VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 8, 2002 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.02-481 SPS Lic/JSA RO Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of July 2002 is provided in the attachment.
If you have any questions or require additional information, please contact us.
Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:
United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 02-07 Approved:
I Site ice President
/Da
Surry Monthly Operating Report No. 02-07 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1............................................................................................................................
3 Operating Data Report - Unit No. 2............................................................................................................................
4 Unit Shutdowns and Power Reductions - Unit No. 1.............................................................................................
5 Unit Shutdowns and Power Reductions - Unit No. 2..............................................................................................
6 Average Daily Unit Power Level - Unit No. 1.....................................................................................................
7 Average Daily Unit Power Level - Unit No. 2......................................................................................................
8 Summary of Operating Experience - Unit Nos. 1 and 2.........................................................................................
9 Facility Changes That Did Not Require NRC Approval.......................................................................................
10 Procedure or Method of Operation Changes That Did Not Require NRC Approval............................................
11 Tests and Experiments That Did Not Require NRC Approval..........................................................................
12 Chemistry Report.....................................................................................................................................................
13 Fuel Handling - Unit Nos. 1 and 2............................................................................................................................
14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications.......................................................................................................................
15
Surry Monthly Operating Report No. 02-07 Page 3 of 15 OPERATING DATA REPORT Docket No.:
Date:
Completed By:
Telephone:
50-280 08/01/02 R. Stief (757) 365-2486 U nit N a m e :...........................................................
Reporting Period:.................................................
Licensed Thermal Power (MWt):..........................
Nameplate Rating (Gross MWe):.........................
Design Electrical Rating (Net MW e):....................
Maximum Dependable Capacity (Gross MWe):...
Maximum Dependable Capacity (Net MWe):.......
Surry Unit 1 July 2002 2546 847.5 788 842 810
- 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9.
Power Level To Which Restricted, If Any (Net MWe):
- 10.
Reasons For Restrictions, If Any:
Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 1894224.0 628285.0 605676.0 100.0%
100.0%
100.5%
103.3%
0.0%
Year-To-Date 5087.0 5087.0 0.0 5087.0 0.0 12894186.5 4320159.0 4153787.0 100.0%
100.0%
100.8%
103.6%
0.0%
Cumulative 259535.0 190848.6 3774.5 188189.2 3736.2 448201664.4 147400262.0 140746648.0 72.5%
73.9%
69.3%
68.8%
12.5%
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Type and duration of scheduled shutdowns are no longer provided.
[
Reference:
Letter SIN 00-069, dated February 7, 2000]
- 25.
If Shut Down at End of Report Period, Estimated Date of Start-up:
Estimated start-up dates are no longer provided. [
Reference:
Letter S/N 00-069, dated February 7, 2000]
- 26.
Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
23.
Surry Monthly Operating Report No. 02-07 Page 4 of 15 OPERATING DATA REPORT Docket No.:
Date:
Completed By:
Telephone:
50-281 08/01/02 R. Stief (757) 365-2486 U nit N am e :...........................................................
Reporting Period:.................................................
Licensed Thermal Power (MWt):..........................
Nameplate Rating (Gross MW e):.........................
Design Electrical Rating (Net MWe):....................
Maximum Dependable Capacity (Gross MWe):...
Maximum Dependable Capacity (Net MWe):.......
Surry Unit 2 July 2002 2546 847.5 788 847 815
- 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9.
Power Level To Which Restricted, If Any (Net MWe):
- 10.
Reasons For Restrictions, If Any:
Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 1894224.0 630135.0 606317.0 100.0%
100.0%
100.0%
103.4%
0.0%
Year-To-Date 5087.0 4428.8 0.0 4390.3 0.0 11097971.3 3717754.0 3586076.0 86.3%
86.3%
86.5%
89.5%
0.0%
Cumulative 256416.0 188246.8 328.1 186006.7 0.0 444122875.5 146094761.0 139543126.0 72.5%
72.5%
69.3%
69.1%
9.9%
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Type and duration of scheduled shutdowns are no longer provided.
[
Reference:
Letter S/N 00-069, dated February 7, 2000]
- 25.
If Shut Down at End of Report Period, Estimated Date of Start-up:
Estimated start-up dates are no longer provided. [
Reference:
Letter S/N 00-069, dated February 7, 2000]
- 26.
Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
23.
Surry Monthly Operating Report No. 02-07 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: July 2002 Docket No.:
Unit Name:
Date:
Completed by:
Telephone:
50-280 Surry Unit 1 08/01/02 R. Stief (757) 365-2486 None during the Reporting Period (1)
F:
Forced S:
Scheduled (2)
REASON:
A Equipment Failure (Explain)
B Maintenance or Test C -
Refueling D
Regulatory Restriction E
Operator Training & Licensing Examination F -
Administrative G -
Operational Error (Explain)
H Other (Explain)
(3)
METHOD:
1 Manual 2
Other (Explain)
(4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit 1 - Same Source
Surry Monthly Operating Report No. 02-07 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: July 2002 Docket No.:
50-281 Unit Name:
Surry Unit 2 Date: 08/01/02 Completed by:
R. Stief Telephone:
(757) 365-2486 None during the Reporting Period (1)
F:
Forced S:
Scheduled (2)
REASON:
A -
Equipment Failure (Explain)
B Maintenance or Test C -
Refueling D
Regulatory Restriction E
Operator Training & Licensing Examination F -
Administrative G -
Operational Error (Explain)
H Other (Explain)
(3)
METHOD:
1 Manual 2
Other (Explain)
(4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit I - Same Source
Surry Monthly Operating Report No. 02-07 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL MONTH:
July 2002 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 816 815 814 813 812 814 814 814 815 814 816 816 817 817 816 815 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Docket No.:
50-280 Unit Name:
Surry Unit 1 Date:
08/01/02 Completed by:
R. Stief Telephone:
(757) 365-2486 Average Daily Power Level (MWe - Net) 814 814 813 813 813 810 812 813 815 816 816 815 813 812 811 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
Surry Monthly Operating Report No. 02-07 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-281 Unit Name:
Surry Unit 2 Date:
08/01/02 Completed by:
R. Stief Telephone:
(757) 365-2486 MONTH:
July 2002 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 816 815 814 813 813 814 813 814 815 816 817 818 818 819 818 817 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 815 815 813 813 813 811 814 814 816 818 817 816 814 814 813 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
Surry Monthly Operating Report No. 02-07 Page 9 of 15
SUMMARY
OF OPERATING EXPERIENCE MONTH/YEAR: July 2002 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
0000 2400 0000 2400 Unit started the month at 100% /846 MWe.
Unit finished the month at 100% / 841 MWe.
Unit started the month at 100% / 848 MWe.
Unit finished the month at 100% / 842 MWe.
UNIT ONE:
07/01/02 07/31/02 UNrr Two:
07/01/02 07/31/02
Surry Monthly Operating Report No. 02-07 Page 10 of 15 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: July 2002 None during the Reporting Period
Surry Monthly Operating Report No. 02-07 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: July 2002 FS02-012 UFSAR Change Request 07/18/02 (Regulatory Evaluation 02-007)
UFSAR Change Request FS02-012 replaces the post-LOCA containment hydrogen analysis model with a new NRC approved analysis model prepared by Westinghouse.
Surry Monthly Operating Report No. 02-07 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MoNTH/YEAR: July 2002 None during the Reporting Period
Surry Monthly Operating Report No. 02-07 Page 13 of 15 CHEMISTRY REPORT MONTH/YEAR: July 2002 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.
Min.
Avg.
Max.
Min.
Avg.
Gross Radioactivity, gCi/ml 3.73E-1 2.16E-1 3.10E-1 3.52E-1 2.05E-1 2.84E-1 Suspended Solids, ppm Gross Tritium, jiCi/ml 1.51 E+0 1.28E+0 1.41 E+0 1.22E+0 8.46E-1 1.04E+0 113 1, pCi/ml 1.82E-4 8.71 E-5 1.43E-4 1.87E-4 9.84E-5 1.14E-4 1131/1133 0.09 0.04 0.07 0.21 0.11 0.13 Hydrogen, cc/kg 39.5 33.5 35.4 39.6 33.7 35.6 Lithium, ppm 2.34 2.08 2.22 2.52 2.21 2.37 Boron - 10, ppm*
191 175 183 268 256 262 Oxygen, (DO), ppm
_ 0.005
< 0.005
_ 0.005
<0.005
_ 0.005
< 0.005 Chloride, ppm 0.006 0.005 0.005 0.006 0.002 0.003 pH @ 25 degree Celsius 6.69 6.51 6.62 6.49 6.27 6.38 Boron - 10 = Total Boron x 0.196 Comments:
None
Surry Monthly Operating Report No. 02-07 Page 14 of 15 FUEL HANDLING UNITS 1 & 2 MONTH/YEAR: July 2002 Number of Date Stored or Assemblies Received per Shipment Assembly Number ANSI Number New or Spent Initial Fuel Shipping Enrichment Cask Activity None during the Reporting Period New Fuel Shipment or Cask No.
Surry Monthly Operating Report No. 02-07 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR: July 2002 None during the Reporting Period