September 2002 Monthly Operating Report for Surry Units 1 & 2
ML022910075
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/09/2002
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
02-622, SPSLic/JSA R0
Download: ML022910075 (16)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 9, 2002 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.

SPS Lic/JSA Docket Nos.

License Nos.

Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of September 2002 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:

United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station 3-02-622 RO 50-280 50-281 DPR-32 DPR-37

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 02-09 Approved:

1 Sit-ice President te

Surry Monthly Operating Report No. 02-09 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1............................................................................................................................

3 Operating Data Report - Unit No. 2............................................................................................................................

4 Unit Shutdowns and Power Reductions - Unit No. 1.............................................................................................

5 Unit Shutdowns and Power Reductions - Unit No. 2..............................................................................................

6 Average Daily Unit Power Level - Unit No. 1.....................................................................................................

7 Average Daily Unit Power Level - Unit No. 2......................................................................................................

8 Summary of Operating Experience - Unit Nos. 1 and 2.........................................................................................

9 Facility Changes That Did Not Require NRC Approval.....................................................................................

10 Procedure or Method of Operation Changes That Did Not Require NRC Approval............................................

11 Tests and Experiments That Did Not Require NRC Approval..............................................................................

12 Chemistry Report...................................................................................................................................................

13 Fuel Handling - Unit Nos. 1 and 2...........................................................................................................................

14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications................................................

15

Surry Monthly Operating Report No. 02-09 Page 3 of 15 OPERATING DATA REPORT Docket No :

Date:

Completed By:

Telephone:

Unit Name:...........................................................

Reporting Period..................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):.........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):...

Maximum Dependable Capacity (Net MWe):.......

50-280 10/01/02 R. Stief (757) 365-2486 Surry Unit 1 September 2002 2546 847.5 788 842 810

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 720.0 720.0 0.0 720.0 0.0 1817844.0 605185.0 584124.0 100.0%

100.0%

100.2%

103.0%

0.0%

Year-To-Date 6551.0 6551.0 0.0 6551.0 0.0 16576130.2 5543596.0 5333696.0 100.0%

100.0%

100.5%

103.3%

0.0%

Cumulative 260999.0 192312.6 3774.5 189653.2 3736.2 451883608.1 148623699.0 141926557.0 72.7%

74.1%

69.5%

69.0%

12.4%

2A.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided fReference" Letter S/N 00-069. dated February 7. 20001

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

1.
2.
3.
4.
5.
6.

7.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

Surry Monthly Operating Report No. 02-09 Page 4 of 15 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

Unit Nam e:...........................................................

Reporting Period:..........................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):.........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):...

Maximum Dependable Capacity (Net MWe):.......

50-281 10/01/02 R. Stief (757) 365-2486 Surry Unit 2 September 2002 2546 847.5 788 847 815

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 720.0 720.0 0.0 720.0 0.0 1832264.5 611866.0 589486.0 100.0%

100.0%

100.5%

103.9%

0.0%

Year-To-Date 6551.0 5892.8 0.0 5854.3 0.0 14824459.8 4958967.0 4781714.0 89.4%

89.4%

89.6%

92.6%

0.0%

Cumulative 257880.0 189710.8 328.1 187470.7 0.0 447849364.0 147335974.0 140738764.0 72.7%

72.7%

69.5%

69.3%

9.9%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter SIN 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

1.
2.
3.
4.
5.
6.

7.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

I

Surry Monthly Operating Report No. 02-09 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: September 2002 Docket No.:

50-280 Unit Name:

Surry Unit 1 Date:

10/01/02 Completed by:

R. Stief Telephone:

(757) 365-2486 (1)

(2)

F:

Forced REASON:

S:

Scheduled A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3

Automatic Scram 4

Other (Explain)

(5)

Exhibit 1 - Same Source (1)

(2)

(3)

(4)

(5)

Method Duration of LER No.

System Component Cause & Corrective Action to Date Type Hours Reason Shutting Code Code Prevent Recurrence Down Rx 09/07/02 S

N/A B

N/A N/A N/A N/A Unit ramped to perform 1 -OSP TM-001, Turbine Inlet Valve Freedom Test 09/07/02 S

N/A A

N/A N/A SL PCV Unit ramped to repair 1-FW-P 1 B (pressure regulating valve)

Surry Monthly Operating Report No. 02-09 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: September 2002 Docket No.:

Unit Name:

Date:

Completed by:

Telephone:

50-281 Surry Unit 2 10/01/02 R. Stief (757) 365-2486 (1)

F:

Forced S:

Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source (1)

(2)

(3)

(4)

(5)

Method Duration of LER No.

System Component Cause & Corrective Action to Date Type Hours Reason Shutting Code Code Prevent Recurrence Down Rx 09/14/02 S

N/A B

N/A N/A N/A N/A Unit ramped to perform 2-OSP TM-001, Turbine Inlet Valve Freedom Test

Surry Monthly Operating Report No. 02-09 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL MONTH:

September 2002 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 819 820 819 818 817 818 598 818 818 818 818 819 819 818 819 819 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Docket No.: 50-280 Unit Name:

Surry Unit 1 Date:

10/01/02 Completed by:

R. Stief Telephone:

(757) 365-2486 Average Daily Power Level (MWe - Net) 819 818 818 817 819 818 819 820 820 820 818 818 819 819 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt

Surry Monthly Operating Report No. 02-09 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-281 Unit Name:

Surry Unit 2 Date: 10/01/02 Completed by:

R. Stief Telephone:

(757) 365-2486 MONTH:

September 2002 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 821 823 822 820 819 819 819 819 818 817 818 819 818 808 818 818 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Average Daily Power Level (MWe - Net) 817 813 819 818 817 818 818 819 819 821 821 823 823 823 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 02-09 Page 9 of 15

SUMMARY

OF OPERATING EXPERIENCE MONTH/YEAR: September 2002 The following chronological sequence by unit is a summary of operating expenences for this month that required load reductions or resulted in significant non-load related incidents.

UNIT ONE:

09/01/02 0000 Unit started the month at 100% / 850 MWe.

09/07/02 0112 Commenced ramp to perform 1-OSP-TM-001 and repair of 1-FW-P-1B. Unit at 100% / 848 MWe.

09/07/02 0152 Stopped ramp at 90% / 770 MWe for 1 -OSP-TM-001.

09/07/02 0247 1-OSP-TM-001 completed SAT. Commenced ramping down for 1-FW-P-1B.

09/07/02 0540 Secured ramp at 59% / 468 MWe.

09/07/02 1430 1-FW-P-1B returned to service.

09/07/02 1505 Commenced ramp to 100%.

09/07/02 2104 Unit at 100% / 843 MWe.

09/30/02 2400 Unit finished the month at 100% / 850 MWe.

UNIT Two:

09/01/02 0000 Unit started the month at 100% / 852 MWe 09/14/02 0135 Commenced ramping unit to 85% power in accordance with 2-OSP-TM-001.

Unit at 100% / 849 MWe.

09/14/02 0251 Stopped ramp at 85% / 730 MWe.

09/14/02 0335 2-OSP-TM-001 completed SAT. Commenced ramp to 100%.

09/14/02 0438 Unit at 100% / 846 MWe.

09/30/02 2400 Unit finished the month at 100% / 853 MWe.

Surry Monthly Operating Report No. 02-09 Page 10 of 15 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: September 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-09 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: September 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-09 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: September 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-09 Page 13 of 15 CHEMISTRY REPORT MONTH/YEAR: September 2002 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.

Min.

Avg.

Max.

Mm.

Avg.

Gross Radioactivity, giCi/ml 3.75E-1 2.26E-1 3.04E-1 3.69E-1 1.65E-1 2.69E-1 Suspended Solids, ppm 0.01 0.01 0.01 0.01 0.01 0.01 Gross Tritium, p.Ci/ml 9.99E-1 8.14E-1 8 69E-1 1.42E+0 1.33E+0 1.37E+0 1131, pCi/ml 2.47E-4 1.23E-4 1.85E-4 6 06E-4 6.57E-5 1.20E-4 1131/1133 0.12 0.05 0.08 0.11 0.07 0.08 Hydrogen, cc/kg 38.7 34.4 36.2 38 9 36.1 37.5 Lithium, ppm 2.32 2.05 2.17 2.34 2.05 2.19 Boron - 10, pprn*

160 136 147 241 226 234 Oxygen, (DO), ppm

_< 0.005

  • 0.005
  • 0.005

_< 0.005

  • _ 0.005

_< 0.005 Chloride, ppm 0.007 0.004 0 004 0.008 0.002 0.003 pH @ 25 degree Celsius 6.88 6.66 6.76 6.52 6.33 6.43 Boron - 10 = Total Boron x 0.196 Comments:

None

Surry Monthly Operating Report No. 02-09 Page 14 of 15 FUEL HANDLING UNITS 1 & 2 MONTh/YEAR: September 2002 Date Stored or Received Number of Assemblies per Shipment Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity None during the Reporting Period New Fuel Shipment or Cask No.

Surry Monthly Operating Report No. 02-09 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR: September 2002 None during the Reporting Period