ML023250382

From kanterella
Jump to navigation Jump to search
October 2002 Monthly Operating Report for Surry Power Station Units 1 & 2
ML023250382
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/12/2002
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
02-694, SPS Lic/JSA R0
Download: ML023250382 (16)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 November 12, 2002 U. S. Nuclear Regulatory Commission Serial No.02-694 Attention: Document Control Desk SPS Lic/JSA R0 Washington, D.C. 20555-0001 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of October 2002 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:

United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 02-10 Approved:

Surry Monthly Operating Report No. 02-10 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1............................................................................................................................

3 Operating Data Report - Unit No. 2............................................................................................................................

4 Unit Shutdowns and Power Reductions - Unit No. 1.............................................................................................

5 Unit Shutdowns and Power Reductions - Unit No. 2.............................................................................................

6 Average Daily Unit Power Level - Unit No. 1.......................................................................................................

7 Average Daily Unit Power Level - Unit No. 2......................................................................................................

8 Summary of Operating Experience - Unit Nos. 1 and 2.........................................................................................

9 Facility Changes That Did Not Require NRC Approval.......................................................................................

10 Procedure or Method of Operation Changes That Did Not Require NRC Approval............................................

11 Tests and Experiments That Did Not Require NRC Approval.............................................................................

12 Chem istry Report.....................................................................................................................................................

13 Fuel Handling - Unit Nos. 1 and 2............................................................................................................................

14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications.......................................................................................................................

15

Surry Monthly Operating Report No. 02-10 Page 3 of 15 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

Unit Name:..........................................................

Reporting Period:.................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):.........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):...

Maximum Dependable Capacity (Net MWe):.......

50-280 11/04/02 R. Stief (757) 365-2486 Surry Unit 1 October 2002 2546 847.5 788 842 810

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 745.0 745.0 0.0 745.0 0.0 1896770.0 633390.0 611952.0 100.0%

100.0%

101.4%

104.2%

0.0%

Year-To-Date 7296.0 7296.0 0.0 7296.0 0.0 18472900.2 6176986.0 5945648.0 100.0%

100.0%

100.6%

103.4%

0.0%

Cumulative 261744.0 193057.6 3774.5 190398.2 3736.2 453780378.1 149257089.0 142538509.0 72.7%

74.2%

69.8%

69.1%

12.3%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

1.
2.
3.
4.
5.
6.

7.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

Surry Monthly Operating Report No. 02-10 Page 4 of 15 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

Unit Name:...........................................................

Reporting Period:.................................................

Licensed Thermal Power (MW t):..........................

Nameplate Rating (Gross MW e):.........................

Design Electrical Rating (Net MW e):....................

Maximum Dependable Capacity (Gross MWe):...

Maximum Dependable Capacity (Net MWe):.......

50-281 11/04/02 R. Stief (757) 365-2486 Surry Unit 2 October 2002 2546 847.5 788 847 815

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 745.0 745.0 0.0 745.0 0.0 1896586.7 636735.0 614569.0 100.0%

100.0%

101.2%

104.7%

0.0%

Year-To-Date 7296.0 6637.8 0.0 6599.3 0.0 16721046.5 5595702.0 5396283.0 90.5%

90.5%

90.8%

93.9%

0.0%

Cumulative 258625.0 190455.8 328.1 188215.7 0.0 449745950.7 147972709.0 141353333.0 72.8%

72.8%

69.8%

69.4%

9.8%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

f

Reference:

Letter S/N 00-069. dated February 7. 20001

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

1.
2.
3.
4.
5.
6.

7.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

Surry Monthly Operating Report No. 02-10 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: October 2002 Docket No.: 50-280 Unit Name:

Surry Unit 1 Date: 11/01/02 Completed by. R. Stief Telephone.

(757) 365-2486 None during the Reporting Period (1)

F:

Forced S:

Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2

Manual Scram 3

Automatic Scram 4

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 02-10 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: October 2002 Docket No.:

Unit Name:

Date:

Completed by:

Telephone:

50-281 Surry Unit 2 11101/02 R. Stief (757) 365-2486 None during the Reporting Period (1)

F:

Forced S: Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 02-10 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL MONTH:

October 2002 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 819 818 817 818 819 820 819 820 821 820 820 820 820 820 821 822 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Docket No.: 50-280 Unit Name:

Surry Unit 1 Date:

11/04/02 Completed by:

R. Stief Telephone:

(757) 365-2486 Average Daily Power Level (MWe - Net) 822 822 823 823 824 824 824 823 824 823 858 823 824 823 824 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 02-10 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name:

Surry Unit 2 Date:

11/04102 Completed by:

R. Stief Telephone:

(757) 365-2486 MONTH:

October 2002 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 822 822 820 821 819 821 821 823 823 824 824 824 825 825 827 827 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 827 826 827 826 826 827 826 827 827 827 862 827 828 828 828 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 02-10 Page 9 of 15

SUMMARY

OF OPERATING EXPERIENCE MONTH/YEAR: October 2002 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

0000 2400 0000 2400 Unit started the month at 100% / 850 MWe.

Unit finished the month at 100% / 853 MWe.

Unit started the month at 100% / 853 MWe Unit finished the month at 100% /858 MWe.

UNrT ONE:

10/01/02 10/31/02 UNIT Two:

10/01/02 10/31/02

Surry Monthly Operating Report No. 02-10 Page 10 of 15 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTH/YEAR: October 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-10 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: October 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-10 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: October 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-10 Page 13 of 15 CHEMISTRY REPORT MoNTH/YEAR: October 2002 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.

Mm.

Avg.

Max.

Mm.

Avg.

Gross Radioactivity, pCi/ml 3.53E-1 1.60E-1 2.81 E-1 3.33E-1 1.69E-1 2.63E-1 Suspended Solids, ppm 0.01 001 0.01 0.01 0.01 0.01 Gross Tritium, pCVml 8.67E-1 8.34E-1 8.51 E-1 1.58E+O 1.04E+O 1.40E+O 1131, j.Ci/ml 2.58E-4 8.75E-5 1.73E-4 1.09E-4 6.14E-5 8.68E-5 1131/1133 0.1 0.04 0.07 0.11 0.05 0.08 Hydrogen, cc/kg 38.1 35 36.1 40.2 357 37.7 Lithium, ppm 2.32 2.12 2.21 2.32 2.12 2.23 Boron - 10, ppm*

135 117 127 227 211 220 Oxygen, (DO), ppm

_5 0.005

_< 0.005

_5 0 005

_5 0.005

_5 0.005

< 0.005 Chloride, ppm 0 005 0.003 0.004 0.004 0.002 0.002 pH @ 25 degree Celsius 7

6.7 6 87 6 61 6.35 6.49 Boron - 10 = Total Boron x 0.196 Comments:

None

Surry Monthly Operating Report No. 02-10 Page 14 of 15 FUEL HANDLING UNrrs 1 & 2 MONTH/YEAR: October 2002 Date Stored or Received Number of Assemblies per Shipment Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity None during the Reporting Period New Fuel Shipment or Cask No.

Surry Monthly Operating Report No. 02-10 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR: October 2002 None during the Reporting Period