VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 9, 2002 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.
SPS Lic/JSA Docket Nos.
License Nos.
Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of November 2002 is provided in the attachment.
If you have any questions or require additional information, please contact us.
Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:
United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station 02-732 RO 50-280 50-281 DPR-32 DPR-37
ýiy.
yc;-e-
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 02-11 Approved:
Pdf J ý Sit ice Presieta
Surry Monthly Operating Report No. 02-11 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. I...........................................................................................................................
3 Operating Data Report - Unit No. 2...........................................................................................................................
4 Unit Shutdowns and Power Reductions - Unit No. 1............................................................................................
5 Unit Shutdowns and Power Reductions - Unit No. 2............................................................................................
6 Average Daily Unit Power Level - Unit No. I........................................................................................................
7 Average Daily Unit Power Level - Unit No. 2........................................................................................................
8 Summary of Operating Experience - Unit Nos. I and 2.......................................................................................
9 Facility Changes That Did Not Require NRC Approval........................................................................................
10 Procedure or Method of Operation Changes That Did Not Require NRC Approval...........................................
11 Tests and Experiments That Did Not Require NRC Approval..............................................................................
12 Chemistry Repo rt.....................................................................................................................................................
13 Fuel Handling - Unit Nos. 1 and 2............................................................................................................................
14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications......................................................................................................................
15
Surry Monthly Operating Report No. 02-11 Page 3 of 15 OPERATING DATA REPORT Docket No.:
Date:
Completed By:
Telephone:
Unit Name:............................................................
Reporting Period:..................................................
Ucensed Thermal Power (MWt):..........................
Nameplate Rating (Gross MWe):..........................
Design Electrical Rating (Net MWe):....................
Maximum Dependable Capacity (Gross MWe):....
Maximum Dependable Capacity (Net MWe):........
50-280 12102102 R. Stief (757) 365-2486 Surry Unit 1 November 2002 2546 847.5 788 842 810
- 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9.
Power Level To Which Restricted, If Any (Net MWe):
- 10.
Reasons For Restrictions, If Any:
Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 720.0 720.0 0.0 720.0 0.0 1832631.2 614071.0 591678.0 100.0%
100.0%
101.5%
104.3%
0.0%
Year-To-Date 8016.0 8016.0 0.0 8016.0 0.0 20305531.4 6791057.0 6537326.0 100.0%
100.0%
100.7%
103.5%
0.0%
Cumulative 262464.0 193777.6 3774.5 191118.2 3736.2 455613009.3 149871160.0 143130187.0 72.8%
74.2%
69.7%
69.2%
12.3%
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
April 2003 Type and duration of scheduled shutdowns are no longer provided.
[
Reference:
Letter SIN 00-069, dated February 7, 2000]
- 25.
If Shut Down at End of Report Period, Estimated Date of Start-up:
Estimated start-up dates are no longer provided. [
Reference:
Letter S/N 00-069, dated February 7. 2000]
- 26.
Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
23.
Surry Monthly Operating Report No. 02-11 Page 4 of 15 OPERATING DATA REPORT Docket No.:
Date:
Completed By:
Telephone:
Unit Name:............................................................
Reporting Period:..................................................
Licensed Thermal Power (MWt):..........................
Nameplate Rating (Gross MWe):..........................
Design Electrical Rating (Net MWe):....................
Maximum Dependable Capacity (Gross MWe):....
Maximum Dependable Capacity (Net MWe):........
50-281 12/02/02 R. Stief (757) 365-2486 Surry Unit 2 November 2002 2546 847.5 788 847 815
- 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9.
Power Level To Which Restricted, If Any (Net MWe):
- 10.
Reasons For Restrictions, If Any:
Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 720.0 683.6 0.0 624.7 0.0 1586809.8 530867.0 512440.0 86.8%
86.8%
87.3%
90.3%
13.2%
Year-To-Date 8016.0 7321.4 0.0 7224.0 0.0 18307856.3 6126569.0 5908723.0 90.1%
90.1%
90.4%
93.5%
1.3%
Cumulative 259345.0 191139.4 328.1 188840.4 0.0 451332760.5 148503576.0 141865773.0 72.8%
72.8%
69.6%
69.4%
9.8%
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Type and duration of scheduled shutdowns are no longer provided.
f
Reference:
Letter SIN 00-069. dated February 7, 20001
- 25.
If Shut Down at End of Report Period, Estimated Date of Start-up:
Estimated start-up dates are no longer provided. [
Reference:
Letter S/N 00-069, dated February 7, 2000]
- 26.
Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
23.
Surry Monthly Operating Report No. 02-11 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: November 2002 Docket No.:
50-280 Unit Name:
Surry Unit 1 Date: 12/02/02 Completed by: R. Stief Telephone:
(757) 365-2486 None during the Reporting Period (1)
F:
Forced S: Scheduled (2)
REASON:
A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Ucensing Examination F -
Administrative G -
Operational Error (Explain)
H Other (Explain)
(3)
METHOD:
I -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Other (Explain)
(4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit I - Same Source
Surry Monthly Operating Report No. 02-11 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: November 2002 Docket No.:
Unit Name:
Date:
Completed by:
Telephone:
50-281 Surry Unit 2 12/02/02 R. Stief (757) 365-2486 (1)
(2)
F:
Forced REASON:
S: Scheduled A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Licensing Examination F -
Administrative G -
Operational Error (Explain)
H Other (Explain)
(4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
(3)
METHOD:
1 -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Other (Explain)
(5)
Exhibit I - Same Source (1)
(2)
(3)
(4)
(5)
Method Duration of LER No.
System Component Cause & Corrective Action to Date Type Hours Reason Shutting Code Code Prevent Recurrence Down Rx 11/23/02 S
11H 44M B
N/A N/A N/A N/A Unit ramped to perform 2-OSP TM-001, Turbine Inlet Valve Freedom Test 11/23/02 F
95H 15M A
3 Report Under JJ HCU Unit 2 tripped due to failure of Review Electro-Hydraulic Controls
Surry Monthly Operating Report No. 02-11 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL MONTH:
November 2002 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 824 824 824 824 824 824 823 824 822 822 824 824 824 824 824 819 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Docket No.:
50-280 Unit Name: Surry Unit 1 Date:
12/02102 Completed by:
R. Stief Telephone:
(757) 365-2486 Average Daily Power Level (MWe - Net) 824 824 824 822 821 822 819 814 813 806 819 823 824 824 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
Sumy Monthly Operating Report No. 02-11 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-281 Unit Name:
Surry Unit 2 Date: 12/02/02 Completed by: R. Stief Telephone:
(757) 365-2486 MONTH:
November 2002 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 828 828 828 828 828 827 828 828 827 827 827 827 828 828 828 827 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Average Daily Power Level (MWe - Net) 825 827 828 828 829 828 115 0
0 0
550 827 826 827 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day In the reporting month. Compute to the nearest whole megawatt.
Surry Monthly Operating Report No. 02-11 Page 9 of 15
SUMMARY
OF OPERATING EXPERIENCE MONTH/YEAR: November 2002 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
UNrT ONE:
11101102 0000 Unit started the month at 100% / 853 MWe.
11/30/02 2400 Unit finished the month at 100% /853 MWe.
UNIT TWO:
11/01/02 0000 Unit started the month at 100% / 858 MWe.
11/23/02 0148 Commenced ramping to 85% In accordance with procedure 2-OSP-TM-001.
11/23/02 0251 Stopped ramp at 85%.
11/23/02 0303 Commenced 2-OSP-TM-001.
11/23/02 0332 Unit Reactor Trip. While closing #3 Governor Valve lAW 2-OSP-TM-001, EHC Control Cards failed causing all Governor Valves to fail shut. Cards replaced.
11/24/02 1550 Reactor Critical.
11/27/02 0247 Generator On-line.
11/27/02 1653 Unit at 100% Power 855 MWe.
11/30/02 2400 Unit finished the month at 100% / 857 MWe.
Surry Monthly Operating Report No. 02-11 Page 10 of 15 FACIuTY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTHYEAR: November 2002 None during the Reporting Period
Surry Monthly Operating Report No. 02-11 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: November 2002 None during the Reporting Period
Surry Monthly Operating Report No. 02-11 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: November 2002 None during the Reporting Period
Surry Monthly Operating Report No. 02-11 Page 13 of 15 CHEMISTRY REPORT MONTHYEAR: November 2002 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.
Min.
Avg.
Max.
Min.
Avg.
Gross Radioactivity, iCilml 3.98E-1 1.39E-1 2.86E-1 3.87E-1 2.82E-2 2.55E-1 Suspended Solids, ppm 0.05 0.01 0.03 Gross Tritium, pCilml 1.21E+0 7.14E-1 8.77E-1 1.63E+0 1.15E+0 1.47E+0 1131, 4Ci/ml 2.85E-4 1.10E-4 1.90E-4 1.84E-4 4.90E-5 1.03E-4 1131/1133 0.11 0.06 0.08 0.1 0.07 0.08 Hydrogen, cc/kg 37.8 35.2 36.5 40.5 36.2 38.4 Lithium, ppm 2.32 2.07 2.19 2.69 2.06 2.29 Boron - 10, ppm*
117 97 107 288 194 235 Oxygen, (DO), ppm
< 0.005
< 0.005
<0.005
<0.005
< 0.005
- 5 0.005 Chloride, ppm 0.004 0.002 0.003 0.003 0.002 0.002 pH ( 25 degree Celsius 7.2 6.87 7
6.77 6.4 6.55 Boron - 10 = Total Boron x 0.196 Comments:
None
Surry Monthly Operating Report No. 02-11 Page 14 of 15 FUEL HANDLING UNITS I & 2 MONTHIYEAR: November 2002 Number of Date Stored or Assemblies Received oer Shioment Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity None during the Reporting Period New Fuel Shipment or Cask No.
Surry Monthly Operating Report No. 02-11 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MoNTIVEAR: November 2002 None during the Reporting Period