ML033530082

From kanterella
Jump to navigation Jump to search
November 2003 Monthly Operating Report for Surry, Units 1 and 2
ML033530082
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/11/2003
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
03-608
Download: ML033530082 (16)


Text

VIRGINIA ELrCTRIC AND POWERl COMPANY RIciMOND, VIRGINIA 23261 December 11, 2003 U. S. Nuclear Regulatory Commission Serial No.03-608 Attention: Document Control Desk SPS Lic/JSA RO Washington, D.C. 20555-0001 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of November 2003 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:

United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 03-11 Approved:

5' e Vice President a

Surry Monthly Operating Report No. 03-11 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1............................................................

3 Operating Data Report - Unit No. 2...........................................................

4 Unit Shutdowns and Power Reductions - Unit No. 1........................................................... 5 Unit Shutdowns and Power Reductions - Unit No. 2........................................................... 6 Average Daily Unit Power Level - Unit No. 1............................................................

7 Average Daily Unit Power Level - Unit No. 2.............................................................

8 Summary of Operating Experience - Unit Nos. 1 and 2............................................................

9 Facility Changes That Did Not Require NRC Approval............................................................ 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval.............................................. 11 Tests and Experiments That Did Not Require NRC Approval..........................

.................................. 12 Chemistry Report...........................................................

13 Fuel Handling - Unit Nos. 1 and 2............................................................

14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications...........................................................

15

Surry Monthly Operating Report No. 03-11 Page 3 of 15 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-280 12/01/03 R. Stief (757) 365-2486

1.

Unit Name:.........................................................

2.

Reporting Period:................................................

3.

Licensed Thermal Power (MWt):.........................

4.

Nameplate Rating (Gross MWe):........................

5.

Design Electrical Rating (Net MWe):...................

6.

Maximum Dependable Capacity (Gross MWe):...

7.

Maximum Dependable Capacity (Net MWe):.......

Surry Unit 1 November 2003 2546 847.5 788 842 810

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe): _

10.

Reasons For Restrictions, If Any:

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 720.00 720.00 0.00 720.00 0.00 1832600.60 615831.00 584347.00 100.00%

100.00%

100.20%

102.99%

0.00%

Year-To-Date 8016.00 6137.88 0.00 5998.57 0.00 14991987.80 4997943.00 4805994.00 74.83%

74.83%

74.02%

76.09%

6.45%

Cumulative 271224.00 200659.48 3774.50 197860.77 3736.20 472498304.50 155503267.00 148548315.00 72.95%

74.33%

69.86%

69.50%

12.09%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 20001

25.

If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 03-11 Page 4 of 15 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-281 12/01/03 R. Stief (757) 365-2486

1.

Unit Name:.........................................................

2.

Reporting Period:................................................

3.

Licensed Thermal Power (MWt):.........................

4.

Nameplate Rating (Gross MWe):........................

5.

Design Electrical Rating (Net MWe):...................

6.

Maximum Dependable Capacity (Gross MWe):...

7.

Maximum Dependable Capacity (Net MWe):.......

Surry Unit 2 November 2003 2546 847.5 788 847 815

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 720.00 152.03 0.00 0.00 0.00 16492.00 0.00 0.00 0.00%

0.00%

0.00%

0.00%

0.00%

Year-To-Date 8016.00 6345.63 0.00 6168.80 0.00 15705208.80 5268222.00 5063321.00 76.96%

76.96%

77.50%

80.16%

2.27%

Cumulative 268105.00 198229.03 328.10 195753.20 0.00 468932193.30 154408755.00 147544038.00 73.01%

73.01%

69.93%

69.84%

9.59%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069. dated February 7. 20001

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 03-11 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: November 2003 Docket No.:

Unit Name:

Date:

Completed by:

Telephone:

50-280 Surry Unit 1 12/01/03 R. Stief (757) 365-2486 None during the Reporting Period (1)

F:

Forced S:

Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Ucensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 03-11 Page6of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MoNTH: November 2003 Docket No.:

50-281 Unit Name:

Surry Unit 2 Date:

12/01/03 Completed by: R. Stief Telephone:

(757) 365-2486 (1)

(2)

(3)

(4)

(5)

Method Duration of LER No.

System Component Cause & Corrective Action to Date Type Hours Reason Shutting Code Code Prevent Recurrence Down Rx 11/01/03 S

720 C

1 NA N/A N/A Unit 2 offline for Refueling Outage/Reactor Vessel Head Replacement (1)

F:

Forced S: Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 03-11 Page 7 of 15 AVERAGE DAILY UNrr POWER LEVEL Docket No.: 50-280 Unit Name:

Surry Unit 1 Date:

12/01/03 Completed by:

R. Stief Telephone:

(757) 365-2486 MONTH:

November 2003 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 825 819 824 825 826 824 821 805 818 804 797 809 810 796 799 810 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Average Daily Power Level (MWe - Net) 811 818 822 808 821 822 810 803 796 797 811 811 810 796 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-11 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 5-281 Unit Name:

Surry Unit 2 Date:

12/012/03 Completed by:

R. Stief Telephone:

(757) 365-2486 MoNrH:

November 2003 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Average Daily Power Level (MWe-Net) 0 0

0 0

0 0

0 0

0 0

0 0

0 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-11 Page 9 of 15

SUMMARY

OF OPERATING EXPERIENCE MoNTE/YA: November 2003 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related Incidents.

UNrT ONE:

11/01/03 0000 Unit started the month at 100% / 856 MWe.

11/30/03 2400 Unit finished the month at 100% / 856 MWe.

UNrr Two:

11/01/03 0000 Unit started the month at 0% / 0 MWe. Unit offline for refueling/reactor vessel head replacement.

11/13/03 0309 Reactor Critical.

11/16/03 1201 Shutdown reactor due to a delay in the startup of the secondary plant for Investigation of the Lube Oil System.

11/19/03 0957 Reactor Critical.

11/22/03 0907 Shutdown reactor due to a delay In the startup of the turbine because of Hydrogen Seal Oil System problems.

11/30/03 2400 Unit finished the month at 0% / 0 MWe.

Surry Monthly Operating Report No. 03-11 Page 10 of 15 FAcILrrY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTHNEAR: November 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-11 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTHYEAR: November 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-1 1 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MoNTHIYrn: November 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-11 Page 13 of 15 CHEMISTRY REPORT MoNTH/YEAR: November 2003 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.

Min.

Avg.

Max.

Min.

Avg.

Gross Radioactivity, pCi/ml 3.47E-1 1.52E-2 2.64E-1 3.59E-2 3.43E-4 1.07E-2 Suspended Solids, ppm 0.25 0.01 0.05 Gross Tritium, gCi/ml 5.93E-1 4.30E-1 5.13E-1 4.39E-2 3.20E-2 3.74E-2 1131, uiCi/ml 2.23E-4 9.38E-5 1.46E-4 2.79E-5 3.23E-6 1.34E-5 1131/1133 0.12 0.05 0.08 Hydrogen, cc/kg 35.8 33.3 34.3 34.4 1.52 25.3 Lithium, ppm 2.31 2.1 2.2 3.96 0.11 2.75 Boron - 10, ppm*

216 200 207 507 365 408 Oxygen, (DO), ppm S 0.005

  • 0.005 S 0.005 6
  • 0.005 1.2 Chloride, ppm 0.005 0.004 0.005 0.013 0.001 0.005 pH @ 25 degree Celsius 6.62 6.42 6.56 6.25 4.8 5.49 Boron - 10 = Total Boron x 0.196 Comments:

Unit 1: 100% power Unit 2: In startup, following Refueling Shutdown

Surry Monthly Operating Report No. 03-11 Page 14 of 15 FUEL HANDLING UNITS 1 & 2 MoNTH/YEAR: November 2003 New Fuel Shipment or Cask No.

Number of Date Stored Assemblies or Received per Shipment Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity None during the Reporting Period

Surry Monthly Operating Report No. 03-11 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MoNTH/YEAR: November 2003 None during the Reporting Period