Text

0 FPL U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - March 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the March 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, SMcElwain Vice President Turkey Point Plant CLM Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

Cy

,/

an FPL Group company APR 0 8 2002 L-2002-068 10 CFR 50.36

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-250 Turkey Point Unit 3 4/4/2002 Craig Mowrey (305) 246-6204 Reporting Period March, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month 744 2lbU I miative 187939.8 No. of hours generator was on line (service hours) 744 2160 185608.5 Unit reserve shutdown hours 0

0 121.8 Net Electrical Energy (MWH) 534257 1549251 120692898 UNIT SHUTDOWNS No.

Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)

(1)

Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% for the month of March, 2002.

2160

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-251 Turkey Point Unit 4 4/4/2002 Craiq Mowrev (305) 246-6204 Reporting Period March, 2002 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 No of hours reactor was critical No. of hours generator was on line (service hours) ulnit r~erve shutdown hours Ui.t reserve------wn hous 0

Net Electrical Energy (MWH) 3566001 1373167 118478178 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% until March 20, 2002, when power was reduced to approximately 50%

in preparation for the refueling outage scheduled to start on March 23, 2002. On March 23, 2002, Unit 4 was manually tripped as part of the unit shutdown procedure for the refueling outage.

Month 528 528 0