June 2004 Monthly Operating Report for Surry Power Station Units 1 and 2
ML042020260
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/12/2004
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
04-407
Download: ML042020260 (16)


Text

vI, 7VIRGINIA ELECTRIC AND POWERI It COMPANY RIcIIMNION, VIRGINIA 23261 July 12, 2004 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.

SPS Lic/JSA Docket Nos.04-407 RO 50-280 50-281 DPR-32 DPR-37 License Nos.

Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of June 2004 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:

United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station

, /I

P I

A

I VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 04-06 Approved

e Surry Monthly Operating Report No. 04-06 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1..........................

3 Operating Data Report - Unit No. 2.

4 Unit Shutdowns and Power Reductions - Unit No. 1

.5 Unit Shutdowns and Power Reductions - Unit No. 2

.6 Average Daily Unit Power Level - Unit No. 1

.7 Average Daily Unit Power Level - Unit No. 2

.8 Summary of Operating Experience - Unit Nos. 1 and 2

.9 Facility Changes That Did Not Require NRC Approval.10 Procedure or Method of Operation Changes That Did Not Require NRC Approval.11 Tests and Experiments That Did Not Require NRC Approval.12 Chemistry Report.13 Fuel Handling - Unit Nos. 1 and 2.14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications.15

Surry Monthly Operating Report No. 04-06 Page 3 of 15 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-280 07/01/04 R. Stief (757) 365-2486

1.

Unit Name:.........................................................

2.

Reporting Period:................................................

3.

Licensed Thermal Power (MWI):.........................

4.

Nameplate Rating (Gross MWe):........................

5.

Design Electrical Rating (Net MWe):...................

6.

Maximum Dependable Capacity (Gross MWe):...

7.

Maximum Dependable Capacity (Net MWe):.......

Surry Unit 1 June 2004 2546 847.5 788 842 810

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 720.00 720.00 0.00 720.00 0.00 1832588.40 611271.00 589389.00 100.00%

100.00%

101.06%

103.88%

0.00%

Year-To-Date 4367.00 4367.00 0.00 4338.43 0.00 10974553.30 3665573.00 3533625.00 99.35%

99.35%

99.90%

102.69%

0.65%

Cumulative 276335.00 205770.48 3774.50 202943.20 3736.20 485366476.90 159804838.00 152695725.00 73.44%

74.79%

70.49%

70.12%

11.83%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

November 2004 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 04-06 Page 4 of 15 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-281 07/01/04 R. Stief (757) 365-2486

1.

Unit Name:.........................................................

2.

Reporting Period:................................................

3.

Licensed Thermal Power (MWt):.........................

4.

Nameplate Rating (Gross MWe):........................

5.

Design Electrical Rating (Net MWe):...................

6.

Maximum Dependable Capacity (Gross MWe):...

7.

Maximum Dependable Capacity (Net MWe):.......

Surry Unit 2 June 2004 2546 847.5 788 847 815

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 720.00 720.00 0.00 720.00 0.00 1832631.20 611479.00 589171.00 100.00%

100.00%

100.40%

103.84%

0.00%

Year-To-Date 4367.00 4212.52 0.00 4189.75 0.00 10622741.10 3555081.00 3431725.00 95.94%

95.94%

96.42%

99.72%

4.06%

Cumulative 273216.00 203174.82 328.10 200636.17 0.00 481269084.90 158533395.00 151524561.00 73.44%

73.44%

70.44%

70.38%

9.45%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 20001

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

T Surry Monthly Operating Report No. 04-06 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: June 2004 Docket No.:

Unit Name:

Date:

Completed by:

Telephone:

50-280 Surry Unit 1 07/01/04 R. Stief (757) 365-2486 None during the Reporting Period (1)

F:

Forced S: Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 04-06 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: June 2004 Docket No.:

Unit Name:

Date:

Completed by:

Telephone:

50-281 Surry Unit 2 07/01/04 R. Stief (757) 365-2486 None during the Reporting Period (1)

F:

Forced S: Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 04-06 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name:

Surry Unit 1 Date:

07/01/04 Completed by: R. Stief Telephone:

(757) 365-2486 MoNrH:

June 2004 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 820 820 819 820 820 820 820 819 817 818 817 819 819 819 818 818 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Average Daily Power Level (MWe - Net) 818 817 817 818 819 819 818 818 818 819 819 819 818 818 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 04-06 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name:

Surry Unit 2 Date:

07/01/04 Completed by:

R. Stief Telephone:

(757) 365-2486 MONTH:

June 2004 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 819 819 820 820 821 821 820 820 819 818 818 819 820 819 819 818 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Average Daily Power Level (MWe - Net) 818 816 815 817 817 817 816 817 817 818 818 818 818 817 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 04-06 Page 9 of 15

SUMMARY

OF OPERATING EXPERIENCE MoNrHN/YEAR: June 2004 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNrT ONE:

06/01/04 06/30/04 UNrr Two:

06/01/04 06/30/04 0000 2400 0000 2400 Unit started the month at 100% / 851 MWe.

Unit finished the month at 100% / 847 MWe.

Unit started the month at 100% / 850 MWe.

Unit finished the month at 100% /846 MWe.

Surry Monthly Operating Report No. 04-06 Page 10 of 15 FACILrry CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTHIYEAR: June 2004 None during the Reporting Period.

Surry Monthly Operating Report No. 04-06 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTH/YEAR: June 2004 None during the Reporting Period

Surry Monthly Operating Report No. 04-06 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MoNTHI/YEAR: June 2004 None during the Reporting Period

Surry Monthly Operating Report No. 04-06 Page 13 of 15 CHEMISTRY REPORT MoNTHIYrEAR: June 2004 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.

Min.

Avg.

Max.

Min.

Avg.

Gross Radioactivity, pCi/ml 3.20E-1 1.72E-1 2.51 E-1 2.77E-1 1.41 E-1 2.09E-1 Suspended Solids, ppm Gross Tritium, ptCi/ml 5.43E-1 4.80E-1 5.09E-1 7.84E-1 6.26E-1 6.90E-1 1131, tCi/ml 2.43E-4 1.03E-4 1.66E-4 1.07E-4 6.40E-5 8.62E-5 1131/1133 0.10 0.04 0.07 0.30 0.16 0.23 Hydrogen, cc/kg 37.8 35.1 36.3 43.8 35.5 40.2 Lithium, ppm 2.27 2.08 2.19 2.29 2.11 2.21 Boron - 10, ppm*

99 83 91 216 196 205 Oxygen, (DO), ppm

  • 0.005 l

0.005

  • 0.005
  • 0.005 5 0.005
  • 0.005 Chloride, ppm 0.003 0.001 0.002 0.008 0.005 0.006 pH @ 25 degree Celsius 7.10 6.94 7.02 6.65 6.45 6.55 Boron - 10 = Total Boron x 0.196 Comments:

Unit 1: Unit at 100% power. Quarterly Suspended Solids not required.

Unit 2: Unit at 100% power. Quarterly Suspended Solids not required.

Surry Monthly Operating Report No. 04-06 Page 14 of 15 FUEL HANDLING UNrrs 1 & 2 MoNTHI/YAR: June 2004 New Fuel Shipment or Cask No.

Number of Date Stored Assemblies or Received per Shipment Assembly Number New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity None during the Reporting Period

Surry Monthly Operating Report No. 04-06 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MoNTH/YEAR: June 2004 None during the Reporting Period