MONTHYEARML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 And Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 2024-09-03
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0517203962005-06-13013 June 2005 May 2005 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0513705192005-05-0404 May 2005 April 2005 Monthly Operating Report for Surry Units 1 and 2 ML0510903492005-04-0808 April 2005 March 2005 Monthly Operating Report from Surry Power Station Units 1 and 2 ML0508104962005-03-15015 March 2005 February 2005 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0505405492005-02-14014 February 2005 January 2005 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0501902152005-01-11011 January 2005 December 2004 Monthly Operating Report for the Surry Power Station, Units 1 and 2 ML0435501382004-12-10010 December 2004 November 2004 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0432104852004-11-10010 November 2004 October 2004 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0429402582004-10-0808 October 2004 September 2004 Monthly Operating Report for Surry, Units 1 & 2 ML0426104132004-09-0909 September 2004 August 2004 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0423003592004-08-10010 August 2004 July 2004 Monthly Operating Report for Surry, Units 1 and 2 ML0420202602004-07-12012 July 2004 June 2004 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0413905502004-05-11011 May 2004 April 2004 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0412602132004-04-13013 April 2004 March 2004 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0407607202004-03-0505 March 2004 February 2004 Monthly Operating Report for Surry, Units 1 and 2 ML0409605422004-02-0909 February 2004 January 2004 Monthly Operating Report for Surry, Units 1 and 2 ML0402107292004-01-11011 January 2004 December 2003 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0335300822003-12-11011 December 2003 November 2003 Monthly Operating Report for Surry, Units 1 and 2 ML0332404632003-11-10010 November 2003 October 2003 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0329406642003-10-13013 October 2003 September 2003 Monthly Operating Report for Surry Units 1 & 2 ML0326709772003-09-12012 September 2003 August 2003 Monthly Operating Report for Surry Units 1 & 2 ML0323805452003-08-11011 August 2003 July 2003 Monthly Operating Report for Surry Units 1 & 2 ML0319903262003-07-0909 July 2003 June 2003 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0316813982003-06-0505 June 2003 May 2003 Monthly Operating Report for Surry Units 1 and 2 ML0314104892003-05-14014 May 2003 April 2003 Monthly Operating Report for Surry Units 1 & 2 ML0310603802003-04-0808 April 2003 March 2003 Monthly Operating Report for Surry Units 1 & 2 ML0308301622003-03-14014 March 2003 February 2003 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0305507462003-02-13013 February 2003 January 2003 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0302303952003-01-14014 January 2003 December 2002 Monthly Operating Report for Surry Units 1 & 2 ML0235205262002-12-0909 December 2002 November 2002 Monthly Operating Report for Surry Units 1 & 2 ML0232503822002-11-12012 November 2002 October 2002 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0229100752002-10-0909 October 2002 September 2002 Monthly Operating Report for Surry Units 1 & 2 ML0226006852002-09-10010 September 2002 August 2002 Monthly Operating Report for Surry Units 1 & 2 ML0222702902002-08-0808 August 2002 July 2002 Monthly Operating Report for Surry Units 1 & 2 ML0220400052002-07-15015 July 2002 June 2002 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0217104242002-06-11011 June 2002 May 2002 Monthly Operating Report for Surry Power Station, Units 1 & 2 ML0215504742002-05-0707 May 2002 April 2002 Monthly Operating Report for Surry Power Station, Units 1 & 2 ML0211304582002-04-15015 April 2002 March 2002 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0208403462002-03-11011 March 2002 February 2002 Monthly Operating Report for Surry Power Station, Units 1 & 2 ML0205801832002-02-0606 February 2002 January 2002 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0204504432002-01-11011 January 2002 December 2001 Monthly Operating Report for Surry Power Station, Units 1 & 2 ML19095A3841980-11-12012 November 1980 Monthly Operating Report for Month of October 1980 ML19095A3821978-08-16016 August 1978 Monthly Operating Report for Month of July 1978 ML19095A3831978-08-0101 August 1978 Monthly Operating Report for Month of July 1978 ML19095A3651978-07-18018 July 1978 Monthly Operating Report for Month of June 1978 ML19095A3661978-06-13013 June 1978 Refueling & Spent Fuel Storage Information & Monthly Operating Report for May 1978 ML19095A3671978-05-12012 May 1978 Monthly Operating Report for Month of April 1978 ML19095A3681978-04-12012 April 1978 Monthly Operating Report for Month of March 1978 ML19095A3691978-03-16016 March 1978 Monthly Operating Report for Month of February 1978 ML19095A3711978-01-0909 January 1978 Monthly Operating Report for Month of December 1977 2005-06-13
[Table view] |
Text
vI, 7VIRGINIA ELECTRIC AND POWERI It COMPANY RIcIIMNION, VIRGINIA 23261 July 12, 2004 U. S. Nuclear Regulatory Commission Serial No.04-407 Attention: Document Control Desk SPS Lic/JSA RO Washington, D.C. 20555-0001 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of June 2004 is provided in the attachment.
If you have any questions or require additional information, please contact us.
Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station
,/I
P I A ;I VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 04-06 Approved:
e Surry Monthly Operating Report No. 04-06 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1.......................... 3 Operating Data Report - Unit No. 2. 4 Unit Shutdowns and Power Reductions - Unit No. 1 .5 Unit Shutdowns and Power Reductions - Unit No. 2 .6 Average Daily Unit Power Level - Unit No. 1 .7 Average Daily Unit Power Level - Unit No. 2 .8 Summary of Operating Experience - Unit Nos. 1 and 2 .9 Facility Changes That Did Not Require NRC Approval .10 Procedure or Method of Operation Changes That Did Not Require NRC Approval .11 Tests and Experiments That Did Not Require NRC Approval .12 Chemistry Report.13 Fuel Handling - Unit Nos. 1and 2.14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications .15
Surry Monthly Operating Report No. 04-06 Page 3 of 15 OPERATING DATA REPORT Docket No.: 50-280 Date: 07/01/04 Completed By: R. Stief Telephone: (757) 365-2486
- 1. Unit Name: ......................................................... Surry Unit 1
- 2. Reporting Period:................................................ June 2004
- 3. Licensed Thermal Power (MWI):......................... 2546
- 4. Nameplate Rating (Gross MWe):........................ 847.5
- 5. Design Electrical Rating (Net MWe):................... 788
- 6. Maximum Dependable Capacity (Gross MWe):... 842
- 7. Maximum Dependable Capacity (Net MWe):....... 810
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Year-To-Date Cumulative
- 11. Hours in Reporting Period 720.00 4367.00 276335.00
- 12. Hours Reactor Was Critical 720.00 4367.00 205770.48
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 3774.50
- 14. Hours Generator On-Line 720.00 4338.43 202943.20
- 15. Unit Reserve Shutdown Hours 0.00 0.00 3736.20
- 16. Gross Thermal Energy Generated (MWH) 1832588.40 10974553.30 485366476.90
- 17. Gross Electrical Energy Generated (MWH) 611271.00 3665573.00 159804838.00
- 18. Net Electrical Energy Generated (MWH) 589389.00 3533625.00 152695725.00
- 19. Unit Service Factor 100.00% 99.35% 73.44%
- 20. Unit Availability Factor 100.00% 99.35% 74.79%
- 21. Unit Capacity Factor (Using MDC Net) 101.06% 99.90% 70.49%
- 22. Unit Capacity Factor (Using DER Net) 103.88% 102.69% 70.12%
- 23. Unit Forced Outage Rate 0.00% 0.65% 11.83%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
November 2004 Type and duration of scheduled shutdowns are no longer provided.
[
Reference:
Letter S/N 00-069, dated February 7, 2000]
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [
Reference:
Letter S/N 00-069, dated February 7, 2000]
- 26. Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Surry Monthly Operating Report No. 04-06 Page 4 of 15 OPERATING DATA REPORT Docket No.: 50-281 Date: 07/01/04 Completed By: R. Stief Telephone: (757) 365-2486
- 1. Unit Name: ......................................................... Surry Unit 2
- 2. Reporting Period:................................................ June 2004
- 3. Licensed Thermal Power (MWt):......................... 2546
- 4. Nameplate Rating (Gross MWe):........................ 847.5
- 5. Design Electrical Rating (Net MWe):................... 788
- 6. Maximum Dependable Capacity (Gross MWe):... 847
- 7. Maximum Dependable Capacity (Net MWe):....... 815
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Year-To-Date Cumulative
- 11. Hours in Reporting Period 720.00 4367.00 273216.00
- 12. Hours Reactor Was Critical 720.00 4212.52 203174.82
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 328.10
- 14. Hours Generator On-Line 720.00 4189.75 200636.17
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1832631.20 10622741.10 481269084.90
- 17. Gross Electrical Energy Generated (MWH) 611479.00 3555081.00 158533395.00
- 18. Net Electrical Energy Generated (MWH) 589171.00 3431725.00 151524561.00
- 19. Unit Service Factor 100.00% 95.94% 73.44%
- 20. Unit Availability Factor 100.00% 95.94% 73.44%
- 21. Unit Capacity Factor (Using MDC Net) 100.40% 96.42% 70.44%
- 22. Unit Capacity Factor (Using DER Net) 103.84% 99.72% 70.38%
- 23. Unit Forced Outage Rate 0.00% 4.06% 9.45%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Type and duration of scheduled shutdowns are no longer provided.
[
Reference:
Letter S/N 00-069, dated February 7, 2000]
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [
Reference:
Letter S/N 00-069, dated February 7, 20001
- 26. Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
T Surry Monthly Operating Report No. 04-06 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: June 2004 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 07/01/04 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)
E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)
H Other (Explain)
(4) (5)
Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Ucensee Event Report (LER) File (NUREG 0161)
Surry Monthly Operating Report No. 04-06 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: June 2004 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 07/01/04 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling - 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)
E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)
H Other (Explain)
(4) (5)
Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)
Surry Monthly Operating Report No. 04-06 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 07/01/04 Completed by: R. Stief Telephone: (757) 365-2486 MoNrH: June 2004 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 820 17 818 2 820 18 817 3 819 19 817 4 820 20 818 5 820 21 819 6 820 22 819 7 820 23 818 8 819 24 818 9 817 25 818 10 818 26 819 11 817 27 819 12 819 28 819 13 819 29 818 14 819 30 818 15 818 16 818 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
Surry Monthly Operating Report No. 04-06 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 07/01/04 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: June 2004 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 819 17 818 2 819 18 816 3 820 19 815 4 820 20 817 5 821 21 817 6 821 22 817 7 820 23 816 8 820 24 817 9 819 25 817 10 818 26 818 11 818 27 818 12 819 28 818 13 820 29 818 14 819 30 817 15 819 16 818 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
Surry Monthly Operating Report No. 04-06 Page 9 of 15
SUMMARY
OF OPERATING EXPERIENCE MoNrHN/YEAR: June 2004 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
UNrT ONE:
06/01/04 0000 Unit started the month at 100% / 851 MWe.
06/30/04 2400 Unit finished the month at 100% / 847 MWe.
UNrr Two:
06/01/04 0000 Unit started the month at 100% / 850 MWe.
06/30/04 2400 Unit finished the month at 100% /846 MWe.
Surry Monthly Operating Report No. 04-06 Page 10 of 15 FACILrry CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTHIYEAR: June 2004 None during the Reporting Period.
Surry Monthly Operating Report No. 04-06 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTH/YEAR: June 2004 None during the Reporting Period
Surry Monthly Operating Report No. 04-06 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MoNTHI/YEAR: June 2004 None during the Reporting Period
Surry Monthly Operating Report No. 04-06 Page 13 of 15 CHEMISTRY REPORT MoNTHIYrEAR: June 2004 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. Avg. Max. Min. Avg.
Gross Radioactivity, pCi/ml 3.20E-1 1.72E-1 2.51 E-1 2.77E-1 1.41 E-1 2.09E-1 Suspended Solids, ppm - -
Gross Tritium, ptCi/ml 5.43E-1 4.80E-1 5.09E-1 7.84E-1 6.26E-1 6.90E-1 1131, tCi/ml 2.43E-4 1.03E-4 1.66E-4 1.07E-4 6.40E-5 8.62E-5 1131/1133 0.10 0.04 0.07 0.30 0.16 0.23 Hydrogen, cc/kg 37.8 35.1 36.3 43.8 35.5 40.2 Lithium, ppm 2.27 2.08 2.19 2.29 2.11 2.21 Boron - 10, ppm* 99 83 91 216 196 205 Oxygen, (DO), ppm
- 0.005 Chloride, ppm 0.003 0.001 0.002 0.008 0.005 0.006 pH @ 25 degree Celsius 7.10 6.94 7.02 6.65 6.45 6.55 Boron - 10 = Total Boron x 0.196 Comments:
Unit 1: Unit at 100% power. Quarterly Suspended Solids not required.
Unit 2: Unit at 100% power. Quarterly Suspended Solids not required.
Surry Monthly Operating Report No. 04-06 Page 14 of 15 FUEL HANDLING UNrrs 1 & 2 MoNTHI/YAR: June 2004 New Fuel Number of New or Spent Shipment or Date Stored Assemblies Assembly ANSI Initial Fuel Shipping Cask No. or Received per Shipment Number Number Enrichment Cask Activity None during the Reporting Period
Surry Monthly Operating Report No. 04-06 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED INTECHNICAL SPECIFICATIONS MoNTH/YEAR: June 2004 None during the Reporting Period