L-2002-068, March 2002 Monthly Operating Report for Turkey Point Units 3 & 4
| ML021000193 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/08/2002 |
| From: | Mcelwain J Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-2002-068 | |
| Download: ML021000193 (3) | |
Text
0 FPL APR 0 8 2002 L-2002-068 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - March 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the March 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, SMcElwain Vice President Turkey Point Plant CLM Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
Cy
,/
an FPL Group company
DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 4/4/2002 COMPLETED BY: Craig Mowrey TELEPHONE: (305) 246-6204 Reporting Period March, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month miative 2lbU I 187939.8 744 2160 No. of hours generator was on line (service hours) 744 2160 185608.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 534257 1549251 120692898 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)
E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% for the month of March, 2002.
DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 4/4/2002 COMPLETED BY: Craiq Mowrev TELEPHONE: (305) 246-6204 Reporting Period March, 2002 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month 528 No of- hours
- - reactor
- -------. critical was No. of hours generator was on line (service hours) 528 ulnit r~erve shutdown hours Ui.t reserve------wn hous 00 Net Electrical Energy (MWH) 3566001 1373167 118478178 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% until March 20, 2002, when power was reduced to approximately 50%
in preparation for the refueling outage scheduled to start on March 23, 2002. On March 23, 2002, Unit 4 was manually tripped as part of the unit shutdown procedure for the refueling outage.
Text
0 FPL APR 0 8 2002 L-2002-068 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - March 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the March 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, SMcElwain Vice President Turkey Point Plant CLM Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
Cy
,/
an FPL Group company
DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 4/4/2002 COMPLETED BY: Craig Mowrey TELEPHONE: (305) 246-6204 Reporting Period March, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month miative 2lbU I 187939.8 744 2160 No. of hours generator was on line (service hours) 744 2160 185608.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 534257 1549251 120692898 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)
E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% for the month of March, 2002.
DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 4/4/2002 COMPLETED BY: Craiq Mowrev TELEPHONE: (305) 246-6204 Reporting Period March, 2002 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month 528 No of- hours
- - reactor
- -------. critical was No. of hours generator was on line (service hours) 528 ulnit r~erve shutdown hours Ui.t reserve------wn hous 00 Net Electrical Energy (MWH) 3566001 1373167 118478178 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% until March 20, 2002, when power was reduced to approximately 50%
in preparation for the refueling outage scheduled to start on March 23, 2002. On March 23, 2002, Unit 4 was manually tripped as part of the unit shutdown procedure for the refueling outage.