporting Period:..................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):..........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):....

Maximum Dependable Capacity (Net MWe):........

50-281 03/04/02 R. Stief (757) 365-2486 Surry Unit 2 February 2002 2546 847.5 788 847 815

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 672.0 672.0 0.0 672.0 0.0 1710545.4 576020.0 556673.0 100.0%

100.0%

101.6%

105.1%

0.0%

Year-To-Date 1416.0 1416.0 0.0 1416.0 0.0 3604586.1 1213195.0 1171995.0 100.0%

100.0%

101.6%

105.0%

0.0%

Cumulative 252745.0 185234.0 328.1 183032.4 0.0 436629490.3 143590202.0 137129045.0 72.4%

72.4%

69.1%

68.9%

10.1%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

April 2002 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

1.
2.
3.
4.
5.
6.

7.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

Surry Monthly Operating Report No. 02-02 Page 5 of 16 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: February 2002 Docket No.:

50-280 Unit Name:

Surry Unit 1 Date:

03/01/02 Completed by:

R. Stief Telephone:

(757) 365-2486 None during the Reporting Period (1)

F:

Forced S:

Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

I Manual 2

Manual Scram 3

Automatic Scram 4

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 02-02 Page 6 of 16 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: February 2002 Docket No.:

50-281 Unit Name:

Surry Unit 2 Date: 03/01/02 Completed by:

R. Stief Telephone:

(757) 365-2486 None during the Reporting Period (1)

F:

Forced S:

Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2

Manual Scram 3

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 02-02 Page 7 of 16 AVERAGE DAILY UNIT POWER LEVEL MONTH:

February 2002 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 824 824 824 825 824 824 824 824 825 824 825 825 824 823 824 823 Day 17 18 19 20 21 22 23 24 25 26 27 28 Docket No.:

50-280 Unit Name:

Surry Unit 1 Date:

03/04/02 Completed by:

R. Stief Telephone:

(757) 365-2486 Average Daily Power Level (MWe - Net) 823 823 823 823 824 823 823 823 823 823 824 823 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 02-02 Page 8 of 16 AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-281 Unit Name:

Surry Unit 2 Date: 03/04/02 Completed by:

R. Stief Telephone:

(757) 365-2486 MONTH:

February 2002 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 829 830 830 827 827 829 829 829 829 829 829 828 829 830 830 829 Day 17 18 19 20 21 22 23 24 25 26 27 28 Average Daily Power Level (MWe - Net) 828 828 828 828 829 828 828 827 827 827 828 828 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 02-02 Page 9 of 16

SUMMARY

OF OPERATING EXPERIENCE MONTH/YEAR: February 2002 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

0000 2400 0000 2400 Unit started the month at 100% / 854 MWe.

Unit finished the month at 100% / 854 MWe.

Unit started the month at 100% / 855 MWe.

Unit finished the month at 100% / 855 MWe.

UNIT ONE:

02/01/02 02/28/02 UNIT Two:

02/01/02 02/28/02

Surry Monthly Operating Report No. 02-02 Page 10 of 16 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: February 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-02 Page 11 of 16 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: February 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-02 Page 12 of 16 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: February 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-02 Page 13 of 16 CHEMISTRY REPORT MONTH/YEAR: February 2002 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.

Min.

Avg.

Max.

Min.

Avg.

Gross Radioactivity, iVCi/ml 3.45E-1 1.73E-1 2.82E-1 3.27E-1 1:.58E-1 2.73E-1 Suspended Solids, ppm Gross Tritium, ipCi/ml 8.18E-1 6.70E-1 7.42E-1 1.52E-1 1.19E-1 1.40E-1 113 1, JACi/ml 6.26E-4 6.94E-5 1.50E-4 2.18E-4 8.27E-5 1.25E-4 1131/1133 0.1 0.05 0.07 0.14 0.05 0.08 Hydrogen, cc/kg 40.4 35.6 37.4 43.2 36.6 38.7 Lithium, ppm 2.43 2.17 2.29 1.51 1.11 1.33 Boron - 10, ppm*

259 245 253 36.7 19.2 28.1 Oxygen, (DO), ppm

< 0.005

< 0.005

< 0.005

< 0.005

_ 0.005

<0.005 Chloride, ppm 0.008 0.007 0.007 0.007 0.001 0.001 pH @ 25 degree Celsius 6.55 6.33 6.41 7.53 7.3 7.39 Boron - 10 = Total Boron x 0.196 Comments:

None

Surry Monthly Operating Report No. 02-02 Page 14 of 16 FUEL HANDLING UNITS I & 2 MONTH/YEAR: February 2002 New Fuel Number of Shipment or Date Stored or Assemblies Cask No.

Received per Shipment Spent Fuel Cask TN-32-27 02/20/02 32 Assembly Number OF4 0R6 0R8 0S8 0T7 1 P2 1S4 1 S9 2E0 2N8 2R5 2R7 2S9 3F8 3P1 3P4 4D2 4D6 New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity LMOJGN LMOC1K LMOC1R LMOESV LMOK83 LM05XG LMOESK LMOES3 LMODF6 LM06G4 LMOC2L LMOC29 LMOESW LMOJHG LM05XP LM05YC LMOAMD LMOAM8 3.6106 3.5948 3.5947 3.5955 3.5866 3.6070 3.5980 3.5961 3.5984 3.4060 3.5926 3.5992 3.5996 3.7956 3.6070 3.6070 3.6006 3.6052 N/A

Surry Monthly Operating Report No. 02-02 Page 15 of 16 FUEL HANDLING UNITS 1 & 2 MONTHIYEAR: February 2002 New Fuel Number of Shipment or Date Stored or Assemblies Cask No.

Received per Shipment Assembly Number 4D7 4P2 4R3 4S6 5C4 5P3 5R2 5R6 5R9 5S1 5S5 5S6 6R1 Cll New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity LMOAM6 LM05YT LMOC2X LMOERX LM08NE LM05XU LMOC2D LMOC1Z LMOC2B LMOESJ LMOESZ LMOESD LMOC27 NOANSI 3.6097 3.6070 3.5908 3.5976 3.3990 3.6070 3.5971 3.5901 3.5885 3.5994 3.6020 3.5965 3.6007 3.1170

Surry Monthly Operating Report No. 02-02 Page 16 of 16 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHIYEAR: February 2002 None during the Reporting Period