March 2005 Monthly Operating Report from Surry Power Station Units 1 and 2
ML051090349
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/08/2005
From: Jernigan D
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
05-221
Download: ML051090349 (19)


Text

VIRGINIA ELECTRIC AND POWErR COMPANY RIcwmOND, VIRGINIA 23261 April 8, 2005 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.

SPS Lic/JSA Docket Nos.05-221 RO 50-280 50-281 DPR-32 DPR-37 License Nos.

Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of March 2005 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Ve tru

ours, onald E-Jgan, Site Vice President Surry Power Station Attachment

'Commitments made by this letter: None cc:

United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. N. P. Garrett NRC Senior Resident Inspector Surry Power Station 2-4

I-VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 05-03 i~

v 1 yo<S Approved:

Surry Monthly Operating Report No. 05-03 Page 2 of 18 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1..........................................................

3 Operating Data Report - Unit No. 2.........................................................

4 Unit Shutdowns and Power Reductions - Unit No. I..........................................................5 Unit Shutdowns and Power Reductions - Unit No. 2.......................................................... 6 Average Daily Unit Power Level - Unit No. 1..........................................................

7 Average Daily Unit Power Level - Unit No. 2..........................................................

8 Summary of Operating Experience - Unit Nos. 1 and 2...........................................................

9 Facility Changes That Did Not Require NRC Approval.........................................................

10 Procedure or Method of Operation Changes That Did Not Require NRC Approval............................................... 11 Tests and Experiments That Did Not Require NRC Approval..........................................................

12 Chemistry Report.........................................................

13 Fuel Handling - Unit Nos. 1 and 2..........................................................

14 Description of Periodic Test(s) Which Were Not Completed Within the Time Umits Specified in Technical Specifications.........................................................

18

Surry Monthly Operating Report No. 05-03 Page3of 18 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-280 04/04/05 R. Stief (757) 365-2486 1.

2.

3.

4.

5.

6.

7.

Unit Name:.........................................................

Reporting Period:................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):.........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):....

Maximum Dependable Capacity (Net MWe):........

Surry Unit 1 March 2005 2546 847.5 788 840 799

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

I 11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744.00 744.00 0.00 744.00 0.00 1893496.90 635059.00 605110.00 100.00%

100.00%

101.79%

103.21%

0.00%

Year-To-Date 2160.00 2068.53 0.00 2037.97 0.00 5169728.40 1727530.00 1645810.00 94.35%

94.35%

95.36%

96.69%

5.65%

Cumulative 282912.00 211469.93 3774.50 208587.19 3736.20 499654406.20 164572805.00 156333209.00 73.73%

75.05%

70.44%

70.13%

11.59%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

Reference:

Letter S/N 00-069, dated February 7, 2000

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 05-03 Page 4 of 18 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-281 04/04/05 R. Stief (757) 365-2486 1.

2.

3.

4.

5.

6.

7.

Unit Name:.........................................................

Reporting Period:................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):.........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):....

Maximum Dependable Capacity (Net MWe):........

Surry Unit 2 March 2005 2546 847.5 788 840 799

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744.00 744.00 0.00 744.00 0.00 1893533.50 637309.00 606337.00 100.00%

100.00%

102.00%

103.42%

0.00%

Year-To-Date 2160.00 2160.00 0.00 2160.00 0.00 5497502.50 1849442.00 1759767.00 100.00%

100.00%

101.97%

103.39%

0.00%

Cumulative 279793.00 209751.82 328.10 207213.17 0.00 497999894.30 164142287.00 155936212.00 74.06%

74.06%

70.73%

70.73%

9.17%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

April 2005 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 20001

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7,2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 05-03 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQuAL To OR GREATER THAN 20%)

REPORT MONTH: March 2005 Docket No.:

Unit Name:

Date:

Completed by:

Telephone:

50-280 Surry Unit 1 04/04/05 R. Stief (757) 365-2486 None during the Reporting Period (1)

F:

Forced S:

Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Ucensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 05-03 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%)

REPORT MONTH: March 2005 Docket No.: 50-281 Unit Name:

Surry Unit 2 Date: 04/04/05 Completed by:

R. Stief Telephone:

(757) 365-2486 None during the Reporting Period (1)

F:

Forced S:

Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Ucensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 05-03 Page7of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 04/04/05 Completed by: R. Stief Telephone:

(757) 365-2486 MONTH:

March 2005 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 813 813 813 813 812 813 814 814 813 814 814 815 813 813 813 813 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 813

-813 814 814 814 814 814 813 813 813 813 813 814 813 813 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 05-03 Page 8 of 18 AVERAGE DAILY UNrT POWER LEVEL Docket No.:

50-281 Unit Name:

Surry Unit 2 Date:

04/04/05 Completed by: R. Stief Telephone: (757) 365-2486 MONTH:

March 2005 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe-Net) 815 815 816 815 815 815 815 814 814 814 815 814 816 815 816 815 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 815 815 816 816 815 815 815 815 815 815 815 814 813 815 816 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 05-03 Page 9 of 18

SUMMARY

OF OPERATING EXPERIENCE MoNTYEAR: March 2005 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNrr ONE:

03/01/05 03/31/05 UNrr Two:

03/01/05 03/31/05 0000 2400 0000 2400 Unit started the month at 1 00%/o / 854 MWe.

Unit finished the month at I 00% / 854 MWe Unit started the month at 100% / 857 MWe.

Unit finished the month at 1 00%/o I 857 MWe.

Surry Monthly Operating Report No. 05-03 Page 10 of 18 FACILrry CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTWYEAR: March 2005 None during the Reporting Period.

Surry Monthly Operating Report No. 05-03 Page 11 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: March 2005 None during the Reporting Period.

Surry Monthly Operating Report No. 05-03 Page 12 of 18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MoNTHIYEAR: March 2005 None during the Reporting Period

Surry Monthly Operating Report No. 05-03 Page 13 of 18 CHEMISTRY REPORT MONTHRYEAR: March 2005 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.

Min.

Avg.

Max.

Min.

Avg.

Gross Radioactivity, gtCvml 4.60E-1 2.39E-1 3.59E-1 2.55E-1 1.34E-1 1.95E-1 Suspended Solids, ppm S 0.010 S 0.010 S 0.010 S 0.010 S 0.010 S 0.010 Gross Tritium, p.Ciml 7.77E-1 6.43E-1 7.12E-1 7.30E-1 5.23E-1 6.24E-1 1131, ACVml 1.61 E-4 7.55E-5 1.13E-4 1.06E-4 2.65E-5 6.13E5 1131/1133 0.09 0.05 0.07 0.37 0.11 0.19 Hydrogen, cc/kg 38.5 35.3 36.9 43.6 39.4 40.9 Lithium, ppm 3.62 3.31 3.49 1.91 1.32 1.61 Boron-10, ppm*

252 237 245 51 29 40 Oxygen, (DO), ppm

  • 0.005
  • 0.005
  • 0.005
  • 0.005
  • 0.005
  • 0.005 Chloride, ppm 0.014 0.012 0.012 0.001 0.001 0.001 pH @ 25 degree Celsius 6.67 6.52 6.59 7.42 7.24 7.31 Boron - 10 = Total Boron x 0.196 Comments:

Unit 1: Unit at 100% power.

Unit 2: Unit at 100% power.

Surry Monthly Operating Report No. 05-03 Page 14 of 18 FUEL HANDLING UNTS 1 & 2 MoNrHIYEAR: March 2005 New Fuel Number of Shipment or Date Stored or Assemblies Cask No.

Received per Shipment Spent Fuel Cask TN-32-44 03/02/05 32 Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity OK8 1X4 1X5 1X6 1X7 1X9 2K1 2K2 2K3 2K4 2K5 2K6 2K7 2K8 2K9 2X1 2X4 2X5 LMOYKG LMOZWV LMOZWW LMOZWX LMOZWY LMOZXO LMOYKV LMOYKW LMOYKX LMOYKY LMOYKZ LMOYLO LMOYL1 LMOYL2 LMOYL3 LMOZX2 LMOZX5 LMOZX6 3.8197 N/A 3.8153 3.8166 3.8024 3.8105 3.8176 3.8179 3.8136 3.8081 3.8177 3.8137 3.8059 3.8204 3.8071 3.8137 3.8136 3.8113 3.8257

Surry Monthly Operating Report No. 05-03 Page 15 of 18 FUEL HANDLING UNITS 1 & 2 MoNrH/YEAR: March 2005 New Fuel Number of Shipment or Date Stored or Assemblies Cask No.

Received per Shipment Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity 3KO 3K1 3K2 6V2 6WO 6W1 6W2 6W3 6W4 6W5 6W6 6W8 DOS 4G7 owl LMOYL4 LMOYL5 LMOYL6 LMOTUJ LMOX41 LMOX46 LMOX47 LMOX48

-LMOX49 LMOX4A LMOX4B LMOX4D LM008E LMOMDC LMOX2E LMOZWG LMOZWH LMOZWM 3.8135 3.8139 3.8138 3.9935 4.0151 4.0053 3.9994 4.0040 3.9940 3.9982 4.0006 3.9910 3.3250 3.9914 3.8280 Spent Fuel Cask TN-32-46 03/23/05 32 N/A Oxi OX2 OX6 3.8162 3.8136 3.8122

Surry Monthly Operating Report No. 05-03 Page 16 of 18 FUEL HANDLING UNITS 1 & 2 MONTrhYEAR: March 2005 New Fuel Number of Shipment or Date Stored or Assemblies Cask No.

Received per Shipment Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity OX7 OX8 1Wi 1W2 1W6 1W9 1XO 1X2 1X3 2WO 2W1 2W3 2W7 3V5 4VO 4V5 4V9 4WO LMOZWN LMOZWP LMOX2Q LMOX2R LMOX2V LMOX2Y LMOZWR LMOZWT LMOZWU LMOX2Z LMOX30 LMOX32 LMOX36 LMOTTR LMOTTW LMOTU1 LMOTU5 LMOX3F 3.8095 3.8113 3.8067 3.8122 3.8004 3.8129 3.8277 3.8060 3.8184 3.8061 3.8150 3.8005 3.8083 4.0012 3.9937 3.9932 3.9991 4.0042

Surry Monthly Operating Report No. 05-03 Page 17 of 18 FUEL HANDLING UNrS 1 &2 MONTWHYEAR: March 2005 New Fuel Number of Shipment or Date Stored or Assemblies Cask No.

Received per Shipment Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity 4W7 4W8 5V2 5V5 5V8 5WO 5W1 5W2 5W6 5W8 LMOX3N LMOX3P LMOTU8 LMOTUB LMOTUE LMOX3R LMOX3S LMOX3T LMOX3X LMOX3Z 4.0034 4.0053 3.9932 3.9877 4.0017 4.0055 4.0034 4.0061 4.0130 4.0060

Surry Monthly Operating Report No. 05-03 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MoNrH/YEAR: March 2005 None during the Reporting Period