LD-96-060, Forwards Rev to Sys 80+ Std Plant Design Control Document

From kanterella
Jump to navigation Jump to search
Forwards Rev to Sys 80+ Std Plant Design Control Document
ML20132C478
Person / Time
Site: 05200002
Issue date: 12/13/1996
From: Brinkman C
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, ASEA BROWN BOVERI, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132C480 List:
References
LD-96-060, LD-96-60, NUDOCS 9612180372
Download: ML20132C478 (1)


Text

ADD i 7%99 '

)

December 13,1996 LD-96-060 i l

Docket 52-002 -

Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 I

Subject:

Revision to the System 80+ Standard Plant Design Control Document  !

Reference:

Letters, C. B. Brinkman to NRC," System 80+ Standard Plant Design Changes,"

LD-96-024, June 27,1996 and LD-96-029, July 25,1996.

Dear Sirs:

I The Reference * .s forwarded changes to the System 80+ Standard Plant design which were reviewed and approved - ae Staff and the ACRS. In accordance with discussions with Mr. J. N. Wilson, this ,

letter transmits tnree (3) copies of the revised pages incorporating these changes into the System 80+ l Standard Plant Design Control Document. These revised pages, transmitted for Staff verification, document the design changes forwarded by the referenced letters. In addition, this revision corrects j g various consistency, editorial and typographical errors that were discovered during review of the DCD.

No additional technical changes, other than those formally submitted in the referenced letters, have been made to the System 80+ Standard Plant design. None of these revisions are required to meet Commission regulations or to maintain the safety conclusions of the FSER.

Each DCD page containing a substantive change is identified by a margin bar adjacent to the change and a footer date of 11/96; editorial or typographic changes likewise list a footer date of 11/96 but do not contain margin bars. In addition, a number of previously issued pages have been reprinted without change to ensure consistent print quality. One further revision to the System 80+ DCD is anticipated to ensure consistency between this document and the final design certification rule.

Please call me or Virgil Paggen (860-285-4700) if you have any questions.

Very truly yours, COMBUSTION ENGINEERING,INC.

4.u <

C. B. Brinkman 1,.,0042

< Director, Nuciear ticensing

}f cc: J. N. Wilson (NRC) ;V F. A. Ross (DOE, w/o enclosure) .,

b ABB Combustion Engineering Nuclear Systems g. W v . * . , ,e v.

Combustion Engineenng. loc 2000 Day Hm Road TMephone (860) 0hs 1911 (rp(n j' \

y PO Box 500 Fax (860) P855203 9612180372 961213 winasu ci ces-osoo P l{

PDR ADOCK 05200002 s A PDR t ,