VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 January 14, 2003 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.
SPS Lic/JSA Docket Nos.
License Nos.
Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of December 2002 is provided in the attachment.
If you have any questions or require additional information, please contact us.
Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:
United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station 03-021 R0 50-280 50-281 DPR-32 DPR-37
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 02-12 Approved:
q
-)_
SifeVice 15residn bate'/
Surry Monthly Operating Report No. 02-12 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1............................................................................................................................
3 Operating Data Report - Unit No. 2............................................................................................................................
4 Unit Shutdowns and Power Reductions - Unit No. 1.............................................................................................
5 Unit Shutdowns and Power Reductions - Unit No. 2..............................................................................................
6 Average Daily Unit Power Level - Unit No. 1.......................................................................................................
7 Average Daily Unit Power Level - Unit No. 2................................................................
................ 8 Summary of Operating Experience - Unit Nos. 1 and 2.........................................................................................
9 Facility Changes That Did Not Require NRC Approval.......................................................................................
10 Procedure or Method of Operation Changes That Did Not Require NRC Approval............................................
11 Tests and Experiments That Did Not Require NRC Approval..............................................................................
12 Chemistry Report...................................................................................................................................................
13 Fuel Handling - Unit Nos. 1 and 2............................................................................................................................
14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications......................................................................................................................
15
Surry Monthly Operating Report No. 02-12 Page 3 of 15 OPERATING DATA REPORT Docket No.:
Date:
Completed By:
Telephone:
Unit Name:...........................................................
Reporting Period:.................................................
Licensed Thermal Power (MWt):..........................
Nameplate Rating (Gross MWe):.........................
Design Electrical Rating (Net MWe):....................
Maximum Dependable Capacity (Gross MWe):...
Maximum Dependable Capacity (Net MWe):.......
50-280 01/02/03 R. Stief (757) 365-2486 Surry Unit 1 December 2002 2546 847.5 788 842 810
- 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9.
Power Level To Which Restricted, If Any (Net MWe):
- 10.
Reasons For Restrictions, If Any:
Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 1893307.4 634164.0 612134.0 100.0%
100.0%
101.6%
104.4%
0.0%
Year-To-Date 8760.0 8760.0 0.0 8760.0 0.0 22198838.8 7425221.0 7149460.0 100.0%
100.0%
100.8%
103.6%
0.0%
Cumulative 263208.0 194521.6 3774.5 191862.2 3736.2 457506316.7 150505324.0 143742321.0 72.9%
74.3%
69.8%
69.3%
12.3%
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
April 2003 Type and duration of scheduled shutdowns are no longer provided
[
Reference:
Letter SIN 00-069, dated February 7, 2000]
- 25.
If Shut Down at End of Report Period, Estimated Date of Start-up:
Estimated start-up dates are no longer provided. [
Reference:
Letter S/N 00-069, dated February 7, 2000]
- 26.
Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- 1.
- 2.
3
- 4.
5
- 6.
7.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
23.
Surry Monthly Operating Report No. 02-12 Page 4 of 15 OPERATING DATA REPORT Docket No.:
Date:
Completed By:
Telephone:
Unit Name:...........................................................
Reporting Period:.................................................
Licensed Thermal Power (MWt):..........................
Nameplate Rating (Gross MWe):.........................
Design Electrical Rating (Net MWe):....................
Maximum Dependable Capacity (Gross MWe):...
Maximum Dependable Capacity (Net MWe):.......
50-281 01/02/03 R. Stief (757) 365-2486 Surry Unit 2 December 2002 2546 847.5 788 847 815
- 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9.
Power Level To Which Restricted, If Any (Net MWe):
- 10.
Reasons For Restrictions, If Any:
Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 1894224.0 636957.0 614944.0 100.0%
100.0%
101.4%
104.9%
0.0%
Year-To-Date 8760.0 8065.4 0.0 7968.0 0.0 20202080.3 6763526.0 6523667.0 91.0%
91.0%
91.4%
94.5%
1.2%
Cumulative 260089.0 191883.4 328.1 189584.4 0.0 453226984.5 149140533.0 142480717.0 72.9%
72.9%
69.7%
69.5%
9.8%
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Type and duration of scheduled shutdowns are no longer provided.
[
Reference:
Letter S/N 00-069, dated February 7, 20001
- 25.
If Shut Down at End of Report Period, Estimated Date of Start-up:
Estimated start-up dates are no longer provided. [
Reference:
Letter S/N 00-069, dated February 7, 2000]
26 Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
23.
Surry Monthly Operating Report No. 02-12 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: December 2002 Docket No.: 50-280 Unit Name:
Surry Unit 1 Date: 01/01/03 Completed by:
R. Stief Telephone:
(757) 365-2486 None during the Reporting Period (1)
F:
Forced S:
Scheduled (2)
REASON:
A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Licensing Examination F -
Administrative G -
Operational Error (Explain)
H Other (Explain)
(3)
METHOD:
1 -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Other (Explain)
(4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit 1 - Same Source
Surry Monthly Operating Report No. 02-12 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: December 2002 Docket No.:
50-281 Unit Name:
Surry Unit 2 Date:
01/01/03 Completed by:
R. Stief Telephone:
(757) 365-2486 None dunng the Reporting Period (1)
F:
Forced S:
Scheduled (2)
REASON:
A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Licensing Examination F -
Administrative G -
Operational Error (Explain)
H Other (Explain)
(3)
METHOD:
1 -
Manual 2
Other (Explain)
(4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit 1 - Same Source
Surry Monthly Operating Report No. 02-12 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL MONTH:
December 2002 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 825 824 825 824 824 824 820 818 819 822 822 823 822 823 824 808 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Docket No.: 50-280 Unit Name: Surry Unit 1
, Date: 01/02/03 Completed by:
R Stief Telephone:
(757) 365-2486 Average Daily Power Level (MWe - Net) 824 825 824 824 824 824 824 824 824 824 824 824 823 823 823 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
Surry Monthly Operating Report No. 02-12 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-281 Unit Name:
Surry Unit 2 Date:
01/02/03 Completed by: R. Stief Telephone:
(757) 365-2486 MONTH:
December 2002 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 826 826 826 826 826 827 826 826 827 826 826 826 828 827 827 826 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 826 827 827 827 827 827 827 826 826 826 826 827 828 828 828 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt
Surry Monthly Operating Report No. 02-12 Page 9 of 15
SUMMARY
OF OPERATING EXPERIENCE MoNTI-YEAR: December 2002 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
0000 2400 0000 2400 Unit started the month at 100% / 853 MWe.
Unit finished the month at 100% / 852 MWe.
Unit started the month at 100% /857 MWe.
Unit finished the month at 100% / 856 MWe.
UNrr ONE:
12/01/02 12/31/02 UNrrTwo:
12/01/02 12/31/02
Surry Monthly Operating Report No. 02-12 Page 10 of 15 FACILrTY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: December 2002 None during the Reporting Period
Surry Monthly Operating Report No. 02-12 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: December 2002 None during the Reporting Period
Surry Monthly Operating Report No. 02-12 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: December 2002 None during the Reporting Period
Surry Monthly Operating Report No. 02-12 Page 13 of 15 CHEMISTRY REPORT MONTHIYEAR: December 2002 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.
Min.
Avg Max.
Mm.
Avg.
Gross Radioactivity, pCi/ml 4 OE-1 2.07E-1 3.15E-1 4 20E-1 1.69E-1 2.78E-1 Suspended Solids, ppm 0 01 0.01 0.01 0.01 0.01 0.01 Gross Tritium, iCi/ml 6.78E-1 5.68E-1 6.34E-1 1.17E+0 1.08E+0 1.13E+0 113 1, PCVml 2.62E-4 1.33E-4 1.81 E-4 1.55E-4 9.02E-5 1.13E-4 1131/1133 0.09 0.05 0.07 0.16 0.08 0.11 Hydrogen, cc/kg 39.1 36.5 38 41.9 36.9 39.5 Lithium, ppm 2.26 2.06 2.16 2.33 2.09 2.21 Boron - 10, ppm*
97 76 87 195 175 186 Oxygen, (DO), ppm
< 0.005
- 0.005
< 0 005
_* 0.005
- 0 005
- 0.005 Chloride, ppm 0.003 0.002 0.002 0.003 0.001 0.002 EH @ 25 dearee Celsius 7.23 6.93 7.39 B3or'on - 10 = Total Boron x 0.196 Comment-:
None 6.8 6 47 6 65 6.8 6 47 6 65
Surry Monthly Operating Report No. 02-12 Page 14 of 15 FUEL HANDLING UNITS 1 & 2 MONTH/YEAR: December 2002 Date Stored or Received Number of Assemblies oer Shipment Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity None during the Reporting Period New Fuel Shipment or Cask No.
Surry Monthly Operating Report No. 02-12 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR: December 2002 None during the Reporting Period