Text
\\,
January 9, 1978' Mr. William McDonald, Director Office of Yianagement Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. McDonald:
Serial No. 013 PO&M/DLB:das Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Operating information for Surry Power Station, Unit Nos. 1 and 2 for the month of December 1977 is attached.
Attachments cc:
Mr. James P. O'Reilly, Director Off ice of Inspection and Enforcement Very truly yours,
~, ))7, ~a??u~;w C. H. Stallings Vice President - Power Supply and Production Operations 7E:0110143
.()*.*
.. ~~
~'.
UNIT Surry Unit 1 DATE Jan. 1, 1978 COMPLETED BY 0. w. Akins DOCKET No._5_0_-_28_0 ____
OPERA TING STATUS
- 1.
REPORTING PERIOD:
0001 771201 THROUGH __. __
24
.... 0.-..0...._..... 7.... 7-=l..::2=3=1,__ ___
- HOURS IN REPORTING PERlOD: __ 7_4_4 ___ __,....,...,~-------------------
2~
CURRENTLY AUTHORIZED POWER LEVEL (MWth} 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 775
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): ___
N_/_A _____ _
. 4.
REASONS FOR RESTRICTION (IF ANY):
- s.
- 6.
- 7.
- 8.
- 9.
- 10.
11 *
- 12.
- 13.
- 14.
lS.
- 16.
- 17.
- 18.
(I)
THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL ********* :* ***
REACTOR RESERVE SHUTDOWN HOURS *******
HOURS GENERATOR ON LINE **.************
UNIT RESERVE SHUTDOWN HOURS.**********
GROSS THERMAL ENERGY 592.2 0
589.4 0
YR TO DATE 6-762. 5 0
fififiS.Z 0
/'"
CUMULATIVE TO DATE 29~316.9 Q
23,565 2 0
GENERA TED (MWH) *********************
GROSS ELECTRICAL ENERGY 1,418,378 16,596,829 65 2 685 2185
-GENERA TED (MWH) *********************
NET ELECTRICAL E~ERGY GENERATED (MWH) *.******** * **************** * ** *
- Rt:ACTOR AVAILABILITY FACTOR (1) *********
UNIT AV AILABlLITY FACTOR (2) ************
UNIT CAPACITY FACTOR (3) **..***********
UNIT FORCED OUTAGE RATE (4) *.*.********
469,850 447,962 79.6%
79.2%
- 77. 7%
.3%
5,281,480 21,359,843
~.023,799 20,267 2 564 77.2%
66.5%
76.1%
fl{!; I 8%
74.0%
59.3%
1.9%
18.1%
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE, AND DURATION OF EACH):
Refoeling S/G Inspection. Aprjl 1978, 4 weeks IF SHUT DOWN AT ENO OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___
N.._/ A ________ _
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
REACTOR AVAILABILITY FACTOR INmAL CRITICALITY INITIAL ELECTRICAL
. POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 DATE LAST DATE FORECAST ACHIEVED (2)
UNIT AVAILABILITY FACTOR
= _H_o_u_R_S_G_E_N_E_R_A_TO_R_O_N_L_IN_E _____ XlOO HOURS IN REPORTING PERIOD (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE
=
NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN Rl::PORTING Pl::RlOD FORCED OUTAGE HOURS
~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
L 0.,
- ._,).
,_)
.e DOCKETNo.s_o_-_28_0 ____......,...
UNIT Surry Unit 1 DATEJan. 2, 1978 COMPLETED BY o
- w
- Akins AVERAGE DAILY UNIT POWER LEVEL MONTH December 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 0
17 769.3 2
0 18 770.6 3
0 19 771.6 4
0
- 20 774.4 5
0 21 773.1 6
0 22 774.4 7
224.3 23 1
773.8 8
690.8 24 773. 7 9
771.5 25 774.8 10
. 768. 2 2a 775.o 11 770.0 27 "773.0 12 767.8 28" 774 ~ 7 13 Z6Z 3 29 775.3 14 768.9 30 774.5 15 768.2 31 771. 7 16 768.3 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit" power level in MWe-net for each day in the reporting month.
Compute tc th,e nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the* net electrical ratiPg of the unit, there may be occasions when the daily
- average power levei -!Xceeds the 100% line (or the restricted.power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
.i I
,j 1':.\\
'....J NO.
- 2.
DATE 12-1-7 12-7-7
SUMMARY
TYPE f*FORCEO DURATION S*SCHEDULED (HOURS) s 153.1 F
1.5
()
UNIT SHUTDOWNS l
)
DOCKET NO. 50-280 UNIT NAME Surry Unit 1 DATE Jan. 3, 1978 COMPLETED BY o. W. Akins REPORT MONTH December
~---~~~~~~-
METHOD OF
~HUTTING DOWN REASON (1t THE REACTOR (2t CORRECTIVE ACTIONS/COMMENTS H
1 S/G Inspection - Unit was down at beginning of this period - Leaks plugged
-. Inspection found satisfactory.
H 3
Lo-Lo S/G Level Trip - During manual feed control on Startup - Restored S/G Levels Feedwater control sensitivity during start-up.
(l) REASON (2) METllOD A* -EQUIPMENT FAILURE (EXPLAIN)
I-MANUAL D-MAINT. OR TEST 2-MANUAL C-REFL)ELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATI E-*OPEllATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINIST!tATIVE G-*OPERATIONAL ERROR (EXPLAIN) 11-0TllER (EXPLAIN)
I *
,_)
0 UNIT Surry Unit 2 DATE Jan. 3, 1978 COMPLETED BY 0
- w. Akins DOCKET No._5_0_-_2_8_1 ____ _
OPERATING STATUS
- 1.
REPORTING PERIOD:_O_o __ o....;;1;;..._,;7....;7....;;1-=2:;..;:0.... 1-,,,....,_,... ______ THROUGH 24 QO 771 2 3 J HOURS IN REPORTING PERIOD: ___
7_4_4 __
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 77 5 3~
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):_---_N_-:_A_. ______ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
- s.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
lS.
- 16.
- 17.
- 18.
(1)
(2)
THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL *..*..*******
REACTOR RESERVE SHUTDOWN HOURS *.*****
HOURS GENERATOR ON LINE......*.*******
UNIT RESERVE SHUTDOWN HOURS...*.******
GROSS THERMAL ENERGY GENERA TED (MWH) **...****.**.**** * ****
GROSS ELECTRICAL ENERGY
-GENERATED (MWH) *********************
NET ELECTRICAL ENERGY GENERATED (MWH)
Rl::ACTOR AVAILABILITY FACTOR :1) *********
UNIT AV AILABlLITY FACTOR (2)....*..*****
UNIT CAPACITY FACTOR (3)..*.**.********
UNIT FORCED OUTAGE RATE (4) **.*********
743.5 0
742.8 0
1,799,378 589,500 559,782 99.9 99.8 97.1 0
CUMULATIVE YR TO DATE TO DATE
~
6,09'3.9 26,412.8 0
0 Sz983.5 252928.9 0
0 13,82i,418 59,166,045 426962020 1925762394 4,457,415 18,553,117 69.6 64.5 68.3 63.6
- 65. z 58.5 25.1 25.5 SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
S/G Inspection. April 15. 1978, 4 weeks IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___,_," ___
N....;/_A ______ _
UNITS IN TEST STA tus (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLJJWING:
REACTOR AVAILABILITY F AC70R =
UNIT AVAILABILITY FACTOR INITIAL CRITICALITY
'INITIAL ELECTRICAL POWER GE.!"ERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
_H_O_U_R_S_G_E_N_E_R_A_T_O_R_O_N_L_IN_._E ____ XlOO HOURS IN REPORTING PERIOD DATE LAST DATE FORECAST ACHIEVED (3)
UNIT CAP AClTY FACTOR NET ELECTRICAL POWER GENERA TED MAX. DEPENDAllL.E CAPACITY (MWe-NET) X HOURS IN RJ::PORTING PJ::RlOD FORCED OUTAGE !WURS (4)
UNIT FORCED OUTAGE RATE x 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
CD A v
.9 DOCKET NO. _5_0_-2_8_1 __
UNIT Surry Unit 2 DATE Jan. 2, 1978 COMPLETED BY O
- W. Akins AVERAGE DAILY UNIT POWER LEVEL MONTH December 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 754.4 17 762.8 2
755.6 18 760.8 3
754.9 19 761.3 4
754.5 20 759.6 5
660.7 21 755.7 6
752.2 22 761.0 7
753.9 23 753.9 8
759.6 24 754.0 9
759.5 25
. 760. 9 10 759.5 26 759.7 11 759.0 27 761~8 12 711.8 28 762.6 13 712.1
- 29 761.9 14 756.9 30
-760.7 15 761.3 31 759.3 16 762.5 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unir power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
- These figures will be used to plot a graph fo:r each reporting month. Note that by using maximum dependable capacity for the* net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, -the.
average daily-unit power output sheet should be footnoted to explain the apparent anomaly.
. J l
- ~
t 1 i
.I
. -~
j 1 j l l
. J
)
l
. *J.,
- 1 l l.I 1
~
.1 i
NO.
DATE 1
12-5-7i
SUMMARY
UNIT SHUTDOWNS REPORT MONTH December TYPE METHOD OF f*FORCED DURATION
~HUTTING DOWN S*SCHEDULED (HOURS)
REASON (1)
THE REACTOR (2)
F 1.2 H
3
- o I
DOCKETN0.~
5_
0-_
2_
81~-*
UNIT NAME Surry Unit. 2 DATE January 2, 1978 COMPLETED BY o. W. Akins CORRECTIVE ACTIONS/COMMENTS Loss of Hotwell Level - Resulted in Lo-Lq S/G Reactor Trip
~
(l) REASON (2) METHOD A*-EQUIPMENT 1-'AILURE (EXPLAIN)
I-MANUAL 8-MAINT. OR TEST 2-MANUAL C-* REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMAT E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-*Ol'ERATIONAL ERROR (EXPLAIN)
II-OTHER (EXPLAIN).
IS t.) J.s~J l l fl.M 8 03