January 2002 Monthly Operating Report for Surry Power Station, Units 1 and 2
ML020580183
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/06/2002
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
02-071
Download: ML020580183 (19)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 06, 2002 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.

SPS Lic/JSA Docket Nos.

License Nos.

Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of January 2002 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:

United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station 02-071 RO 50-280 50-281 DPR-32 DPR-37 1-11ý V'/

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 02-01 Approved:

Site Vice President D e-

Surry Monthly Operating Report No. 02-01 Page 2 of 18 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1...........................................................................................................................

3 Operating Data Report - Unit No. 2...........................................................................................................................

4 Unit Shutdowns and Power Reductions - Unit No. 1............................................................................................

5 Unit Shutdowns and Power Reductions - Unit No. 2.............................................................................................

6 Average Daily Unit Power Level - Unit No. 1......................................................................................................

7 Average Daily Unit Power Level - Unit No. 2........................................................................................................

8 Summary of Operating Experience - Unit Nos. 1 and 2.........................................................................................

9 Facility Changes That Did Not Require NRC Approval.........................................................................................

10 Procedure or Method of Operation Changes That Did Not Require NRC Approval...........................................

11 Tests and Experiments That Did Not Require NRC Approval..............................................................................

12 Chemistry Report.....................................................................................................................................................

13 Fuel Handling - Unit Nos. 1 and 2............................................................................................................................

14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications......................................................................................................................

18

Surry Monthly Operating Report No. 02-01 Page 3 of 18 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

U nit N am e :............................................................

Reporting Period:..................................................

Licensed Thermal Power (MW t):..........................

Nameplate Rating (Gross MW e):..........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):....

Maximum Dependable Capacity (Net MW e):........

50-280 02/04/02 R. Stief (757) 365-2486 Surry Unit 1 January 2002 2546 847.5 788 842 810

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 1893551.9 635091.0 613399.0 100.0%

100.0%

101.8%

104.6%

0.0%

Year-To-Date 744.0 744.0 0.0 744.0 0.0 1893551.9 635091.0 613399.0 100.0%

100.0%

101.8%

104.6%

0.0%

Cumulative 255192.0 186505.6 3774.5 183846.2 3736.2 437201029.8 143715194.0 137206260.0 72.0%

73.5%

68.8%

68.2%

12.7%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 20001

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

1.
2.
3.
4.
5.
6.

7.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

Surry Monthly Operating Report No. 02-01 Page 4 of 18 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

U nit N a m e :............................................................

Reporting Period:..................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):..........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):....

Maximum Dependable Capacity (Net MWe):........

50-281 02/04/02 R. Stief (757) 365-2486 Surry Unit 2 January 2002 2546 847.5 788 847 815

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 1894040.7 637175.0 615322.0 100.0%

100.0%

101.5%

105.0%

0.0%

Year-To-Date 744.0 744.0 0.0 744.0 0.0 1894040.7 637175.0 615322.0 100.0%

100.0%

101.5%

105.0%

0.0%

Cumulative 252073.0 184562.0 328.1 182360.4 0.0 434918944.9 143014182.0 136572372.0 72.3%

72.3%

69.0%

68.8%

10.1%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

April 2002 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

1.
2.
3.
4.
5.
6.

7.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

Surry Monthly Operating Report No. 02-01 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: January 2002 Docket No.:

50-280 Unit Name:

Surry Unit 1 Date:

02/04/02 Completed by:

R. Stief Telephone:

(757) 365-2486 None during the Reporting Period (1)

F:

Forced S:

Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 02-01 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: January 2002 Docket No.:

50-281 Unit Name:

Surry Unit 2 Date:

02/04/02 Completed by:

R. Stief Telephone:

(757) 365-2486 None during the Reporting Period (1)

F:

Forced S:

Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 Manual 2

Manual Scram 3

Automatic Scram 4

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 02-01 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL MONTH:

January 2002 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 825 827 825 825 825 825 823 824 825 825 825 825 825 823 824 824 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Docket No.:

50-280 Unit Name:

Surry Unit 1 Date:

02/04/02 Completed by:

R. Stief Telephone:

(757) 365-2486 Average Daily Power Level (MWe - Net) 826 826 824 825 824 824 824 825 825 824 825 824 824 824 824 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 02-01 Page 8 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-281 Unit Name:

Surry Unit 2 Date: 02/04/02 Completed by:

R. Stief Telephone:

(757) 365-2486 MONTH:

January 2002 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 827 827 826 827 828 827 827 826 826 825 826 825 826 827 828 826 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 828 828 828 827 827 828 828 827 827 827 828 828 828 829 828 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 02-01 Page 9 of 18

SUMMARY

OF OPERATING EXPERIENCE MONTHIYEAR: January 2002 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

0000 2400 0000 2400 Unit started the month at 100% / 854 MWe.

Unit finished the month at 100% / 854 MWe.

Unit started the month at 100% / 855 MWe.

Unit finished the month at 100% / 855 MWe.

UNIT ONE:

01/01/02 01/31/02 UNIT Two:

01/01/02 01/31/02

Surry Monthly Operating Report No. 02-01 Page 10 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: January 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-01 Page 11 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: January 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-01 Page 12 of 18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: January 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-01 Page 13 of 18 CHEMISTRY REPORT MONTH/YEAR: January 2002 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.

Min.

Avg.

Max.

Min.

Avg.

Gross Radioactivity, p.Ci/ml 3.36E-1 2.37E-1 2.79E-1 3.24E-1 2.10E-1 2.64E-1 Suspended Solids, ppm Gross Tritium, pCi/ml 5.87E-1 3.55E-1 4.72E-1 1.51 E-1 1.39E-1 1.47E-1 1131, AtCi/mI 1.74E-4 5.51E-5 1.22E-4 1.97E-4 8.11E-5 1.15E-4 1131/1133 0.12 0.04 0.09 0.12 0.05 0.07 Hydrogen, cc/kg 39.6 35.4 37.7 43 36.7 39.9 Lithium, ppm 2.48 2.23 2.38 2.03 1.54 1.79 Boron - 10, ppm*

269 258 263 56.6 37.6 48.5 Oxygen, (DO), ppm

_ 0.005

_ 0.005

< 0.005

< 0.005

< 0.005

_ 0.005 Chloride, ppm 0.022 0.005 0.008 0.002 0.001 0.001 pH @ 25 degree Celsius 6.5 6.29 6.39 7.38 7.2 7.29 Boron - 10 = Total Boron x 0.196 Comments:

None

Surry Monthly Operating Report No. 02-01 Page 14 of 18 FUEL HANDLING UNITS 1 & 2 MONTHIYEAR: January 2002 Number of Date Stored or Assemblies Received per Shipment New Fuel Shipment or Cask No.

Unit 2 Batch 20 Shipment #1 Unit 2 Batch 20 Shipment #2 12 12 Assembly Number 01/03/02 01/08/02 ANSI Number 01R 04R 1OR 16R 22R 33R 38R 39R 41R 45R 53R 59R 02R 06R 13R 17R 19R 20R New or Spent Initial Fuel Shipping Enrichment Cask Activity LM1CNM LM1CNQ LMICNW LMICP2 LM1CP8 LM1CPK LMICPQ LM1CPR LM1CPT LM1CPX LM1CQ5 LM1CQB LM1CNN LM1CNS LM1CNZ LM1CP3 LM1CP5 LM1CP6 571.00 GBq 568.69 GBq 4.1011 4.0923 4.0992 4.1074 4.1010 4.1077 4.2437 4.2486 4.2440 4.2459 4.2675 4.2500 4.1000 4.1007 4.1018 4.0986 4.1089 4.1007

Surry Monthly Operating Report No. 02-01 Page 15 of 18 FUEL HANDLING UNITS 1 & 2 MONTH/YEAR: January 2002 New Fuel Number of Shipment or Date Stored or Assemblies Cask No.

Received per Shipment Unit 2 Batch 20 Shipment #3 01/09/02 12 Assembly Number 21 R 36R 48R 52R 54R 56R 05R 11R 18R 23R 27R 31 R 32R 34R 42R 43R 49R 60R New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity LM1CP7 LM1CPN LM1CQ0 LM1CQ4 LM1 CQ6 LM1CQ8 LMICNR LM1CNX LM1CP4 LM1CP9 LM1CPD LM1CPH LM1CPJ LM1CPL LM1 CPU LMICPV LM1CQ1 LM1CQC 4.0985 4.0999 4.2554 4.2646 4.2747 4.2432 4.1083 4.1013 4.1075 4.1080 4.1031 4.1076 4.1011 4.1102 4.2453 4.2466 4.2516 4.2564 569.06 GBq

Surry Monthly Operating Report No. 02-01 Page 16 of 18 FUEL HANDLING UNITS I & 2 MONTHIYEAR: January 2002 Number of Date Stored or Assemblies Received per Shipment New Fuel Shipment or Cask No.

Unit 2 Batch 20 Shipment #4 Unit 2 Batch 20 Shipment #5 12 12 Assembly Number 01/10/02 01/11/02 ANSI Number 07R 08R 12R 24R 25R 30R 35R 37R 44R 47R 51R 55R 03R 09R 14R 15R 26R 28R New or Spent Initial Fuel Shipping Enrichment Cask Activity LM1CNT LM1CNU LMICNY LM1 CPA LM1CPB LMICPG LM1CPM LM1CPP LM1CPW LM1CPZ LM1CQ3 LM1CQ7 LM1CNP LM1CNV LM1CP0 LMICP1 LM1CPC LM1CPE 570.17 GBq 570.17 GBq 4.1082 4.1003 4.1023 4.0989 4.1067 4.1025 4.1005 4.2445 4.2446 4.2486 4.2413 4.2517 4.0935 4.0988 4.1015 4.0986 4.1085 4.1029

Surry Monthly Operating Report No. 02-01 Page 17 of 18 FUEL HANDLING UNITS 1 & 2 MONTH/YEAR: January 2002 Date Stored or Received Number of Assemblies ner Shioment Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity 29R 40R 46R 50R 57R LM1CPF LM1CPS LM1CPY LM1CQ2 LM1CQ9 58R LM1CQA New Fuel Shipment or Cask No.

4.1004 4.2477 4.2521 4.2482 4.2445 4.2465 Cask No Der Shipment

Surry Monthly Operating Report No. 02-01 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHIYEAR: January 2002 None during the Reporting Period