ML020840346

From kanterella
Jump to navigation Jump to search
February 2002 Monthly Operating Report for Surry Power Station, Units 1 & 2
ML020840346
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/11/2002
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
02-141
Download: ML020840346 (17)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 11, 2002 U. S. Nuclear Regulatory Commission Serial No.02-141 Attention: Document Control Desk SPS Lic/JSA RO Washington, D.C. 20555-0001 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of February 2002 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 02-02 Approved: L I Site-Vice President "at

Surry Monthly Operating Report No. 02-02 Page 2 of 16 TABLE OF CONTENTS Page Section 3

Operating Data Report - Unit No. I ...........................................................................................................................

4 Operating Data Report - Unit No. 2 ...........................................................................................................................

5 Unit Shutdowns and Power Reductions - Unit No. 1 ............................................................................................

6 Unit Shutdowns and Power Reductions - Unit No. 2 .............................................................................................

7 Average Daily Unit Power Level - Unit No. 1 ......................................................................................................

8 Average Daily Unit Power Level - Unit No. 2 ........................................................................................................

9 Summary of Operating Experience - Unit Nos. 1 and 2 .........................................................................................

10 Facility Changes That Did Not Require NRC Approval .......................................................................................

Procedure or Method of Operation Changes That Did Not Require NRC Approval ........................................... 11 12 Tests and Experiments That Did Not Require NRC Approval ..............................................................................

13 Chemistry Report .....................................................................................................................................................

14 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................

Description of Periodic Test(s) Which Were Not Completed Within the Time Limits 16 Specified in Technical Specifications ......................................................................................................................

Surry Monthly Operating Report No. 02-02 Page 3 of 16 OPERATING DATA REPORT Docket No.: 50-280 Date: 03/04/02 Completed By: R. Stief Telephone: (757) 365-2486

1. U nit N am e: ............................................................ Surry Unit 1
2. Reporting Period: .................................................. February 2002
3. Licensed Thermal Power (MWt): .......................... 2546
4. Nameplate Rating (Gross MWe): .......................... 847.5
5. Design Electrical Rating (Net MWe): .................... 788
6. Maximum Dependable Capacity (Gross MWe): .... 842
7. Maximum Dependable Capacity (Net MWe): ........ 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 672.0 1416.0 255864.0
12. Hours Reactor Was Critical 672.0 1416.0 187177.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5
14. Hours Generator On-Line 672.0 1416.0 184518.2
15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2
16. Gross Thermal Energy Generated (MWH) 1710850.9 3604402.8 438911880.7
17. Gross Electrical Energy Generated (MWH) 573616.0 1208707.0 144288810.0
18. Net Electrical Energy Generated (MWH) 553573.0 1166972.0 137759833.0
19. Unit Service Factor 100.0% 100.0% 72.1%
20. Unit Availability Factor 100.0% 100.0% 73.6%
21. Unit Capacity Factor (Using MDC Net) 101.7% 101.7% 68.9%
22. Unit Capacity Factor (Using DER Net) 104.5% 104.6% 68.3%
23. Unit Forced Outage Rate 0.0% 0.0% 12.7%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 20001

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 02-02 Page 4 of 16 OPERATING DATA REPORT Docket No.: 50-281 Date: 03/04/02 Completed By: R. Stief Telephone: (757) 365-2486

1. U nit N ame : ............................................................ Surry Unit 2
2. Reporting Period: .................................................. February 2002
3. Licensed Thermal Power (MWt): .......................... 2546
4. Nameplate Rating (Gross MWe): .......................... 847.5
5. Design Electrical Rating (Net MWe): .................... 788
6. Maximum Dependable Capacity (Gross MWe): .... 847
7. Maximum Dependable Capacity (Net MWe): ........ 815
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative 672.0 1416.0 252745.0

11. Hours in Reporting Period 672.0 1416.0 185234.0
12. Hours Reactor Was Critical 0.0 0.0 328.1
13. Reactor Reserve Shutdown Hours 672.0 1416.0 183032.4
14. Hours Generator On-Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 1710545.4 3604586.1 436629490.3
16. Gross Thermal Energy Generated (MWH) 576020.0 1213195.0 143590202.0
17. Gross Electrical Energy Generated (MWH) 556673.0 1171995.0 137129045.0
18. Net Electrical Energy Generated (MWH) 100.0% 100.0% 72.4%
19. Unit Service Factor 100.0% 100.0% 72.4%
20. Unit Availability Factor 101.6% 101.6% 69.1%
21. Unit Capacity Factor (Using MDC Net) 105.1% 105.0% 68.9%
22. Unit Capacity Factor (Using DER Net) 0.0% 0.0% 10.1%
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

April 2002 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 02-02 Page 5 of 16 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: February 2002 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 03/01/02 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 02-02 Page 6 of 16 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: February 2002 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 03/01/02 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (2) (3)

(1) METHOD:

F: Forced REASON:

1 - Manual S: Scheduled A - Equipment Failure (Explain)

B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit 1 - Same Source Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 02-02 Page 7 of 16 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 03/04/02 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: February 2002 Average Daily Power Level Average Daily Power Level (MWe - Net) Day (MWe - Net)

Day 1 824 17 823 2 824 18 823 3 824 19 823 4 825 20 823 5 824 21 824 6 824 22 823 7 824 23 823 8 824 24 823 9 825 25 823 10 824 26 823 11 825 27 824 12 825 28 823 13 824 14 823 15 824 16 823 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 02-02 Page 8 of 16 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 03/04/02 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: February 2002 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 829 17 828 2 830 18 828 3 830 19 828 4 827 20 828 5 827 21 829 6 829 22 828 7 829 23 828 8 829 24 827 9 829 25 827 10 829 26 827 11 829 27 828 12 828 28 828 13 829 14 830 15 830 16 829 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 02-02 Page 9 of 16

SUMMARY

OF OPERATING EXPERIENCE MONTH/YEAR: February 2002 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNIT ONE:

02/01/02 0000 Unit started the month at 100% / 854 MWe.

02/28/02 2400 Unit finished the month at 100% / 854 MWe.

UNIT Two:

02/01/02 0000 Unit started the month at 100% / 855 MWe.

02/28/02 2400 Unit finished the month at 100% / 855 MWe.

Surry Monthly Operating Report No. 02-02 Page 10 of 16 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: February 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-02 Page 11 of 16 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: February 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-02 Page 12 of 16 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: February 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-02 Page 13 of 16 CHEMISTRY REPORT MONTH/YEAR: February 2002 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. Avg. Max. Min. Avg.

Gross Radioactivity, iVCi/ml 3.45E-1 1.73E-1 2.82E-1 3.27E-1 1:.58E-1 2.73E-1 Suspended Solids, ppm - -

Gross Tritium, ipCi/ml 8.18E-1 6.70E-1 7.42E-1 1.52E-1 1.19E-1 1.40E-1 113 1, JACi/ml 6.26E-4 6.94E-5 1.50E-4 2.18E-4 8.27E-5 1.25E-4 1131/1133 0.1 0.05 0.07 0.14 0.05 0.08 Hydrogen, cc/kg 40.4 35.6 37.4 43.2 36.6 38.7 Lithium, ppm 2.43 2.17 2.29 1.51 1.11 1.33 Boron - 10, ppm* 259 245 253 36.7 19.2 28.1 Oxygen, (DO), ppm < 0.005 < 0.005 < 0.005 < 0.005 _ 0.005 <0.005 Chloride, ppm 0.008 0.007 0.007 0.007 0.001 0.001 pH @ 25 degree Celsius 6.55 6.33 6.41 7.53 7.3 7.39

None

Surry Monthly Operating Report No. 02-02 Page 14 of 16 FUEL HANDLING UNITS I & 2 MONTH/YEAR: February 2002 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity Spent Fuel Cask 02/20/02 32 OF4 LMOJGN 3.6106 N/A TN-32-27 0R6 LMOC1K 3.5948 0R8 LMOC1R 3.5947 0S8 LMOESV 3.5955 0T7 LMOK83 3.5866 1P2 LM05XG 3.6070 1S4 LMOESK 3.5980 1 S9 LMOES3 3.5961 2E0 LMODF6 3.5984 2N8 LM06G4 3.4060 2R5 LMOC2L 3.5926 2R7 LMOC29 3.5992 2S9 LMOESW 3.5996 3F8 LMOJHG 3.7956 3P1 LM05XP 3.6070 3P4 LM05YC 3.6070 4D2 LMOAMD 3.6006 4D6 LMOAM8 3.6052

Surry Monthly Operating Report No. 02-02 Page 15 of 16 FUEL HANDLING UNITS 1 & 2 MONTHIYEAR: February 2002 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity 4D7 LMOAM6 3.6097 4P2 LM05YT 3.6070 4R3 LMOC2X 3.5908 4S6 LMOERX 3.5976 5C4 LM08NE 3.3990 5P3 LM05XU 3.6070 5R2 LMOC2D 3.5971 5R6 LMOC1Z 3.5901 5R9 LMOC2B 3.5885 5S1 LMOESJ 3.5994 5S5 LMOESZ 3.6020 5S6 LMOESD 3.5965 6R1 LMOC27 3.6007 Cll NOANSI 3.1170

Surry Monthly Operating Report No. 02-02 Page 16 of 16 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHIYEAR: February 2002 None during the Reporting Period