Confirms That C-E Application for Design Certification for Sys 80+ Std Design Considered Submitted Per 10CFR52.45
ML20246D183
Person / Time
Site: 05200002
Issue date: 08/21/1989
From: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
PROJECT-675A LD-89-097, LD-89-97, NUDOCS 8908250282
Download: ML20246D183 (1)


Text

,_ ,

'l r

tr  ;

~.f 4? l 1

SOfssBUSTI6N ENGINEERING ' August 21,.1989 i i

!. LD .89-097 i

Project No. 675 q j

Dr. Thomas E. Murley Office of Nuclear Reactor Regulation l I

U. S. Nuclear ~ Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

Subject:

Design Certification of the System 80+= Standard Design

References:

Letter LD-89-035, A. E. Scherer (C-E) to ,

T. E. Murley (NRC), dated March 30, 1989 l

Dear Dr. Murley:

On' March 30,1989 (Reference), Combustion Engineering submitted its application for Design Certification of our System 80+= standard nuclear power plant design. Since that time the regulations in

'0 CFR 52 have been finalized and are now effective. The purpose of this letter is to confirm that Combustion Engineering's application for Design Certification may be considered to have been submitted pursuant to 10 CFR 52.45.

1 If you have any questions, please feel free to contact me or Mr.

E. H. Kennedy of my staff at (203) 285-4520.

Very truly yours, COMBUSTION ENGINEERING, INC.

_A. [Scherer Director Nuclear Licensing AES:jeb p 3 2.

cc: F. Ross (DOE-Germantown) '

t R. Singh (NRC) i Power Systems 1000 Prospect Hill Road (203) 688-1911 Combustion Engineenng, Inc. Post Office Box 500 Telex: 99297 Windsor, Connecticut 06095-0500 99082502G2 89082j PDR PROJ 675A PDR g,