July 2004 Monthly Operating Report for Surry, Units 1 and 2
ML042300359
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/10/2004
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
04-477
Download: ML042300359 (16)


Text

VIRGINIA ELECTRIC AND POVwER COMPANY RICIIMONSD, VIRGINIA 23261 August 10, 2004 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.

SPS Lic/JSA Docket Nos.04-477 RO 50-280 50-281 DPR-32 DPR-37 License Nos.

Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of July 2004 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:

United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. N. P. Garrett NRC Senior Resident Inspector Surry Power Station

ii4 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 04-07 Approved:

President Date

Surry Monthly Operating Report No. 04-07 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1............................................................

3 Operating Data Report - Unit No. 2...........................................................

4 Unit Shutdowns and Power Reductions - Unit No. 1............................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2........................................................... 6 Average Daily Unit Power Level - Unit No. 1.............................................................

7 Average Daily Unit Power Level - Unit No. 2............................................................

8 Summary of Operating Experience - Unit Nos. 1 and 2.............................................................

9 Facility Changes That Did Not Require NRC Approval........................................................... 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval.............................................. 11 Tests and Experiments That Did Not Require NRC Approval........................

................................... 12 Chemistry Report............................................................

13 Fuel Handling - Unit Nos. 1 and 2...........................................................

14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications............................................................

15

Surry Monthly Operating Report No. 04-07 Page 3 of 15 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-280 08/02/04 R. Stief (757) 365-2486

1.

Unit Name:.........................................................

2.. Reporting Period:................................................
3.

Licensed Thermal Power (MWt):.........................

4.

Nameplate Rating (Gross MWe):........................

5.

Design Electrical Rating (Net MWe):...................

6.

Maximum Dependable Capacity (Gross MWe):...

7.

Maximum Dependable Capacity (Net MWe):.......

Surry Unit 1 July 2004 2546 847.5 788 842 810

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744.00 744.00 0.00 744.00 0.00 1893631.30 628872.00 606049.00 100.00%

100.00%

100.57%

103.37%

0.00%

Year-To-Date 5111.00 5111.00 0.00 5082.43 0.00 12868184.60 4294445.00 4139674.00 99.44%

99.44%

99.99%

102.79%

0.56%

Cumulative 277079.00 206514.48 3774.50 203687.20 3736.20 487260108.20 160433710.00 153301774.00 73.51%

74.86%

70.58%

70.21%

11.79%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

November 2004 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 20001

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 04-07 Page 4 of 15 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-281 08/02/04 R. Stief (757) 365-2486

1.

Unit Name:............

....................... Surry Unit 2

2.

Reporting Period:...................................

July 2004

3.

Licensed Thermal Power (MWt):.........................

2546

4.

Nameplate Rating (Gross MWe):........................

847.5

5.

Design Electrical Rating (Net MWe):...................

788

6.

Maximum Dependable Capacity (Gross MWe):...

847

7.

Maximum Dependable Capacity (Net MWe):.......

815

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

10.

Power Level To Which Restricted, If Any (Net MWe):

Reasons For Restrictions, If Any:

11.

Hours in Reporting Period

12.

Hours Reactor Was Critical

13.

Reactor Reserve Shutdown Hours

14.

Hours Generator On-Line

15.

Unit Reserve Shutdown Hours

16.

Gross Thermal Energy Generated (MWH)

17.

Gross Electrical Energy Generated (MWH)

18.

Net Electrical Energy Generated (MWH)

19.

Unit Service Factor

20.

Unit Availability Factor

21.

Unit Capacity Factor (Using MDC Net)

22.

Unit Capacity Factor (Using DER Net)

23.

Unit Forced Outage Rate This Month 744.00 744.00 0.00 744.00 0.00 1893631.30 628275.00 605834.00 100.00%

100.00%

99.91%

103.34%

0.00%

Year-To-Date 5111.00 4956.52 0.00 4933.75 0.00 12516372.40 4183356.00 4037559.00 96.53%

96.53%

96.93%

100.25%

3.47%

Cumulative 273960.00 203918.82 328.10 201380.17 0.00 483162716.20 159161670.00 152130395.00 73.51%

73.51%

70.52%

70.47%

9.41%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 04-07 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EauAL TO OR GREATER THAN 20%)

REPORT MONTH: July 2004 Docket No.: 50-280 Unit Name:

Surry Unit 1 Date:

08/02/04 Completed by:

R. Stief Telephone:

(757) 365-2486 None during the Reporting Period (1)

F:

Forced S: Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 04-07 Page 6 of 15 UNrT SHUTDOWN AND POWER REDUCTION (EauAL To OR GREATER THAN 20%)

REPORT MONTH: July 2004 Docket No.:

50-281 Unit Name:

Surry Unit 2 Date:

08/02/04 Completed by: R. Stief Telephone:

(757) 365-2486 None during the Reporting Period (1)

F:

Forced S: Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 04-07 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name:

Surry Unit 1 Date:

08/01/04 Completed by:

R. Stief Telephone:

(757) 365-2486 MONTH:

July 2004 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 816 815 815 817 815 814 814 814 813 813 813 813 811 810 812 813 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe-Net) 815 815 815 814 814 815 816 817 819 818 817 816 816 815 814 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 04-07 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-281 Unit Name:

Surry Unit 2 Date:

08/01/04 Completed by: R. Stief Telephone:

(757) 365-2486 MONTH:

July 2004 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 816 816 813 813 813 812 812 814 813 811 812 813 811 812 813 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe-Net) 816 815 815 814 814 814 815 816 818 818 817 816 817 816 815 813 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 04-07 Page 9 of 15

SUMMARY

OF OPERATING EXPERIENCE MoNTH/YEm: July 2004 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNrr ONE:

07/01/04 07/31/04 UNrr Two:

07/01/04 07/31/04 0000 2400 0000 2400 Unit started the month at 100% / 847 MWe.

Unit finished the month at 100% / 845 MWe.

Unit started the month at 100% / 846 MWe.

Unit finished the month at 100% / 845 MWe.

Surry Monthly Operating Report No. 04-07 Page 10 of 15 FAc-LrrY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTHYEAR: July 2004 None during the Reporting Period.

Surry Monthly Operating Report No. 04-07 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTHrNEAR: July 2004 None during the Reporting Period

Surry Monthly Operating Report No. 04-07 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REOUIRE NRC APPROVAL MoNTH/YEAR: July 2004 None during the Reporting Period

Surry Monthly Operating Report No. 04-07 Page 13 of 15 CHEMISTRY REPORT MoNTH/YEAR: July 2004 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.

Min.

-g Max.

Min.

Avg.

Gross Radioactivity, PCiml 3.00E-1 1.74E-1 2.63E-1 2.70E-1 1.63E-1 2.25E-1 Suspended Solids, ppmr Gross Tritium, pCi/ml 5.53E-1 5.13E-1 5.34E-1 9.14E-1 8.13E-1 8.68E-1 1131, pCi/ml 2.06E-4 8.52E-5 1.67E-4 1.08E-4 4.85E-5 7.52E-5 1131/1133 0.08 0.03 0.06 0.34 0.14 0.22 Hydrogen, cc/kg 37.1 29.9 34.4 42.6 37.7 40.1 Lithium, ppm 2.25 2.11 2.17 2.28 2.14 2.21 Boron - 10, ppm' 82 64 73 195 181 188 Oxygen, (DO), ppm

  • 0.005
  • 0.005
  • 0.005
  • 0.005
  • 0.005
  • 0.005 Chloride, ppm 0.003 0.001 0.002 0.008 0.005 0.006 pH @ 25 degree Celsius 7.22 7.01 7.14 6.71 6.54 6.6 Boron - 10 = Total Boron x 0.196 Comments:

Unit 1: Unit at 100% power. Quarterly Suspended Solids not required.

Unit 2: Unit at 100% power. Quarterly Suspended Solids not required.

Surry Monthly Operating Report No. 04-07 Page 14 of 15 FUEL HANDLING UNrrs1 &2 MoNTH/YEAR: July 2004 New Fuel Shipment or Cask No.

Number of Date Stored Assemblies or Received per Shipment Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity None during the Reporting Period

R Surry Monthly Operating Report No. 04-07 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MoNTH/YEAR: July 2004 None during the Reporting Period