June 2004 Monthly Operating Report for Surry Power Station Units 1 and 2
ML042020260
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/12/2004
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
04-407
Download: ML042020260 (16)


Text

vI, 7VIRGINIA ELECTRIC AND POWERI It COMPANY RIcIIMNION, VIRGINIA 23261 July 12, 2004 U. S. Nuclear Regulatory Commission Serial No.04-407 Attention: Document Control Desk SPS Lic/JSA RO Washington, D.C. 20555-0001 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of June 2004 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station

,/I

P I A ;I VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 04-06 Approved:

e Surry Monthly Operating Report No. 04-06 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1.......................... 3 Operating Data Report - Unit No. 2. 4 Unit Shutdowns and Power Reductions - Unit No. 1 .5 Unit Shutdowns and Power Reductions - Unit No. 2 .6 Average Daily Unit Power Level - Unit No. 1 .7 Average Daily Unit Power Level - Unit No. 2 .8 Summary of Operating Experience - Unit Nos. 1 and 2 .9 Facility Changes That Did Not Require NRC Approval .10 Procedure or Method of Operation Changes That Did Not Require NRC Approval .11 Tests and Experiments That Did Not Require NRC Approval .12 Chemistry Report.13 Fuel Handling - Unit Nos. 1and 2.14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications .15

Surry Monthly Operating Report No. 04-06 Page 3 of 15 OPERATING DATA REPORT Docket No.: 50-280 Date: 07/01/04 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ......................................................... Surry Unit 1
2. Reporting Period:................................................ June 2004
3. Licensed Thermal Power (MWI):......................... 2546
4. Nameplate Rating (Gross MWe):........................ 847.5
5. Design Electrical Rating (Net MWe):................... 788
6. Maximum Dependable Capacity (Gross MWe):... 842
7. Maximum Dependable Capacity (Net MWe):....... 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 720.00 4367.00 276335.00
12. Hours Reactor Was Critical 720.00 4367.00 205770.48
13. Reactor Reserve Shutdown Hours 0.00 0.00 3774.50
14. Hours Generator On-Line 720.00 4338.43 202943.20
15. Unit Reserve Shutdown Hours 0.00 0.00 3736.20
16. Gross Thermal Energy Generated (MWH) 1832588.40 10974553.30 485366476.90
17. Gross Electrical Energy Generated (MWH) 611271.00 3665573.00 159804838.00
18. Net Electrical Energy Generated (MWH) 589389.00 3533625.00 152695725.00
19. Unit Service Factor 100.00% 99.35% 73.44%
20. Unit Availability Factor 100.00% 99.35% 74.79%
21. Unit Capacity Factor (Using MDC Net) 101.06% 99.90% 70.49%
22. Unit Capacity Factor (Using DER Net) 103.88% 102.69% 70.12%
23. Unit Forced Outage Rate 0.00% 0.65% 11.83%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

November 2004 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 04-06 Page 4 of 15 OPERATING DATA REPORT Docket No.: 50-281 Date: 07/01/04 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ......................................................... Surry Unit 2
2. Reporting Period:................................................ June 2004
3. Licensed Thermal Power (MWt):......................... 2546
4. Nameplate Rating (Gross MWe):........................ 847.5
5. Design Electrical Rating (Net MWe):................... 788
6. Maximum Dependable Capacity (Gross MWe):... 847
7. Maximum Dependable Capacity (Net MWe):....... 815
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 720.00 4367.00 273216.00
12. Hours Reactor Was Critical 720.00 4212.52 203174.82
13. Reactor Reserve Shutdown Hours 0.00 0.00 328.10
14. Hours Generator On-Line 720.00 4189.75 200636.17
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 1832631.20 10622741.10 481269084.90
17. Gross Electrical Energy Generated (MWH) 611479.00 3555081.00 158533395.00
18. Net Electrical Energy Generated (MWH) 589171.00 3431725.00 151524561.00
19. Unit Service Factor 100.00% 95.94% 73.44%
20. Unit Availability Factor 100.00% 95.94% 73.44%
21. Unit Capacity Factor (Using MDC Net) 100.40% 96.42% 70.44%
22. Unit Capacity Factor (Using DER Net) 103.84% 99.72% 70.38%
23. Unit Forced Outage Rate 0.00% 4.06% 9.45%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 20001

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

T Surry Monthly Operating Report No. 04-06 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: June 2004 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 07/01/04 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Ucensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 04-06 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: June 2004 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 07/01/04 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling - 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 04-06 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 07/01/04 Completed by: R. Stief Telephone: (757) 365-2486 MoNrH: June 2004 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 820 17 818 2 820 18 817 3 819 19 817 4 820 20 818 5 820 21 819 6 820 22 819 7 820 23 818 8 819 24 818 9 817 25 818 10 818 26 819 11 817 27 819 12 819 28 819 13 819 29 818 14 819 30 818 15 818 16 818 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 04-06 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 07/01/04 Completed by: R. Stief Telephone: (757) 365-2486 MONTH: June 2004 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 819 17 818 2 819 18 816 3 820 19 815 4 820 20 817 5 821 21 817 6 821 22 817 7 820 23 816 8 820 24 817 9 819 25 817 10 818 26 818 11 818 27 818 12 819 28 818 13 820 29 818 14 819 30 817 15 819 16 818 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 04-06 Page 9 of 15

SUMMARY

OF OPERATING EXPERIENCE MoNrHN/YEAR: June 2004 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNrT ONE:

06/01/04 0000 Unit started the month at 100% / 851 MWe.

06/30/04 2400 Unit finished the month at 100% / 847 MWe.

UNrr Two:

06/01/04 0000 Unit started the month at 100% / 850 MWe.

06/30/04 2400 Unit finished the month at 100% /846 MWe.

Surry Monthly Operating Report No. 04-06 Page 10 of 15 FACILrry CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTHIYEAR: June 2004 None during the Reporting Period.

Surry Monthly Operating Report No. 04-06 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MoNTH/YEAR: June 2004 None during the Reporting Period

Surry Monthly Operating Report No. 04-06 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MoNTHI/YEAR: June 2004 None during the Reporting Period

Surry Monthly Operating Report No. 04-06 Page 13 of 15 CHEMISTRY REPORT MoNTHIYrEAR: June 2004 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. Avg. Max. Min. Avg.

Gross Radioactivity, pCi/ml 3.20E-1 1.72E-1 2.51 E-1 2.77E-1 1.41 E-1 2.09E-1 Suspended Solids, ppm - -

Gross Tritium, ptCi/ml 5.43E-1 4.80E-1 5.09E-1 7.84E-1 6.26E-1 6.90E-1 1131, tCi/ml 2.43E-4 1.03E-4 1.66E-4 1.07E-4 6.40E-5 8.62E-5 1131/1133 0.10 0.04 0.07 0.30 0.16 0.23 Hydrogen, cc/kg 37.8 35.1 36.3 43.8 35.5 40.2 Lithium, ppm 2.27 2.08 2.19 2.29 2.11 2.21 Boron - 10, ppm* 99 83 91 216 196 205 Oxygen, (DO), ppm

  • 0.005 l 0.005
  • 0.005
  • 0.005 5 0.005
  • 0.005 Chloride, ppm 0.003 0.001 0.002 0.008 0.005 0.006 pH @ 25 degree Celsius 7.10 6.94 7.02 6.65 6.45 6.55 Boron - 10 = Total Boron x 0.196 Comments:

Unit 1: Unit at 100% power. Quarterly Suspended Solids not required.

Unit 2: Unit at 100% power. Quarterly Suspended Solids not required.

Surry Monthly Operating Report No. 04-06 Page 14 of 15 FUEL HANDLING UNrrs 1 & 2 MoNTHI/YAR: June 2004 New Fuel Number of New or Spent Shipment or Date Stored Assemblies Assembly ANSI Initial Fuel Shipping Cask No. or Received per Shipment Number Number Enrichment Cask Activity None during the Reporting Period

Surry Monthly Operating Report No. 04-06 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED INTECHNICAL SPECIFICATIONS MoNTH/YEAR: June 2004 None during the Reporting Period