Forwards Vols 1-17,consisting of Chapters 1-18,to CESSAR Design Certification, for Approval,Per 10CFR52
ML20247G535
Person / Time
Site: 05200002, 05000470
Issue date: 03/30/1989
From: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20247G537 List:
References
LD-89-035, LD-89-35, NUDOCS 8904040261
Download: ML20247G535 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

e I

I l

Oi M285T1000 EIGGIIIEERINg March 30,1989 LD-89-035 l t

Docket No. STN 50-470F .

(Project No. 675)  !

l l

Dr. Thomas E. Murley, Director j Office of Nuclear Reactor Regulation 1 Attn: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555 l

1

Subject:

Design Certification of the System 80+= Standard Design I 1

1

Reference:

Letter, L. S. Rubenstein (NRC) to A. E. Scherer (C-E),

dated October 13, 1987.

Dear Dr. Murley:

Combustion Engineering is pleased to submit its application for Design Certification of our System 80+= standardized nuclear power plant design. We seek Design Certification as currently allowed by 10 CFR 50 Appendix 0 and as envisioned by proposed Part 52 to the Commission's regulations.

As required by 10 CFR 50.4, thirty-seven (37) copies of the Combustion Engineering Standard Safety Analysis Report - Design Certification (CESSAR-DC), through Amendment E, are transmitted j herewith. CESSAR-DC has been developed as a series of amendments to our previous standard safety analysis report (CESSAR-F) which was granted a Final Design Approval, FDA-2, in 1983 under Docket Number STN-50-470F. We, therefore, request that the new docket created for review of CESSAR-DC include all of the previous material contained in Docket Number STN-50-470F, including the Safety Evaluation Report and final design approval (FDA-2). This approach ,

is consistent with our proposed Licensing Review Basis document and was considered acceptable in the Reference letter.

Pre-application review of CESSAR-DC by the Staff has been proceeding under Project Number 675. As the amendment process is l completed, all pages from CESSAR-F, which curren+.ly remain in CESSAR-DC, will be replaced. As originally intended, those CESSAR-F pages remain as an approximate guide to the forthcoming results for the System 80+ design.

Power Systems 1000 Prospect Hill Road (203) 688-1911 Combustion Engineering, Inc. Post Office Box 500 Telex: 99297

" " h.)

8904040261 890330 '

PDR ADOCK 05000470 iN 7/t K PDC q

Q3n $tlN 1

r, - - - - - - - - - - - - - - - - - - - - - - - _ - - - - - - - . -

1 Dr. Thomas E. Murley LD-89-035

+

March 30,13fs9 Page 2 Pursuant to 10 CFR 50.30(b), this application is submitted under the enclosed oath or affirmation.

If you or your staff have any questions on this application, please feel free to contact me or Mr. E. II. Kennedy of my staff at (203) 285-4520.

Very truly yours, l

COMBUSTION ENGINEERING, INC.

I 1

) 1222 A. E. dherer Director Nuclear Licensing AES:Jeb

Enclosures:

As stated ec: Mr. J. Devine (EPRI)

Mr. Frank Ross (DOE-Germantown) l l

l l

i j

l 1

---___________d

l UNITED STATES OF AMERICA l NUCLEAR REGULATORY COMMISSION In the Matter of: )

)

Combustion Engineering, Inc. )

)

Standard Plant Design )

APPLICATION FOR REVIEW OF

" COMBUSTION ENGINEERING STANDARD SAFETY ANALYSIS REPORT -

DESIGN CERTIFICATION" Shelby T. Brewer, being duly sworn, states that he is the President, Nuclear Power Businesses, of Combustion Engineering, Inc.; that he is authorized on the part of said corporation to sign and file with the Nuclear Regulatory Commission this document; and that all statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

l l

COMBUSTION ENGINEERING, INC.

By:

ilby T. Brewer F 'ident Nuclear Power Businesses Subscribed and sworn to before me thisafr4 day l of Ma,w k 1989.

1

$AYt. tat &h$C(N.

Mcrany (Lajic (Mj uthmUnea gy kes 3/all95