July 2003 Monthly Operating Report for Surry Units 1 & 2
ML032380545
Person / Time
Site: Surry  
Issue date: 08/11/2003
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
03-438, SPS Lic/JSA R0
Download: ML032380545 (19)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 11, 2003 U. S. Nuclear Regulatory Commission Serial No.

03438 Attention: Document Control Desk SPS LIcIJSA RO Washington, D.C. 20555-0001 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units I and 2 for the month of July 2003 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter None cc:

United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATNG REPORT REPORT No. 03-07 Sie Vice President

/

ata

Surry Monthly Operating Report No. 03-07 Page 2 of 18 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1...........................................................

3 Operating Data Report - Unit No. 2..........................................................

.4 Unit Shutdowns and Power Reductions - Unit No. 1...........................................................

5 Unit Shutdowns and Power Reductions - Unit No. 2...........................................................

6 Average Daily Unit Power Level - Unit No. 1...........................................................

7 Average Daily Unit Power Level - Unit No. 2...........................................................

8 Summary of Operating Experience - Unit Nos. 1 and 2...........................................................

9 Facility Changes That Did Not Require NRC Approval..........................................................

10 Procedure or Method of Operation Changes That Did Not Require NRC Approval.

11 Tests and Experiments That Did Not Require NRC Approval..........................................................

12 Chemistry Report..........................................................

13 Fuel Handling - Unit Nos. 1 and 2..........................

14 Description of Periodic Test(s) Which Were Not Completed Within the Time imits Specified in Technical Specifications1....................................................................................................................... 18

Surry Monthly Operating Report No. 03-07 Page 3 of 18 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-280 08/04/03 R. Stief (757) 365-2486

1.

Unit Name:..........

Surry Unit 1

2.

Reporting Penod:.................

July 2003

3.

Licensed Thermal Power (MWt):..........................

2546

4.

Nameplate Rating (Gross MWe):.........................

847.5

5.

Design Electrical Rating (Net MWe):....................

788

6.

Maximum Dependable Capacity (Gross MWe):...

842

7.

Maximum Dependable Capacity (Net MWe):

810

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

Power Level To Which Restricted, If Any (Net MWe):

Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative Hours in Reporting Period 744.0 5087.0 268295.0 Hours Reactor Was Critical 744.0 3469.5 197991.1 Reactor Reserve Shutdown Hours 0.0 0.0 3774.5 Hours Generator On-Une 744.0 3347.2 195209.4 Unit Reserve Shutdown Hours 0.0 0.0 3736.2 Gross Thermal Energy Generated (MWH) 1894162.9 8358925.3 465865242.0 Gross Electrical Energy Generated (MWH) 630113.0 2787091.0 153292415.0 Net Electrical Energy Generated (MWH) 607545.0 2686342.0 146428663.0 Unit Service Factor 100.0%

65.8%

72.8%

Unit Availability Factor 100.0%

65.8%

74.2%

Unit Capacity Factor (Using MDC Net) 100.8%

65.2%

69.7%

Unit Capacity Factor (Using DER Net) 103.6%

67.0%

69.3%

Unit Forced Outage Rate 0.0%

9.3%

12.2%

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000}

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Surry Monthly Operating Report No. 03-07 Page 4 of 18 OPERATNG DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-281 08/04/03 R. Stief (757) 365-2486

1.

Unit Name:...........................................................

2.

Reporting Period:.............

3.

Licensed Thermal Power (MWt):..........................

4.

Nameplate Rating (Gross MWe):.........................

5.

Design Electrical Rating (Net MWe):....................

6.

Madmum Dependable Capacity (Gross MWe):...

7.

Maximum Dependable Capacity (Net MWe):.......

Surry Unit 2 July 2003 2546 847.5 788 847 815

8.

It Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 1893796.3 630182.0 607230.0 100.0/0 100.0%

100.1%

103.6%

0.0%h Year-To-Date 5087.0 5024.1 0.0 4999.3 0.0 12712768.7 4277972.0 4109354.0 98.3%

98.3%

99.1%

102.5%

1.7%

Cumulative 265176.0 196907.5 328.1 194583.7 0.0 465939753.2 153418505.0 146590071.0 73.4%

73.4%

70.3%

70.2%

9.6%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

September 2003 Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter SN 00-069, dated February 7,20001

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

4A Surry Monthly Operating Report No. 03-07 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQuAL To OR GREATER THAN 20%)

REPORT MONTH: July 2003 Docket No.: 50-280 Unit Name:

Surry Unit I Date:

08/04/03 Completed by: R. Stief Telephone: (757) 365-2486 None during the Reporting Period (1)

F:

Forced S: Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

4 Surry Monthly Operating Report No. 03-07 Page 6 of 18 UNIT SHUTDOWN AND POWER REDuanON (EQUAL To OR GREATER THA 20%)

REPORT Moium: July 2003 Docket No.:

50-281 Unit Name:

Surry Unit 2 Date: 08/04/03 Completed by:

R. Stief Telephone:

(757) 365-2486 None during the Reporting Period (1)

F:

Forced S:

Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Ucensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 03-07 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 08/04/03 Completed by:

R. Stief Telephone:

(757) 365-2486 MoNTh:

July 2003 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 819 820 821 819 817 818 817 818 817 817 816 817 817 818 818 818 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 817 815 818 818 817 816 816 816 815 804 814 814 816 817 817 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day In the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-07 Page 8 of 18 AVERAGE DALY UNIT POWER LEVEL Docket No.:

50-281 Unit Name:

Surry Unit 2 Date: 08/04/03 Completed by: R. Stief Telephone:

(757) 365-2486 MoNTH:

July 2003 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 817 819 820 819 818 815 816 816 815 814 816 815 816 817 816 817 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 816 816 817 816 815 814 814 817 815 816 816 816 816 818 817 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day In the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 03-07 Page 9 of 18

SUMMARY

OF OPERATING EXPERIENCE MoNTWHEAR: July 2003 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted In significant non-load related incidents.

UNrr ONE:

07/01/03 0000 Unit started the month at 100% 848 MWe.

07/26/03 0243 "1A7 waterbox removed from service In accordance with procedure 1-MOP-CW-001.

07/27/03 0115 "A" retumedto service.

07/31/03 2400 Unit finished the month at 100% /846 MWe.

UNrrTwo:

07/01/03 0000 Unit started the month at 100% 847 MWe.

07/31/03 2400 Unit finished the month at 100% /848 MWe.

Surry Monthly Operating Report No. 03-07 Page 10 of 18 FACILrrY CHANGES THAT DID NOT REOUIRE NRC APPROVAL MoNTmYEAR: July 2003 DCP 97-037 Design Change Package 10/14/98 (Safety Evaluation 98-089)

Design Change Package 97-037, CCHX SW Inlet Pipe Repair" Installed an aternate service water (SW) flow path to the component cooling heat exchangers (CCHX) to allow planned cleaning, recoating and repair to the normal supply line.

RE 03-004 Regulatory Evaluation 03-004 07/10/03 Regulatory Evaluation 03-004 evaluates the effect of the replacement of the P-250 plant computer with the Westinghouse Ovation computer system. The new Ovation system will replace the power calorimetric program for the calculation of feedflow, steamflow and power that s functionally equivalent to the existing P-250 programming.

Surry Monthly Operating Report No. 03-07 Page 11 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID Nor REQUIRE NRC APPROVAL MoNTH/YEAR: July 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-07 Page 12 of 18 TEsTs AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: July 2003 None during the Reporting Period

Surry Monthly Operating Report No. 03-07 Page 13 of 18 CHEMISTRY REPORT MowEAYEA: July 2003 Unit No.

Unit No. 2 Primary Coolant Analysis Max.

Min.

A Max.

Min.

Avg.

Gross Radioactivity, uCml 3.46E-1 1.73E-1 2.67E-1 2.68E-1 1.10E-1 1.60E-1 Suspended Solids, ppm Gross Tritium, ptCVml 4.67E-1 2.36E-1 3.46E-1 5.42E-1 4.76E-1 5.15E-1 1131. LCIml 1M4E4 6.47E-5 1.14E4 1.35E4 5.64E-5 9.1 OE 5 1131/1133 0.09 0.04 0.07 0.11 0.05 0.07 Hydrogen, cclkg 32.5 29.9 31.6 34.8 34 34.5 Lithium m

2.47 2.12 2.31 2.16 1.48 1.77 Boron - 10, ppm*

264 252 258 58.4 38 48.6 Oxygen, (DO), ppm 0.01 S 0.005 0.009 0.01 S 0.005 0.009 Chloride, ppm 0.006 0.001 0.004 0.003 0.001 0.001 pH @ 25 degree Celsius 6.35 6.21 6.28 7.38 7.1 7.23 Boron - 10 = Total Boron x 0.196 Comments: Suspended Solids reported quarterly. No samples for July.

None

Surry Monthly Operating Report No. 03-07 Page 14 of 18 FUEL HANDUNG UNrTs 1 & 2 MOcM.UYEAR: July 2003 New Fuel Shipment or Cask No.

Spent Fuel Cask TN-32-34 Number of Date Stored or Assemblies Received Der ShlDment Assembly Number ANSI Initial Number Enrichment New or Spent Fuel Shipping Cask Activity 07/16/03 32 OR1 IMOCIL 3.5930 N/A OR2 OV3 OV8 1R8 1R9 1V2 1V3 1V6 1Y7 1V8 2R9 2VO 2V3 2V4 3R1 3R4 3R8 LMOC2K LMOTST LMOTSY LMOC26 LMOC19 LMOTT2 LMOTT3 LMOTT6 LMOTI 7 LMOTT8 LMOC1 H LMOTTA LMOT1`D LMOTTE LMOC1C LMOC1G LMOC2E 3.5932 3.8093 3.8091 3.5826 3.5908 3.8151 3.8081 3.8158 3.8061 3.8091 3.5763 3.8041 3.8041 3.8008 3.5999 3.6025 3.5805

I Surry Monthly Operating Report No. 03-07 Page 15 of 18 FUEL HANDUNG UNrTs 1 & 2 MONTHYEAR: July 2003 New Fuel Number of Shipment or Date Stored or Assemblies Cask No.

Received per Shipment Assembly Number ANSI Number Initial Enrichment New or Spent Fuel Shipping Cask Activity 3V1 3V2 3W6 4R2 4R4 4R6 4W1 4W3 4W9 5RO 5R3 5R5 W36 W42 0,14 LMOTTM LMOTTN LMOX3B LMOC2A LMOC2Y LMOC2N LMOX3G LMOX3J LMOX3Q LMOC2M LMOC1Y LMOC31 LM041J LM041 N LMOUYA LM05Y5 LMOX2F LMOX2G 3.8103 3.8077 3.9995 3.5973 3.5891 3.6034 4.0039 4.0049 4.0057 3.5919 3.5832 3.6049 3.2030 3.2030 3.8066 3.6070 3.8094 3.7963 Spent Fuel Cask TN-32-35 07/29/03 32 N/A Opi OW2 OW3

e 1.

Surry Monthly Operating Report No. 03-07 Page 16 of 18 FUEL HANDUNG UNITS 1 & 2 MoNTmIYEAR: July 2003 New Fuel Number of

- Shipment or Date Stored or Assemblies Cask No.

Received per Shipment Assembly Number ANSI Initial Number Enrichment New or Spent Fuel Shipping Cask Activitv OW4 OW5 OW6 OW7 1D5 1J2 1J6 1N2 1V5 2J1 3AO 3H6 3119 3J0 3J2 3J3 3J4 3J5 LMOX2H LMOX2J LMOX2K LMOX2L LMOALL LMOUYJ LMOUYN LM06G5 LMOTT5 LMOUYT LM04US LMORNW LMORNZ LMOUZ2 LMOUZ4 LMOUZ5 LMOUZ6 LMOUZ7 3.7972 3.8053 3.8139 3.8100 3.5888 3.8061 3.8052 3.4060 3.8041 3.8057 3.3930 4.0081 4.0103 3.8161 3.8127 3.8122 3.8171 3.8121

Surry Monthly Operating Report No. 03-07 Page l7of 18 FUEL HANDUNG UNTS 1 & 2 MotrHmYER: July 2003 New Fuel Number of Shipment or Date Stored or Assemblies Assembly Cask No.

Received per Shipment Number 4H1 4H4 4NO 4P4 6NO 5P2 5P4 5P5 6P5 6P7 New or Spent ANSI Initial Fuel Shipping Number Enrichment Cask Activity LMORP1 LMORP4 LM06F8 LMO5YM LMD6G1 LMO5Y9 LMD9PH LM05XM LM09PG LM05YJ 4.0106 4.0105 3.4060 3.6070 3.4060 3.6070 3.6070 3.6070 3.6070 3.6070

Surry Monthly Operating Report No. 03-07 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MoNTHYEAR: July 2003 None during the Reporting Period