ML031060380

From kanterella
Jump to navigation Jump to search
March 2003 Monthly Operating Report for Surry Units 1 & 2
ML031060380
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/08/2003
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
03-252, SPS Lic/JSA R0
Download: ML031060380 (19)


Text

i VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 8, 2003 U. S. Nuclear Regulatory Commission Serial No.03-252 Attention: Document Control Desk SPS Lic/JSA RO Washington, D.C. 20555-0001 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of March 2003 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 03-03 Approved: - - de1t Site Vice President " / C~ite

Surry Monthly Operating Report No. 03-03 Page 2 of 18 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1............................................................ 3 Operating Data Report - Unit No. 2 ............................................................. 4 Unit Shutdowns and Power Reductions - Unit No. 1............................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2 ............................................................. 6 Average Daily Unit Power Level - Unit No. 1............................................................. 7 Average Daily Unit Power Level - Unit No. 2 ............................................................. 8 Summary of Operating Experience - Unit Nos. 1 and 2 ............................................................. 9 Facility Changes That Did Not Require NRC Approval ............................................................ 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval ................................................. 11 Tests and Experiments That Did Not Require NRC Approval ............................................................ 12 Chemistry Report ............................................................ 13 Fuel Handling - U Nosnit 1 and . 2 ............................................................ 14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ............................................................ 18

Surry Monthly Operating Report No. 03-03 Page 3 of 18 OPERATING DATA REPORT Docket No.: 50-280 Date: 04/01/03 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ........................................................... Surry Unit 1
2. Reporting Period:................................................. March 2003
3. Licensed Thermal Power (MWt):.......................... 2546
4. Nameplate Rating (Gross MWe):......................... 847.5
5. Design Electrical Rating (Net MWe):.................... 788
6. Maximum Dependable Capacity (Gross MWe): ... 842
7. Maximum Dependable Capacity (Net MWe):....... 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 744.0 2160.0 265368.0
12. Hours Reactor Was Critical 744.0 1869.7 196391.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5
14. Hours Generator On-Line 744.0 1816.3 193678.5
15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2
16. Gross Thermal Energy Generated (MWH) 1894101.8 4537277.5 462043594.2
17. Gross Electrical Energy Generated (MWH) 634113.0 1514216.0 152019540.0
18. Net Electrical Energy Generated (MWH) 611723.0 1459566.0 145201887.0
19. Unit Service Factor 100.0% 84.1% 73.0%
20. Unit Availability Factor 100.0% 84.1% 74.4%
21. Unit Capacity Factor (Using MDC Net) 101.5% 83.4% 69.9%
22. Unit Capacity Factor (Using DER Net) 104.3% 85.8% 69.4%
23. Unit Forced Outage Rate 0.0% 15.9% 12.3%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

April 2003 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 20001

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 03-03 Page 4 of 18 OPERATING DATA REPORT Docket No.: 50-281 Date: 04/01/03 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ........................................................... Surry Unit 2
2. Reporting Period:................................................. March 2003
3. Licensed Thermal Power (MWt):.......................... 2546
4. Nameplate Rating (Gross MWe):......................... 847.5
5. Design Electrical Rating (Net MWe):.................... 788
6. Maximum Dependable Capacity (Gross MWe): ... 847
7. Maximum Dependable Capacity (Net MWe): ....... 815
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 744.0 2160.0 262249.0
12. Hours Reactor Was Critical 744.0 2097.1 193980.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 328.1
14. Hours Generator On-Line 744.0 2072.3 191656.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1893001.9 5261115.5 458488100.0
17. Gross Electrical Energy Generated (MWH) 635482.0 1784903.0 150925436.0
18. Net Electrical Energy Generated (MWH) 613928.0 1703924.0 144184641.0
19. Unit Service Factor 100.0% 95.9% 73.1%
20. Unit Availability Factor 100.0% 95.9% 73.1%
21. Unit Capacity Factor (Using MDC Net) 101.2% 96.8% 69.9%
22. Unit Capacity Factor (Using DER Net) 104.7% 100.1% 69.8%
23. Unit Forced Outage Rate 0.0% 4.1% 9.7%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 03-03 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: March 2003 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 04/01/03 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 03-03 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: March 2003 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 04101/03 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 03-03 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 04/01/03 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: March 2003 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 821 17 821 2 821 18 821 3 821 19 822 4 822 20 823 5 822 21 823 6 822 22 822 7 822 23 823 8 822 24 821 9 822 25 821 10 822 26 821 11 823 27 824 12 823 28 824 13 823 29 824 14 823 30 824 15 823 31 823 16 821 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-03 Page 8 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 04/01/03 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: March 2003 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 825 17 827 2 825 18 826 3 825 19 827 4 825 20 826 5 825 21 826 6 825 22 826 7 812 23 826 8 826 24 826 9 826 25 826 10 826 26 826 11 825 27 825 12 825 28 825 13 825 29 825 14 826 30 824 15 827 31 823 16 827 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-03 Page 9 of 18

SUMMARY

OF OPERATING EXPERIENCE MONTHNEAR: March 2003 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNrr ONE:

03/01/03 0000 Unit started the month at 100% / 852 MWe.

03/31/03 2400 Unit finished the month at 100% /853 MWe.

UNrTTwo:

03/01/03 0000 Unit started the month at 100% / 854 MWe.

03/07/03 1252 Commenced ramp to 90% power in accordance with 2-OP-TM-005 in prep for swapping HP Heater Drain Pumps.

03/07/03 1350 Stopped ramp at 90% / 770 MWe.

03/07/03 1414 Started Heater Drain Pump 2-SD-P-1A.

03/07/03 1507 Secured Heater Drain Pump 2-SD-P-1 B.

03/07/03 1648 Commenced ramp to 100%.

03/07/03 1839 Unit at 100% /853 MWe.

03/31/03 2400 Unit finished the month at 100% / 854 MWe.

Surry Monthly Operating Report No. 03-03 Page 10 of 18 FACILrrY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTHNEAR: March 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-03 Page 11 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: March 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-03 Page 12 of 18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MoNTH/YEAR: March 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-03 Page 13 of 18 CHEMISTRY REPORT MONTH/YEAR: March 2003 Unit No 1 Unit No. 2 Primary Coolant Analysis Max. Min. Avg. Max. Min. Avg.

Gross Radioactivity, AiCiml 3.68E-1 1.89E-1 2.67E-1 3.69E-1 1.61 E-1 2.53E-1 Suspended Solids, ppm S 0.01

  • 0.01 S 0.01 S 0.01
  • 0.01 S 0.01 Gross Tritium, pCVml 9.67E-2 8.58E-2 9.27E-2 8.34E-1 7.73E-1 8.07E-1 1131, Ci/mI 2.88E-4 1.63E-4 2.23E-4 1.18E-4 6.76E-5 8.97E-5 1131/1133 0.09 0.05 0.07 0.11 0.06 0.08 Hydrogen, cc/kg 40.5 35.3 37.3 38.7 37.1 37.8 Lithium, ppm 1.71 1.15 1.4 2.32 2.08 2.19 Boron - 10, ppm* 43.5 23.7 33 7 139 120 130 Oxygen, (DO), ppm
  • 0.005
  • 0.005
  • 0.005
  • 0.005
  • 0.005 *0 005 Chloride, ppm 0.002 0.001 0.001 0.004 0.001 0.002 pH @ 25 degree Celsius 7.56 6.92 7.39 7.07 6.24 6.71

None

Surry Monthly Operating Report No. 03-03 Page 14 of 18 FUEL HANDLING UNITS 1 &2 MONTHIYEAR: March 2003 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity Unit 1 Batch 21 Shipment #1 03/10/03 12 01F LM 1EYQ 4.0983 573.13 GBq 06F LM1EYV 4.0930 07F LM1 EYW 4.1090 13F LM1 EZ2 4.1107 19F LM 1EZ8 4.1039 29F LM1 EZJ 4.2509 32F LM1 EZM 4.2484 37F LM1 EZS 4.2497 40F LM1 EZV 4.2475 45F LM1 FOO 4.2499 49F LM 1F04 4.2518 52F LM1 F07 4.2516 Unit 1 Batch 21 Shipment #2 03/11103 12 02F LM1 EYR 4.0970 563.88 GBq 03F LM1 EYS 4.0951 04F LM1 EYT 4.0927 05F LM1 EYU 4.0958 08F LM1 EYX 4.1128 09F LM1 EYY 4.0923

Surry Monthly Operating Report No. 03-03 Page 15 of 18 FUEL HANDLING UNITS 1 &2 MONTHYEAR: March 2003 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity 1OF LM1 EYZ 4.0993 11F LM1 EZO 4.1034 12F LM1 EZ1 4.1064 14F LM1 EZ3 4.1063 43F LM1 EZY 4.2488 44F LM1 EZZ 4.2518 Unit 1 Batch 21 Shipment #3 03/12/03 12 20F LM1 EZ9 4.1041 577.57 GBq 21 F LM1 EZA 4.2410 24F LM1EZD 4.2319 25F LM1 EZE 4.2390 26F LM1EZF 4.2399 27F LM1 EZG 4.2535 28F LM1 EZH 4.2449 30F LM1 EZK 4.2448 31 F LM1 EZL 4.2381 33F LM1EZN 4.2545 34F LM1 EZP 4.2487 35F LM1 EZQ 4.2447

Surry Monthly Operating Report No. 03-03 Page 16 of 18 FUEL HANDLING UNITS 1 &2 MONTH/YEAR: March 2003 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity Unit 1 Batch 21 Shipment #4 03/13/03 12 15F LM1 EZ4 4.1071 574.61 GBq 16F LM1 EZ5 4.1188 17F LM1 EZ6 4.1019 18F LM1 EZ7 4.0963 22F LM1 EZB 4.2357 23F LM1 EZC 4.2367 36F LM1 EZR 4.2478 38F LM1EZT 4.2500 39F LM1 EZU 4.2492 41 F LM1 EZW 4.2489 42F LM1 EZX 4.2490 46F LM1 F01 4.2505 Unit 1 Batch 21 Shipment #5 03/14/03 8 47F LM1 F02 4.2520 387.76 GBq 48F LM1 F03 4.2532 5OF LM1 F05 4.2503 51 F LM1 F06 4.2538 53F LM1F08 4.2498 54F LM1F09 4.2512

Surry Monthly Operating Report No. 03-03 Page 17 of 18 FUEL HANDLING UNITS 1 &2 MoNTH/YEAR: March 2003 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity 55F LM1 FOA 4.2519 56F LM1 FOB 4.2524

Surry Monthly Operating Report No. 03-03 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED INTECHNICAL SPECIFICATIONS MONTHIYEAR: March 2003 None during the Reporting Period