July 2003 Monthly Operating Report for Surry Units 1 & 2
ML032380545
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/11/2003
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
03-438, SPS Lic/JSA R0
Download: ML032380545 (19)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 11, 2003 U. S. Nuclear Regulatory Commission Serial No. 03438 Attention: Document Control Desk SPS LIcIJSA RO Washington, D.C. 20555-0001 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units I and 2 for the month of July 2003 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter None cc: United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATNG REPORT REPORT No. 03-07 Sie Vice President / ata

Surry Monthly Operating Report No. 03-07 Page 2 of 18 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1........................................................... 3 Operating Data Report - Unit No. 2 .......................................................... .4 Unit Shutdowns and Power Reductions - Unit No. 1 ........................................................... 5 Unit Shutdowns and Power Reductions - Unit No. 2........................................................... 6 Average Daily Unit Power Level - Unit No. 1........................................................... 7 Average Daily Unit Power Level - Unit No. 2 ........................................................... 8 Summary of Operating Experience - Unit Nos. 1 and 2 ........................................................... 9 Facility Changes That Did Not Require NRC Approval .......................................................... 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval . ................................................

11 Tests and Experiments That Did Not Require NRC Approval .......................................................... 12 Chemistry Report .......................................................... . 13 Fuel Handling - Unit Nos. 1 and 2 .......................... 14 Description of Periodic Test(s) Which Were Not Completed Within the Time imits Specified in Technical Specifications1....................................................................................................................... 18

Surry Monthly Operating Report No. 03-07 Page 3 of 18 OPERATING DATA REPORT Docket No.: 50-280 Date: 08/04/03 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: .......... ........................ Surry Unit 1
2. Reporting Penod: ................. ................. July 2003
3. Licensed Thermal Power (MWt): .......................... 2546
4. Nameplate Rating (Gross MWe): ......................... 847.5
5. Design Electrical Rating (Net MWe): .................... 788
6. Maximum Dependable Capacity (Gross MWe): ... 842
7. Maximum Dependable Capacity (Net MWe): ....... 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 744.0 5087.0 268295.0
12. Hours Reactor Was Critical 744.0 3469.5 197991.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5
14. Hours Generator On-Une 744.0 3347.2 195209.4
15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2
16. Gross Thermal Energy Generated (MWH) 1894162.9 8358925.3 465865242.0
17. Gross Electrical Energy Generated (MWH) 630113.0 2787091.0 153292415.0
18. Net Electrical Energy Generated (MWH) 607545.0 2686342.0 146428663.0
19. Unit Service Factor 100.0% 65.8% 72.8%
20. Unit Availability Factor 100.0% 65.8% 74.2%
21. Unit Capacity Factor (Using MDC Net) 100.8% 65.2% 69.7%
22. Unit Capacity Factor (Using DER Net) 103.6% 67.0% 69.3%
23. Unit Forced Outage Rate 0.0% 9.3% 12.2%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000}

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 03-07 Page 4 of 18 OPERATNG DATA REPORT Docket No.: 50-281 Date: 08/04/03 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ........................................................... Surry Unit 2
2. Reporting Period: ............. July 2003
3. Licensed Thermal Power (MWt):.......................... 2546
4. Nameplate Rating (Gross MWe):......................... 847.5
5. Design Electrical Rating (Net MWe):.................... 788
6. Madmum Dependable Capacity (Gross MWe): ... 847
7. Maximum Dependable Capacity (Net MWe): ....... 815
8. It Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 744.0 5087.0 265176.0
12. Hours Reactor Was Critical 744.0 5024.1 196907.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 328.1
14. Hours Generator On-Line 744.0 4999.3 194583.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1893796.3 12712768.7 465939753.2
17. Gross Electrical Energy Generated (MWH) 630182.0 4277972.0 153418505.0
18. Net Electrical Energy Generated (MWH) 607230.0 4109354.0 146590071.0
19. Unit Service Factor 100.0/0 98.3% 73.4%
20. Unit Availability Factor 100.0% 98.3% 73.4%
21. Unit Capacity Factor (Using MDC Net) 100.1% 99.1% 70.3%
22. Unit Capacity Factor (Using DER Net) 103.6% 102.5% 70.2%
23. Unit Forced Outage Rate 0.0%h 1.7% 9.6%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

September 2003 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter SN 00-069, dated February 7,20001

25. If Shut Down at End of Report Period, Estimated Date of Start-up: Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

4A Surry Monthly Operating Report No. 03-07 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQuAL To OR GREATER THAN 20%)

REPORT MONTH: July 2003 Docket No.: 50-280 Unit Name: Surry Unit I Date: 08/04/03 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

4 Surry Monthly Operating Report No. 03-07 Page 6 of 18 UNIT SHUTDOWN AND POWER REDuanON (EQUAL To OR GREATER THA 20%)

REPORT Moium: July 2003 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 08/04/03 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Ucensing Examination F - Administrative G - Operational Error (Explain)

H Other (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

Surry Monthly Operating Report No. 03-07 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 08/04/03 Completed by: R. Stief Telephone: (757) 365-2486 MoNTh: July 2003 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 819 17 817 2 820 18 815 3 821 19 818 4 819 20 818 5 817 21 817 6 818 22 816 7 817 23 816 8 818 24 816 9 817 25 815 10 817 26 804 11 816 27 814 12 817 28 814 13 817 29 816 14 818 30 817 15 818 31 817 -

16 818 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day In the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-07 Page 8 of 18 AVERAGE DALY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 08/04/03 Completed by: R. Stief Telephone: (757) 365-2486 MoNTH: July 2003 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 817 17 816 2 819 18 816 3 820 19 817 4 819 20 816 5 818 21 815 6 815 22 814 7 816 23 814 8 816 24 817 9 815 25 815 10 814 26 816 11 816 27 816 12 815 28 816 13 816 29 816 14 817 30 818 15 816 31 817 16 817 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day In the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-07 Page 9 of 18

SUMMARY

OF OPERATING EXPERIENCE MoNTWHEAR: July 2003 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted In significant non-load related incidents.

UNrr ONE:

07/01/03 0000 Unit started the month at 100% 848 MWe.

07/26/03 0243 "1A7 waterbox removed from service In accordance with procedure 1-MOP-CW-001.

07/27/03 0115 "A" retumedto service.

07/31/03 2400 Unit finished the month at 100% /846 MWe.

UNrrTwo:

07/01/03 0000 Unit started the month at 100% 847 MWe.

07/31/03 2400 Unit finished the month at 100% /848 MWe.

Surry Monthly Operating Report No. 03-07 Page 10 of 18 FACILrrY CHANGES THAT DID NOT REOUIRE NRC APPROVAL MoNTmYEAR: July 2003 DCP 97-037 Design Change Package 10/14/98 (Safety Evaluation 98-089)

Design Change Package 97-037, CCHX SW Inlet Pipe Repair" Installed an aternate service water (SW) flow path to the component cooling heat exchangers (CCHX) to allow planned cleaning, recoating and repair to the normal supply line.

RE 03-004 Regulatory Evaluation 03-004 07/10/03 Regulatory Evaluation 03-004 evaluates the effect of the replacement of the P-250 plant computer with the Westinghouse Ovation computer system. The new Ovation system will replace the power calorimetric program for the calculation of feedflow, steamflow and power that s functionally equivalent to the existing P-250 programming.

Surry Monthly Operating Report No. 03-07 Page 11 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID Nor REQUIRE NRC APPROVAL MoNTH/YEAR: July 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-07 Page 12 of 18 TEsTs AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: July 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-07 Page 13 of 18 CHEMISTRY REPORT MowEAYEA: July 2003 Unit No. Unit No. 2 Primary Coolant Analysis Max. Min. A Max. Min. Avg.

Gross Radioactivity, uCml 3.46E-1 1.73E-1 2.67E-1 2.68E-1 1.10E-1 1.60E-1 Suspended Solids, ppm Gross Tritium, ptCVml 4.67E-1 2.36E-1 3.46E-1 5.42E-1 4.76E-1 5.15E-1 1131. LCIml 1M4E4 6.47E-5 1.14E4 1.35E4 5.64E-5 9.1 OE 5 1131/1133 0.09 0.04 0.07 0.11 0.05 0.07 Hydrogen, cclkg 32.5 29.9 31.6 34.8 34 34.5 Lithium m 2.47 2.12 2.31 2.16 1.48 1.77 Boron - 10, ppm* 264 252 258 58.4 38 48.6 Oxygen, (DO), ppm 0.01 S 0.005 0.009 0.01 S0.005 0.009 Chloride, ppm 0.006 0.001 0.004 0.003 0.001 0.001 pH @ 25 degree Celsius 6.35 6.21 6.28 7.38 7.1 7.23

  • Boron - 10 = Total Boron x 0.196 Comments: Suspended Solids reported quarterly. No samples for July.

None

Surry Monthly Operating Report No. 03-07 Page 14 of 18 FUEL HANDUNG UNrTs 1 & 2 MOcM.UYEAR: July 2003 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received Der ShlDment Number Number Enrichment Cask Activity Spent Fuel Cask TN-32-34 07/16/03 32 OR1 IMOCIL 3.5930 N/A OR2 LMOC2K 3.5932 OV3 LMOTST 3.8093 OV8 LMOTSY 3.8091 1R8 LMOC26 3.5826 1R9 LMOC19 3.5908 1V2 LMOTT2 3.8151 1V3 LMOTT3 3.8081 1V6 LMOTT6 3.8158 1Y7 LMOTI 7 3.8061 1V8 LMOTT8 3.8091 2R9 LMOC1 H 3.5763 2VO LMOTTA 3.8041 2V3 LMOT1`D 3.8041 2V4 LMOTTE 3.8008 3R1 LMOC1C 3.5999 3R4 LMOC1G 3.6025 3R8 LMOC2E 3.5805

I Surry Monthly Operating Report No. 03-07 Page 15 of 18 FUEL HANDUNG UNrTs 1 & 2 MONTHYEAR: July 2003 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity 3V1 LMOTTM 3.8103 3V2 LMOTTN 3.8077 3W6 LMOX3B 3.9995 4R2 LMOC2A 3.5973 4R4 LMOC2Y 3.5891 4R6 LMOC2N 3.6034 4W1 LMOX3G 4.0039 4W3 LMOX3J 4.0049 4W9 LMOX3Q 4.0057 5RO LMOC2M 3.5919 5R3 LMOC1Y 3.5832 5R5 LMOC31 3.6049 W36 LM041J 3.2030 W42 LM041 N 3.2030 Spent Fuel Cask TN-32-35 07/29/03 32 0,14 LMOUYA 3.8066 N/A Opi LM05Y5 3.6070 OW2 LMOX2F 3.8094 OW3 LMOX2G 3.7963

e 1.

Surry Monthly Operating Report No. 03-07 Page 16 of 18 FUEL HANDUNG UNITS 1 & 2 MoNTmIYEAR: July 2003 New Fuel Number of New or Spent

- Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activitv OW4 LMOX2H 3.7972 OW5 LMOX2J 3.8053 OW6 LMOX2K 3.8139 OW7 LMOX2L 3.8100 1D5 LMOALL 3.5888 1J2 LMOUYJ 3.8061 1J6 LMOUYN 3.8052 1N2 LM06G5 3.4060 1V5 LMOTT5 3.8041 2J1 LMOUYT 3.8057 3AO LM04US 3.3930 3H6 LMORNW 4.0081 3119 LMORNZ 4.0103 3J0 LMOUZ2 3.8161 3J2 LMOUZ4 3.8127 3J3 LMOUZ5 3.8122 3J4 LMOUZ6 3.8171 3J5 LMOUZ7 3.8121

Surry Monthly Operating Report No. 03-07 Page l7of 18 FUEL HANDUNG UNTS 1 & 2 MotrHmYER: July 2003 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity 4H1 LMORP1 4.0106 4H4 LMORP4 4.0105 4NO LM06F8 3.4060 4P4 LMO5YM 3.6070 6NO LMD6G1 3.4060 5P2 LMO5Y9 3.6070 5P4 LMD9PH 3.6070 5P5 LM05XM 3.6070 6P5 LM09PG 3.6070 6P7 LM05YJ 3.6070

Surry Monthly Operating Report No. 03-07 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED INTECHNICAL SPECIFICATIONS MoNTHYEAR: July 2003 None during the Reporting Period