VIRGINIA ELrCTRIC AND POWERl COMPANY RIciMOND, VIRGINIA 23261 December 11, 2003 U. S. Nuclear Regulatory Commission Serial No.03-608 Attention: Document Control Desk SPS Lic/JSA RO Washington, D.C. 20555-0001 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of November 2003 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 03-11 Approved: 5' e Vice President a

Surry Monthly Operating Report No. 03-11 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1 ............................................................ 3 Operating Data Report - Unit No. 2 ........................................................... 4 Unit Shutdowns and Power Reductions - Unit No. 1 ........................................................... 5 Unit Shutdowns and Power Reductions - Unit No. 2 ........................................................... 6 Average Daily Unit Power Level - Unit No. 1............................................................ 7 Average Daily Unit Power Level - Unit No. 2............................................................. 8 Summary of Operating Experience - Unit Nos. 1 and 2 ............................................................ 9 Facility Changes That Did Not Require NRC Approval ............................................................ 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval .............................................. 11 Tests and Experiments That Did Not Require NRC Approval .......................... .................................. 12 Chemistry Report ........................................................... 13 Fuel Handling - Unit Nos. 1 and 2 ............................................................ 14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ........................................................... 15

Surry Monthly Operating Report No. 03-11 Page 3 of 15 OPERATING DATA REPORT Docket No.: 50-280 Date: 12/01/03 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name:......................................................... Surry Unit 1
2. Reporting Period:................................................ November 2003
3. Licensed Thermal Power (MWt):......................... 2546
4. Nameplate Rating (Gross MWe):........................ 847.5
5. Design Electrical Rating (Net MWe):................... 788
6. Maximum Dependable Capacity (Gross MWe):... 842
7. Maximum Dependable Capacity (Net MWe):....... 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe): _
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 720.00 8016.00 271224.00
12. Hours Reactor Was Critical 720.00 6137.88 200659.48
13. Reactor Reserve Shutdown Hours 0.00 0.00 3774.50
14. Hours Generator On-Line 720.00 5998.57 197860.77
15. Unit Reserve Shutdown Hours 0.00 0.00 3736.20
16. Gross Thermal Energy Generated (MWH) 1832600.60 14991987.80 472498304.50
17. Gross Electrical Energy Generated (MWH) 615831.00 4997943.00 155503267.00
18. Net Electrical Energy Generated (MWH) 584347.00 4805994.00 148548315.00
19. Unit Service Factor 100.00% 74.83% 72.95%
20. Unit Availability Factor 100.00% 74.83% 74.33%
21. Unit Capacity Factor (Using MDC Net) 100.20% 74.02% 69.86%
22. Unit Capacity Factor (Using DER Net) 102.99% 76.09% 69.50%
23. Unit Forced Outage Rate 0.00% 6.45% 12.09%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 20001

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 03-11 Page 4 of 15 OPERATING DATA REPORT Docket No.: 50-281 Date: 12/01/03 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ......................................................... Surry Unit 2
2. Reporting Period:................................................ November 2003
3. Licensed Thermal Power (MWt):......................... 2546
4. Nameplate Rating (Gross MWe):........................ 847.5
5. Design Electrical Rating (Net MWe):................... 788
6. Maximum Dependable Capacity (Gross MWe):... 847
7. Maximum Dependable Capacity (Net MWe):....... 815
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 720.00 8016.00 268105.00
12. Hours Reactor Was Critical 152.03 6345.63 198229.03
13. Reactor Reserve Shutdown Hours 0.00 0.00 328.10
14. Hours Generator On-Line 0.00 6168.80 195753.20
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 16492.00 15705208.80 468932193.30
17. Gross Electrical Energy Generated (MWH) 0.00 5268222.00 154408755.00
18. Net Electrical Energy Generated (MWH) 0.00 5063321.00 147544038.00
19. Unit Service Factor 0.00% 76.96% 73.01%
20. Unit Availability Factor 0.00% 76.96% 73.01%
21. Unit Capacity Factor (Using MDC Net) 0.00% 77.50% 69.93%
22. Unit Capacity Factor (Using DER Net) 0.00% 80.16% 69.84%
23. Unit Forced Outage Rate 0.00% 2.27% 9.59%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069. dated February 7. 20001

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 03-11 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: November 2003 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 12/01/03 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Ucensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Ucensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 03-11 Page6of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MoNTH: November 2003 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 12/01/03 Completed by: R. Stief Telephone: (757) 365-2486 (1) (2) (3) (4) (5)

Method Duration of LER No. System Component Cause & Corrective Action to Date Type Hours Reason Shutting Code Code Prevent Recurrence Down Rx 11/01/03 S 720 C 1 NA N/A N/A Unit 2 offline for Refueling Outage/Reactor Vessel Head Replacement (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 03-11 Page 7 of 15 AVERAGE DAILY UNrr POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 12/01/03 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: November 2003 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 825 17 811 2 819 18 818 3 824 19 822 4 825 20 808 5 826 21 821 6 824 22 822 7 821 23 810 8 805 24 803 9 818 25 796 10 804 26 797 11 797 27 811 12 809 28 811 13 810 29 810 14 796 30 796 15 799 16 810 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-11 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 5-281 Unit Name: Surry Unit 2 Date: 12/012/03 Completed by: R. Stief Telephone: (757) 365-2486 MoNrH: November 2003 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe- Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-11 Page 9 of 15

SUMMARY

OF OPERATING EXPERIENCE MoNTE/YA: November 2003 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related Incidents.

UNrT ONE:

11/01/03 0000 Unit started the month at 100% / 856 MWe.

11/30/03 2400 Unit finished the month at 100% / 856 MWe.

UNrr Two:

11/01/03 0000 Unit started the month at 0% / 0 MWe. Unit offline for refueling/reactor vessel head replacement.

11/13/03 0309 Reactor Critical.

11/16/03 1201 Shutdown reactor due to a delay in the startup of the secondary plant for Investigation of the Lube Oil System.

11/19/03 0957 Reactor Critical.

11/22/03 0907 Shutdown reactor due to a delay In the startup of the turbine because of Hydrogen Seal Oil System problems.

11/30/03 2400 Unit finished the month at 0% / 0 MWe.

Surry Monthly Operating Report No. 03-11 Page 10 of 15 FAcILrrY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTHNEAR: November 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-11 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTHYEAR: November 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-1 1 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MoNTHIYrn: November 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-11 Page 13 of 15 CHEMISTRY REPORT MoNTH/YEAR: November 2003 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. Avg. Max. Min. Avg.

Gross Radioactivity, pCi/ml 3.47E-1 1.52E-2 2.64E-1 3.59E-2 3.43E-4 1.07E-2 Suspended Solids, ppm 0.25 0.01 0.05 Gross Tritium, gCi/ml 5.93E-1 4.30E-1 5.13E-1 4.39E-2 3.20E-2 3.74E-2 1131, uiCi/ml 2.23E-4 9.38E-5 1.46E-4 2.79E-5 3.23E-6 1.34E-5 1131/1133 0.12 0.05 0.08 - - -

Hydrogen, cc/kg 35.8 33.3 34.3 34.4 1.52 25.3 Lithium, ppm 2.31 2.1 2.2 3.96 0.11 2.75 Boron - 10, ppm* 216 200 207 507 365 408 Oxygen, (DO), ppm S 0.005

  • 0.005 S 0.005 6
  • 0.005 1.2 Chloride, ppm 0.005 0.004 0.005 0.013 0.001 0.005 pH @ 25 degree Celsius 6.62 6.42 6.56 6.25 4.8 5.49

Unit 1: 100% power Unit 2: In startup, following Refueling Shutdown

Surry Monthly Operating Report No. 03-11 Page 14 of 15 FUEL HANDLING UNITS 1 & 2 MoNTH/YEAR: November 2003 New Fuel Number of New or Spent Shipment or Date Stored Assemblies Assembly ANSI Initial Fuel Shipping Cask No. or Received per Shipment Number Number Enrichment Cask Activity None during the Reporting Period

Surry Monthly Operating Report No. 03-11 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED INTECHNICAL SPECIFICATIONS MoNTH/YEAR: November 2003 None during the Reporting Period